R16PS00508_Solicitation.pdf

PDF 31 MB Posted

Attached to
Grand Coulee Fire Station Federal contract opportunity
Solicitation number
R16PS00508
Issued by
Department of the Interior Bureau of Reclamation

About this file

Solicitation R16PS00508

View the file

Other files for this federal contract opportunity

Other files attached to Grand Coulee Fire Station, newest first.
File Type Posted
Sol_R16PS00508_Amd_000005.pdf PDF
Sol_R16PS00508_Amd_000004.pdf PDF
R16PS00508__-_Pre-Bid_Construction_Meeting_Attendance.pdf PDF
SF_30_Amend_3.pdf PDF
R16PS00508-Amend_1_COMPLETE.pdf PDF
SF-30_Amend_2.pdf PDF
508Grand_Coulee_Fire_Station_amd_002.pdf PDF
508_Grand_Coulee_Fire_Station_amd_002_drawings.pdf PDF
0508_Grand_Coulee_Fire_Station_drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of the Interior Bureau of Reclamation

July 2016

Solicitation No. R16PS00508 Grand Coulee Fire Station

Grand Coulee Dam Columbia Basin Project - Washington

This solicitation issued by Contracting Officer

Pacific Northwest Region Bureau of Reclamation

1150 North Curtis Road, Suite 100 Boise ID 83706-1234

Phone inquiries regarding this solicitation should be made to Regional Acquisition Management Officer

Telephone Number: (208) 378-5364

GRAND COULEE FIRE STATION

GRAND COULEE DAM, WASHINGTON

FOREWORD

Work is located at the Grand Coulee Power Office (GCPO), approximately 90 miles west of Spokane, Washington in Grant County, near the town of Coulee Dam, Washington.

The principal components of the work to be performed under these specifications include:

construction of the new Fire Station including all associated utilities, site civil improvements, precast concrete water intertie building and approximately 2,250 linear feet of new potable water main, underground medium voltage power, demolition of asphalt roads adjacent to site, realignment of roadways, construction of concrete paved roads and parking surfaces, cast-in-place concrete retaining wall, and storm water infiltration basin. The Fire Station shall be constructed in accordance with the Federal Guiding Principles for New Construction through the GBCI-NC 2009 Compliance Path.

A pre-offer site visit will be conducted in accordance with Clause 52.236-27 Alternate I, in Section L entitled “Site Visit - Construction.” Offerors are strongly urged to participate in the site visit. Failure by offerors to inspect the site will not relieve them of the responsibility of properly estimating the difficulty or cost of successfully performing the work in accordance with the specifications and within the allowed time. Attendees are to provide and wear safety boots, hard hats, and safety vests.

FOR INFORMATION REGARDING BUREAU OF RECLAMATION'S HANDBOOK

ENTITLED "RECLAMATION SAFETY AND HEALTH STANDARDS," (2009

EDITION) WHICH IS APPLICABLE TO WORK UNDER THIS CONTRACT, SEE

NOTICE IN PART II, SECTION I ENTITLED "SAFETY AND HEALTH."

FOR DATE AND PLACE OF OFFER SUBMISSION, SEE "SOLICITATION, OFFER,

AND AWARD," STANDARD FORM 1442, IMMEDIATELY FOLLOWING THE

"TABLE OF CONTENTS."

Solicitation No. R16PS00508 Grand Coulee Fire Station Columbia Basin Project, Washington

PART I THE SCHEDULE

SECTION A SOLICITATION/CONTRACT FORM ..................................................................... A-1

SECTION B SUPPLIES OR SERVICES AND PRICES .................................................................B-1

SECTION C DESCRIPTION/SPECIFICATIONS .......................................................................... C-1

VOLUME 1

SPECIFICATIONS

DIVISION 01—GENERAL REQUIREMENTS

01 09 00 General Commissioning Requirements 01 11 00 Summary of Work 01 14 10 Use of Site 01 14 30 Interruption of Service 01 29 00 Payment Procedures 01 31 19 Project Meetings 01 32 10 Construction Program 01 33 00 Submittals Supplement:

Table 01 33 00A - List of Submittals 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 21 Removal from Work 01 35 30 Contractor’s Onsite Safety and Health Personnel 01 42 10 Reference Standards 01 43 33 Manufacturer’s Field Services Supplement:

Manufacturer’s Certificate of Proper Installation 01 45 33 Special Inspection, Observation, and Testing Supplements:

Contractor’s Statement of Responsibility Component Manufacturer’s Seismic Certificate of Compliance Table 1: Structural and Geotechnical Observations Table 2: Required Nonstructural Special Inspection Table 3: Required Structural Special Inspection Table 4: Testing for Required Special Inspection Table 5: Required Special Inspection for Seismic Resistance for Structural

Systems Table 6: Testing for Seismic Resistance 01 46 00 Quality Procedures i

Columbia Basin Project, Washington

01 46 20 Testing Agency Services 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 55 20 Traffic Control 01 57 13 Temporary Erosion and Sediment Control 01 57 20 Environmental Controls 01 57 50 Tree and Plant Protection 01 57 90 Preservation of Historical and Archaeological Data 01 60 00 Product Requirements 01 64 40 Government-Furnished Products 01 71 20 Surveying 01 74 10 Cleaning 01 74 19 Construction Waste Management and Disposal 01 78 23 Operation and Maintenance Data Supplement:

Maintenance Summary Form 01 78 30 Project Record Documents 01 81 13 Sustainable Design Requirements Supplements:

GCPO Fire Station Guiding Principles GBCI-NC 2009 Compliance Path Materials Submittal Form VOC Submittal Form 01 88 15 Anchorage and Bracing 01 91 14 Equipment Testing and Facility Startup Supplements:

Unit Process Startup Form Facility Performance Demonstration/Certification Form

DIVISION 02—EXISTING CONDITIONS

02 41 00 Demolition

DIVISION 03—CONCRETE

03 10 00 Concrete Forming and Accessories 03 15 00 Concrete Joints and Accessories 03 21 00 Reinforcing Steel 03 30 00 Cast-In-Place Concrete Supplements:

Concrete Mix Design, Class 4500F2S1P1C1 (Structural Concrete) Concrete Mix Design, Class 4500F1S1P0C1 (Secondary Concrete) Concrete Mix Design, Class 4500F3S1P1C2 (Nonstructural) 03 35 10 Special Concrete Finishes 03 39 00 Concrete Curing ii

Columbia Basin Project, Washington

03 62 00 Nonshrink Grouting

DIVISION 04—MASONRY

04 22 00 Concrete Unit Masonry 04 26 13 Concrete Masonry Veneer

DIVISION 05—METALS

05 05 23 Welding Supplement:

Welding and Nondestructive Testing Table 05 12 00 Structural Steel Framing 05 31 00 Steel Decking 05 41 00 Structural Metal Stud Framing 05 50 00 Metal Fabrications 05 51 00 Metal Pan Stairs 05 52 20 Decorative Metal Railings 05 53 00 Metal Gratings

DIVISION 06—WOOD, PLASTICS, AND COMPOSITES

06 10 00 Rough Carpentry 06 16 00 Sheathing 06 40 23 Interior Architectural Woodwork

DIVISION 07—THERMAL AND MOISTURE PROTECTION

07 14 16 Cold Fluid-Applied Waterproofing 07 17 13 Bentonite Waterproofing 07 19 00 Water Repellents 07 21 00 Thermal Insulation 07 27 26 Fluid Applied Water Resistive Barriers and Accessories 07 41 13 Metal Roof Panels 07 42 13 Insulated Metal Wall Panels 07 42 63 Formed Metal Wall Panels 07 42 70 Metal Soffit Panels 07 52 16 SBS Modified Bituminous Membrane Roofing 07 53 00 Single Ply Roofing 07 62 00 Sheet Metal Flashing and Trim 07 72 00 Roof Accessories 07 81 00 Intumescent Fireproofing 07 84 13 Through Penetration Fire Stopping 07 84 46 Fire-Resistive Joint System 07 92 00 Joint Sealants iii

Columbia Basin Project, Washington

VOLUME 2

DIVISION 08—OPENINGS

08 11 13 Hollow Metal Doors and Frames 08 14 16 Flush Wood Doors 08 31 13 Access Doors and Frames 08 41 13 Aluminum Entrance and Storefronts 08 43 33 Folding Glass Storefronts 08 44 13 Glazed Aluminum Curtain Walls 08 51 13 Aluminum Windows 08 53 13 Quick Response Four-Fold Doors 08 71 00 Finish Hardware 08 80 00 Glazing 08 83 00 Mirrors 08 90 00 Louvers and Vents

DIVISION 09—FINISHES

09 22 16 Nonstructural Metal Framing 09 29 00 Gypsum Board 09 30 13 Tiling 09 51 13 Acoustical Panel Ceiling 09 65 19 Resilient Sheet Flooring 09 65 20 Resilient Athletic Flooring 09 66 23 Epoxy-Resin Terrazzo Flooring 09 84 36 Sound-Absorbing Ceiling Units 09 91 00 Exterior and Interior Painting

DIVISION 10—SPECIALTIES

10 22 00 All Glass Sliding Partition 10 23 10 Glazed Interior Wall and Door Assemblies 10 26 00 Impact Resistant Wall Protection 10 28 00 Toilet Accessories 10 44 13 Fire Protection Specialties 10 44 16 Fire Extinguishers 10 75 16 Ground-Set Flagpoles 10 90 00 Miscellaneous Specialties iv

Columbia Basin Project, Washington

DIVISION 11—EQUIPMENT

11 31 00 Appliances

DIVISION 12—FURNISHINGS

12 21 13 Roller Window Shades 12 48 16 Floor Grilles

DIVISION 13—NOT USED

DIVISION 14—CONVEYING EQUIPMENT

14 24 00 Hydraulic Elevators

DIVISIONS 15 THROUGH 20—NOT USED

DIVISION 21—FIRE SUPPRESSION

21 05 00 Common Work Results for Fire Suppression 21 13 13 Wet-Pipe Sprinkler Systems Supplement:

Grand Coulee Power Office Industrial Area Potable Water Hydraulic Analysis

DIVISION 22—PLUMBING

22 07 00 Plumbing Piping Insulation 22 08 00 Commissioning of Plumbing 22 10 01 Plumbing Piping and Accessories 22 30 00 Plumbing Equipment 22 40 00 Plumbing Fixtures

