This submittal register outlines the required submissions for a $99 million Rapid Disaster Infrastructure (RDI) #2 HUBZone set-aside Multiple Award Task Order Contract (MATOC) issued by the Department of the Army Corps of Engineers Engineering District Omaha. The contractor must submit proposals by 15 January 2021 and will be required to provide construction, rehabilitation, and flood risk reduction support through task orders for time-sensitive disaster work. Task orders may be firm fixed price or cost reimbursement. Eligible contractors must be registered under NAICS code 236220 for construction of other nonresidential structures other than nonbuilding structures in the System for Award Management. There is no limit on the number of task orders that may be issued against the MATOC, which has an estimated maximum value of $99 million and covers the contiguous United States, Alaska, Hawaii, and outlying areas. The solicitation is restricted to only HUBZone small business contractors. The submittal register outlines required pre-construction, shop drawing, test report, certificate, and closeout submissions specified by the contract sections for management plans, schedules, safety documentation, and as-built drawings.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 3 PAGES

$550M Unrestricted MATOC Rapid Disaster Infrastructure #2

01 12 00 SD-01 Preconstruction Submittals G AOProposed Methods of Operation

1.13 G AOProgress Charts

1.2Construction Right-of-Way 1.8.6State and Federal Highways 1.8.7State and Local Public Roads

SD-02 Shop Drawings

1.4 G AOCare of Water

1.8.3 G AOTraffic Control

SD-11 Closeout Submittals 1.15Warranty of Construction

01 30 00.24 SD-02 Shop Drawings

1.40 G [RO][Equipment Room Drawings

1.22 G [AO][Plant Layout Drawings

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G [RO]Project Scheduler Qualifications

3.4.1 G [RO]Preliminary Project Schedule

3.4.2 G [RO]Initial Project Schedule

3.6.2 G [RO]Periodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.9 G [RO][Submittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.3.1 G ROPreliminary High Performance

and Sustainable Building Checklist

1.4.1 G ROSustainability Action Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 3 PAGES

01 33 29 1.5.3.1 G ROPreliminary Sustainability eNotebook

SD-11 Closeout Submittals

1.5.3.1 G ROFinal High Performance and

Sustainable Building Checklist

1.5.3.1 G ROFinal Sustainability eNotebook

1.5.3.1 G ROAmended Final Sustainability

eNotebook

1.5.3.1 G ROAmended Final High

Performance and Sustainable Building Checklist

01 35 26 SD-01 Preconstruction Submittals

1.7 G [RO]Accident Prevention Plan (APP)

SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports

1.12.2 G [RO]Accident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates 1.6.1.5Crane Operators/Riggers

1.7.2.2 G [RO]Standard Lift Plan

1.7.2.3 G [RO]Critical Lift Plan

1.7.2.4 G [RO]Naval Architecture Analysis

1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 3 PAGES

01 35 26 1.12.4Certificate of Compliance 1.14License Certificates

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G [RO]Contractor Quality Control (CQC)

Plan SD-06 Test Reports

3.9Verification Statement 01 74 19 SD-01 Preconstruction Submittals

1.5 G [RO]Waste Management Plan

SD-11 Closeout Submittals

1.6Records 01 78 36.00 24 SD-11 Closeout Submittals

1.2.5Equipment Warranty Booklet 01 78 39.00 24 SD-03 Product Data

1.7.2 G DO50 Percent Preliminary As-Built

Drawings

1.7.3 G DO100 Percent Preliminary As-Built

Drawings

SD-11 Closeout Submittals

1.7.4 G DOFinal As-Built Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR