RCS 20-036 REMARKS PAGE.pdf
PDF 90 KB Posted
- Attached to
- Repair Lighting, Buildings 1168 and 3128
- Solicitation number
- W50S6K20B0007
- Issued by
-
Department of the Army National Guard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW Package.pdf | ||
| RCS 20-036 Lighting Upgrade B1168 and B3128 AF 813 EPF Signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REMARKS PAGE RCS 20-036
AF 813 Continuation Sheet Page 1 of 3
COMMENT NUMBERS CORRELATE TO AFF 813; COMPLIANCE WITH COMMENTS IS MANDATORY.
7. COMMUNITY PLANNER—AIR INSTALLATION COMPATIBLE-USE ZONE (AICUZ)/LAND USE
ANALYSIS, COMMENTS, REQUIREMENTS (Mr. Duane Hoskins; duane.hoskins.1@us.af.mil; 907-377-4251):
• “No significant impact to ACUIZ or base land use or development.”
8. AIR QUALITY ANALYSIS, COMMENTS, REQUIREMENTS (Ms. Heidi Young; heidi.young.6@us.af.mil; 907- 377-1815):
• Projects involving construction or renovation work that requires connecting to an old structure (utilidoc or utilidor) or renovating, repairing, or demolishing an old structure, you must contact Insulation Shop (CEO/CEOII) by phone (907-377-5133) or by email (charles.herbert@us.af.mil, james.walsh.23@us.af.mil) prior to the work to obtain more details and to inspect the old site records for asbestos. If asbestos is discovered, an asbestos plan will be required and must include the following:
1. All asbestos waste disposal records shall be signed by CEO/CEOII prior to removal of such waste from the base. A copy of the completed manifest (signed by the receiving landfill) shall be submitted to CEO/CEOII and CES/CEIE.
2. The contractor shall follow Section 2.1.13, below, of the Eielson AFB Asbestos Management and Operations Plan (AMOP). A copy of the AMOP may be obtained from 354 CES/CEIEC.
3. The Contractor is:
a. Responsible for identifying asbestos containing material (ACM) prior to conducting maintenance, abatement, renovation, or demolition activities.
b. Responsible for making proper notification and providing copies to CES/CEIEC and
CEO/CEOII.
c. Prior to final approval of job completion, a copy of asbestos removal procedures, amounts removed, type of product removed, location of removal actions and residual product left in place be provided to CEO/CEOII Insulation Shop, Tel# 907-377-5133 or via email to charles.herbert@us.af.mil or to andrew.broome@us.af.mil. This is required for updates to the facility asbestos register maintained by the Insulation Shop in accordance with 40 CFR 763, AFI32-1052 and AFOSH 161-21.
9. WATER QUALITY ANALYSIS, COMMENTS, REQUIREMENTS (Mr. John Conover; john.conover@us.af.mil;
907-377-7725):
• June 1 no comment
10a. OCCUPATIONAL SAFETY ANALYSIS, COMMENTS, REQUIREMENTS 907-377-4260 or mishap@us.af.mil
• All applicable personal protective equipment (PPE) must be worn/utilized. If work is performed in a confined space, a confined space permit will be required.
10b. OCCUPATIONAL HEALTH ANALYSIS, COMMENTS, REQUIREMENTS: BIOENVIRONMENTAL ENGINEERING: TSgt Ann Turner; ann.e.turner12@mail.mil or usaf.eielson.354-mdg.mbx.bioenvironmental@mail.mil 907-377-6687.
• Abide by all safety data sheet information and guidance. Contact Bioenvironmental Engineering if there is a risk of chemical exposure or if any chemical release occurs.
mailto:duane.hoskins.1@us.af.mil mailto:heidi.young.6@us.af.mil mailto:john.conover@us.af.mil mailto:mishap@us.af.mil mailto:ann.e.turner12@mail.mil mailto:usaf.eielson.354-mdg.mbx.bioenvironmental@mail.mil
11a. HAZARDOUS MATERIALS ANALYSIS, COMMENTS, REQUIREMENTS (Mr. Justin Hogrefe;
justin.hogrefe.1@us.af.mil; 907-377-5209):
• All hazmat must be ordered/tracked through Enterprise, Environmental, Safety, & Occupational Health Management Information System (EESOH-MIS).