DIVISION 23—HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

23 05 93 Testing, Adjusting, and Balancing for HVAC 23 07 00 HVAC Insulation 23 08 00 Commissioning of HVAC 23 09 00 Instrumentation and Control Devices for HVAC 23 09 13 HVAC Controls, Field Components, and Instruments 23 09 23 Direct-Digital Control System for HVAC 23 21 13 Hydronic Piping—General Supplements:

Piping Schedule Carbon Steel Pipe and Fittings—Hydronic Water Service Data Sheet Copper Tube and Fittings—Hydronic Water Service Data Sheet 23 21 14 Hydronic Specialties v

Columbia Basin Project, Washington

23 23 00 Refrigerant Piping 23 25 00 HVAC Water Treatment 23 31 13 Metal Ducts and Accessories 23 34 00 HVAC Fans 23 36 00 Air Terminal Units 23 37 00 Air Outlets and Inlets 23 52 00 Heating Boilers 23 77 00 Air Handling Units 23 81 00 Unitary Air-Conditioning Equipment 23 82 00 Terminal Heating and Cooling Units 23 84 00 Humidity Control Equipment

DIVISIONS 24 AND 25—NOT USED

VOLUME 3

DIVISION 26—ELECTRICAL

26 01 25 Electrical Testing 26 05 02 Basic Electrical Requirements 26 05 04 Basic Electrical Materials and Methods 26 05 05 Conductors 26 05 26 Grounding and Bonding for Electrical Systems 26 05 33 Raceway and Boxes 26 05 70 Electrical Systems Analysis 26 08 00 Commissioning of Electrical Systems 26 12 02 Oil-Filled Pad Mounted Transformers 26 20 00 Low-Voltage AC Induction Motors 26 24 16 Panelboards 26 27 26 Wiring Devices 26 32 13 Diesel Engine Generator Set 26 36 23 Automatic Transfer Switches 26 41 00 Facility Lightning Protection 26 43 00 Surge Protective Devices (SPD) 26 50 00 Lighting

DIVISION 27—COMMUNICATIONS

27 05 14 Cable Television Premises Distribution System 27 10 10 Basic Communications Materials and Methods 27 44 04 Audio Visual Systems 27 51 23 Intercommunication System

DIVISION 28—ELECTRONIC SAFETY AND SECURITY

vi

Columbia Basin Project, Washington

28 13 70 Access Control, Intrusion Detection and Surveillance System 28 31 00 Fire Detection, Alarm, and Mass Notification System

DIVISIONS 29 AND 30—NOT USED

DIVISION 31—EARTHWORK

31 10 00 Site Clearing 31 23 13 Subgrade Preparation 31 23 16 Excavation 31 23 19 Dewatering 31 23 23 Fill and Backfill 31 23 24 Trench Backfill 31 32 19 Geotextile 31 37 00 Riprap

DIVISION 32—EXTERIOR IMPROVEMENTS

32 11 23 Aggregate Base Courses 32 12 16 Asphalt Paving 32 13 13 Concrete Paving 32 16 00 Curbs and Gutters 32 17 23 Pavement Markings 32 91 13 Soil Preparation 32 92 00 Turf and Grasses

DIVISION 33—UTILITIES

33 05 01 Conveyance Piping—General Supplement:

Cement-Mortar-Lined Ductile Iron Pipe and Fittings Data Sheet

33 05 13 Manholes 33 05 16 Precast Concrete Utility Structure 33 12 13 Water Service Connections 33 12 16 Water Utility Distribution Valves and Instrumentation 33 12 17 Air and Vacuum Release Valve Assemblies 33 12 19 Water Utility Distribution Fire Hydrants 33 13 00 Disinfection of Water Utility Distribution Facilities 33 41 01 Storm Drain and Sanitary Sewer Piping

Supplements:

Corrugated Metal Data Sheet Polyvinyl Chloride (PVC) Data Sheet Corrugated Polyethylene (CPE) Data Sheet

33 44 13 Catch Basins 33 46 00 Subsurface Drainage vii

Columbia Basin Project, Washington

DIVISIONS 34 THROUGH 51—NOT USED DIVISION 52—

DRAWINGS

52 00 00 Drawings

DIVISION 53—GEOLOGIC INVESTIGATIONS AND RECORDS

Geotechnical Data Report

VOLUME 4

DRAWINGS

SECTION D PACKAGING AND MARKING ................................................................................. D-1

SECTION E INSPECTION AND ACCEPTANCE ..........................................................................E-1 E.1. 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984) ........................................ E-1 E.2. 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)...................................... E-1

E.3. 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994) - ALTERNATE I

APR 1984) ....................................................................................................................... E-3

SECTION F DELIVERIES OR PERFORMANCE ......................................................................... F-1

F.1. 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF

WORK (APR 1984) ......................................................................................................... F-1 F.2. 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEPT 2000) ................... F-1 F.3. 52.242-14 SUSPENSION OF WORK (APR 1984) ........................................................ F-1

SECTION G CONTRACT ADMINISTRATION DATA ................................................................ G-1

G.1. GOVERNMENT POINT OF CONTACT--BUREAU OF RECLAMATION--PN

REGION (OCT 2010) ..................................................................................................... G-1

G.2. 1452.201-70 AUTHORITIES AND DELEGATIONS--DEPARTMENT OF THE

INTERIOR (MAY 2010) ................................................................................................ G-1

G.3. ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS-INVOICE

PROCESSING PLATFORM (IPP) (APRIL 2013) ........................................................ G-2

SECTION H SPECIAL CONTRACT REQUIREMENTS ............................................................. H-1

H.1. AUTHORIZED WORKERS NOTICE TO POTENTIAL BUREAU OF

RECLAMATION CONTRACTORS (SEP 2002).......................................................... H-1

H.2. CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM

(DEC 2015) ..................................................................................................................... H-2

PART II CONTRACT CLAUSES

SECTION I CONTRACT CLAUSES ................................................................................................ I-1 viii

I.1. 52.202-1 DEFINITIONS (NOV 2013) ............................................................................. I-1 I.2. 52.203-3 GRATUITIES (APR 1984) ............................................................................... I-1 I.3. 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)........................ I-2

I.4. 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE

GOVERNMENT (SEPT 2006)......................................................................................... I-2 I.5. 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014) .......................................... I-2

I.6. 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS

FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014) ........................................... I-4

I.7. 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER

ACTIVITY (MAY 2014) .................................................................................................. I-5

I.8. 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN

FEDERAL TRANSACTIONS (OCT 2010) .................................................................... I-6

I.9. 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT

(MAR 2016) .................................................................................................................... I-10 I.10. 52.203-14 DISPLAY OF HOTLINE POSTER(S) (OCT 2015) .................................... I-14

I.11. 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND

REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER

RIGHTS (APR 2014) ...................................................................................................... I-15

I.12. 52.203-99 PROHIBITION ON CONTRACTING WITH ENTITIES THAT

REQUIRE CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS

(MAR 2015) .................................................................................................................... I-15

I.13. 1452.203-70 RESTRICTION ON ENDORSEMENTS--DEPARTMENT OF THE

INTERIOR (JUL 1996) .................................................................................................. I-16

I.14. 1452.204-70 RELEASE OF CLAIMS -- DEPARTMENT OF THE INTERIOR

(JUL 1996) ...................................................................................................................... I-16

I.15. 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER

FIBER CONTENT PAPER (MAY 2011) ...................................................................... I-16

I.16. 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR

PERSONNEL (JAN 2011) ............................................................................................. I-17

I.17. 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER

SUBCONTRACT AWARDS (OCT 2015) .................................................................... I-17

I.18. 52.204-12 DATA UNIVERSAL NUMBERING SYSTEM NUMBER

MAINTENANCE (DEC 2012)....................................................................................... I-21

I.19. 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE. (JUL

2013) ............................................................................................................................... I-21

I.20. 52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS (JAN 2014) ..... I-23

I.21. 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE

MAINTENANCE (JUL 2015) ........................................................................................ I-24

I.22. 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS

AND CERTIFICATIONS (DEC 2014) .......................................................................... I-25

I.23. 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR

INFORMATION SYSTEMS (JUN 2016) ..................................................................... I-25 ix

Columbia Basin Project, Washington

I.24. 52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN

SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED,

OR PROPOSED FOR DEBARMENT (OCT 2015) ...................................................... I-27

I.25. 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION

REGARDING RESPONSIBILITY MATTERS (JUL 2013) ......................................... I-28

I.26. 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED

DOMESTIC CORPORATIONS (NOV 2015) ............................................................... I-29

I.27. 52.210-1 MARKET RESEARCH (APR 2011) .............................................................. I-30 I.28. 52.214-26 AUDIT AND RECORDS--SEALED BIDDING (OCT 2010) ..................... I-30

I.29. 52.214-27 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR

PRICING DATA--MODIFICATIONS--SEALED BIDDING (AUG 2011) ................. I-31

I.30. 52.214-28 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA

MODIFICATIONS SEALED BIDDING (OCT 2010) .................................................. I-33 I.31. 52.214-29 ORDER OF PRECEDENCE-SEALED BIDDING (JAN 1986) .................. I-34 I.32. 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011) ......... I-34 I.33. 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2014) ............ I-35 I.34. 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2011) ............................ I-37

I.35. 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM

REREPRESENTATION (JUL 2013) ............................................................................. I-37 I.36. 52.222-3 CONVICT LABOR (JUNE 2003) .................................................................. I-39

I.37. 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS

-OVERTIME COMPENSATION (MAY 2014) ............................................................ I-40

I.38. 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (MAY 2014) ............ I-41

I.39. 52.222-7 WITHHOLDING OF FUNDS (MAY 2014) .................................................. I-43 I.40. 52.222-8 PAYROLLS AND BASIC RECORDS (MAY 2014) ..................................... I-44 I.41. 52.222-9 APPRENTICES AND TRAINEES (JULY 2005) .......................................... I-45

I.42. 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB

1988) ............................................................................................................................... I-47 I.43. 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014) ....................... I-47 I.44. 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014) ................... I-48

I.45. 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE

REQUIREMENTS AND RELATED REGULATIONS (MAY 2014) .......................... I-49

I.46. 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988) .............. I-49 I.47. 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2014) .................................... I-49 I.48. 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015).................. I-49 I.49. 52.222-26 EQUAL OPPORTUNITY (APR 2015) ........................................................ I-50

I.50. 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR

CONSTRUCTION (APR 2015) ..................................................................................... I-52 I.51. 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015).......................... I-57

I.52. 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES

(JUL 2014) ...................................................................................................................... I-58 I.53. 52.222-37 EMPLOYMENT REPORTS VETERANS (FEB 2016) ............................... I-58 x

I.54. 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE

NATIONAL LABOR RELATIONS ACT (DEC 2010) ................................................ I-59

I.55. 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015) ...................... I-61 I.56. 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015) ................. I-68

I.57. 52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC

2015) ............................................................................................................................... I-71

I.58. 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS

UNDER SERVICE AND CONSTRUCTION CONTRACTS (SEPT 2013) ................. I-75

I.59. 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL

SAFETY DATA (JAN 1997) ALTERNATE I (JUL 1995) ........................................... I-76

I.60. 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW

INFORMATION (MAY 2011)....................................................................................... I-78 I.61. 52.223-6 DRUG-FREE WORKPLACE (MAY 2001) ................................................... I-78 I.62. 52.223-7 NOTICE OF RADIOACTIVE MATERIALS (JAN 1997) ............................ I-80

I.63. 52.223-11 OZONE-DEPLETING SUBSTANCES AND HIGH GLOBAL

WARMING POTENTIAL HYDROFLUOROCARBONS (JUN 2016) ....................... I-81

I.64. 52.223-15 ENERGY EFFICIENCY IN ENERGY-CONSUMING PRODUCTS

(DEC 2007) ..................................................................................................................... I-82

I.65. 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS

IN SERVICE AND CONSTRUCTION CONTRACTS (MAY 2008) .......................... I-83

I.66. 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT

MESSAGING WHILE DRIVING (AUG 2011) ............................................................ I-84 I.67. 52.223-20 AEROSOLS (JUN 2016)............................................................................... I-84 I.68. 52.223-21 FAOMS (JUN 2016) ..................................................................................... I-85

I.69. WBR 1452.223-80 ASBESTOS-FREE WARRANTY--BUREAU OF

RECLAMATION (OCT 1992) ....................................................................................... I-86

I.70. WBR 1452.223-81 SAFETY AND HEALTH -- BUREAU OF RECLAMATION

(JUNE 2015) ................................................................................................................... I-86

I.71. WBR 1452.223-82 PROTECTING FEDERAL EMPLOYEES AND THE

PUBLIC FROM EXPOSURE TO TOBACCO SMOKE IN THE FEDERAL

WORKPLACE–BUREAU OF RECLAMATION (DEC 2009) .................................... I-87

I.72. 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS (FEB 2016) ........................................................................... I-87

I.73. 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUNE

2008) ............................................................................................................................... I-92

I.74. 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007) ...................................... I-93

I.75. 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND

COPYRIGHT INFRINGEMENT (DEC 2007) .............................................................. I-93

I.76. 52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS (DEC

2007) ............................................................................................................................... I-93 I.77. 52.227-17 RIGHTS IN DATA - SPECIAL WORKS (DEC 2007) ................................ I-94 I.78. 52.228-1 BID GUARANTEE (SEP 1996) ..................................................................... I-95 xi

Columbia Basin Project, Washington

I.79. 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997) ........................................... I-96

I.80. 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION

(JAN 1997)...................................................................................................................... I-96 I.81. 52.228-11 PLEDGE OF ASSETS (JAN 2012) .............................................................. I-97

I.82. 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS

(MAY 2014).................................................................................................................... I-97 I.83. 52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014) ................................ I-97

I.84. 52.228-15 PERFORMANCE AND PAYMENT BONDS-CONSTRUCTION

(OCT 2010) ................................................................................................................... I-101

I.85. 1452.228-70 LIABILITY INSURANCE-DEPARTMENT OF THE INTERIOR

(JUL 1996) .................................................................................................................... I-102

I.86. WBR 1452.228-84 CERTIFICATION OF REPRESENTATIVES FOR

CORPORATE SURETIES--BUREAU OF RECLAMATION (SEP 1996) ................ I-103

I.87. 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013) ............................ I-103

I.88. WBR 1452.231-81 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE

-- BUREAU OF RECLAMATION (JUL 1998) ........................................................... I-105

I.89. 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION

CONTRACTS (MAY 2014) ......................................................................................... I-107 I.90. 52.232-17 INTEREST (MAY 2014) ............................................................................ I-110 I.91. 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014) ............................................... I-111

I.92. 52.232-27 PROMPT PAY FOR CONSTRUCTION CONTRACTS (MAY 2014) ..... I-111

I.93. 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-SYSTEM FOR

AWARD MANAGEMENT (JUL 2013) ...................................................................... I-120

I.94. 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS

(JUN 2013).................................................................................................................... I-121

