Ref_Doc_90_Plans_TWY Recon_Rehab~1.pdf
PDF 48 MB Posted
- Solicitation number
- S-KA0010-00016107
- Issued by
- Jackson County, Amity City, Oregon
About this file
Project Summary: Ashland Municipal Airport Taxiway Reconstruction and Rehabilitation
This comprehensive design document package pertains to the City of Ashland's reconstruction and rehabilitation of Taxiway A and associated infrastructure at Ashland Municipal Airport (Sumner Parker Field) in Ashland, Oregon. The project, designated A.I.P. No. 3-41-0002-013-2021 with project number 12403.005.01, encompasses the full-depth reconstruction, grading, and electrical improvements of approximately 40 linear miles of taxiway pavement, along with stormwater management, erosion control, and lighting system upgrades. The work is organized into three distinct work areas: Work Area #1 extends from Taxiway A6 to the northern side of Taxiway A3 (STA 5+00 to 32+77) under Schedule A; Work Area #2 covers the same area within the runway obstacle-free zone requiring runway closure, also under Schedule A; and Work Area #3 extends from STA 32+90 to approximately STA 44+00 for crack and slurry seal work under Schedule B. The total contract duration is 90 calendar days, with a single 15-day continuous runway closure permitted within that period for Work Areas #2 and #3, which must be completed concurrently. The contract documents indicate an anticipated start date of August 2022 with completion targeted for November 2022.
The project incorporates extensive infrastructure improvements including 6-inch perforated high-density polyethylene underdrains throughout the taxiway system, stormwater management with multiple outfalls and cleanouts, demolition of existing culverts, and installation of new electrical systems comprising taxiway edge lighting, guidance signage, junction base cans, and primary loop cable for the Medium Intensity Runway Lighting (MIRL) system. Pavement specifications call for 3 inches of asphalt concrete (P-403) over 9 inches of aggregate base course (P-208), with cement-treated subgrade (P-156) stabilization where required. The project requires contractor compliance with airport safety procedures, maintenance of public access to facilities, protection of existing utilities, and adherence to Oregon Department of Environmental Quality stormwater pollution prevention requirements. Liquidated damages will be assessed if work is not completed within the specified calendar day periods, and the contractor must maintain equipment height limitations of 10 feet, stockpile height limits of 10 feet at least 195 feet from the runway centerline, and control dust throughout construction activities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
DECEMBER 2021
CITY OF ASHLAND
ASHLAND MUNICIPAL AIRPORT / SUMNER PARKER FIELD
TAXIWAY RECONSTRUCTION AND REHABILITATION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
X:
\P ro je ct s\
As hl an d, C ity o f\2
- T ax iw ay
R eh ab ilit at io n\ C
AD
W O
R
KI
N G
\G -0
1_ C ov er
S he et .d w g
AS NOTED12403.005.01
PRELIM
IN
ARY
NOT FOR C
ONSTRUCTIO
N
G-01
COVER SHEET
GJR
MAH
JNR
CITY OF ASHLAND
ASHLAND MUNICIPAL AIRPORT / SUMNER PARKER FIELD
TAXIWAY RECONSTRUCTION & REHABILITATION
A.I.P. NO. 3-41-0002-013-2021
DECEMBER 2021
DRAWING INDEX
SHEET
NUMBER
DRAWING
NUMBER DRAWING TITLE
1 G-01 COVER SHEET
2 G-02 SITE AND SURVEY CONTROL PLAN
3 G-03 CONSTRUCTION SAFETY AND PHASING PLAN
4 G-04 CONSTRUCTION SAFETY AND PHASING PLAN NOTES AND DETAILS
5 G-05 WORK AREA 1 AND 2 PLAN
6 G-06 WORK AREA 1 AND 2 PLAN
7 G-07 WORK AREA 3
8 EC-01 EROSION CONTROL PLAN STA 5+00 TO 24+75
9 EC-02 EROSION CONTROL PLAN STA 24+75 TO 45+00
10 EC-03 EROSION CONTROL PLAN NOTES
11 EC-04 EROSION CONTROL PLAN DETAILS
12 C-01 DEMOLITION PLAN STA 5+00 TO 24+50
13 C-02 DEMOLITION PLAN STA 24+50 TO 44+50
14 C-03 PLAN AND PROFILE STA 4+50 TO 9+50
15 C-04 PLAN AND PROFILE STA 9+50 TO 14+50
16 C-05 PLAN AND PROFILE STA 14+50 TO 19+50
17 C-06 PLAN AND PROFILE STA 19+50 TO 25+50
18 C-07 PLAN AND PROFILE STA 25+50 TO 28+75
19 C-08 PLAN AND PROFILE STA 28+75 TO 32+89
20 C-09 PLAN AND PROFILE TAXIWAY A4 AND A5
21 C-10 PLAN AND PROFILE NORTHWEST APRON TAXILANE 1 AND 2
22 C-11 SITE GRADING PLAN STA 4+75 TO 13+90
23 C-12 SITE GRADING PLAN STA 13+90 TO 23+40
24 C-13 SITE GRADING PLAN STA 23+40 TO 33+00
25 C-14 STORMWATER PLAN STA 4+50 TO 20+75
26 C-15 STORMWATER PLAN STA 20+75 TO 33+00
27 C-16 CROSS SECTIONS STA 5+00 TO 12+50
28 C-17 CROSS SECTIONS STA 12+50 TO 21+00
29 C-18 CROSS SECTIONS STA 21+00 TO 28+50
30 C-19 CROSS SECTIONS STA 28+50 TO 32+50
31 C-20 CRACK REPAIR AND SEAL COAT PLAN
32 C-21 PAVEMENT MARKING PLAN STA 5+00 TO STA 27+00
33 C-22 PAVEMENT MARKING PLAN STA 27+00 TO STA 44+50
34 C-23 DETAILS PAVEMENT CROSS SECTIONS
35 C-24 DETAILS PAVEMENT CROSS SECTIONS
36 C-25 DETAILS UNDERDRAINS AND CLEANOUTS
37 C-26 MISCELLANEOUS DETAILS CRACK REPAIR & SLURRY SEAL DETAILS
38 C-27 DETAILS PAVEMENT MARKING
39 E-01 ELECTRICAL SITE PLAN
40 E-02 ELECTRICAL DEMOLITION PLAN STA 5+00 TO STA 19+00
41 E-03 ELECTRICAL DEMOLITION PLAN STA 19+00 TO STA 32+25
42 E-04 ELECTRICAL DEMOLITION PLAN STA 32+25 TO STA 45+00
43 E-05 LIGHT & SIGN INSTALLATION PLAN STA 5+00 TO STA 19+00
44 E-06 LIGHT & SIGN INSTALLATION PLAN STA 19+00 TO STA 32+00
45 E-07 LIGHT & SIGN INSTALLATION PLAN STA 32+00 TO STA 45+00
46 E-08 ELECTRICAL DETAILS
47 E-09 ELECTRICAL DETAILS
48 E-10 GUIDANCE SIGN DETAILS AND SCHEDULE
49 E-11 TAXIWAY LIGHT SCHEDULE
50 E-12 ELECTRICAL ONE-LINE DIAGRAM AND DETAILS
51 E-13 RUNWAY LOOP LIGHTING DIAGRAM
SITE MAP
NO SCALE
VICINITY MAP
NO SCALE
APPROXIMATE
WORK AREA
JOSEPH
ASTORIA
PORTLAND THE DALLES
UMATILLA
BOARDMAN
LA GRANDE
TILLAMOOK
SALEM
NEWPORT ALBANY
CORVALLIS
FLORENCE
REEDSPORT
EUGENE
COOS BAY
ROSEBURG
GRANTS PASS
ASHLAND KLAMATH FALLS LAKEVIEW
BEND
REDMOND
PRINEVILLE
MADRAS
CONDON
BAKER
JOHN DAY
BURNS
ONTARIO
VALE
JORDAN
VALLEY
WASHINGTON
CALIFORNIA NEVADA
ID
AH
O
I-5 26 197
PROJECT
SITE
LEGEND
E
SURVEY CONTROL/BENCH MARK
FOUND MONUMENT, 3" BRASS CAP
TIE DOWN ANCHOR
JUNCTION BOX
RUNWAY EDGE LIGHT
GEOTECH TEST BORING LOCATION
GEOTECH ASPHALT CORE LOCATION
UNDERGROUND POWER LINE
L-867 BASE CAN
ELECTRICAL VAULT
TAXIWAY EDGE LIGHT
CENTERLINE
SAWCUT LINE
AC PAVEMENT
SLURRY SEAL
EDGE OF PAVEMENT
STRIPE
REFLECTOR
DUCT BANK
GUIDANCE SIGN
CUT/FILL LINE
MAJOR CONTOUR
MINOR CONTOUR
STORM DRAINAGE
CATCH BASIN
MANHOLE
UNDERDRAIN
CLEANOUT
EXISTING PROPOSED
SD
UD UD
co
E E
J
TA
XI
W
AY
AR
U
N W
AY
2-
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
V
C/F C/F
E E E E E E
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
O
FZ
OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ
O
FZ
OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ
0+
4+
0+
4+
0+
4+
0+
4+
5+00 10+00 15+00 20+00 25+00 30+00 35+00 40+00 45+00
TAXIWAY A
STA: 4+50.00
N: 199954.47 E: 4334751.01
TAXIWAY A STA: 11+58.16 =
TAXIWAY A5 STA: 502+00
N: 199390.69 E: 4335179.55
TAXIWAY A STA: 22+98.63 =
TAXIWAY A4 STA: 402+00
N: 198482.74 E: 4335869.69
TAXIWAY A5
STA: 500+00.00
N: 199511.71 E: 4335338.77
TAXIWAY A5
STA: 504+00.00
N: 199269.66 E: 4335020.32
TAXIWAY A
STA: 45+00.00
N: 196730.19 E: 4337201.83
TAXIWAY A4
STA: 400+00.00
N: 198603.76 E: 4336028.91
TAXIWAY A4
STA: 404+00.00
N: 198361.71 E: 4335710.47
CONTROL MONUMENT DATA TABLE
POINT NO. DESCRIPTION
5/8" IRON ROD W/OPC "JTA INC. CONTROL"
5/8" IRON ROD W/OPC "JTA INC. CONTROL"
5/8" IRON ROD W/OPC "JTA INC. CONTROL"
5/8" IRON ROD W/OPC "JTA INC. CONTROL"
5/8" IRON ROD W/OPC "JTA INC. CONTROL"
5/8" IRON ROD W/OPC "JTA INC. CONTROL"
5/8" IRON ROD W/OPC "JTA INC. CONTROL"
5/8" IRON ROD W/OPC "JTA INC. CONTROL"
NORTHING EASTING ELEVATION
UNITS: INTERNATIONAL FEET
198100.1140
198515.0277
198919.2178
199724.8109
199202.2674
198420.0964
197601.2329
197078.8902
196734.5768
197228.7260
197703.2130
199333.7250
4336097.2515
4335774.7682
4335476.1460
4334887.7627
4335019.4605
4335643.2983
4336216.5975
4336643.5005
4337112.3491
4336738.4945
4336442.8810
4335194.5922
1873.20
1867.09
1861.89
1849.36
1856.96
1867.67
1880.71
1883.66
1893.84
1884.63
1881.36
1857.12
5/8" IRON ROD W/OPC "JTA INC. CONTROL"
STAINLESS STEEL ROD NGS FFA S03 A (PID NZ1353)
STAINLESS STEEL ROD NGS FFA S03 B (PID NZ1354)
5/8" IRON ROD W/OPC "JTA INC. CONTROL"
REFERENCE MONUMENT DATA TABLE
POINT NO.
