Contract Price Form R1.xls
XLS spreadsheet 34 KB Posted
- Solicitation number
- Not on record
About this file
Revised Contract Price Form - This removes reference to Building 11 from Project 15 since the statement of work was changed to remove that requirement. Economizer installation is still required for rooftop units on buildings 3A and 4.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 1442 MP Mar 7.pdf | ||
| Brdg Docs MenloPark-Mech Controls Drft V9 to GSA 022510.pdf | ||
| Questions and Answers Part 2.doc | DOC document | |
| Summary of changes on Mar 5.doc | DOC document | |
| USGS_SIGN_IN_SHEET.pdf | ||
| Questions and Answers.doc | DOC document | |
| Mar 1 Menlo Park Solicitation instructions R1.doc | DOC document | |
| sf24 - bid bond.pdf | ||
| MenloParkPoints.csv | CSV file | |
| MenloParkPoints.pdf | ||
| Contract Price Form R1.xls | XLS spreadsheet | |
| Menlo Park Specifications Revised 030110 MenloPark.pdf | ||
| Mar 1 Menlo Park Agreement R1.doc | DOC document | |
| specs for GSA furnished computers.pdf | ||
| Reps and certs.doc | DOC document | |
| About GP4 Files.doc | DOC document | |
| GSA Order Document Security.pdf | ||
| CAD_standards_R2NY1-k_0Z5RDZ-i34K-pR.pdf | ||
| USGS MP - Feb 28 Amendment.zip | ZIP file | |
| M 1.0 USGS Campus Level Network.pdf | ||
| Specifications_Final_MenloPark.docx | DOCX document | |
| M 1.1 Building Level Network Concept.pdf | ||
| FBO.zip | ZIP file |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price
| CLIN | Description | Qty | Unit Price | Bid Price | |
| Project 1A: Convert Building 15 Laboratory Spaces to Variable Air Volume | |||||
| 1 | Engineering & Design | LOT | $ | ||
| VAV Controls - Labs with Fume Hoods: | |||||
| 2 | New exhaust valve w/ fast acting actuator & FHC (per hood) | 75 | $ | ||
| 3 | New exhaust VAV device w/ actuator and local min/max controller (one per large canopy/cabinet) | 20 | $ | ||
| 4 | New fast acting actuator and LRC for existing supply box | 70 | $ | ||
| VAV Controls - Labs without Fume Hoods: | |||||
| 5 | New exhaust VAV device w/ actuator and misc. ductwork | 100 | $ | ||
| 6 | New lab controller for the existing box (space volumetric offset control) | 90 | $ | ||
| VAV Controls - Labs with a Radioactive Fume Hood | |||||
| 7 | New fume hood monitor (FHM) and sensor to replace existing for the radioactive fume hoods. | 8 | $ | ||
| 8 | New CAV controller for the existing supply box (constant supply airflow for these labs) | 8 | $ | ||
| 9 | All Other (VFDs, TAB, Commissioning, PM, etc.) | LOT | $ | ||
| Project 1B: Convert Building 15 Non-Lab Spaces to Variable Air Volume | |||||
| VAV Controls - Non-Lab Spaces | |||||
| 10 | New exhaust duct VAV device and misc. ductwork | 40 | $ | ||
| 11 | New VAV controller for the existing supply box | 171 | $ | ||
| 12 | All Other (TAB, Commissioning, PM, etc.) | LOT | $ | ||
| 13 | Project 2: Completely Replace the Building 15 Control System | $ | |||
| 14 | Project 3: Completely Replace the Building 1 and 2 Control System | $ | |||
| 15 | Project 4: Completely Replace the Building 3 Control System | $ | |||
| 16 | Project 5: Completely Replace the Building 3A Control System | $ | |||
| 17 | Project 6: Install Network Communications to Connect Buildings to a Central BAS Front End | $ | |||
| 18 | Project 7: Re-commission VAV Operation for Package Units in Building 4 | $ | |||
| 19 | Project 8: Primary Chilled Water System Variable Speed Pumping, Building 15 | $ | |||
| 20 | Project 9: Primary Hot Water System Variable Speed Pumping, Building 15 | $ | |||
| 21 | Project 10: Primary Chilled Water System Variable Speed Pumping, Building 1 and 2 | $ | |||
| 22 | Project 11: Secondary Hot Water System Variable Speed Pumping, Building 1 and 2 | $ | |||
| 23 | Project 12: Primary Chilled Water System Variable Speed Pumping, Building 3 | $ | |||
| 24 | Project 13: Replace the Air-Cooled Trane Chiller, Building 1 and 2 | $ | |||
| 25 | Project 14: Replace the Air-Cooled McQuay Chiller, Building 3 | $ | |||
| 26 | Project 15: Install Air-side Economizer on the Rooftop AHUs, Building 3A and 4 | $ | |||
| 27 | Project 16: Install Energy Meters For All Major HVAC Equipment, All Buildings | $ | |||
| TOTAL PRICE - Energy Projects at USGS Geological Survey Campus, Menlo Park CA | $ | ||||
| $ | |||||
| 28 | Project 3: Deduct for not replacing Building 1 Control System (keep existing CSI Control system & workstation for Bldg 1) | $ | |||
| 29 | Markup (overhead and profit) to be applied to subcontracts and materials for equitable adjustments (changes etc., both increases and decreases) | _______% | |||
| 30 | Markup (overhead and profit) to be applied to direct labor costs (wages and benefits) to be applied to direct labor for equitable adjustments (changes etc., both increases and decreases) | _______% |
Subs
Scope of Work (Mechanical, Controls, Electrical, Structural, Fire Life Safety, etc) Name of Subcontractor Subcontractor Contact Name Subcontractor Contact Phone Number
Sheet3
File details come from the government source that posted it. Updated .