I.95. 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL

BUSINESS SUBCONTRACTORS (DEC 2013) ......................................................... I-122

I.96. WBR 1452.232-80 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT) --

BUREAU OF RECLAMATION (SEPT 2003) ............................................................ I-122

I.97. WBR 1452.232-81 PAYMENT FOR MOBILIZATION AND PREPARATORY

WORK --BUREAU OF RECLAMATION (MAY 2000) ALTERNATE I (MAY

2000) ............................................................................................................................. I-124

I.98. WBR 1452.232-82 OTHER INVOICE REQUIREMENTS -- BUREAU OF

RECLAMATION (DEC 2002) ..................................................................................... I-126

I.99. PROJECTION OF INVOICES -- PACIFIC NORTHWEST REGION (MAR

2000) ............................................................................................................................. I-126

I.100. 52.233-1 DISPUTES (MAY 2014) ALTERNATE I (DEC 1991) ............................... I-126 I.101. 52.233-3 PROTEST AFTER AWARD (AUG 1996) ................................................... I-128

I.102. 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT

2004) ............................................................................................................................. I-129 I.103. 52.236-2 DIFFERING SITE CONDITIONS (APR 1984) ........................................... I-129 xii

I.104. 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE

WORK (APR 1984) ...................................................................................................... I-129

I.105. 52.236-4 PHYSICAL DATA (APR 1984) ................................................................... I-130 I.106. 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984) ................. I-130 I.107. 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991) ................................... I-130

I.108. 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES,

EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984) ........................... I-131 I.109. 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984) ............................. I-131 I.110. 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984) ......... I-131 I.111. 52.236-12 CLEANING UP (APR 1984) ...................................................................... I-132

I.112. 52.236-13 ACCIDENT PREVENTION (NOV 1991) - ALTERNATE I (NOV

1991) ............................................................................................................................. I-132

I.113. 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB

1997)- ALTERNATE I (APR 1984)............................................................................. I-133 I.114. 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995) ................................ I-134

I.115. WBR 1452.236-84 PRESERVATION OF CULTURAL RESOURCES –

BUREAU OF RECLAMATION (FEB 2000) .............................................................. I-135

I.116. WBR 1452.237-80 SECURITY REQUIREMENTS – BUREAU OF

RECLAMATION (FEBRUARY 2011) ....................................................................... I-137

I.117. PN REGION IMPLEMENTATION OF SECURITY REQUIREMENTS –

CONSTRUCTION CONTRACTS ............................................................................... I-141 I.118. 52.242-13 BANKRUPTCY (JUL 1995)....................................................................... I-143 I.119. 52.243-4 CHANGES (JUNE 2007) .............................................................................. I-143

I.120. WBR 1452.243-80 MODIFICATION PROPOSALS -- BUREAU OF

RECLAMATION (DEC 2001) ALTERNATE III (JUL 1998) .................................... I-144 I.121. 52.244-2 SUBCONTRACTS (OCT 2010) ................................................................... I-145 I.122. 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (JUN 2016) .................. I-147

I.123. 52.248-3 VALUE ENGINEERING—CONSTRUCTION (OCT 2015) -

ALTERNATE I (APR 1984) ........................................................................................ I-149

I.124. 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT

(FIXED-PRICE) (APR 2012)-ALTERNATE I (SEP 1996) ........................................ I-152 I.125. 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)................... I-156 I.126. 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984) ........................ I-157 I.127. 52.253-1 COMPUTER GENERATED FORMS (JAN 1991) ...................................... I-157

PART III LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J LIST OF ATTACHMENTS ......................................................................................... J-1

PART IV REPRESENTATIONS AND INSTRUCTIONS

SECTION K REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS

OF BIDDERS ................................................................................................................ K-1 xiii

Columbia Basin Project, Washington

K.1. 52.203-98, PROHIBITION ON CONTRACTING WITH ENTITIES THAT

REQUIRE CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS—

REPRESENTATION (FEB 2015) - DEVIATION ........................................................ K-1

K.2. 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR

2016) ............................................................................................................................... K-1

SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS ........................L-1 L.1. 52.204-7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013) ................................ L-1

L.2. 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE

REPORTING (JUL 2015)................................................................................................ L-3

L.3. 52.211-3 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA

INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND

COMMERCIAL ITEM DESCRIPTIONS (JUN 1988) .................................................. L-4

L.4. 52.211-6 BRAND NAME OR EQUAL (AUG 1999) (DEVIATION) ........................... L-4

L.5. WBR 1452.211-80 NOTICE OF INTENT TO ACQUIRE METRIC PRODUCTS

AND SERVICES - BUREAU OF RECLAMATION (MAR 1993) ............................... L-5 L.6. 52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS (DEC 1989) ...................... L-6 L.7. 52.214-4 FALSE STATEMENTS IN BIDS (APR 1984) ............................................... L-6 L.8. 52.214-5 SUBMISSION OF BIDS (MAR 1997) ............................................................ L-6 L.9. 52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS (APR 1984) ...................... L-6

L.10. 52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS

OF BIDS (NOV 1999) ..................................................................................................... L-7 L.11. 52.214-12 PREPARATION OF BIDS (APR 1984) ........................................................ L-8 L.12. 52.214-18 PREPARATION OF BIDS--CONSTRUCTION (APR 1984) ...................... L-8