DESCRIPTIONNORTHING EASTING ELEVATION
UNITS: INTERNATIONAL FEET
NOTE:
REFERENCE MONUMENT POSITIONS WERE ESTABLISHED BY RTK GPS METHODS ONLY AND ARE NOT TO BE USED FOR PROJECT SURVEY
CONTROL.
3-INCH BRASS CAP AT END OF R/W 12199823.8927
196954.7186
4334661.8474
4336842.7427
1849.39
1888.40 3-INCH BRASS CAP AT END OF R/W 30
E E
E E
E E
E E
E
R
SA
R
SA
R
SA
R
SA
R
SA
R
SA
R
SA
R
SA
O
FZ
O
FZ
O
FZ
O
FZ
O
FZ
100+00 104+00
200+00 204+00
+0
NORTHWEST APRON TAXILANE 2
STA: 200+00.00
N: 198066.89 E: 4336437.00
NORTHWEST APRON TAXILANE 2
STA: 204+00.00
N: 197824.83 E: 4336118.55
TAXIWAY A STA: 29+73.00 =
NORTHWEST APRON TAXILANE 2 STA: 202+00
N: 197945.86 E: 4336277.78
TAXIWAY A STA: 30+93.07 =
NORTHWEST APRON TAXILANE 1 STA: 102+00
N: 197850.27 E: 4336350.43
NORTHWEST APRON TAXILANE 1
STA: 100+00.00
N: 197971.30 E: 4336509.66
NORTHWEST APRON TAXILANE 1
STA: 104+00.00
N: 197729.24 E: 4336191.21
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
DECEMBER 2021
CITY OF ASHLAND
ASHLAND MUNICIPAL AIRPORT / SUMNER PARKER FIELD
TAXIWAY RECONSTRUCTION AND REHABILITATION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
X:
\P ro je ct s\
As hl an d, C ity o f\2
- T ax iw ay
R eh ab ilit at io n\ C
AD
W O
R
KI
N G
\G -0
2_ Si te a nd S ur ve y C on tro l P la n.
dw g
AS NOTED12403.005.01
PRELIM
IN
ARY
NOT FOR C
ONSTRUCTIO
N
G-02
SITE AND SURVEY CONTROL PLAN
GJR
MAH
JNR
DEAD INDIAN MEMORIAL RD
G-02
SITE AND SURVEY CONTROL PLAN
SCALE: 1" = 150'
APRON
RUNWAY 12-30
TAXIWAY A
EMIGRANT CREEK RD
CONTRACTORS
STAGING AREA
LOCAL ACCESS
ROAD,
CONSTRUCTION
VEHICLES
PROHIBITED
FBONORTHWEST APRON
TAXILANE 2
NORTHWEST APRON
TAXILANE 1
TW
Y
A3 TW
Y
A2 TW
Y
A1TW
Y
A4TW
Y
A5TW
Y
A6 150 0 150 300
SCALE OF FEET
SCALE: 1"=150'
301 3
1 300
LEGEND
PAVEMENT RECONSTRUCTION
PAVEMENT REHABILITATION
OBSTACLE FREE ZONE
RUNWAY SAFETY AREA
CONTRACTOR HAUL/ ACCESS ROUTE
CONTRACTOR STAGING AREA
RSA
OFZ
GENERAL NOTES:
1. CONTRACTOR'S ACCESS ROAD, HAUL ROADS, AND STAGING AREAS SHALL BE CONSTRUCTED PER DRAWING G-03.
ALL DISTURBED AREAS SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION AT NO COST TO OWNER.
2. PROVIDE FOR AND MAINTAIN PUBLIC PARKING AND ACCESS TO EXISTING AIRPORT HANGARS, BUILDINGS, AND FBO
FACILITIES AT ALL TIMES.
3. THE LOCATION OF EXISTING UNDERGROUND UTILITIES SHOWN THROUGHOUT THIS SET OF DRAWINGS ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTORS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL
UNDERGROUND UTILITIES.
4. ALL PAVEMENT SURFACES TO REMAIN SHALL BE PROTECTED FROM DAMAGE DUE TO CONSTRUCTION ACTIVITY.
RESTORE DAMAGED PAVEMENT TO ORIGINAL OR BETTER CONDITION AT NO COST TO THE OWNER.
5. MATERIAL STOCKPILES SHALL NOT EXCEED 10' IN HEIGHT.
6. CONTRACTOR SHALL CONTROL DUST AND SMOKE RELATED TO CONSTRUCTION ACTIVITIES AT ALL TIMES.
7. FOR ACCESS TO THE SURVEY CONTROL POINTS THAT ARE LOCATED OUTSIDE OF THE CONSTRUCTION AREA, CONTRACTOR/SURVEYOR SHALL COORDINATE AND RECEIVE APPROVAL FROM THE AIRPORT BEFORE ENTRY INTO
THIS AREA.
8. FOR GEOTECHNICAL INFORMATION, REFER TO GEOTECHNICAL ENGINEERING REPORT FROM FOUNDATION ENGINEERING, INC., TITLED "ASHLAND MUNICIPAL AIRPORT PARALLEL TAXIWAY REHABILITATION" DATED OCTOBER 20, 2021.
0'
(T
YP
0'
(T
YP
5'
(T
YP
) 60
(T
YP
G-02
NORTHWEST APRON TAXILANES
SCALE: 1" = 50'
SEE
G-02
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
50 0 50 100
SCALE OF FEET
SCALE: 1"=50'
R U
N W
AY
2-
30TA
XI
W
AY
A
TAXIWAY A CL
RUNWAY 12-30 CL
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ
O
FZ
OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ
5+00 10+00 15+00 20+00 25+00 30+00 35+00 40+00 45+00
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
DECEMBER 2021
CITY OF ASHLAND
ASHLAND MUNICIPAL AIRPORT / SUMNER PARKER FIELD
TAXIWAY RECONSTRUCTION AND REHABILITATION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
X:
\P ro je ct s\
As hl an d, C ity o f\2
- T ax iw ay
R eh ab ilit at io n\ C
AD
W O
R
KI
N G
\G -0
TO
G -0
7_ W or k
Ar ea a nd
S af et y
Pl an
.d w g
AS NOTED12403.005.01
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
PRELIM
IN
ARY
NOT FOR C
ONSTRUCTIO
N
G-03
CONSTRUCTION SAFETY AND PHASING PLAN
GJR
MAH
JNR
150 0 150 300
SCALE OF FEET
SCALE: 1"=150'
DEAD INDIAN MEMORIAL RD
NOTES:
1. FOR WORK AREA SEQUENCING AND WORK AREA/PHASING NOTES, SEE
SHEET G-04.
2. PLACE LOW LEVEL BARRICADES AND TUBULAR MARKERS WHERE SHOWN ON
WORK AREA PLAN, AS DESCRIBED IN THE SPECIFICATIONS, OR AS DIRECTED
BY THE ENGINEER.
3. CONTRACTOR SHALL MAINTAIN THE EXISTING ACCESS ROAD AND REPAIR
ANY DAMAGE AT THE CONCLUSION OF CONSTRUCTION AT NO COST TO
OWNER.
4. STAGING AREA AND STAGING AREA ACCESS ROAD WIDTH, LENGTH, DEPTH,
AND MATERIAL IMPROVEMENTS TO BE DETERMINED BY THE CONTRACTOR
AND SUBMITTED TO THE OWNER FOR APPROVAL. AT THE CONCLUSION OF
THE PROJECT, THE CONTRACTOR SHALL REMOVE AND RESTORE THE
STAGING AREA AND STAGING AREA ACCESS ROAD TO IT'S ORIGINAL
CONDITION.
5. SOME WORK AREA LIMITS ARE NOT VISIBLE ON THIS SHEET DUE TO THE
DRAWING SCALE AND BECAUSE THEY ARE OBSCURED BY OTHER LINE
WORK. FOR WORK AREA LAYOUT DIMENSIONS AND DETAILS, SEE DRAWINGS
G-05, G-06, AND G-07.
