Reference - Pictues of Clermont Bldg Windows and MEP for B38 Wall 554-21-133.docx

DOCX document 7 MB Posted

Attached to
Z1DA--(C)554-21-133 Board up and secure Clermont VAMC Campus (VA-21-00047767)
Solicitation number
36C25921Q0473
Issued by

View the file

Other files

File Type Posted
BLDG 38_AsbestosSurvey_022614.pdf PDF
S06- Questions 2.docx DOCX document
36C25921Q0473 0003.docx DOCX document
BLDG 38_roof AsbestosSurvey_041415.pdf PDF
S05- Questions and Answers.docx DOCX document
36C25921Q0473 0002.docx DOCX document
SOW - Board up and Secure Clermont campus_updated.docx DOCX document
36C25921Q0473 0001.docx DOCX document
Bid Schedule_updated.docx DOCX document
Site Visit Attendance.pdf PDF
Site Visit Meeting Doc.docx DOCX document
36C25921Q0473_1.docx DOCX document
Denver Decommissioning Window Boarding External Lighting.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VAMC

1055 Clermont Street February 9, 2021 Denver, CO 80220

Board Up and Secure Clermont VAMC Campus Project 554-21-133

The attached pictures are examples of typical windows in the Old VAMC Clermont Buildings 1, 4, 6, 8, 19, 21, 24, 38 and Parking Garage that either require or have had the windows boarded up on the inside (Part I). This document does not show all windows requiring boarding up. Part II shows mechanical, electrical and plumbing utilities connecting Building 1 and 38 that will require cutting and capping where the CMU wall will be constructed. Pictures may NOT show all mechanical, electrical and plumbing lines that require cutting and capping.

Part I

Bldg 1, West Side - Atrium Entrance. Windows, doors and circular entry all require boarding up on the first level.

Bldg 1 Chapel, West Side - Door by Atrium. All Chapel stain glass windows require boarding up.

Parking Garage, East Side. All Parking Garage windows on first Level require boarding up.

Bldg 24, Canteen West side. Example of boarding completed on first level. No additional work required.

Bldg 19/21, North Side. All first floor windows require boarding up.

Bldg 1, South Side – ED Entrance. Example of completed boarding up.

Bldg 1, South Side. All first floor windows require boarding up.

Bldg 1, South Side Entrance. All first floor windows and entrances require boarding up.

Bldg 1, South Side Entrances. All first floor windows and entrances require boarding up.

Bldg 1, South Side. All first floor windows require boarding up.

Bldg 1, South Side. All first floor windows require boarding up.

Bldg 1, East Side. All first floor windows and entrances require boarding up.

Bldg 1, East Side. All first floor windows and entrances require boarding up.

Bldg 1, East Side. All first floor windows require boarding up.

Bldg 1, East Side. All first floor windows require boarding up.

Bldg 1, East Side. All first floor windows and entrances require boarding up.

Bldg 1, East Side. Specific 2nd Floor windows that require boarding up.

Bldg 1 & 38, East Side connecting Hallway. Example of completed boarding up.

Bldg 38, East Side. All first floor entrances require boarding up.

Bldg 38, East Side. All first floor entrances require boarding up.

Bldg 38, East Side Main Entrance. All first floor windows and entrances require boarding up.

Bldg 38, East Side. All first floor windows and entrances require boarding up.

Bldg 38, North Side. All first floor entrances require boarding up.

Bldg 38, West Side. All first floor windows require boarding up.

Bldg 38, West Side. All first floor windows require boarding up.

Bldg 4, East and North Sides. All first floor windows and entrances require boarding up.

Bldg 4, South Side. All first floor entrances require boarding up.

Bldg 4, West Side. All first floor windows and entrances require boarding up.

Bldg 6, East Side. All first floor windows require boarding up.

Bldg, West Side. All first floor windows and entrances require boarding up.

Bldg 8, East Side. All first floor windows and entrances require boarding up.

Bldg 8, West Side. All first floor windows and entrances require boarding up.

Part II Mechanical, electrical and plumbing utilities that run between buildings 1 and 38 that will need to be cut and capped before the CMU wall is constructed. Pictures do not necessarily show all utilities lines that will require cutting and capping.

Picture in ceiling of mechanical, electrical and plumbing utilities between buildings 1 and 38 that will require cutting and capping before construction of the CMU wall.

Picture in ceiling of mechanical, electrical and plumbing utilities between buildings 1 and 38 that will require cutting and capping before construction of the CMU wall.

Picture in ceiling of mechanical, electrical and plumbing utilities between buildings 1 and 38 that will require cutting and capping before construction of the CMU wall.

Picture in ceiling of mechanical, electrical and plumbing utilities between buildings 1 and 38 that will require cutting and capping before construction of the CMU wall.

Picture in ceiling of mechanical, electrical and plumbing utilities between buildings 1 and 38 that will require cutting and capping before construction of the CMU wall.

Picture in ceiling of mechanical, electrical and plumbing utilities between buildings 1 and 38 that will require cutting and capping before construction of the CMU wall.

Picture in ceiling of mechanical, electrical and plumbing utilities between buildings 1 and 38 that will require cutting and capping before construction of the CMU wall.

image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.jpeg image14.jpeg image15.jpeg image16.jpeg image17.jpeg image18.jpeg image19.jpeg image20.jpeg image21.jpeg image22.jpeg image23.jpeg image24.jpeg image25.jpeg image26.jpeg image27.jpeg image28.jpeg image29.jpeg image30.jpeg image31.jpeg image32.jpeg image33.jpeg image34.jpeg image35.jpeg image36.jpeg image37.jpeg image38.jpeg image39.jpeg image1.jpeg image2.jpeg image3.jpeg image4.jpeg