Revised Contract Price Form - This removes reference to Building 11 from Project 15 since the statement of work was changed to remove that requirement. Economizer installation is still required for rooftop units on buildings 3A and 4.

View the file

Other files

File Type Posted
SF 1442 MP Mar 7.pdf PDF
Brdg Docs MenloPark-Mech Controls Drft V9 to GSA 022510.pdf PDF
Questions and Answers Part 2.doc DOC document
Summary of changes on Mar 5.doc DOC document
USGS_SIGN_IN_SHEET.pdf PDF
Questions and Answers.doc DOC document
Mar 1 Menlo Park Solicitation instructions R1.doc DOC document
sf24 - bid bond.pdf PDF
MenloParkPoints.csv CSV file
MenloParkPoints.pdf PDF
Contract Price Form R1.xls XLS spreadsheet
Menlo Park Specifications Revised 030110 MenloPark.pdf PDF
Mar 1 Menlo Park Agreement R1.doc DOC document
specs for GSA furnished computers.pdf PDF
Reps and certs.doc DOC document
About GP4 Files.doc DOC document
GSA Order Document Security.pdf PDF
CAD_standards_R2NY1-k_0Z5RDZ-i34K-pR.pdf PDF
USGS MP - Feb 28 Amendment.zip ZIP file
M 1.0 USGS Campus Level Network.pdf PDF
Specifications_Final_MenloPark.docx DOCX document
M 1.1 Building Level Network Concept.pdf PDF
FBO.zip ZIP file
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price

CLINDescriptionQtyUnit PriceBid Price
Project 1A: Convert Building 15 Laboratory Spaces to Variable Air Volume
1Engineering & DesignLOT$
VAV Controls - Labs with Fume Hoods:
2New exhaust valve w/ fast acting actuator & FHC (per hood)75$
3New exhaust VAV device w/ actuator and local min/max controller (one per large canopy/cabinet)20$
4New fast acting actuator and LRC for existing supply box70$
VAV Controls - Labs without Fume Hoods:
5New exhaust VAV device w/ actuator and misc. ductwork100$
6New lab controller for the existing box (space volumetric offset control)90$
VAV Controls - Labs with a Radioactive Fume Hood
7New fume hood monitor (FHM) and sensor to replace existing for the radioactive fume hoods.8$
8New CAV controller for the existing supply box (constant supply airflow for these labs)8$
9All Other (VFDs, TAB, Commissioning, PM, etc.)LOT$
Project 1B: Convert Building 15 Non-Lab Spaces to Variable Air Volume
VAV Controls - Non-Lab Spaces
10New exhaust duct VAV device and misc. ductwork40$
11New VAV controller for the existing supply box171$
12All Other (TAB, Commissioning, PM, etc.)LOT$
13Project 2: Completely Replace the Building 15 Control System$
14Project 3: Completely Replace the Building 1 and 2 Control System$
15Project 4: Completely Replace the Building 3 Control System$
16Project 5: Completely Replace the Building 3A Control System$
17Project 6: Install Network Communications to Connect Buildings to a Central BAS Front End$
18Project 7: Re-commission VAV Operation for Package Units in Building 4$
19Project 8: Primary Chilled Water System Variable Speed Pumping, Building 15$
20Project 9: Primary Hot Water System Variable Speed Pumping, Building 15$
21Project 10: Primary Chilled Water System Variable Speed Pumping, Building 1 and 2$
22Project 11: Secondary Hot Water System Variable Speed Pumping, Building 1 and 2$
23Project 12: Primary Chilled Water System Variable Speed Pumping, Building 3$
24Project 13: Replace the Air-Cooled Trane Chiller, Building 1 and 2$
25Project 14: Replace the Air-Cooled McQuay Chiller, Building 3$
26Project 15: Install Air-side Economizer on the Rooftop AHUs, Building 3A and 4$
27Project 16: Install Energy Meters For All Major HVAC Equipment, All Buildings$
TOTAL PRICE - Energy Projects at USGS Geological Survey Campus, Menlo Park CA$
$
28Project 3: Deduct for not replacing Building 1 Control System (keep existing CSI Control system & workstation for Bldg 1)$
29Markup (overhead and profit) to be applied to subcontracts and materials for equitable adjustments (changes etc., both increases and decreases)_______%
30Markup (overhead and profit) to be applied to direct labor costs (wages and benefits) to be applied to direct labor for equitable adjustments (changes etc., both increases and decreases)_______%

Subs

Scope of Work (Mechanical, Controls, Electrical, Structural, Fire Life Safety, etc) Name of Subcontractor Subcontractor Contact Name Subcontractor Contact Phone Number

Sheet3