G-03
CONSTRUCTION SAFETY AND PHASING PLAN
SCALE: 1" = 150'
APRON
RUNWAY 12-30
TAXIWAY A
EMIGRANT CREEK RD
LEGEND:
RUNWAY SAFETY AREA
RUNWAY OBSTACLE
FREE ZONE
PROPOSED WA #1
BOUNDARY
PROPOSED PAVEMENT
RECONSTRUCTION
PROPOSED WA #2
BOUNDARY
WORK AREA #3 (TYP):
CRACK AND/OR SLURRY SEAL AND
ELECTRICAL IMPROVEMENTS
(SCHEDULE B)
CONTRACTORS STAGING
AREA, SEE NOTE 4
LOCAL ACCESS ROAD,
CONSTRUCTION
VEHICLES PROHIBITED
APPROXIMATE EXTENT OF ACCESS
ROAD REPAIR, SEE NOTE 3
STAGING AREA ACCESS
ROAD, SEE NOTE 4
APPROX. LOCATION OF
FUTURE HANGARS (NIC)
FBO
NORTHWEST APRON
TAXILANE 2
NORTHWEST APRON
TAXILANE 1
TW
Y
A3 TW
Y
A2 TW
Y
A1TW
Y
A4TW
Y
A5TW
Y
A6
WORK AREA #2 (TYP):
FULL DEPTH RECONSTRUCTION,
GRADING, AND STORM/
ELECTRICAL IMPROVEMENTS
(SCHEDULE A)
ELECTRICAL ROOM
PLACE LIGHTED RUNWAY
CLOSURE CROSS OVER
RUNWAY NUMERAL DURING
RUNWAY CLOSURE (TYP)
0'
0'
TAXIWAY A CL
RUNWAY 12-30 CL
RSA
OFZ
WORK AREA DESCRIPTIONS:
1. WORK AREA #1 - TAXIWAY A FROM TWY A6 TO THE NORTHERN SIDE OF TWY
A3 (STA 5+00 TO 32+77), SCHEDULE A.
2. WORK AREA #2 - TAXIWAY A FROM TAXIWAY A6 TO THE NORTHERN SIDE OF
TWY A3 (STA 5+00 TO 32+90) WITHIN THE RUNWAY OFZ, SCHEDULE A. WORK
WITHIN THIS WORK AREA REQUIRES A RUNWAY CLOSURE.
3. WORK AREA #3 - TAXIWAY A FROM THE NORTHERN SIDE OF TWY A3 (STA
32+90) TO THE SOUTH END OF TWY A (APPROX. STA 44+00), SCHEDULE B.
WORK WITHIN THIS WORK AREA REQUIRES A RUNWAY CLOSURE.
WORK AREA #1 (TYP):
FULL DEPTH RECONSTRUCTION,
GRADING, AND STORM/
ELECTRICAL IMPROVEMENTS
(SCHEDULE A)
5'
PROPOSED CRACK SEAL
AND/ OR SLURRY SEAL
CONTRACTOR STAGING
AREA
PROPOSED WA #3
BOUNDARY
CONTRACTOR HAUL/
ACCESS ROADS
0'
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
DECEMBER 2021
CITY OF ASHLAND
ASHLAND MUNICIPAL AIRPORT / SUMNER PARKER FIELD
TAXIWAY RECONSTRUCTION AND REHABILITATION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
X:
\P ro je ct s\
As hl an d, C ity o f\2
- T ax iw ay
R eh ab ilit at io n\ C
AD
W O
R
KI
N G
\G -0
TO
G -0
7_ W or k
Ar ea a nd
S af et y
Pl an
.d w g
AS NOTED12403.005.01
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
PRELIM
IN
ARY
NOT FOR C
ONSTRUCTIO
N
G-04
CONSTRUCTION SAFETY AND PHASING PLAN
NOTES AND DETAILS
GJR
MAH
JNR
GENERAL WORK AREA NOTES:
1. THE CONTRACTOR SHALL BE RESTRICTED TO USE THE
ENTRANCE AND HAULING ROUTES SHOWN ON THE DRAWINGS.
FOLLOW AIRPORT AND FAA SAFETY PROCEDURES WHEN
MOVING EQUIPMENT OR PERSONNEL. NO PERSONAL
VEHICLES SHALL BE ALLOWED OUTSIDE OF THE STAGING
AREA. THE AIRPORT MAY IMMEDIATELY REMOVE ANY
PERSONNEL AND EQUIPMENT FROM THE SITE IN VIOLATION OF
AIRPORT SAFETY PROCEDURES.
2. AVOID IMPACTS TO AIRFIELD LIGHTING AND PAVEMENTS
OUTSIDE WORK AREA. PROVIDE TEMPORARY CONNECTIONS
TO KEEP ELECTRICAL SYSTEMS ENERGIZED OUTSIDE OF THE
WORK AREA AT NO COST TO AIRPORT.
3. LIMIT EQUIPMENT HEIGHT TO 10 FEET UNLESS OTHERWISE
APPROVED BY THE ENGINEER.
4. LIMIT STOCK PILES TO 10' IN HEIGHT AND AT LEAST 195' FROM
RUNWAY CENTERLINE AND 44.5' FROM TAXIWAY CENTERLINE.
STOCK PILES SHALL NOT PENETRATE PART 77 SURFACES AS
SHOWN IN THESE PLANS.
5. IN THE EVENT OF AN EMERGENCY, MOVE ALL EQUIPMENT AND
PERSONNEL TO THE CONTRACTOR'S STAGING AREA UNLESS
OTHERWISE DIRECTED BY THE ENGINEER.
6. ACCESS TO ANY WORK AREA MUST BE AUTHORIZED BY THE
ENGINEER PRIOR TO WORK IN THAT AREA. NOTIFY THE
ENGINEER A MINIMUM OF 72 HOURS PRIOR TO BEGINNING
WORK IN ANY AREA.
7. PLACE LOW LEVEL BARRICADES, BARRICADES, AND TUBULAR
MARKERS AS SHOWN AND DESCRIBED IN SECTION 01300 OF
THE SPECIFICATIONS.
8. FOR RUNWAY CLOSURE, PLACE CONTRACTOR-PROVIDED
ILLUMINATED CLOSURE CROSSES AS SHOWN. DISENGAGE
LIGHTING SYSTEM, BEACON, REILS, RUNWAY 12 PAPI, RUNWAY
30 PAPI, AND WINDCONE DURING RUNWAY CLOSURE(S).
9. WHILE WORKING IN ANY AREA, THE CONTRACTOR SHALL
HAVE AN AIRPORT RADIO CAPABLE OF MONITORING THE
AIRPORT UNICOM FREQUENCY (122.8).
10. FOR ADDITIONAL REQUIREMENTS, REFER TO SECTION 01300,
AIRPORT SAFETY, IN THE TECHNICAL SPECIFICATIONS.
11. MAINTAIN PUBLIC ACCESS TO ALL AIRPORT FACILITIES AND
OPERATION AREAS, OUTSIDE OF CLOSED WORK AREAS, AT
ALL TIMES.
12. PROVIDE ACCESS TO THE AIRFIELD AT ALL TIMES DURING
CONSTRUCTION FOR EMERGENCY AMBULANCE, MEDI-VAC,
AND LIFE-FLIGHT OPERATIONS. DURING MEDICAL EVACUATION
EMERGENCIES CONTRACTOR SHALL MOVE ALL WORKERS AND
EQUIPMENT TO THE STAGING AREA.
13. DISENGAGE LIGHTING CIRCUITS, DARKEN LIGHT FIXTURES,
AND COVER GUIDANCE SIGNS AS DIRECTED BY THE AIRPORT
OR ENGINEER TO PREVENT AIRCRAFT FROM TAXIING
TOWARDS CLOSED WORK AREAS.
WORK IN SAFETY AREAS AND OBJECT
FREE AREAS:
1. NO WORK IS ALLOWED IN ACTIVE RUNWAY AND TAXIWAY
SAFETY AREAS. RUNWAY SAFETY AREA (RSA) AND TAXIWAY
SAFETY AREA (TSA) ARE DEFINED AS AREAS THAT SHALL BE
CLEARED AND GRADED AND HAVE NO RUTS, HUMPS,
DEPRESSIONS, OR OTHER SURFACE VARIATIONS. THE
MAXIMUM SLOPE ANYWHERE WITHIN A RUNWAY OR TAXIWAY
SAFETY AREA SHALL BE 5%. IN TRANSITIONS FROM PAVED TO
UNPAVED AREAS, A 1.5 INCH VERTICAL DROP IS ALLOWED. THE
RUNWAY AND TAXIWAY SAFETY AREAS SHALL BE MAINTAINED
AT ALL TIMES WHEN THE RUNWAY AND TAXIWAY IS OPEN TO
AIR TRAFFIC. PERSONNEL, EQUIPMENT, OR MATERIAL WITHIN
A RUNWAY SAFETY AREA AT ANY TIME REQUIRES A CLOSURE.
SAFETY AREAS THAT ARE CLOSED FOR CONSTRUCTION MUST
MEET THESE CRITERIA PRIOR TO REOPENING.
2. THE CONTRACTOR SHALL ANTICIPATE THE CONSTRUCTION OF
TEMPORARY FILLS, COMPACTION, AND GRADING TO MEET THE
REQUIREMENTS OF "WORK IN SAFETY AREAS AND OBJECT
FREE AREAS", PRIOR TO REOPENING RUNWAYS AND
TAXIWAYS. THIS WORK IS CONSIDERED INCIDENTAL TO
VARIOUS WORK ITEMS AND SEPARATE PAYMENT WILL NOT BE
MADE.
3. CONTRACTOR SHALL NOT ENTER ANY ACTIVE RSA OR TSA
WITHOUT AUTHORIZATION FROM THE AIRPORT. ALL
EQUIPMENT, TOOLS, AND MATERIALS SHALL BE MOVED TO
STAGING AREAS PRIOR TO REOPENING A RUNWAY OR
TAXIWAY.
4. SAFETY AREA LIMITS
TAXIWAY - 24.5' FROM
RUNWAY 12-30 - 60' FROM ; 240' FROM
THRESHOLD
5. RUNWAY AND TAXIWAY OBJECT FREE AREAS/ZONES ARE
DEFINED AS AREAS THAT SHALL BE CLEAR OF FIXED OR
MOVABLE OBJECTS. WORK MAY OCCUR IN RUNWAY OBJECT
FREE AREAS, HOWEVER, EQUIPMENT NOT IN USE, AND
MATERIAL STOCKPILES AND STORAGE SHALL BE PLACED AT
LEAST 125 FEET FROM ANY RUNWAY CENTERLINE. NO WORK
MAY OCCUR IN TAXIWAY OBJECT OBJECT FREE AREAS UNLESS
THE TAXIWAY IS CLOSED TO AIRCRAFT TRAFFIC. NO STORAGE
OF EQUIPMENT, MATERIALS OR STOCKPILES IS ALLOWED
WITHIN TAXIWAY OBJECT FREE AREAS.
