2. 25LLNV-0002 Repair K Spans AF66.xlsx
XLSX spreadsheet 36 KB Posted
- Attached to
- Repair LSA K Spans
- Solicitation number
- Not on record
About this file
This document is a Schedule of Material Submittals for a K-Span Repair project for the Air Force at Nevatim Air Base in Israel. The detailed submission schedule outlines 32 required material and documentation submittals, including itemized quotes, construction work schedules, vehicle/personnel rosters, and specific product submittals for components such as steel doors, window flashing, insulation, drywall, paint, interior doors, fire suppression systems, and various other building materials and systems.
The project involves comprehensive repairs and replacements, including door replacements, envelope sealing, interior wall construction, window repairs, fire suppression system repair, countertop replacement, mold cleaning, and facility debris removal. The solicitation is associated with Project Number ALUA 23-0199, with a site visit scheduled for 15 July 2025 at 1000 local time. Contractors are required to provide all necessary personnel, equipment, tools, supervision, and services for the specified repairs at the LSA K Spans location in Israel, with questions to be submitted by 20 July 2025 and answers to be posted by 22 July 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI LSA K-Span Repair _Photos 2.docx | DOCX document | |
| RFI LSA K-Span Repair _Photos 1.docx | DOCX document | |
| 3. 25LLNV-0002 Repair K Spans RFI_Final.xlsx | XLSX spreadsheet | |
| Solicitation Amendment - FA491325R00020003.pdf | ||
| Solicitation Amendment - FA491325R00020002.pdf | ||
| Solicitation Amendment - FA491325R00020001.pdf | ||
| 4. Israeli Air Force Base Security Requirements.pdf | ||
| 1. 25LLNV-0002 Repair K Spans SoW.docx | DOCX document | |
| Solicitation - FA491325R0002.pdf | ||
| 3. 25LLNV-0002 Repair K Spans Request for Information (RFI) Template.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NCOC-A (2)
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER : | PROJECT TITLE: | SOLICITATION/CONTRACT NO.: | ||||||||||||||||||
| 25LLNV0002 | K-SPAN Repairs | ||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | NO. OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||||||||||
| CERTIFICATIONS | DRAWINGS | SAMPLES | PRODUCT DATA | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | REPORTS / TEST RESULTS | OTHER | ||||||||||||
| APPROVED | DIS- APPROVED | ||||||||||||||||||||
| GENERAL | |||||||||||||||||||||
| 1 | Itemized Quote and Proposal of Work (5.1) | X | |||||||||||||||||||
| 2 | Construction Work Schedule (3.0) | X | |||||||||||||||||||
| 3 | Vehicle/Personnel Roster (3.3) | X | |||||||||||||||||||
| 4 | Worksite Laydown Yard - Site Plan (if applicable) | X | |||||||||||||||||||
| 5 | Steel Door Submittal (4.2) | X | X | X | X | ||||||||||||||||
| 6 | Steel Door Submittal (4.2) - Keying Plan | X | X | ||||||||||||||||||
| 7 | Sealing Compound Product Data (4.3) | X | X | ||||||||||||||||||
| 8 | Window Flashing Product Data (4.3) | X | X | ||||||||||||||||||
| 9 | Wall Framing Material Submittal (4.4) | X | X | ||||||||||||||||||
| 10 | Insulation Material Submittal (4.4) | X | X | ||||||||||||||||||
| 11 | Drywall Submittal (4.4) | X | X | ||||||||||||||||||
| 12 | Paint Submittal (4.4) | X | X | ||||||||||||||||||
| 13 | Interior Door Submittal (4.5) | X | X | X | |||||||||||||||||
| 14 | Interior Door Hardware Submittal (4.5) | X | X | ||||||||||||||||||
| 15 | Quote for Re-coring Cylinders (4.5) | X | |||||||||||||||||||
| 16 | Yard Cleaning (4.6) - Waste Disposal Plan (if required) | X | |||||||||||||||||||
| 17 | Window Submittal (4.7) | X | X | ||||||||||||||||||
| 18 | Mini Blinds Submittal (4.7) | X | X | ||||||||||||||||||
| 19 | Fire Suppression System Components (4.8) | X | X | X | X | X | |||||||||||||||
| 20 | Paint Submittal (4.9) | X | X | ||||||||||||||||||
| 21 | Patching Material Submital (4.10) | X | X | ||||||||||||||||||
| 22 | Rubber Baseboard Submittal (4.11) | X | X | ||||||||||||||||||
| 23 | Countertop Material Submittal (4.12) | X | X | ||||||||||||||||||
| 24 | Door and Lock Submittal (4.13) | X | X | X | |||||||||||||||||
| 25 | Door and Lock Submittal (4.13) - Keying Plan | X | |||||||||||||||||||
| 26 | Cleaning Agents Submittal (4.14) | X | X | ||||||||||||||||||
| 27 | Waste Disposal Plan (4.15) (if required) | X | |||||||||||||||||||
| 28 | Ceiling Panel Submittal (4.16) | X | |||||||||||||||||||
| 29 | Cleaning Agents Submittal (4.17) | X | X | ||||||||||||||||||
| 30 | Showerhead Submittal (4.18) | X | X | ||||||||||||||||||
| 31 | Cleaning Agents Submittal (4.19) (if used) | X | X | ||||||||||||||||||
| 32 | Warranty Documents (5.2) | X | X |
Task Order Proposal Request - PROJECT # ALUA 23-0199 Attachment&KFF0000 &K0000004
AF FORM 66
(Computer Generated) PAGE &P of &N
NCOC-A
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER : | PROJECT TITLE: | SOLICITATION/CONTRACT NO.: | ||||||||||||||||||
| 23-0199 | K-SPAN Repairs | ||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | NO. OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||||||||||
| CERTIFICATIONS | DRAWINGS | SAMPLES | PRODUCT DATA | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | REPORTS / TEST RESULTS | OTHER | ||||||||||||
| APPROVED | DIS- APPROVED | ||||||||||||||||||||
| GENERAL | |||||||||||||||||||||
| 1 | Door Replacement and New Hardware (4.2) | X | X | X | |||||||||||||||||
| 2 | Envelope Sealing (4.3) | X | |||||||||||||||||||
| 3 | Construction of Interior Wall (4.3) | X | |||||||||||||||||||
| 4 | Construction of Interior Wall (4.4) | X | |||||||||||||||||||
| 5 | Interior Door Replacement (4.5) | X | X | ||||||||||||||||||
| 6 | Yard Cleaning (4.6) | X | |||||||||||||||||||
| 7 | MWR Windows (4.7) | X | X | ||||||||||||||||||
| 8 | Fire Supression System Repair (4.8) | X | X | X | X | X | |||||||||||||||
| 9 | Wall Hole Patching (4.10) | ||||||||||||||||||||
| 10 | Rubber Baseboard Replacement (4.11) | X | X | X | |||||||||||||||||
| 11 | Restroom Countertop Replacement (4.12) | X | X | X | |||||||||||||||||
| 12 | Door and Lock Replacement (4.13) | X | |||||||||||||||||||
| 13 | Mold Cleaning (4.13) | X | X | X | X | ||||||||||||||||
| 14 | Facility Trash and Debris Removal | X | |||||||||||||||||||
| 15 | Ceiling Panel Repair | X | |||||||||||||||||||
| 16 | Vent and HVAC Cleaning ( |
Task Order Proposal Request - PROJECT # ALUA 23-0199 Attachment&KFF0000 &K0000004
AF FORM 66
(Computer Generated) PAGE &P of &N