This document outlines the scope of work for a five-year internal pipe inspection and maintenance of the fire sprinkler systems at the Abraham Lincoln Presidential Library and Museum (ALPLM) facilities in Springfield, Illinois. The scope includes performing inspections, tests, and maintenance on the fire sprinkler systems, standpipes, fire pumps, and related equipment at the ALPLM Museum, Library, Parking Garage, and Union Station locations. The work involves draining down the systems, performing five-year internal pipe inspections, check valve inspections, hydrostatic tests, pressure gauge installations, flow tests, and refilling the systems upon completion. The contractor must be licensed by the Illinois Office of State Fire Marshal as a Fire Sprinkler Contractor authorized to perform these fire sprinkler inspections.
The document provides detailed quantities and locations of the various fire sprinkler system components to be inspected at each ALPLM facility. Work hours and coordination requirements with ALPLM staff are also specified. The contractor will be required to provide all inspection documentation upon completion of the work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| REVISED NFPA 25 5 year inspection scope of work.docx | DOCX document | |
| Standard Certifications .doc | DOC document | |
| B-22963 Walkthrough - Site Visit Details.pdf | ||
| Standard Terms and Conditions v.20.1~13.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Abraham Lincoln Presidential Library and Museum (ALPLM) NFPA 25 (5 year) Inner Pipe Inspection Contractor will provide the necessary Material, Labor and Equipment to perform the listed sprinkler inspection per NFPA 25 for all listed items for each facility of the Abraham Lincoln Presidential Library & Museum (ALPLM) categorized for each building. Please note that work will need to be coordinated with the Facilities Services Director or Chief Building Engineer. Work performed at the Museum and Library will have to be coordinated as some work will have to be done before or after working hours. All work for the Garage and Union Station can be performed during normal working hours.
Museum NFPA 25 Five-year inspection (212 N. Sixth St, Springfield, IL 62701) Consists of (2 Dry System) (1 Pre- Action) (124 – Wet Standpipes) Items included in inspection:
· Drain down the systems to perform inspections
· Perform a five (5) year internal pipe inspection of system piping for all zones (x3)
· Perform a five (5) year check valve inspection of system check valves (1 swing, 7 alarm/drain)
· Perform a five (5) year hydrostatic tests of the FDC connection
· Provide and install thirteen (13) fire sprinkler system pressure gauges
· Perform a five (5) year inspection on all Dry Valve restricted orifices and check valves
· Perform a five (5) year flow test of the Wet Standpipes (x4)- perform full flow test on 3 standpipes (1st floor of NE, NW, and W stairwells); perform limited test on remaining 9 standpipes (i.e. flow small amount of water into a bucket, ensure basic functionality is operable).
· Re-Fill the Fire Sprinkler System and put back into service upon completion of work
· Provide all inspection documentation of fire sprinkler inspections
Library NFPA 25 Five-year inspection (112 N. Sixth St, Springfield, IL 62701) Consists of (13 Wet Systems) (2 Dry Systems) (21 Pre-Action) (1 Fire Pump) (412 Wet Standpipes) Items included in inspection:
· Drain down the systems to perform inspections
· Perform a five (5) year internal pipe inspection on all system piping for all zones (x16)
· Perform a five (5) year check valve inspection of all system check valves (6 swing, 9 alarm/drain)
· Perform a five (5) year hydrostatic tests of the FDC connection
· Provide and install ten (10) new fire sprinkler system pressure gauges
· Perform a five (5) year inspection on all Dry Valve restricted orifices and check valves
· Perform a five (5) year flow test of Wet Standpipes (x4) – perform full flow test on 2 standpipes (1st floor of NE and SW stairwell); perform limited test on remaining 10 standpipes (i.e. flow small amount of water into a bucket, ensure basic functionality is operable).
· Perform a five (5) year inspection of all fire pump check valves
· Re-Fill the Systems upon completion of work
· Provide all inspection documentation of fire sprinkler inspections
ALPLM Parking Garage NFPA 25 Five-year inspection (301 N. Sixth St, Springfield, IL 62701) Consists of (1 Dry System) Items included in inspection:
· Drain down the system to perform inspections and service
· Perform a five-year (5) internal pipe inspection of system piping for all zones (Dry System)
· Perform a five-year (5) check valve inspection of system and FDC check valves (x23 swing, 2 alarm/drain)
· Perform a five-year (5) hydrostatic test of the FDC connection (x2)
· Perform a five-year (5) hydrostatic test of the Dry Standpipe FDC connections (x2)
· Provide and install two (2) new fire sprinkler system pressure gauges
· Perform a five (5) year inspection on all Dry Valve restricted orifices and check valves
· Provide and install two (2) automatic ball drips to FDC to prevent freezing
· Labor and Material
· Re-Fill the systems upon completion of work
· Provide inspection tags for all five-year (5) inspection items
· Provide all documentation of inspections and service
· Normal Working Hours Monday-Friday
Union Station NFPA 25 Five-year inspection (500 E. Madison St., Springfield, IL 62701) Consist of: Inspections Items – (4 Wet Systems) (2 Dry Systems) (1 Fire Pump) Items included in inspection:
· Drain down the Fire Sprinkler System to perform inspections and service
· Perform a five (5) year internal pipe inspection of system piping for all zones
· Perform a five (5) year check valve inspection on all system and FDC check valves (3 swing, 7 alarm/drain)
· Perform a five (5) year hydrostatic tests of the FDC piping connection
· Provide and install ten (10) new fire sprinkler system pressure gauges
· Perform a five (5) year inspection on all Dry Valve restricted orifices and check valves
· Perform a five (5) year inspection of all Fire Pump Check Valves
· Provide and install a new inspector’s test sight glass that was leaking
· Provide all inspection documentation of fire sprinkler inspections
· Re-Fill the Fire Sprinkler System and put back into service upon completion of work
· Normal Working Hours Monday-Friday
Vendor/Staff Qualifications
The contractor shall be licensed by the Illinois Office of State Fire Marshal (OSFM) as a Fire Sprinkler Contractor authorized to perform fire sprinkler inspections. The contractor and its employees shall comply with all applicable OSFM rules and NFPA standards. Bidders are encouraged to provide evidence of license and may be required by ALPLM to produce such evidence prior to award.