6. OBJECT FREE AREA/ZONE LIMITS
TAXIWAYS - 44.5' FROM
RUNWAY 12-30 - 125' FROM
7. RUNWAY AND TAXIWAY SAFETY AREA AND RUNWAY AND
TAXIWAY OBJECT FREE AREA CRITERIA MUST BOTH BE MET
PRIOR TO OPENING AN IMPACTED RUNWAY OR TAXIWAY.
CL
CL
CL
CL
SEQUENCING AND PHASING NOTES:
1. ALL WORK SHALL BE COMPLETE WITHIN 90 CALENDAR DAYS OF
CONTRACT NOTICE TO PROCEED. REFER TO DETAIL 3, THIS
SHEET.
2. ONE RUNWAY CLOSURE OF 15 CONTINUOUS CALENDAR DAYS
IS ALLOWED. THIS CLOSURE SHALL OCCUR WITHIN THE 90
CALENDAR DAY PERIOD AS DESCRIBED IN NOTE 1 ABOVE.
3. WORK IN WA #1 SHALL BE COMPLETED IN 90 CONTINUOUS
CALENDAR DAYS. IF WORK IS NOT COMPLETE WITHIN THE 90
CALENDAR DAY PERIOD, LIQUIDATED DAMAGES WILL BE
ASSESSED.
4. WORK IN WA #2 AND WA #3 WILL REQUIRE A RUNWAY CLOSURE
AND SHALL BE COMPLETED IN 15 CONTINUOUS CALENDAR
DAYS. IF WORK IS NOT COMPLETE WITHIN THE 15 CALENDAR
DAY PERIOD, LIQUIDATED DAMAGES WILL BE ASSESSED. WORK
IN WA #2 AND WA #3 SHALL BE CONCURRENT.
5. WORK EXEMPT FROM EACH CALENDAR DAY CONTRACT PERIOD
INCLUDES THE SECOND APPLICATION OF PAVEMENT
MARKINGS. A CONTINUOUS 1 CALENDAR DAY (24 HOUR)
CLOSURE FOR THE SECOND APPLICATION OF PAVEMENT
MARKINGS WILL BE PERMITTED, A MINIMUM OF 30 DAYS AFTER
PAVING OPERATIONS HAVE BEEN COMPLETED.
6. THE RUNWAY 12 PAPI CAN BE OUT OF SERVICE FOR UP TO 15
CALENDAR DAYS OUTSIDE THE RUNWAY CLOSURE DATES TO
ALLOW THE CONSTRUCTION OF THE NEW PAPI ELECTRICAL
LINE. NOTIFY THE ENGINEER A MINIMUM OF 7 DAYS IN
ADVANCE OF DE-ENERGIZING THE RUNWAY 12 PAPI.
TR
AN
SI
TI
ONA
L
SU
RF
AC
E
S= 7:1
TRANSITIONAL
SURFACE S=7:1
CL
CL
PART 77
SURFACE
EXISTING
GROUND
PROFILE GRADE
AT RUNWAY
CENTERLINE CONTRACTOR STOCKPILED
MATERIAL AND EQUIPMENT
SHALL NOT PENETRATE
PART 77 SURFACE, NOR
SHALL IT BE LEFT
UNATTENDED WITHIN
OBJECT FREE ZONES.
RUNWAY 12-30 OFZ (125')
ORANGE / WHITE STRIPE
HIGH REFLECTIVE SHEETING
BATTERY OR SOLAR POWERED RED
LENS STANDARD BARRICADE LIGHT
ELEVATION
FILL WITH WATER
OR SAND
ORANGE BODY
NOTES:
1. BARRICADES SHALL MEET THE REQUIREMENTS OF AC 150/5370-2, CURRENT EDITION.
2. PLACE BARRICADE PER THE PLANS OR AS DIRECTED BY THE ENGINEER.
3. BARRICADES SHALL BE PROVIDED BY THE CONTRACTOR. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR PLACING, FILLING, EMPTYING, MOVING, MAINTAINING AND PROTECTING
BARRICADES THROUGHOUT THE DURATION OF THE PROJECT.
4. LIGHTS ARE TO BE NO FARTHER APART THAN 10' WHEN PLACED.
5. BARRICADES SHALL BE COVERED WITH REFLECTIVE SHEETING OR OTHER MATERIAL APPROVED BY
THE ENGINEER.
6. BARRICADES SHALL BE APPROPRIATELY WEIGHTED DOWN TO RESTRICT MOVEMENT FROM HIGH
WINDS OR PROP WASH.
SELF-CONNECTING
PINS
10"
10"
6' - 0"
VARIES
8' - 0"
G-04
TYPICAL CROSS SECTION
PART 77 SURFACE
NO SCALE
G-04
LOW LEVEL BARRICADE DETAIL
NO SCALE
TOTAL CONTRACT TIME = 90 CALENDAR DAYS
WA #1 = 90 CALENDAR DAYS
WA #2 & WA #3 =
15 CALENDAR DAYS
SEE NOTE 1
G-04
CONTRACT TIMELINE
NO SCALE
BE
G
IN
W
O R
K
EN
D
W O
R K
NOTES:
1. THE 15 DAY RUNWAY CLOSURE REQUIRED FOR WA #2 AND
WA #3 MAY OCCUR ANYTIME WITHIN THE 90 CALENDAR
DAY CONTRACT PERIOD.
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ
ST
A:
+5
ST
A:
+1
ST
A:
+3
X
X X X X X X X X
X X X X X
X
X X X X
X
X X
X X
X X X X X
X
X X X X X X X X X X X X X X X X X
5+00 10+00 15+00
ST
A:
+7
ST
A:
+2
ST
A:
0+
ST
A:
1+
ST
A:
2+
ST
A:
3+
4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
DECEMBER 2021
CITY OF ASHLAND
ASHLAND MUNICIPAL AIRPORT / SUMNER PARKER FIELD
TAXIWAY RECONSTRUCTION AND REHABILITATION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
X:
\P ro je ct s\
As hl an d, C ity o f\2
- T ax iw ay
R eh ab ilit at io n\ C
AD
W O
R
KI
N G
\G -0
TO
G -0
7_ W or k
Ar ea a nd
S af et y
Pl an
.d w g
AS NOTED12403.005.01
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
PRELIM
IN
ARY
NOT FOR C
ONSTRUCTIO
N
G-05
WORK AREA 1 AND 2 PLAN
GJR
MAH
JNR
NOTES:
1. FOR WORK AREA SEQUENCING AND WORK AREA/PHASING NOTES, SEE
SHEET G-04.
2. PLACE LOW LEVEL BARRICADES AND TUBULAR MARKERS WHERE SHOWN ON
WORK AREA PLAN, AS DESCRIBED IN THE SPECIFICATIONS, OR AS DIRECTED
BY THE ENGINEER.
3. PLACE TUBULAR MARKERS AT OFZ.
G-05
WORK AREA 1 AND 2 PLAN
SCALE: 1" = 50'
TAXIWAY A
LEGEND:
RUNWAY SAFETY AREA
RUNWAY OBSTACLE
FREE ZONE
PROPOSED WA #1
BOUNDARY
PROPOSED PAVEMENT
RECONSTRUCTION
PROPOSED WA #2
BOUNDARY
PROPOSED WA #1 & 2
LOW-LEVEL BARRICADES
PROPOSED WA #1
TUBULAR MARKERS
CONTRACTOR HAUL/
ACCESS ROADS
LOW LEVEL BARRICADE,
SEE (TYP)2
G-04
TW
Y
A6
TAXIWAY A CL
50 0 50 100
SCALE OF FEET
SCALE: 1"=50'
RUNWAY 12-30 CL
RUNWAY 12-30
X X
RSA
OFZ
1'
6'
5'
M
AT
C H
L
IN
E
ST
A
+0 0, S
EE
D R
AW
IN
G G
-0
TW
Y
A5
TUBULAR MARKERS,
SEE NOTE 3 (TYP)
WORK AREA #2 (TYP):
FULL DEPTH RECONSTRUCTION,
GRADING, AND STORM/
ELECTRICAL IMPROVEMENTS
(SCHEDULE A)
WORK AREA #1 (TYP):
FULL DEPTH RECONSTRUCTION,
GRADING, AND STORM/
ELECTRICAL IMPROVEMENTS
(SCHEDULE A)
PLACE LIGHTED RUNWAY CLOSURE CROSS
OVER RUNWAY NUMERAL DURING RUNWAY
CLOSURE FOR WA #2 AND WA #3 WORK (TYP)
0'
' 35
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ
X
ST
A:
8+
ST
A:
1+
ST
A:
2+
X X
X
X X X X X X X X X X
X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X
ST
A:
2+
ST
A:
2+
ST
A:
9+
ST
A:
3+
ST
A:
4+
ST
A:
2+
19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
DECEMBER 2021
CITY OF ASHLAND
ASHLAND MUNICIPAL AIRPORT / SUMNER PARKER FIELD
TAXIWAY RECONSTRUCTION AND REHABILITATION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
X:
\P ro je ct s\
As hl an d, C ity o f\2
- T ax iw ay
R eh ab ilit at io n\ C
AD
W O
R
KI
N G
\G -0
TO
G -0
7_ W or k
Ar ea a nd
S af et y
Pl an
.d w g
AS NOTED12403.005.01
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
PRELIM
IN
ARY
NOT FOR C
ONSTRUCTIO
N
G-06
WORK AREA 1 AND 2 PLAN
GJR
MAH
JNR
G-06
WORK AREA 1 AND 2 PLAN
SCALE: 1" = 50'
TAXIWAY A
WORK AREA #1,
SCHEDULE A
LOW LEVEL BARRICADE,
SEE (TYP)
G-04
TW
Y
A3
TW
Y
A4
TAXIWAY A CL
50 0 50 100
SCALE OF FEET
SCALE: 1"=50'
RUNWAY 12-30 CL
RUNWAY 12-30
6'
5'
M
AT
C H
L
IN
E
ST
A
+0 0, S
EE
D R
AW
IN
G G
-0
N W
AP
R
O N
TL
N
N W
AP
R
O N
TL
N
APRON
NORWEST APRON
REFER TO DRAWING G-07 FOR
WORK AREA #3 INFORMATION
STAGING AREA
ACCESS ROAD
WORK AREA #2 (TYP):
FULL DEPTH RECONSTRUCTION,
GRADING, AND STORM/
ELECTRICAL IMPROVEMENTS
(SCHEDULE A)
WORK AREA #1 (TYP):
FULL DEPTH RECONSTRUCTION,
GRADING, AND STORM/
ELECTRICAL IMPROVEMENTS
(SCHEDULE A)
NOTES:
1. FOR WORK AREA SEQUENCING AND WORK AREA/PHASING NOTES, SEE
SHEET G-04.
