This document is a Schedule of Material Submittals for a K-Span Repair project for the Air Force at Nevatim Air Base in Israel. The detailed submission schedule outlines 32 required material and documentation submittals, including itemized quotes, construction work schedules, vehicle/personnel rosters, and specific product submittals for components such as steel doors, window flashing, insulation, drywall, paint, interior doors, fire suppression systems, and various other building materials and systems.

The project involves comprehensive repairs and replacements, including door replacements, envelope sealing, interior wall construction, window repairs, fire suppression system repair, countertop replacement, mold cleaning, and facility debris removal. The solicitation is associated with Project Number ALUA 23-0199, with a site visit scheduled for 15 July 2025 at 1000 local time. Contractors are required to provide all necessary personnel, equipment, tools, supervision, and services for the specified repairs at the LSA K Spans location in Israel, with questions to be submitted by 20 July 2025 and answers to be posted by 22 July 2025.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NCOC-A (2)

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER :PROJECT TITLE:SOLICITATION/CONTRACT NO.:
25LLNV0002K-SPAN Repairs
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALNO. OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
CERTIFICATIONSDRAWINGSSAMPLESPRODUCT DATAMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSREPORTS / TEST RESULTSOTHER
APPROVEDDIS- APPROVED
GENERAL
1Itemized Quote and Proposal of Work (5.1)X
2Construction Work Schedule (3.0)X
3Vehicle/Personnel Roster (3.3)X
4Worksite Laydown Yard - Site Plan (if applicable)X
5Steel Door Submittal (4.2)XXXX
6Steel Door Submittal (4.2) - Keying PlanXX
7Sealing Compound Product Data (4.3)XX
8Window Flashing Product Data (4.3)XX
9Wall Framing Material Submittal (4.4)XX
10Insulation Material Submittal (4.4)XX
11Drywall Submittal (4.4)XX
12Paint Submittal (4.4)XX
13Interior Door Submittal (4.5)XXX
14Interior Door Hardware Submittal (4.5)XX
15Quote for Re-coring Cylinders (4.5)X
16Yard Cleaning (4.6) - Waste Disposal Plan (if required)X
17Window Submittal (4.7)XX
18Mini Blinds Submittal (4.7)XX
19Fire Suppression System Components (4.8)XXXXX
20Paint Submittal (4.9)XX
21Patching Material Submital (4.10)XX
22Rubber Baseboard Submittal (4.11)XX
23Countertop Material Submittal (4.12)XX
24Door and Lock Submittal (4.13)XXX
25Door and Lock Submittal (4.13) - Keying PlanX
26Cleaning Agents Submittal (4.14)XX
27Waste Disposal Plan (4.15) (if required)X
28Ceiling Panel Submittal (4.16)X
29Cleaning Agents Submittal (4.17)XX
30Showerhead Submittal (4.18)XX
31Cleaning Agents Submittal (4.19) (if used)XX
32Warranty Documents (5.2)XX

Task Order Proposal Request - PROJECT # ALUA 23-0199 Attachment&KFF0000 &K0000004

AF FORM 66

(Computer Generated) PAGE &P of &N

NCOC-A

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER :PROJECT TITLE:SOLICITATION/CONTRACT NO.:
23-0199K-SPAN Repairs
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALNO. OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
CERTIFICATIONSDRAWINGSSAMPLESPRODUCT DATAMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSREPORTS / TEST RESULTSOTHER
APPROVEDDIS- APPROVED
GENERAL
1Door Replacement and New Hardware (4.2)XXX
2Envelope Sealing (4.3)X
3Construction of Interior Wall (4.3)X
4Construction of Interior Wall (4.4)X
5Interior Door Replacement (4.5)XX
6Yard Cleaning (4.6)X
7MWR Windows (4.7)XX
8Fire Supression System Repair (4.8)XXXXX
9Wall Hole Patching (4.10)
10Rubber Baseboard Replacement (4.11)XXX
11Restroom Countertop Replacement (4.12)XXX
12Door and Lock Replacement (4.13)X
13Mold Cleaning (4.13)XXXX
14Facility Trash and Debris RemovalX
15Ceiling Panel RepairX
16Vent and HVAC Cleaning (

Task Order Proposal Request - PROJECT # ALUA 23-0199 Attachment&KFF0000 &K0000004

AF FORM 66

(Computer Generated) PAGE &P of &N

File details come from the government source that posted it. Updated .