11b. HAZARDOUS WASTE ANALYSIS, COMMENTS, REQUIREMENTS (Ms. Ariane Glover;
ariane.glover@us.af.mil; 907-377-1659): All contractors performing work on Eielson AFB are required to complete onsite hazardous waste training provided by 354 CES/CEIEC. Contractor training must be completed two weeks prior to field work start date and prior to receiving the Environmental Element signature on the Work Clearance Request (AF Form 103). Please contact 377-1659 to schedule a training for handling hazardous wastes, including aerosol cans management. All costs associated with waste disposal are the responsibility of the contractor. Empty aerosol cans are the only waste accepted at the base Hazardous Waste Facility for disposal. All hazardous waste must be managed in accordance with the requirements for large quantity generators (40 CFR 262.17) under the Resource Conservation Recovery Act. Hazardous waste and non-regulated waste manifests must be signed by a designated AF POC prior to shipment off-base. Please coordinate signature through the base Hazardous Waste Facility (377-1668) 10-days prior to planned transport.
Lamps/Bulbs to be disposed of as waste must be handled as Universal Waste and comply with regulations for Large Quantity Generators, in accordance with 40 CFR 273.5. Still usable fixtures and lighting turned should be into Defense Logistics Agency - Disposition Services (DLA-DS).
11c. SOLID WASTE ANALYSIS, COMMENTS, REQUIREMENTS (Mr. Lonnie Britton; lonnie.britton@us.af.mil;
907-377-3313):
• No impact to Solid Waste Program
12. BIOLOGICAL ANALYSIS, COMMENTS, REQUIREMENTS (Mr. Ron Gunderson;
ronald.gunderson@us.af.mil; 907-377-5182):
• No impacts to biological resources.
13. CULTURAL ANALYSIS, COMMENTS, REQUIREMENTS (Mr. Ron Gunderson; ronald.gunderson@us.af.mil;
907-377-5182):
• No impacts to cultural resources.
14. GEOLOGY & SOILS/RESTORATION ANALYSIS, COMMENTS, REQUIREMENTS (Mr. Joseph Price;
joseph.price.17@us.af.mil; 907-377-3578 or Ms. Kris Smith; 907-377-4299; kristina.smith.10@us.af.mil
• Interior construction only. No comments or concerns. Joseph Price, AFCEC/CZOP, 377-3578
15. SOCIOECONOMIC IMPACTS ANALYSIS, COMMENTS, REQUIREMENTS (Mr. Justin Hogrefe;
justin.hogrefe.1@us.af.mil; 907-377-5209):
• No adverse impact to low income or minority populations, employment, population projections, or local fiscal impacts.
16a. TANKS/SPILLS ANALYSIS, COMMENTS, REQUIREMENTS (Ms. Larsen Welsh; larsen.welsh@us.af.mil;
907-377-2937):
mailto:justin.hogrefe.1@us.af.mil mailto:ariane.glover@us.af.mil mailto:lonnie.britton@us.af.mil mailto:ronald.gunderson@us.af.mil mailto:ronald.gunderson@us.af.mil mailto:joseph.price.17@us.af.mil mailto:kristina.smith.10@us.af.mil mailto:justin.hogrefe.1@us.af.mil mailto:larsen.welsh@us.af.mil
• No comments/concerns.
16b. TOXICS ANALYSIS, COMMENTS, REQUIREMENTS (Ms. Ariane Glover; ariane.glover@us.af.mil; 907-377- 1659): Based on the age of the facilities, no known lead based paint concerns.
Light ballasts containing PCBs must be managed in accordance with Toxic Substances Control Act (TSCA).
Additionally, any light ballast not marked with “No PCBs” should be assumed to contain PCBs and managed under TSCA regulations. Additionally, ballasts containing DEHP exhibiting a characteristic waste must be managed in accordance with the Resource Conservation and Recovery Act as hazardous waste.
16c. ENVIRONMENTAL MANAGEMENT SYSTEM ANALYSIS, COMMENTS, REQUIREMENTS (Ms. Ariane Glover; ariane.glover@us.af.mil; 907-377-1659): All contractors working on the installation are required to take the Environmental Management System (EMS) General Awareness Training (course EMS100AFIT00004) offered on TEACH (7 min duration). Training can be accessed electronically at the following site: https://usaf.learningbuilder.com. Training certificates will be required as a submittal and must be provided prior to receiving the Environmental Element signature on the AF Form 103, Work Clearance Request.
mailto:ariane.glover@us.af.mil mailto:ariane.glover@us.af.mil https://usaf.learningbuilder.com/
File details come from the government source that posted it. Updated .