2. PLACE LOW LEVEL BARRICADES AND TUBULAR MARKERS WHERE SHOWN ON
WORK AREA PLAN, AS DESCRIBED IN THE SPECIFICATIONS, OR AS DIRECTED
BY THE ENGINEER.
3. PLACE TUBULAR MARKERS AT OFZ.
LEGEND:
RUNWAY SAFETY AREA
RUNWAY OBSTACLE
FREE ZONE
PROPOSED WA #1
BOUNDARY
PROPOSED PAVEMENT
RECONSTRUCTION
PROPOSED WA #2
BOUNDARY
PROPOSED WA #1 & 2
LOW-LEVEL BARRICADES
PROPOSED WA #1
TUBULAR MARKERS
CONTRACTOR HAUL/
ACCESS ROADS
X X
RSA
OFZ
TUBULAR MARKERS,
SEE NOTE 3 (TYP)
.5
' 35
PROTECT EXISTING
SANITARY SEWER
MANHOLE
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA R
SA
R
SA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ
O
FZ
O
FZ
O
FZ
O
FZ
OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ
X
ST
A:
4+
X X X
ST
A:
2+
ST
A:
2+
32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
DECEMBER 2021
CITY OF ASHLAND
ASHLAND MUNICIPAL AIRPORT / SUMNER PARKER FIELD
TAXIWAY RECONSTRUCTION AND REHABILITATION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
X:
\P ro je ct s\
As hl an d, C ity o f\2
- T ax iw ay
R eh ab ilit at io n\ C
AD
W O
R
KI
N G
\G -0
TO
G -0
7_ W or k
Ar ea a nd
S af et y
Pl an
.d w g
AS NOTED12403.005.01
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
PRELIM
IN
ARY
NOT FOR C
ONSTRUCTIO
N
G-07
WORK AREA 3
GJR
MAH
JNR
G-07
WORK AREA 3
SCALE: 1" = 50'
TAXIWAY A
LEGEND:
RUNWAY SAFETY AREA
RUNWAY OBJECT FREE AREA
PROPOSED WA #1
BOUNDARY
PROPOSED PAVEMENT
RECONSTRUCTION
PROPOSED WA #2
BOUNDARY
PROPOSED CRACK SEAL
AND/OR SLURRY SEAL
PROPOSED WA #3
BOUNDARY
LOW LEVEL BARRICADE,
SEE (TYP)
G-04
TW
Y
A3
TAXIWAY A CL
50 0 50 100
SCALE OF FEET
SCALE: 1"=50'
RUNWAY 12-30 CL
RUNWAY 12-30
X X
RSA
OFZ
5'
APRON
REFER TO DRAWING G-06 FOR WORK
AREA #1 AND #2 INFORMATION
TW
Y
A2 TW
Y
A1
PROPOSED WA #1 & 2
LOW-LEVEL BARRICADES
PROPOSED WA #1
TUBULAR MARKERS
PROPOSED WA #3
LOW-LEVEL BARRICADES
PROPOSED WA #3
TUBULAR MARKERS
CONTRACTOR HAUL/
ACCESS ROADS
3'
6'
WORK AREA #3 (TYP):
CRACK AND/OR SLURRY SEAL AND
ELECTRICAL IMPROVEMENTS
(SCHEDULE B)
NOTES:
1. FOR WORK AREA SEQUENCING AND WORK AREA/PHASING NOTES, SEE
SHEET G-04.
2. PLACE LOW LEVEL BARRICADES AND TUBULAR MARKERS WHERE SHOWN ON
WORK AREA PLAN, AS DESCRIBED IN THE SPECIFICATIONS, OR AS DIRECTED
BY THE ENGINEER.
3. PLACE TUBULAR MARKERS AT OFZ.
TUBULAR MARKERS,
SEE NOTE 3 (TYP)
PLACE LIGHTED RUNWAY CLOSURE CROSS
OVER RUNWAY NUMERAL DURING RUNWAY
CLOSURE FOR WA #2 AND WA #3 WORK (TYP)
X X
TUBULAR MARKERS,
SEE NOTE 3 (TYP)
SF
SF
SF
SF
SF SF SF SF
SF
SF
SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF
SF
C/F
C/F C/F
C/FC/F
C/F
C/FC/F C/F
C/FC/F
C /F
C/ F C/F C/F
C/F
C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F
C/F C/F C/F
C/ F
C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C /F
C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F
C/FC/F
C/F C/F C/F C/F C /F
C/FC/FC/FC/F
1850 1855 1860 1865 1870
5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00
STA: 6+10.65, 103.00' LT,
ANGLE POINT
STA: 7+13.65, 39.50' LT,
ANGLE POINT
STA: 4+73.00, 111.70' RT,
BEGIN SILT FENCE
STA: 14+25.00, 92.78' LT,
END SILT FENCE
STA: 14+25.00, 39.50' LT,
ANGLE POINT
EC-01
EROSION CONTROL PLAN
STA 5+00 TO 24+75
GJR
MAH
JNR
TAXIWAY A
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
DECEMBER 2021
CITY OF ASHLAND
ASHLAND MUNICIPAL AIRPORT / SUMNER PARKER FIELD
TAXIWAY RECONSTRUCTION AND REHABILITATION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
X:
\P ro je ct s\
As hl an d, C ity o f\2
- T ax iw ay
R eh ab ilit at io n\ C
AD
W O
R
KI
N G
\E C
-0 to E
C -0
Er os io n C on tro l P la n.
dw g
AS NOTED12403.005.01
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
PRELIM
IN
ARY
NOT FOR C
ONSTRUCTIO
N
M
AT
C H
L
IN
E
ST
A
+7 5, S
EE
D R
AW
IN
G E
C -0
EC-01
EROSION CONTROL PLAN
STA 5+00 TO 24+75
SCALE: 1" = 80'
SITE INFORMATION
AREA TYPE AREA SIZE (AC)
TOTAL PROPERTY 93
DISTURBED 4.3
IMPERVIOUS 2.2
PERVIOUS 2.1
NOTES:
1. PLACE SEDIMENT FENCE AROUND SOIL STOCK PILES AS
NEEDED.
2. HYDROSEED STAGING AREAS, HAUL ROUTES, AND OTHER
DISTURBED SURFACES, UNLESS OTHERWISE SHOWN,
OUTSIDE OF DAYLIGHT LIMITS AT NO COST TO THE
OWNER. HYDROSEEDING SHALL NOT OCCUR ON GRAVEL
SHOULDERS. REFER TO TECHNICAL SPECIFICATIONS FOR
ADDITIONAL SEEDING REQUIREMENTS.
SEEDING INFORMATION
SEED GERMINATION
(MIN, %)
APPLICATION RATE
(LBS/AC)
DWARF PERENNIAL
RYEGRASS 80 100
CREEPING RED
FESCUE 20 100
ANTICIPATED PROJECT SCHEDULE:
1. ANTICIPATED START DATE FOR WORK IS AUGUST 2022.
WORK INCLUDES DEMOLITION OF EXISTING TAXIWAY AND
RECONSTRUCTION, INCLUDING CLEARING AND GRADING
SHOULDERS FOR DRAINAGE. AND PAVEMENT
REHABILITATION WITH SLURRY SEAL.
2. ANTICIPATED END DATE FOR WORK IS NOVEMBER 2022; NO
TEMPORARY STOP DATES ARE ANTICIPATED.
3. FINAL STABILIZATION AND REMOVAL OF TEMPORARY
STORMWATER CONTROLS IS ANTICIPATED TO OCCUR IN
THE WINTER OF 2022.
SD
LEGEND:
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
NEW MAJOR CONTOUR
NEW MINOR CONTOUR
NEW AC PAVEMENT, WORK AREA 1
SEEDING AREA
SHOULDER/STAGING AREA ROCK
CUT/FILL LINE
EXISTING FLOW LINE
PROPOSED FLOW LINE
EXISTING STORM LINE
EXISTING MANHOLE
SEDIMENT
FENCE PER
C/F C/F
SF SF SF SF1
EC-04
EC-04
BIO FILTER
BAG PER
RUNWAY 12
RUNUP AREA
RUNWAY 12-30
TW
Y
A6
80 0 80 160
SCALE OF FEET
SCALE: 1"=80'
TW
Y
A5
TW
Y
A4
CULVERT TO BE DEMOLISHED
C/F C/F C/F C/F C/F C/F C/F
C/F
C/FC/FC/FC/F C/F C/F
C/F
C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F C/F 1875 1880
25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00
EC-02
EROSION CONTROL PLAN
STA 24+75 TO 45+00
GJR
MAH
JNR
M
AT
C H
L
IN
E
ST
A
+7 5, S
EE
D R
AW
IN
G E
C -0
FBO
EC-02
EROSION CONTROL PLAN
STA 24+75 TO 45+00
SCALE: 1" = 80'
CONSTRUCTION ENTRANCE PER OREGON DEQ
CONSTRUCTION STORMWATER BMP MANUAL
PARAGRAPH 2.19, DATED MARCH, 2013, SEE 3
EC-04
NOTES:
1. PLACE SEDIMENT FENCE AROUND SOIL STOCK PILES AS
NEEDED.
2. HYDROSEED STAGING AREAS, HAUL ROUTES, AND OTHER
DISTURBED SURFACES, UNLESS OTHERWISE SHOWN,
OUTSIDE OF DAYLIGHT LIMITS AT NO COST TO THE
OWNER. HYDROSEEDING SHALL NOT OCCUR ON GRAVEL
SHOULDERS. REFER TO TECHNICAL SPECIFICATIONS FOR
ADDITIONAL SEEDING REQUIREMENTS.
SEEDING INFORMATION
SEED GERMINATION
(MIN, %)
APPLICATION RATE
(LBS/AC)
DWARF PERENNIAL
RYEGRASS 80 100
CREEPING RED
FESCUE 20 100
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
DECEMBER 2021
CITY OF ASHLAND
ASHLAND MUNICIPAL AIRPORT / SUMNER PARKER FIELD
TAXIWAY RECONSTRUCTION AND REHABILITATION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
X:
\P ro je ct s\
As hl an d, C ity o f\2
- T ax iw ay
R eh ab ilit at io n\ C
AD
W O
R
KI
N G
\E C
-0 to E
C -0
Er os io n C on tro l P la n.
dw g
AS NOTED12403.005.01
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
PRELIM
IN
ARY
NOT FOR C
ONSTRUCTIO
N
SD
LEGEND:
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
NEW MAJOR CONTOUR
NEW MINOR CONTOUR
PROPOSED NEW AC PAVEMENT
PROPOSED CRACK AND/OR
SLURRY SEAL
SHOULDER/STAGING
AREA ROCK
CUT/FILL LINE
EXISTING FLOW LINE
PROPOSED FLOW LINE
EXISTING STORM LINE
EXISTING MANHOLE
C/F C/F
SEEDING AREA
BIO FILTER
BAG PER
CONTRACTOR STAGING AREA, PORTABLE
TOILET, CONCRETE WASHOUT AND SOIL
STOCKPILE TO OCCUR WITHIN THIS AREA,
REFER TO G-03 FOR ADDITIONAL INFORMATION
TAXIWAY A
RUNWAY 12-30
APRON
80 0 80 160
SCALE OF FEET
SCALE: 1"=80'
ANTICIPATED PROJECT SCHEDULE:
1. ANTICIPATED START DATE FOR WORK IS AUGUST 2022.
WORK INCLUDES DEMOLITION OF EXISTING TAXIWAY AND
RECONSTRUCTION, INCLUDING CLEARING AND GRADING
SHOULDERS FOR DRAINAGE. AND PAVEMENT
REHABILITATION WITH SLURRY SEAL.
2. ANTICIPATED END DATE FOR WORK IS NOVEMBER 2022; NO
TEMPORARY STOP DATES ARE ANTICIPATED.
3. FINAL STABILIZATION AND REMOVAL OF TEMPORARY
STORMWATER CONTROLS IS ANTICIPATED TO OCCUR IN
THE WINTER OF 2022.
EC-04
TW
Y
A3 TW
Y
A2 TW
Y
A1
SITE INFORMATION
AREA TYPE AREA SIZE (AC)
TOTAL PROPERTY 93
DISTURBED 4.3
IMPERVIOUS 2.2
PERVIOUS 2.1
EC-03
EROSION CONTROL PLAN NOTES
GJR
MAH
JNR
1. INCLUDE A LIST OF ALL PERSONNEL (BY NAME AND POSITION) THAT ARE RESPONSIBLE FOR THE DESIGN, INSTALLATION AND MAINTENANCE OF STORMWATER CONTROL MEASURES (E.G. ESCP DEVELOPER, BMP INSTALLER (SEE SECTION 4.10), AS WELL AS THEIR INDIVIDUAL RESPONSIBILITIES. (SECTION 4.4.C.II)
2. VISUAL MONITORING INSPECTION REPORTS MUST BE MADE IN ACCORDANCE WITH DEQ 1200-C PERMIT
REQUIREMENTS. (SECTION 6.5)
3. INSPECTION LOGS MUST BE KEPT IN ACCORDANCE WITH DEQ 1200-C PERMIT REQUIREMENTS. (SECTION 6.5.Q)
4. RETAIN A COPY OF THE ESCP AND ALL REVISIONS ON SITE AND MAKE IT AVAILABLE ON REQUEST TO DEQ, AGENT, OR THE LOCAL MUNICIPALITY. (SECTION 4.7)
5. THE PERMIT REGISTRANT MUST IMPLEMENT THE ESCP. FAILURE TO IMPLEMENT ANY OF THE CONTROL MEASURES OR PRACTICES DESCRIBED IN THE ESCP IS A VIOLATION OF THE PERMIT. (SECTION 4 AND 4.11)
6. THE ESCP MUST BE ACCURATE AND REFLECT SITE CONDITIONS. (SECTION 4.8)
7. SUBMISSION OF ALL ESCP REVISIONS IS NOT REQUIRED. SUBMITTAL OF THE ESCP REVISIONS IS ONLY UNDER SPECIFIC CONDITIONS. SUBMIT ALL NECESSARY REVISION TO DEQ OR AGENT WITHIN 10 DAYS.
(SECTION 4.9)
8. SEQUENCE CLEARING AND GRADING TO THE MAXIMUM EXTENT PRACTICAL TO PREVENT EXPOSED INACTIVE
AREAS FROM BECOMING A SOURCE OF EROSION. (SECTION 2.2.2)
9. CREATE SMOOTH SURFACES BETWEEN SOIL SURFACE AND EROSION AND SEDIMENT CONTROLS TO
PREVENT STORMWATER FROM BYPASSING CONTROLS AND PONDING. (SECTION 2.2.3)
10. IDENTIFY, MARK, AND PROTECT (BY CONSTRUCTION FENCING OR OTHER MEANS) CRITICAL RIPARIAN AREAS AND VEGETATION INCLUDING IMPORTANT TREES AND ASSOCIATED ROOTING ZONES, AND VEGETATION AREAS TO BE PRESERVED. IDENTIFY VEGETATIVE BUFFER ZONES BETWEEN THE SITE AND SENSITIVE AREAS (E.G. WETLANDS), AND OTHER AREAS TO BE PRESERVED, ESPECIALLY IN PERIMETER AREAS. (SECTION 2.2.1)
11. PRESERVE EXISTING VEGETATION WHEN PRACTICAL AND RE-VEGETATE OPEN AREAS. RE-VEGETATE OPEN AREAS WHEN PRACTICABLE BEFORE AND AFTER GRADING OR CONSTRUCTION. IDENTIFY THE TYPE OF
VEGETATIVE SEED MIX USED. (SECTION 2.2.5)
12. MAINTAIN AND DELINEATE ANY EXISTING NATURAL BUFFER WITHIN THE 50-FEET OF WATERS OF THE STATE.
(SECTION 2.2.4)
13. INSTALL PERIMETER SEDIMENT CONTROL, INCLUDING STORM DRAIN INLET PROTECTION AS WELL AS ALL
SEDIMENT BASINS, TRAPS, AND BARRIERS PRIOR TO LAND DISTURBANCE. (SECTIONS 2.1.3)
14. CONTROL BOTH PEAK FLOW RATES AND TOTAL STORMWATER VOLUME, TO MINIMIZE EROSION AT OUTLETS
AND DOWNSTREAM CHANNELS AND STREAMBANKS. (SECTIONS 2.1.1 AND 2.2.16)
15. CONTROL SEDIMENT AS NEEDED ALONG THE SITE PERIMETER AND AT ALL OPERATIONAL INTERNAL STORM DRAIN INLETS AT ALL TIMES DURING CONSTRUCTION, BOTH INTERNALLY AND AT THE SITE BOUNDARY.
(SECTIONS 2.2.6 AND 2.2.13)
16. ESTABLISH CONCRETE TRUCK AND OTHER CONCRETE EQUIPMENT WASHOUT AREAS BEFORE BEGINNING
CONCRETE WORK. (SECTION 2.2.14)
17. APPLY TEMPORARY AND/OR PERMANENT SOIL STABILIZATION MEASURES IMMEDIATELY ON ALL DISTURBED AREAS AS GRADING PROGRESSES. TEMPORARY OR PERMANENT STABILIZATION MEASURES ARE NOT REQUIRED FOR AREAS THAT ARE INTENDED TO BE LEFT UNVEGETATED, SUCH AS DIRT ACCESS ROADS OR
UTILITY POLE PADS. (SECTIONS 2.2.20 AND 2.2.21)
18. ESTABLISH MATERIAL AND WASTE STORAGE AREAS, AND OTHER NON-STORMWATER CONTROLS. (SECTION 2.3.7)
19. KEEP WASTE CONTAINER LIDS CLOSED WHEN NOT IN USE AND CLOSE LIDS AT THE END OF THE BUSINESS DAY FOR THOSE CONTAINERS THAT ARE ACTIVELY USED THROUGHOUT THE DAY. FOR WASTE CONTAINERS THAT DO NOT HAVE LIDS, PROVIDE EITHER (1) COVER (E.G., A TARP, PLASTIC SHEETING, TEMPORARY ROOF) TO PREVENT EXPOSURE OF WASTES TO PRECIPITATION, OR (2) A SIMILARLY EFFECTIVE MEANS DESIGNED TO PREVENT THE DISCHARGE OF POLLUTANTS (E.G., SECONDARY CONTAINMENT). (SECTION 2.3.7)
20. PREVENT TRACKING OF SEDIMENT ONTO PUBLIC OF PRIVATE ROADS USING BMPS SUCH AS: CONSTRUCTION ENTRANCE, GRAVELED (OR PAVED) EXITS AND PARKING AREAS, GRAVEL ALL UNPAVED ROADS LOCATED ONSITE, OR USE AN EXIT TIRE WASH. THESE BMPS MUST BE IN PLACE PRIOR TO LAND-DISTURBING
ACTIVITIES. (SECTION 2.2.7)
21. WHEN TRUCKING SATURATED SOILS FROM THE SITE, EITHER USE WATER-TIGHT TRUCKS OR DRAIN LOADS
ON SITE. (SECTION 2.2.7.F)
22. CONTROL PROHIBITED DISCHARGES FROM LEAVING THE CONSTRUCTION SITE, I.E., CONCRETE WASH-OUT, WASTEWATER FROM CLEANOUT OF STUCCO, PAINT AND CURING COMPOUNDS. (SECTIONS 1.5 AND 2.3.9)
23. ENSURE THAT STEEP SLOPE AREAS WHERE CONSTRUCTION ACTIVITIES ARE NOT OCCURRING ARE NOT
DISTURBED. (SECTION 2.2.10)
24. PREVENT SOIL COMPACTION IN AREAS WHERE POST-CONSTRUCTION INFILTRATION FACILITIES ARE TO BE
INSTALLED. (SECTION 2.2.12)
25. USE BMPS TO PREVENT OR MINIMIZE STORMWATER EXPOSURE TO POLLUTANTS FROM SPILLS; VEHICLE AND EQUIPMENT FUELING, MAINTENANCE, AND STORAGE; OTHER CLEANING AND MAINTENANCE ACTIVITIES; AND WASTE HANDLING ACTIVITIES. THESE POLLUTANTS INCLUDE FUEL, HYDRAULIC FLUID, AND OTHER OILS FROM VEHICLES AND MACHINERY, AS WELL AS DEBRIS, FERTILIZER, PESTICIDES AND HERBICIDES, PAINTS, SOLVENTS, CURING COMPOUNDS AND ADHESIVES FROM CONSTRUCTION OPERATIONS. (SECTIONS 2.2.15
AND 2.3)
26. PROVIDE PLANS FOR SEDIMENTATION BASINS THAT HAVE BEEN DESIGNED PER SECTION 2.2.17 AND
STAMPED BY AN OREGON PROFESSIONAL ENGINEER. (SECTION 2.2.17.A)
27. IF ENGINEERED SOILS ARE USED ON SITE, A SEDIMENTATION BASIN/IMPOUNDMENT MUST BE INSTALLED.
(SECTIONS 2.2.17 AND 2.2.18)
28. PROVIDE A DEWATERING PLAN FOR ACCUMULATED WATER FROM PRECIPITATION AND UNCONTAMINATED
GROUNDWATER SEEPAGE DUE TO SHALLOW EXCAVATION ACTIVITIES. (SEE SECTION 2.4)
29. IMPLEMENT THE FOLLOWING BMPS WHEN APPLICABLE: WRITTEN SPILL PREVENTION AND RESPONSE PROCEDURES, EMPLOYEE TRAINING ON SPILL PREVENTION AND PROPER DISPOSAL PROCEDURES, SPILL KITS IN ALL VEHICLES, REGULAR MAINTENANCE SCHEDULE FOR VEHICLES AND MACHINERY, MATERIAL DELIVERY AND STORAGE CONTROLS, TRAINING AND SIGNAGE, AND COVERED STORAGE AREAS FOR WASTE
AND SUPPLIES. (SECTION 2.3)
30. USE WATER, SOIL-BINDING AGENT OR OTHER DUST CONTROL TECHNIQUE AS NEEDED TO AVOID
WIND-BLOWN SOIL. (SECTION 2.2.9)
31. THE APPLICATION RATE OF FERTILIZERS USED TO REESTABLISH VEGETATION MUST FOLLOW MANUFACTURER'S RECOMMENDATIONS TO MINIMIZE NUTRIENT RELEASES TO SURFACE WATERS. EXERCISE CAUTION WHEN USING TIME-RELEASE FERTILIZERS WITHIN ANY WATERWAY RIPARIAN ZONE. (SECTION 2.3.5)
32. IF AN ACTIVE TREATMENT SYSTEM (FOR EXAMPLE, ELECTRO-COAGULATION, FLOCCULATION, FILTRATION, ETC.) FOR SEDIMENT OR OTHER POLLUTANT REMOVAL IS EMPLOYED, SUBMIT AN OPERATION AND MAINTENANCE PLAN (INCLUDING SYSTEM SCHEMATIC, LOCATION OF SYSTEM, LOCATION OF INLET, LOCATION OF DISCHARGE, DISCHARGE DISPERSION DEVICE DESIGN, AND A SAMPLING PLAN AND FREQUENCY) BEFORE OPERATING THE TREATMENT SYSTEM. OBTAIN ENVIRONMENTAL MANAGEMENT PLAN APPROVAL FROM DEQ BEFORE OPERATING THE TREATMENT SYSTEM. OPERATE AND MAINTAIN THE
TREATMENT SYSTEM ACCORDING TO MANUFACTURER'S SPECIFICATIONS. (SECTION 1.2.9)
33. TEMPORARILY STABILIZE SOILS AT THE END OF THE SHIFT BEFORE HOLIDAYS AND WEEKENDS, IF NEEDED.
THE REGISTRANT IS RESPONSIBLE FOR ENSURING THAT SOILS ARE STABLE DURING RAIN EVENTS AT ALL
TIMES OF THE YEAR. (SECTION 2.2)
34. AS NEEDED BASED ON WEATHER CONDITIONS, AT THE END OF EACH WORKDAY SOIL STOCKPILES MUST BE STABILIZED OR COVERED, OR OTHER BMPS MUST BE IMPLEMENTED TO PREVENT DISCHARGES TO SURFACE
WATERS OR CONVEYANCE SYSTEMS LEADING TO SURFACE WATERS. (SECTION 2.2.8)
35. SEDIMENT FENCE: REMOVE TRAPPED SEDIMENT BEFORE IT REACHES ONE THIRD OF THE ABOVE GROUND
HEIGHT AND BEFORE FENCE REMOVAL. (SECTION 2.1.5.B)
36. OTHER SEDIMENT BARRIERS (SUCH AS BIOBAGS): REMOVE SEDIMENT BEFORE IT REACHES TWO INCHES
DEPTH ABOVE GROUND HEIGHT AND BEFORE BMP REMOVAL. (SECTION 2.1.5.C)
37. CATCH BASINS: CLEAN BEFORE RETENTION CAPACITY HAS BEEN REDUCED BY FIFTY PERCENT. SEDIMENT BASINS AND SEDIMENT TRAPS: REMOVE TRAPPED SEDIMENTS BEFORE DESIGN CAPACITY HAS BEEN
REDUCED BY FIFTY PERCENT AND AT COMPLETION OF PROJECT. (SECTION 2.1.5.D)
38. WITH 24 HOURS, SIGNIFICANT SEDIMENT THAT HAS LEFT THE CONSTRUCTION SITE, MUST BE REMEDIATED.
INVESTIGATE THE CAUSE OF THE SEDIMENT RELEASE AND IMPLEMENT STEPS TO PREVENT A RECURRENCE OF THE DISCHARGE WITHIN THE SAME 24 HOURS. ANY IN-STREAM CLEAN UP OF SEDIMENT SHALL BE
PERFORMED ACCORDING TO THE OREGON DEPARTMENT OF STATE LANDS REQUIRED TIMEFRAME.
(SECTION 2.2.19.A)
39. THE INTENTIONAL WASHING OF SEDIMENT INTO STORM SEWERS OR DRAINAGE WAYS MUST NOT OCCUR.
VACUUMING OR DRY SWEEPING AND MATERIAL PICKUP MUST BE USED TO CLEAN UP RELEASED SEDIMENTS.
(SECTION 2.2.19)
40. DOCUMENT ANY PORTION(S) OF THE SITE WHERE LAND DISTURBING ACTIVITIES HAVE PERMANENTLY CEASED OR WILL BE TEMPORARILY INACTIVE FOR 14 OR MORE CALENDAR DAYS. (SECTION 6.5.F)
41. PROVIDE TEMPORARY STABILIZATION FOR THAT PORTION OF THE SITE WHERE CONSTRUCTION ACTIVITIES CEASE FOR 14 DAYS OR MORE WITH A COVERING OF BLOWN STRAW AND A TACKIFIER, LOOSE STRAW, OR AN ADEQUATE COVERING OF COMPOST MULCH UNTIL WORK RESUMES ON THAT PORTION OF THE SITE.
(SECTION 2.2.20)
42. DO NOT REMOVE TEMPORARY SEDIMENT CONTROL PRACTICES UNTIL PERMANENT VEGETATION OR OTHER COVER OF EXPOSED AREAS IS ESTABLISHED. ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED, ALL TEMPORARY EROSION CONTROLS AND RETAINED SOILS MUST BE REMOVED AND DISPOSED OF PROPERLY, UNLESS NEEDED FOR LONG TERM USE FOLLOWING TERMINATION OF PERMIT COVERAGE.
(SECTION 2.2.21)
EROSION/SEDIMENT CONTROL PLAN (ESCP) NOTES:
REFER TO NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) STORMWATER DISCHARGE PERMIT, ISSUED BY OREGON DEPARTMENT OF ENVIRONMENTAL QUALITY PURSUANT TO ORS 468B.050 AND SECTION 402 OF THE FEDERAL CLEAN WATER ACT.
EROSION/SEDIMENT INSPECTION FREQUENCY
SITE CONDITION MINIMUM FREQUENCY
1. ACTIVE PERIOD. ON INITIAL DATE THAT LAND DISTURBANCE ACTIVITIES COMMENCE.
WITHIN 24 HOURS OF ANY STORM EVENT, INCLUDING RUNOFF FROM
SNOW MELT, THAT RESULTS IN DISCHARGE FROM THE SITE. AT LEAST
ONCE EVERY 14 DAYS, REGARDLESS OF WHETHER STORMWATER RUNOFF
IS OCCURRING.
2. INACTIVE PERIODS GREATER
THAN FOURTEEN (14)
CONSECUTIVE CALENDAR
DAYS.
