fbo_Project Specification List.pdf
PDF 8 KB Posted
- Attached to
- STEWARDSHIP AND ERFO ROAD 3278
- Solicitation number
- R6-12-09-298472
About this file
Project Specification List
View the file
Other files
| File | Type | Posted |
|---|---|---|
| fbo_Sheet 2 of 5.pdf | ||
| fbo_Sheet 3 of 5.pdf | ||
| fbo_Sheet 5 of 5.pdf | ||
| fbo_Sheet 1 of 5.pdf | ||
| fbo_Project Specifications.pdf | ||
| SF 24.pdf | ||
| fbo_Sheet 4 of 5.pdf | ||
| fbo_09-298472_Packet to complete and return.pdf | ||
| fbo_09-298472_Road 3278 Solicitation Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Title Revised 3278
Preface Preface FP03 & 3/15/2004 X 101 Terms, Format, and Definitions FP03 X 101 .01 Meaning of Terms 1/22/2009 X 101 .03 Abbreviations 6/16/2006 X 101 .04 Definitions 3/29/2007 X
102 Bid, Award, and Execution of Contract FP03 X 102 .00 Bid, Award, and Execution of Contract 2/16/2005 X
103 Scope of Work FP03 X 103 .00 Deletions 2/16/2005 X
104 Control of Work FP03 X 104 .00 Deletions 6/16/2006 X 104 .06 Use of Road by Contractor 2/17/2005 X
105 Control of Material FP03 X 105 .02 Material Sources 1/18/2007 X 105 .02 Material Sources 3/8/2007 X 105 .05 Use of Materials found in Work 5/12/2004 X
106 Acceptance of Work FP03 X 106 .01 Conformity with Contract Requirements 7/31/2007 X 106 .07 Delete 5/11/2004 X
107 Legal Relations and Responsibility to the Public FP03 X 107 .02 Protection and Restoration of Property and Landscape 2/17/2005 X 107 .05 Responsibility for Damage Claims 5/11/2004 X 107 .06 Contractor's Responsibility for Work 6/16/2006 X 107 .08 Sanitation, Health and Safety 5/11/2004 X 107 .09 Legal Relationship of the Parties 6/16/2006 X 107 .10 Environmental Protection 6/16/2006 X 107 .11 Protection of Forests, Parks, and Public Lands 2/17/2005 X
108 Prosecution and Progress FP03 X 108 Delete 2/16/2005 X
109 Measurement and Payment FP03 X 109 Deletions 2/17/2005 X 109 .02 Measurement Terms and Definitions 6/16/2006 X
151 Mobilization FP03 X
153 Contractor Quality Control FP03 X 153 .04 Records 10/24/2007 X
155 Schedules for Construction Contracts FP03 X 155 .00 Delete 5/11/2004 X
156 Public Traffic FP03 X 156 .00 Complete Specification 4/17/2007 X
170 .00 Develop water supply and Watering 3/26/2007 X
171 .00 Weed and Disease Prevention 3/26/2007 X
204 Excavation and Embankment FP03 X
204 .00 Complete Specification 3/26/2009 X
303 Road Reconditioning FP03 X
303 .01 Work 3/2/2005 X
303 .04 Shoulder Reconditioning. 11/26/2008 X
303 .05 Roadbed Reconditioning 3/26/2007 X
303 .06 Aggregate Surface Reconditioning 4/4/2007 X
303 .10 Measurement 3/26/2007 X
322 .00 Minor Aggregate Courses 10/24/2007 X
404 Minor Hot Asphalt Concrete FP03 X 404 .02 Composition of Mix 6/9/2006 X 404 .04 Weather Limitations 3/2/2005 X 404 .06 Placing 3/2/2005 X 404 .07 Compacting 3/2/2005 X 404 .09 Acceptance 3/2/2005 X
703 Aggregate FP03 X 703 .05 Subbase, Base, Surface Course, and Screened Aggregate. 12/7/2006 X
All specifications not included in the specification listing, but referenced by listed specifications, are applicable.
FP- 03 SPECIFICATION LIST FOR 3278 STEWARDSHIP/ERFO PROJECT
The supplements shown on the specification list are physically attached.
File details come from the government source that posted it. Updated .