Sheet 5 of 5
Asphalt Transition Detail
Steps:
1 –Excavate trench across road or trail to a depth approximately 3 times the thickness of the Hot Mix Asphalt Concrete (HMAC). The trench should be approximately 3-feet wide.
2 – Start paving in the bottom of the trench.
3 – Immediately place the excavated material from step one back into the trench and compact the aggregate and then the HMAC as the roller moves onto the
HMAC.
3’ min
Hot Mix Asphalt Concrete
Existing Aggregate
Excavation Line
Excavated & Backfilled Material
Subgrade
Paving Direction Rolling Direction
3’ min