Contract Price Form R1.xls
XLS spreadsheet 34 KB Posted
- Solicitation number
- Not on record
About this file
Revised Contract Price Form
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 1442 MP Mar 7.pdf | ||
| Contract Price Form R1.xls | XLS spreadsheet | |
| Brdg Docs MenloPark-Mech Controls Drft V9 to GSA 022510.pdf | ||
| Questions and Answers Part 2.doc | DOC document | |
| Summary of changes on Mar 5.doc | DOC document | |
| USGS_SIGN_IN_SHEET.pdf | ||
| Questions and Answers.doc | DOC document | |
| Mar 1 Menlo Park Solicitation instructions R1.doc | DOC document | |
| sf24 - bid bond.pdf | ||
| MenloParkPoints.csv | CSV file | |
| MenloParkPoints.pdf | ||
| Menlo Park Specifications Revised 030110 MenloPark.pdf | ||
| Mar 1 Menlo Park Agreement R1.doc | DOC document | |
| specs for GSA furnished computers.pdf | ||
| Reps and certs.doc | DOC document | |
| About GP4 Files.doc | DOC document | |
| GSA Order Document Security.pdf | ||
| CAD_standards_R2NY1-k_0Z5RDZ-i34K-pR.pdf | ||
| USGS MP - Feb 28 Amendment.zip | ZIP file | |
| M 1.0 USGS Campus Level Network.pdf | ||
| Specifications_Final_MenloPark.docx | DOCX document | |
| M 1.1 Building Level Network Concept.pdf | ||
| FBO.zip | ZIP file |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price
| CLIN | Description | Qty | Unit Price | Bid Price | |
| Project 1A: Convert Building 15 Laboratory Spaces to Variable Air Volume | |||||
| 1 | Engineering & Design | LOT | $ | ||
| VAV Controls - Labs with Fume Hoods: | |||||
| 2 | New exhaust valve w/ fast acting actuator & FHC (per hood) | 75 | $ | ||
| 3 | New exhaust VAV device w/ actuator and local min/max controller (one per large canopy/cabinet) | 20 | $ | ||
| 4 | New fast acting actuator and LRC for existing supply box | 70 | $ | ||
| VAV Controls - Labs without Fume Hoods: | |||||
| 5 | New exhaust VAV device w/ actuator and misc. ductwork | 100 | $ | ||
| 6 | New lab controller for the existing box (space volumetric offset control) | 90 | $ | ||
| VAV Controls - Labs with a Radioactive Fume Hood | |||||
| 7 | New fume hood monitor (FHM) and sensor to replace existing for the radioactive fume hoods. | 8 | $ | ||
| 8 | New CAV controller for the existing supply box (constant supply airflow for these labs) | 8 | $ | ||
| 9 | All Other (VFDs, TAB, Commissioning, PM, etc.) | LOT | $ | ||
| Project 1B: Convert Building 15 Non-Lab Spaces to Variable Air Volume | |||||
| VAV Controls - Non-Lab Spaces | |||||
| 10 | New exhaust duct VAV device and misc. ductwork | 40 | $ | ||
| 11 | New VAV controller for the existing supply box | 171 | $ | ||
| 12 | All Other (TAB, Commissioning, PM, etc.) | LOT | $ | ||
| 13 | Project 2: Completely Replace the Building 15 Control System | $ | |||
| 14 | Project 3: Completely Replace the Building 1 and 2 Control System | $ | |||
| 15 | Project 4: Completely Replace the Building 3 Control System | $ | |||
| 16 | Project 5: Completely Replace the Building 3A Control System | $ | |||
| 17 | Project 6: Install Network Communications to Connect Buildings to a Central BAS Front End | $ | |||
| 18 | Project 7: Re-commission VAV Operation for Package Units in Building 4 | $ | |||
| 19 | Project 8: Primary Chilled Water System Variable Speed Pumping, Building 15 | $ | |||
| 20 | Project 9: Primary Hot Water System Variable Speed Pumping, Building 15 | $ | |||
| 21 | Project 10: Primary Chilled Water System Variable Speed Pumping, Building 1 and 2 | $ | |||
| 22 | Project 11: Secondary Hot Water System Variable Speed Pumping, Building 1 and 2 | $ | |||
| 23 | Project 12: Primary Chilled Water System Variable Speed Pumping, Building 3 | $ | |||
| 24 | Project 13: Replace the Air-Cooled Trane Chiller, Building 1 and 2 | $ | |||
| 25 | Project 14: Replace the Air-Cooled McQuay Chiller, Building 3 | $ | |||
| 26 | Project 15: Install Air-side Economizer on the Rooftop AHUs, Building 3A, 4 and 11 | $ | |||
| 27 | Project 16: Install Energy Meters For All Major HVAC Equipment, All Buildings | $ | |||
| 27A | Water and gas meters | $ | |||
| TOTAL PRICE - Energy Projects at USGS Geological Survey Campus, Menlo Park CA | $ | ||||
| $ | |||||
| 28 | Project 3: Deduct for not replacing Building 1 Control System (keep existing CSI Control system & workstation for Bldg 1) | $ | |||
| 29 | Markup (overhead and profit) to be applied to subcontracts and materials for equitable adjustments (changes etc., both increases and decreases) | _______% | |||
| 30 | Markup (overhead and profit) to be applied to direct labor costs (wages and benefits) to be applied to direct labor for equitable adjustments (changes etc., both increases and decreases) | _______% |
Subs
Scope of Work (Mechanical, Controls, Electrical, Structural, Fire Life Safety, etc) Name of Subcontractor Subcontractor Contact Name Subcontractor Contact Phone Number
Sheet3