fbo_Sheet 5 of 5.pdf

PDF 10 KB Posted

Attached to
STEWARDSHIP AND ERFO ROAD 3278
Solicitation number
R6-12-09-298472
Issued by

About this file

Sheet 5 of 5

View the file

Other files

File Type Posted
fbo_Sheet 2 of 5.pdf PDF
fbo_Sheet 3 of 5.pdf PDF
fbo_Sheet 1 of 5.pdf PDF
fbo_Project Specifications.pdf PDF
SF 24.pdf PDF
fbo_Sheet 4 of 5.pdf PDF
fbo_Project Specification List.pdf PDF
fbo_09-298472_Packet to complete and return.pdf PDF
fbo_09-298472_Road 3278 Solicitation Package.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet 5 of 5

Asphalt Transition Detail

Steps:

1 –Excavate trench across road or trail to a depth approximately 3 times the thickness of the Hot Mix Asphalt Concrete (HMAC). The trench should be approximately 3-feet wide.

2 – Start paving in the bottom of the trench.

3 – Immediately place the excavated material from step one back into the trench and compact the aggregate and then the HMAC as the roller moves onto the

HMAC.

3’ min

Hot Mix Asphalt Concrete

Existing Aggregate

Excavation Line

Excavated & Backfilled Material

Subgrade

Paving Direction Rolling Direction

3’ min