Radome Removal Pre-Proposal Conf Brief_V12.pptx

PPTX presentation 12 MB Posted

Attached to
National Weather Service Radiosonde Frequency Migration Project (RFMP) Upper Air Inflation Buildings (UAIB) Dome Removal and Roof Remediation
Solicitation number
1305M223RNWWG0005
Issued by

About this file

This PowerPoint presentation provides an overview of a pre-proposal conference for a federal contract solicitation to remove domes and remediate roofs at National Weather Service radio sounding facility buildings. The related solicitation seeks offers to remove radomes and perform roof repairs at National Weather Service Upper Air Inflation Buildings as part of the agency's Radiofrequency Migration Project. Offerors must submit proposals by April 15th, 2023 with contract awards expected in July 2023. The solicitation is designated for small businesses with work to be completed at sites across the continental United States over a one year period. Questions from the pre-proposal conference presentation should be directed to the listed point of contact at the issuing agency, the Department of Commerce's National Oceanic and Atmospheric Administration.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NWS Radome Removal Project Pre-Proposal Conference

11-July-2023

Sterling Field Support Center 43741 Weather Service Rd.

Sterling, VA 20166

Task Mission Remove Radomes at selected sites without compromising Upper air Inflation Building (UAIB) integrity Review PWS Highlights & Deliverables Overview of UAIB’s & Radomes Types & Settings / Radome Details / Roof Conditions / On-site Constraints / Map Proposal Instructions Address Questions Tour of Radome (On-site Attendees) Adjourn

Agenda

NWS intends to remove (Government) selected radomes given the constraints of building conditions Radome candidates for removal will be selected under the assumption that:

UAIBs are structurally sound UAIBs will not require any significant structural changes/repairs to make the building safe for use after the radome is removed Major structural changes, repairs, or modifications as a result of Radome removal are considered beyond the scope of this contract.

Task Mission

Review PWS & Deliverables Task Area 1: Assessment (Site Visit) Submit plans to remove the radome and any required refurbishment of the UAIB roof.

Submit plans to dispose of the radome and related construction materials.

Submit a detailed cost estimate to execute radome removal, disposal.

Task Area 2: Radome Removal Remove the radome and associated materials.

Repair/refurbish the roof on UAIB and cover it with a long lasting, durable waterproof membrane.

Dispose of the old radome and related materials in an environmentally responsible manner.

Deliver site-specific Final Report with associated documentation.

Objectives:

Site-Specific Planning Package must include:

Appendix C: Radome Removal Plan Appendix D: Radome and Structural Materials Disposal Plan Appendix E: Roof Repair/Refurbishment Radome Removal Design Plan Appendix F: Hazardous Materials Removal/Mitigation Plan, if needed Appendix G: Accident Prevention Plan

Review PWS & Deliverables (cont.)

Review PWS & Deliverables (cont.)

Site-Specific Cost Estimate to include:

Project Planning: Engineering design and planning Mobilization and Equipment Staging: Travel to the site and set up the equipment Radome Removal & Disposal: Remove the radome and any electrical conduits UAIB Roof Surface Preparation: Refurbish roof structure as needed and prep the roof deck for waterproofing UAIB Roof Membrane Installation: Install a new waterproof roofing membrane, and any needed caulking/flashing Site Clean Up and Inspection: Cleanup and return building to operational status Project Wrap Up and Reports: Engineering follow up and report preparation in the weeks after construction

Review PWS & Deliverables (cont.)

Site-Specific Radome Removal Reports to include:

Summary of the removal activity from start to finish; highlighting key steps and any problems encountered Description of any deviations from the radome removal plan Description of how and where all radome components, construction materials, and hazardous materials were disposed Before and after photographs of the UAIB roof (pre- & post-removal) Final ‘as-built’ drawings that reflect modifications (specified in the PWS) Description of areas of concerns related to the UAIB’s structure or physical condition Any lessons learned (best practices) at this site that may be applicable for future radome removal activities

General Task Deliverables

Task 1 & 2 Deliverables

Types & Settings:

Diverse Scenarios: UAIB’s vary in age, condition, and construction material.

UAIB’s are located at sites throughout CONUS with unique layouts and varying degrees of access.

UAIB & Radome Overview

Site: Jackson, MS UAIB: Corrugated Steel Site: Springfield, MO UAIB: Cinder Block Site: Salem, OR UAIB: Masonry/Stucco Site: Greensboro, NC UAIB: Brick & Mortar Radomes are typically made of fiberglass sections bolted together and to the UAIB roof.

Site: Dallas/FW, TX UAIB: Cinder Block

Site: Grand Junction, CO

Radome Details (Exterior):

UAIB & Radome Overview (cont.)

Weathered Radome with Entry Door Detail

Radome with Peeling Paint and Rivets Detail

Radome with Access Detail Radome with UAIB Roof Detail

Radome Details (Interior):

UAIB & Radome Overview (cont.)

Weathered Radome Interior with Rust Detail Radome Interior Detailing Sections Radome Interior with Non-Spray Insulation & Concrete Floor Radome Interior with Spray Insulation & Concrete Floor

The quality of roofing at each UAIB will vary from site to site.

