REDACTED_UPDATED WIIN24-01_W&WA Well Permit.pdf
PDF 972 KB Posted
- Solicitation number
- QQ-122228
- Issued by
- Pittsylvania County, Virginia
About this file
This is a Well Permit document related to the Well Installation and Well Abandonment (WIIN24-01_W&WA) project in Luray, Virginia. The project involves the installation of a new water well and the abandonment of an existing well at a specified location in Luray. The permit establishes the regulatory framework and requirements for conducting these water well operations in compliance with Virginia state regulations. The document outlines the technical specifications, environmental considerations, and procedural requirements that contractors must follow when executing well installation and abandonment activities. Specific details regarding project timelines, site access requirements, and completion milestones are documented to ensure proper coordination and adherence to state water resource management standards.
The permit establishes the conditions under which well drilling and abandonment activities must be performed, including compliance with Virginia Department of Environmental Quality standards and local ordinances. The document serves as the official authorization for the contracted work and includes specifications for well construction materials, drilling methods, abandonment procedures, and any monitoring or testing requirements. All work must be performed by licensed well contractors in accordance with Virginia water well construction standards and applicable environmental protection regulations. The permit ensures that both the installation of the new well and the proper decommissioning of the existing well meet state and local requirements for groundwater protection and public safety.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Construction Terms and Conditions-.docx | DOCX document | |
| General_Terms_and_Conditions PIM 45 July 2025.docx | DOCX document | |
| ARPA FUNDING-.docx | DOCX document | |
| WIIN24-01_W&WA_Well Installation and Spring Abandonment SOW.pdf | ||
| SPECIAL TERMS AND CONDITIONS.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .