Reduced Pressure Zone RPZ Inventory List.pdf
PDF 116 KB Posted
- Solicitation number
- 36C24226Q0397
About this file
This is an inventory list of Cross-Connection Control (CCC) devices at Northport VA Medical Center documenting 51 backflow prevention devices across multiple building locations. The inventory includes Reduced Pressure (RPZ) and Double Check Valve (DCV) devices manufactured by Wilkins, Febco, Watts, Ames, Apollo, and Zurn, with sizes ranging from 3/4 inches to 6 inches. Each device entry specifies the manufacturer, model number, serial number, and device location within the facility.
The majority of devices show inspection dates of 12/10/2024 or 12/10/2025 with "Complete" status. Four devices have "Pending" status: one kitchen blast chiller device with unknown manufacturer, one hemodialysis device on the third floor with unknown manufacturer, one wheelchair repair room device removed for winter with last testing in August 2023, and one mechanics room device with no inspection date recorded. Two devices show inspection dates of 6/4/2025. Notable entries include specific access requirements, such as devices requiring ladder access in Room 26 Mechanical Equipment and a device requiring a key for access in the Building 200 climate control area. The inventory serves as a maintenance and compliance tracking document for the medical center's water system backflow prevention infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24226Q0397 Amendment 0001.pdf | ||
| 36C24226Q0397.pdf | ||
| Sol Pricing Worksheet - NP Backflow.xlsx | XLSX spreadsheet | |
| Wage Determination Suffolk County Pulled 26-03-03.docx | DOCX document | |
| 36C24226Q0397_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A RPZ Invenstory List-Northport VA Medical Center
Location of Cross- Connection Control (CCC) Device Manufacturer Type Model# Size Serial# Inspection Date Status
B 200 West Side Vault in Berm by Cardboard Compactor FEBCO RPZ 860 LF 6" N2403080957 12/10/2025 Complete
B 10 ROOM 3 MECHANICS RM Wilkins RPZ 975XL2 3/4" ABA34751 12/10/2025 Complete
B 12 MECHANICS ROOM SPRINKLER CONTROL
VALVE MAIN DRAIN Wilkins RPZ 975XL2 3/4" ABA15986 12/10/2024 Complete
B 12 ROOM 2 BASEMENT WATTS RPZ 009 1 1/2" 129020 12/10/2024 Complete B 200 KITCHEN BEHIND BLAST CHILLER unknown RPZ Pending B 200 SUB BASEMENT EAST SIDE Febco RPZ 860 LF 6" N2309281037 12/10/2024 Complete B 200 Hemodialysis, 3rd floor A351 WILKINS RPZ 975XL2 1 1/2" ACP5944 12/10/2024 Complete B 200 Hemodialysis, 3rd floor A351 WILKINS RPZ 975XL2 1 1/2" ACP5951 12/10/2024 Complete B 200 Hemodialysis, 3rd floor A352 unknown RPZ Pending B 200 N. Rm. DO- 30 ONCOLOGY MECHANICS WATTS RPZ 009 M3 3/4" 441001 12/10/2024 Complete B 200 ROOM C165 WATTS RPZ LF909 1 1/2" 18550 12/10/2024 Complete B 200 ROOM E054 WILKINS RPZ 975XL2 1" ABA78459 12/10/2024 Complete B 200 SUB BASEMENT EAST SIDE, Stairs 2 Audiology WATTS DCV 007 3/4" 33831 12/10/2025 Complete
B 200, Sub Basement, East Side Stairs 2 Audiology Ser Num 3C10037 AMES DCV 3000SS 6" 105620224 12/10/2024 Complete
B 203 BOILER PLANT WILKINS RPZ 375 2 1/2" L157319 12/10/2024 Complete B 203 BOILER PLANT WILKINS RPZ 375 2 1/2" L158489 12/10/2024 Complete
B 210 SEWAGE TREATMENT PLANT BOILER &
GENERATOR ROOM Watts RPZ LF009M2QT 1 1/2" 127862 12/10/2024 Complete
B 5 ROOM 11 MECHANICAL EQUIPMENT RM WILKINS RPZ 975XL2 3/4" AJAW8553 12/10/2024 Complete B 61 SPRINKLER Sprinkler Control rm. (main drain sprinkler control rmIn front of the building use the left doorThe door is on your right down the hallway)
WILKINS DCV 950XL 1 1/2" AMA09028 12/10/2024 Complete
B 63 MECHANICAL WILKINS DCV 350DA 6" 77782 12/10/2024 Complete B 63 MECHANICAL EQUIPMENT ROOM Wilkins RPZ 975XL2 1" ABAA5075 12/10/2024 Complete B 63 MECHANICAL EQUIPMENT ROOM (Stairwell #
2) WILKINS DCV 950XL 3/3" HC78499 12/10/2024 Complete
B 64 TRANSFER SWITCH ROOM, Fire Alarm Control Panel inside MECHANICAL EQUIPMENT WILKINS RPZ 975XL2 3/4" ABR1097 12/10/2024 Complete
B 7 ROOM 11 STEAM/HOT WATER ROOM WILKINS RPZ 975XL2 1" ABA41576 6/4/2025* Complete B 74 WELL HOUSE # 1 FEBCO RPZ 860 LF 3" N2403061026 12/10/2024 Complete B 8 - ROOM 1 SPRINKLER CONTROL WATTS DCV 007 3/4" 88345 12/10/2024 Complete B 8 ROOM #10/11 MECHANICS WILKINS RPZ 975XL2 1" ABA41012 12/10/2024 Complete B 8 Room 1 Sprinkler Control valve Fire AMES DCV 3000SS 4" 105366 12/10/2024 Complete B 8 ROOM 1-C COMPRESSOR ROOM Febco RPZ 860 LF 3" N2309291032 12/10/2025 Complete B 8 ROOM 1-C COMPRESSOR ROOM FEBCO RPZ 860 LF 3" N2403110114 12/10/2025 Complete B 9 RM 19 WHEEL CHAIR REPAIR ROOM AMES DCV 3000SS 4" 1101477 12/10/2024 Complete B 9 ROOM 15 MECHANICS ROOM WILKINS RPZ 975XL2 1" ABA36860 Pending B 9 ROOM 19 WHEEL CHAIR REPAIR ROOM Febco RPZ 860 LF 3" N2309291034 6/4/2025 Complete B 9 ROOM 19 WHEEL CHAIR REPAIR ROOM FEBCO RPZ 860 LF 3" N4203061027 12/10/2025 Complete B 9 ROOM 19 WHEEL CHAIR REPAIR ROOM Apollo DCV DCV 3/4' 85592 12/10/2024 Complete B 92 ROOM 160 EMS Equipment Storage WILKINS DCV 950XL 3/4" ALA34320 12/10/2024 Complete B 92 ROOM 192 STORAGE CLOSET APOLLO DCV DC4A 3/4" 44007C 12/10/2024 Complete B 92 ROOM 26 MECHANICAL EQUIPMENT ZURN RPZ 375XL 2" AKG0592 12/10/2024 Complete B 92 ROOM 26 MECHANICAL EQUIPMENT RM in back by loading dock.
Note: Will Require a Ladder for Access.
WILKINS DCV 950XL 1" ALA07890 12/10/2024 Complete
B 92 ROOM 26 MECHANICAL EQUIPMENT Room in back of loading dock WATTS RPZ LF909-FS 4" 28969 12/10/2024 Complete
B 92, in the back (double doors), ROOM 26 MECHANICAL EQUIPMENT ROOM in back of loading dock
WATTS DCV LF719 2" 13875 12/10/2024 Complete
Back of Chapel Outside Wilkins RPZ 975XL2 1' 3830562 Removed for Winter, last tested 8/2023 Pending
Bld 200 -Main Hospital (go to 4th Floor, then use stair case to go up to 375A) WILKINS RPZ 375 3" L151855 12/10/2024 Complete
Building 200, Climate control Side of 200 building loading dock last door on left double swing doors then hallway make two lefts to basement door authorized personnel only fire door keep close at all times.
NOTE: Key is Needed for Access.
WATTS RPZ 009 M2 2' 60532 12/10/2024 Complete
NORTHEAST SIDE OF GOLF COURSE WATTS RPZ LF909-FS 6" 20206 12/10/2024 Complete STRIPPER BLD WILKINS RPZ 975XL2 1" abz8718 12/10/2024 Complete
Annual 2024