The Pittsburgh site illustrates the typical membrane barrier on UAIB roof surrounding each Radome.

UAIB Roof Conditions

Site: Pittsburgh, PA

Site: Pittsburgh, PA Typical UAIB Site Layout An example of UAIB roof materials and conditions around each Radome.

Radome

Some UAIB’s have existing equipment on their roof requiring attention to work around.

Greensboro illustrates an antenna array that rests upon the roof near the Radome.

Any roofing activity will need to address repositioning existing assets.

NWS will alert the vendor to sites with similar constraints.

On-Site Constraints

Site: Greensboro, NC UAIB: Brick & Mortar Examples of MROS on UAIB roof that must be worked around during roof rehab.

NPR Mount

UAIB (MROS Sites) Dome Removal Candidates (as of April 5, 2023)

Puerto Rico

KCRP

KBRO

KTBW

KMHX

KRNK

KMFL

KMAF

KRIW

KLKN

KREV

KEPZ

KABQ

KBOI

KOTX

KTFX

KGGW

KBIS

KABR

KUNR

KLBF

KOAX

KAMA

KFWD

KGJT

KTOP

KINL

KGRB

KILX

KSGF

KLZK

KSHV

KLCH

KJAN

KBMX

KFFC

KTAE

KJAX

KKEY

KCHS

KOHX

KAPX

KILN

KPBZ

KLWX

KOKX

KBUF

KGYX

KCAR

KGSO

KSJU

SFSC

KFGZ

KMFR

Proposal Instructions Proposal Due: July 21, 2023 at 12:00 PM EDT Submit to: Nicole Frie, Nicole.Frie@noaa.gov Proposal Volume Format:

Volume I: Business Proposal Volume II: Technical Proposal Volume III: Past Performance Volume IV: Price

Volume/InstructionsPage Limit
Volume I: Business Proposal -
This volume consists of the actual offer to enter into a contract to perform the work required in this RFP. It also includes required representations, certifications and acknowledgments; and all solicitation amendments.Unlimited
Volume II: Technical Proposal -
Factor 1 Technical Approach20 pages
Volume III: Past Performance -

Factor 2 Past Performance

6 pages
Volume IV: Price -

Factor 3 Price Unlimited

Factor 1 – Technical Approach Planned approach to performing this work Type of equipment to be used Labor categories Qualifications for both CLIN 0001 Site Assessment and CLIN 0002 Dome Removal and Roof Remediation Crew accommodations, major subcontractors and their roles, and anticipated schedule of work.

Factor 1 – Technical Approach (Continued) The planned approach shall include:

Health and safety plan Quality assurance plan Quality control inspection system

Factor 2 – Past Performance Describe relevant performance on other contracts or affirmatively state that it possesses no relevant past performance.

List up to, but not more than three (3) contracts similar in size, scope, and complexity as that of the PWS, utilizing Attachment III – Past Performance Information Form. Each past performance reference is to be listed separately.

Factor 2 – Past Performance (Continued)

There are a total of 53 sites to be surveyed Dome Removal and Roof Remediation will be placed as orders under this IDIQ using the established CLIN 0002 Labor Categories and FFP Hourly Rates after the completion of CLIN 0001 site assessments.

The amount of all orders shall not exceed $9,850,000.00, or the contractor’s total price whichever is higher.

Evaluation Factors The government intends to select the best value proposal based on a tradeoff considering:

Non-price Factor 1 (Technical Approach) is the most important Non-price Factor 2 (Past Performance) is the second most important When combined, the non-price factors (Factors 1 and 2) are significantly more important than price (Factor 3)

Evaluation Factors Factor 1 - Technical Approach:

The government will evaluate the extent to which the proposed approach meets or exceeds requirements outlined in the solicitation and Attachment I Dome Removal PWS and provides value to the government.

Evaluation Factors Factor 2 – Past Performance:

The offeror’s past performance, based on contracts that are relevant in terms of size, scope, and complexity to the instant requirement, will be evaluated to determine, as appropriate, successful performance of contract requirements, quality and timeliness of delivery of goods and services, level of communication between the contracting parties, proactive management, and customer satisfaction.

Evaluation Factors Factor 3 – Price:

Price proposals should support the proposed technical factor and will be evaluated for reasonableness of (1) Total Evaluated Price (TEP), (2) completeness and (3) unbalanced pricing. Offerors whose price is determined to be incomplete or unreasonable will not be considered for award.

Address Questions

Tour of Radome (On-site Attendees)

BACKUP

UAIB Drawings: Masonry

UAIB Drawings: Steel image5.png image6.png image7.png image8.jpeg image9.png image10.png image11.png image12.png image13.PNG image14.PNG image19.png image15.jpeg image16.jpeg image17.jpeg image18.jpeg image20.jpeg image21.jpeg image22.jpeg image23.jpeg image24.jpeg image25.jpeg image26.jpeg image31.jpeg image27.png image28.jpeg image29.jpeg image30.jpeg image32.jpeg image33.jpeg image34.jpeg image35.jpeg image3.jpg image4.png image36.png image37.png image38.png image39.png image40.emf image41.png image42.png image2.png image1.jpeg