L.13. 52.214-19 CONTRACT AWARD-SEALED BIDDING--CONSTRUCTION

(AUG 1996) ..................................................................................................................... L-9

L.14. 52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR

1991) ................................................................................................................................ L-9 L.15. 52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991) .................. L-9

L.16. FACSIMILE ACKNOWLEDGMENT OF AMENDMENTS, MODIFICATIONS

TO BIDS, AND WITHDRAWALS OF BIDS -- BUREAU OF RECLAMATION

-- PN REGION (JUNE 2016) .......................................................................................... L-9

L.17. 52.216-1 TYPE OF CONTRACT (APR 1984) ............................................................. L-10

L.18. 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY

SITE OF THE WORK (MAY 2014) ............................................................................. L-10

L.19. 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO

ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION

(FEB 1999)..................................................................................................................... L-11

L.20. NON-DISCRIMINATION NOTICE TO U.S. DEPARTMENT OF THE

INTERIOR CONTRACTORS, SUBCONTRACTORS, AND LESSORS --

BUREAU OF RECLAMATION -- PN REGION (JAN 2000) ..................................... L-12 xiv

L.21. 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—

CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY

2014) .............................................................................................................................. L-12

L.22. INVOICING PROJECTION INFORMATION -- PACIFIC NORTHWEST

REGION (MAR 2000) ................................................................................................... L-13

L.23. 52.233-2 SERVICE OF PROTEST – DEPARTMENT OF THE INTERIOR

(SEPT 2006) (DEVIATION) ......................................................................................... L-13

L.24. 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB

1995) .............................................................................................................................. L-14

L.25. WBR 1452.236-80 RESTRICTION ON SUBMISSION AND USE OF EQUAL

PRODUCTS--BUREAU OF RECLAMATION (APR 1992) ....................................... L-15

L.26. WBR 1452.236-85 INSTRUCTION FOR MOBILIZATION AND

PREPARATORY WORK SCHEDULE LINE ITEM -- BUREAU OF

RECLAMATION (MAY 2000) .................................................................................... L-15

L.27. 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984) ................... L-15

SECTION M EVALUATION FACTORS FOR AWARD .............................................................. M-1 M.1. PRICE REASONABLENESS DETERMINATION (MAY 2010) ................................ M-1

M.2. WBR 1452.225-82 NOTICE OF WORLD TRADE ORGANIZATION

GOVERNMENT PROCUREMENT AGREEMENT EVALUATIONS--

BUREAU OF RECLAMATION (MAY 2005) .............................................................. M-1 xv

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040275766

Bureau of Reclamation

Pacific Northwest Region

Regional Office Acquisition Management Division

R10

1150 N. Curtis Road, Ste. 100

Boise ID 83706-1234

Bureau of Reclamation, PN-7208

Attn: R16PS00508 1150 N. Curtis Road, Ste 100 Boise, ID 83706-1234

Matthew Steele 208-378-5342 x

08/02/2016

R16PS00508

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Project Title: Grand Coulee Fire Station, Grand Coulee Dam, Washington.

The specified work on this project has an order of magnitude between $10,000,000 and

$25,000,000.

THIS IS A TOTAL SMALL BUSINESS SET ASIDE.

Block 13a, below, requires submission of 1 complete copy of the Bid--please review provision FAR 52.214-5, Submission of Bids, for the

Bid instructions.

Bids are due in accordance with block 13a below; however, you may submit your bid earlier than the date specified.

NOTE: THE LAST DAY THAT QUESTIONS WILL BE ACCEPTED BY THE GOVERNMENT IS 10 CALENDAR

DAYS PRIOR TO THE BID DUE DATE (SEE BLCOK 13a). ALL QUESIONS MUST BE SUBMITTED TO

THE CONTRACTING OFFICER.

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 548 calendar days and complete it within ________________ ________________ calendar days after receiving

F.1. 52.211-10

09/01/2016

NSN 7540-01-155-3212

x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Bureau of Reclamation Pacific Northwest Region

Regional Office Acquisition Management Division

R10

1150 N. Curtis Road, Ste. 100

Boise ID 83706-1234

Rebecca L. Thomson

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

R16PS00508

Delivery: 12/31/2017

Delivery Location Code: 0009906770

Bureau of Reclamation-PN-GCPO

Grand Coulee - Receiving

Hwy 155 - Warehouse B - Door 6

Industrial Area

Grand Coulee WA 99133 US

FOB: Destination

00010 Grand Coulee Fire Station Construction

(See Price Schedule, CLINs 1 - 2)

Period of Performance: 08/01/2016 to 12/31/2017

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Grand Coulee Dam, Washington

Schedule

B-1

CONTINUATION OF SECTION B – SUPPLIES OR SERVICES AND PRICES

GRAND COULEE FIRE STATION

GRAND COULEE DAM, WASHINGTON

B.1 SCHEDULES

(a) Bids will be considered for award on the following schedules, but no bid will be considered for award on only a part of the schedules.

(b) All bids are subject to the terms and conditions of this solicitation

(c) Definitions:

(1) CLIN – Contract Line Item Number.

(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.