THE INSPECTOR MAY REDUCE THE FREQUENCY OF INSPECTIONS IN ANY
AREA OF THE SITE WHERE THE STABILIZATION STEPS IN SECTION 2.2.20
HAVE BEEN COMPLETED TO TWICE PER MONTH FOR THE FIRST MONTH,
NO LESS THAN 14 CALENDAR DAYS APART, THEN ONCE PER MONTH.
3. PERIODS DURING WHICH THE
SITE IS INACCESSIBLE DUE TO
INCLEMENT WEATHER.
IF SAFE, ACCESSIBLE AND PRACTICAL, INSPECTIONS MUST OCCUR DAILY
AT A RELEVANT DISCHARGE POINT OR DOWNSTREAM LOCATION OF THE
RECEIVING WATERBODY.
4. PERIODS DURING WHICH
CONSTRUCTION ACTIVITIES
ARE SUSPENDED AND RUNOFF
IS UNLIKELY DUE TO FROZEN
CONDITIONS.
VISUAL MONITORING INSPECTIONS MAY BE TEMPORARILY SUSPENDED.
IMMEDIATELY RESUME MONITORING UPON THAWING, OR WHEN WEATHER
CONDITIONS MAKE DISCHARGES LIKELY.
5. PERIODS DURING WHICH
CONSTRUCTION ACTIVITIES
ARE CONDUCTED AND RUNOFF
IS UNLIKELY DUE TO FROZEN
CONDITIONS.
VISUAL MONITORING INSPECTIONS MAY BE REDUCED TO ONCE A MONTH.
IMMEDIATELY RESUME MONITORING UPON THAWING, OR WHEN WEATHER
CONDITIONS MAKE DISCHARGES LIKELY.
AUTHORIZED NON-STORMWATER DISCHARGES:
1. WATER AND ASSOCIATED DISCHARGES FROM EMERGENCY FIREFIGHTING ACTIVITIES;
2. FIRE HYDRANT FLUSHING;
3. PROPERLY MANAGED LANDSCAPE IRRIGATION;
4. WATER USED TO WASH EQUIPMENT AND VEHICLES (EXCLUDING THE ENGINE, UNDERCARRIAGE, AND WHEELS/TIRES) PROVIDED THERE IS
NO DISCHARGE OF SOAPS, SOLVENTS, OR DETERGENTS USED;
5. WATER TO CONTROL DUST;
6. POTABLE WATER INCLUDING UNCONTAMINATED WATER LINE FLUSHINGS;
7. EXTERNAL BUILDING WASHDOWN, PROVIDED SOAPS, SOLVENTS, AND DETERGENTS ARE NOT USED, AND EXTERNAL SURFACES DO NOT
CONTAIN HAZARDOUS SUBSTANCES;
8. PAVEMENT WASH WATERS, PROVIDED SPILLS OR LEAKS OF TOXIC OR HAZARDOUS SUBSTANCES HAVE NOT OCCURRED (UNLESS ALL SPILL MATERIAL HAS BEEN REMOVED) AND WHERE SOAPS, SOLVENTS, AND DETERGENTS ARE NOT USED. DIRECTING PAVEMENT WASH WATERS INTO ANY SURFACE WATER, STORM DRAIN INLET, OR STORMWATER CONVEYANCE IS PROHIBITED, UNLESS THE CONVEYANCE IS CONNECTED TO A SEDIMENT BASIN, SEDIMENT TRAP, OR SIMILARLY EFFECTIVE CONTROL FOR THE POLLUTANTS PRESENT. PER 2.2.19.b, HOSING OF ACCUMULATED SEDIMENTS ON PAVEMENT INTO ANY STORMWATER CONVEYANCE IS PROHIBITED;
9. UNCONTAMINATED AIR CONDITIONING OR COMPRESSOR CONDENSATE;
10. UNCONTAMINATED, NON-TURBID DISCHARGES OF GROUNDWATER OR SPRING WATER;
11. FOUNDATION OR FOOTING DRAINS WHERE FLOWS ARE NOT CONTAMINATED WITH PROCESS MATERIALS SUCH AS SOLVENTS OR
CONTAMINATED GROUNDWATER; AND
12. CONSTRUCTION DEWATERING ACTIVITIES (INCLUDING GROUNDWATER DEWATERING AND WELL DRILLING DISCHARGE ASSOCIATED WITH
THE REGISTERED CONSTRUCTION ACTIVITY), PROVIDED THAT:
12.1. THE WATER IS LAND APPLIED IN A WAY THAT RESULTS IN COMPLETE INFILTRATION WITH NO POTENTIAL TO DISCHARGE TO A SURFACE WATER OF THE STATE, OR THE USE OF A SANITARY OR COMBINED SEWER DISCHARGE IS AUTHORIZED WITH LOCAL
SEWER DISTRICT APPROVAL; OR
12.2. BEST MANAGEMENT PRACTICES AND A TREATMENT SYSTEM APPROVED BY DEQ OR AGENT (SEE SECTION 1.2.9) ARE USED TO
ENSURE COMPLIANCE WITH DISCHARGE AND WATER QUALITY REQUIREMENTS IN SECTION 2.4.
POLLUTANT-GENERATING ACTIVITIES:
1. STORMWATER DISCHARGE FOR THE SITE DOES NOT REACH "WATERS OF THE STATE". POLLUTANT-GENERATING ACTIVITIES FOR THE
SITE INCLUDE CLEARING, GRUBBING, STRIPPING, EXCAVATION, BACKFILL, COMPACTION, ASPHALT PAVEMENT AND ASPHALT PAINTING.
STORAGE OF POLLUTANTS AND FUELING AND MAINTENANCE OF EQUIPMENT SHALL OCCUR IN CONTRACTORS STAGING AREA.
RAIN GAUGE:
1. NO RAIN GAUGE ON AIRPORT PROPERTY.
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
DECEMBER 2021
CITY OF ASHLAND
ASHLAND MUNICIPAL AIRPORT / SUMNER PARKER FIELD
TAXIWAY RECONSTRUCTION AND REHABILITATION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
X:
\P ro je ct s\
As hl an d, C ity o f\2
- T ax iw ay
R eh ab ilit at io n\ C
AD
W O
R
KI
N G
\E C
-0 to E
C -0
Er os io n C on tro l P la n.
dw g
AS NOTED12403.005.01
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
PRELIM
IN
ARY
NOT FOR C
ONSTRUCTIO
N
EC-04
EROSION CONTROL PLAN DETAILS
GJR
MAH
JNR
NOTES:
1. CONSTRUCT SEDIMENT FENCE PER ODOT STANDARD DRAWING RD1040.
2. BURY BOTTOM OF FILTER FABRIC 6" MIN. VERTICALLY BELOW GRADE.
3. POST SPACING 6' IF GEOTEXTILE ELONGATION LESS THAN 50%, 4' OTHERWISE.
FLOW
BALED HAY OR STRAW
NO SCALE
PLAN VIEW
NOTES:
1. CONSTRUCT BIOFILTER BAG CHECK DAM PER ODOT
STANDARD DRAWING RD1005.
2. STAKING OF BAGS REQUIRED USING (2) 2"X2"X18" (MIN)
PER BAG. STAKES SHALL EXTEND 6" INTO GROUND
(MIN).
3. SURFACE MUST BE SMOOTH BEFORE APPLICATION.
NO SCALE
PROFILE VIEW
EC-04
SEDIMENT FENCE
NO SCALE
EC-04
BIO FILTER BAG
NO SCALE
MATCH EXISTING GRADE
100'
B
B
AC
C
ES
S
R O
AD
' R
M
IN
20' MIN.
8" MIN, UNLESS OTHERWISE
SPECIFIED BY SOILS ENGINEER.
ORIGINAL GRADE
4" - 1" OPEN GRADED
AGGREGATE
FILTER FABRIC
PLAN
N.T.S.
SECTION B-B
N.T.S.
EC-04
CONSTRUCTION
ENTRANCE DETAIL
NO SCALE
VARIES
10' MIN.
A A
STAKE (TYP)
STANDARD RECTANGULAR
STRAW BALE (TYP)
STANDARD RECTANGULAR
STRAW BALE (TYP)
2 - 2"X2" WOOD STAKES
PER BALE, DRIVEN 12" MIN.
INTO GROUND (TYP)
10 MIL POLYETHYLENE
PLASTIC LINING
SECTION A-A
N.T.S.
EC-04
CONCRETE WASHOUT
DETAIL
NO SCALE
STAPLE PLASTIC LINING TO
BALES, 2 PER BALE
PLAN
N.T.S.
6"
2"
STAPLE DETAIL
N.T.S.
1/8" DIAMETER
STEEL WIRE
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
DECEMBER 2021
CITY OF ASHLAND
ASHLAND MUNICIPAL AIRPORT / SUMNER PARKER FIELD
TAXIWAY RECONSTRUCTION AND REHABILITATION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
X:
\P ro je ct s\
As hl an d, C ity o f\2
- T ax iw ay
R eh ab ilit at io n\ C
AD
W O
R
KI
N G
\E C
-0 to E
C -0
Er os io n C on tro l P la n.
dw g
AS NOTED12403.005.01
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
PRELIM
IN
ARY
NOT FOR C
ONSTRUCTIO
N
A
A
NOTES:
1. INSTALL CONSTRUCTION ENTRANCE
PER ODOT STANDARD DRAWING
RD1000.
4'
1.
5'
2.
5'
GEOTEXTILE
2X2 WOOD POSTGEOTEXTILE,
UPSLOPE
COMPACT
NATIVE
BACKFILL
FRONT VIEW SECTION A-A
TOP VIEW
ANGLE ENDS OF SEDIMENT
FENCE TO TRAP SOIL (TYP)
WITHOUT SLEEVE
SECTION A-A
WITH SLEEVE
GEOTEXTILE,
DOWNSLOPE
COMPACT
NATIVE
BACKFILL
JOIN END POSTS WITH
TWO WRAPS OR OVERLAP
ONE POST SPACING
2X2 WOOD POST
1'
MIN
6" M
IN
3" COUNTERSINK
NOTES:
1. INSTALL CONSTRUCTION TRUCK
WASHOUT PER ODOT STANDARD
DRAWING RD1070.
OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ
C/F
C /F
C/F C/F…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .