REDM-2223-16 - Response to Questions.pdf
PDF 84 KB Posted
- Attached to
- Continuing Contract for the Northeast, Central & South Regions – A/E Environmental Services
- Solicitation number
- RFSQ-04263
- Issued by
- Leon County, Florida
About this file
This document is a response to questions regarding a Request for Qualifications (RFQ) for Continuing Contracts - Architect-Engineering Services - Environmental for the South, Northeast, and Central Florida Regions. The RFQ, identified as RFQ-REDM 22/23-16, is being issued by the Florida Department. The solicitation seeks qualified firms to provide architect-engineering services for environmental projects in the designated regions. The responses address questions related to submission requirements, such as the need to provide work product examples and the format of the firm's DBPR license submission.
The related State and Local Contract Opportunity is for Continuing Contracts for the Northeast, Central, and South Regions – Architectural/Engineering Environmental Services. This opportunity includes notices of withdrawal and negotiation for the Central, Northeast, and South Regions, as well as revised solicitation advertisements for the South Region and the overall statewide contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Qualifications
Continuing Contracts – Architect-Engineering Services - Environmental South, Northeast, and Central Florida Regions
RFQ-REDM 22/23-16
FAILURE TO FILE A PROTEST WITHIN THE TIME PRESCRIBED IN SECTION 120.57(3),
FLORIDA STATUTES, OR FAILURE TO POST THE BOND OR OTHER SECURITY REQUIRED BY
LAW WITHIN THE TIME ALLOWED FOR FILING A BOND SHALL CONSTITUTE A WAIVER OF
PROCEEDINGS UNDER CHAPTER 120, FLORIDA STATUTES.
The Department’s responses to timely submitted questions are below.
Question Number Question Response
1 Do we need to submit work product examples (such as reports etc.) as part of our response package? Please explain.
The requirements of the submission are detailed in Section 8 of the solicitation.
2 Section 8.4 - Does the “Physical” copy mentioned here means a printed/hard copy of the firm’s FL DBPR license? Please explain.
“Physical” refers to a printed/hard copy of the firms DBPR licensure
File details come from the government source that posted it. Updated .