Price Schedule

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

1 WBR

1452.23

2-81

Mobilization and Preparatory Work

For the lump sum of $

2 Grand Coulee Fire Station For the lump sum of $

Total for CLIN 1 and 2 $_________________

SECTION C DESCRIPTION/SPECIFICATIONS

C-1

DIVISION 01 - GENERAL REQUIREMENTS

General Commissioning Requirements 01 09 00 - 1

SECTION 01 09 00

GENERAL COMMISSIONING REQUIREMENTS

PART 1 GENERAL

1.01 PAYMENT

A. Include in lump sum price offered for the Grand Coulee Power Office Fire Station.

1.02 SUMMARY

A. The COR will employ an independent Commissioning Authority. The Commissioning Authority is an independent and knowledgeable third party, hired to verify that the systems work as intended. The Commissioning Authority will inform the COR and the Architect of the results of commissioning and provide recommendations for final acceptance of commissioned systems.

B. Commissioning is the process to verify to the COR that mechanical and electrical systems, as well as other special systems, function together properly to meet the facility performance requirements and design intent as described in the Contract Documents. The Contractor shall be responsible for participation in the commissioning process as outlined below, and in references and attachments throughout the Contract Documents. The Contractor shall furnish labor and materials sufficient to meet all requirements of building commissioning under this Contract.

C. The Commissioning Authority, acting on the behalf of the COR, will be cognizant of the COR’s Facilities Staff's need to be informed and given the opportunity to participate actively in the commissioning process to ensure a complete, thorough turnover of systems once the project is complete. To this end, the Commissioning Authority will ensure that Facilities Personnel are informed of commissioning activity and schedule, and of any coordination issues, such as special testing procedures or opportunity for hands-on training during functional testing.

D. The Commissioning Authority is not authorized to modify, add to, or revoke the requirements of the Contract Documents. A change in the work can only be made as provided in the General Conditions.

E. Specification sections in Division 01, General Requirements (01 09 00);

Division 22 Plumbing (Section 22 08 00, Commissioning of Plumbing);

Division 23, Heating, Ventilating, and Air Conditioning (Section 23 08 00, Commissioning of HVAC); and Division 26, Electrical (Section 26 08 00, Commissioning of Electrical Systems); outline the specific commissioning

01 09 00 - 2 responsibilities of each subcontractor for that division, and also obligate the Contractor to coordinate and manage the commissioning responsibilities of those subcontractors.

1.03 RELATED WORK

A. Drawings and general provisions of Contract, and Division 01 Specification Sections, apply to the work of this section.

B. General requirements for testing agencies as specified in Section 01 46 00, Quality Procedures.

C. Applicable Divisions 03 through 08 sections identify requirement for building enclosure components, installation, testing and demonstration of performance.

D. Applicable Division 22, Plumbing, and Division 23, Heating, Ventilating, and Air Conditioning sections identifying the requirements for plumbing and HVAC systems relating to the installation of mechanical equipment and systems, particularly with respect to equipment and system testing, start-up and performance demonstration/observation. Coordinate with the work of Division 26, Electrical.

E. Applicable Division 26, Electrical sections specifying the requirements for materials and installation of electrical equipment and systems, particularly with respect to equipment and system testing, start-up and performance demonstration/observation. Coordinate with the work of Division 22, Plumbing, and Division 23, Heating, Ventilating, and Air Conditioning.

1.04 TERMS

A. Acceptable Performance: A component or system being able to meet specified design parameters under actual load, including satisfactory documented completion of all functional performance tests, control system trending, and resolution of outstanding issues.

B. Commissioning Authority: An independent and knowledgeable third party hired to verify that the systems achieve acceptable performance.

C. Commissioning Team: The term used to define the overall group associated with performing commissioning work, including designated representatives of the COR, Facilities Staff, Design Professionals, Construction Team, and the Commissioning Authority.

D. Construction Team: The term used to define the overall group responsible for performing the work to complete the work on the Contract Documents, including the Construction Manager, Contractor, the Mechanical Contractor and associated subcontractors, and the Electrical Contractor and associates subcontractors.

01 09 00 - 3

E. Design Intent: Documentation behind design decisions that were made to meet the COR's project requirements. The design intent describes the systems, components, conditions and methods to provide a fully functioning building.

F. Functional Performance Testing: Full range of checks, tests and demonstrations carried out to determine that all components, sub-systems, systems, and interfaces between the systems function in accordance with the Contract Documents. In this context, function includes all modes and sequences of control operation, all interlocks and conditional control responses, and all specified responses to abnormal emergency conditions.

G. COR Project Requirements (OPR): A document developed by the COR, with help of the Commissioning Authority and Design Team. The OPR details the functional requirements of the project, and the expectations of the buildings use and operation as it relates to the systems being commissioned.

1.05 DUTIES OF CONTRACTOR

A. Incorporate commissioning activities into the overall construction schedule.

B. Coordinate participation of the Mechanical, Electrical, Controls, Security, Fire Alarm and TAB Contractors in the commissioning process.

C. Collect and provide to the Commissioning Authority information requested for development of a complete commissioning plan, prefunctional test checklists, Commissioning Field Notebook, and functional test procedures.

D. Review…