R16PS00462_Solicitation_Amendment_4.docx
DOCX document 270 KB Posted
- Attached to
- Design Build Water Treatment Plant Federal contract opportunity
- Solicitation number
- R16PS00462
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 52_00_00_-_Drawings.docx | DOCX document | |
| 00_00_02_-_Drawings_(1).pdf | ||
| 01_20_05_-_Cost_Estimating_Requirements.docx | DOCX document | |
| 00_00_01_-_Specifications.pdf | ||
| 01_86_46_-_Water_Treatment_Performance_Requirements.docx | DOCX document | |
| SF-30.pdf | ||
| R16PS00462_Solicitation_Amendment_5_(2).docx | DOCX document | |
| R16PS00462_Questions_and_Answers_Amendment_5.docx | DOCX document | |
| SF-30.pdf | ||
| Email_-_Re__Phase_2_R16PS00462.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUTTER LATERAL WATER TREATMENT PLANT (DESIGN BUILD)
NAVAJO GALLUP WATER SUPPLY PROJECT, NM
SOLICITATION NO. R16PS00462
FOUR CORNERS CONSTRUCTION OFFICE –
FARMINGTON, NM
ALL OFFERS MUST BE CLEARLY IDENTIFIED AS
“REQUEST FOR PROPOSAL”
TO PRECLUDE MISHANDLING
Offers MUST be delivered to:
| BUREAU OF RECLAMATION |
| ATTN: LESLIE CORPENING, UC-861 |
125 SOUTH STATE STREET
SALT LAKE CITY, UT 84138-1147
PRIOR TO SOLICITATION CLOSING DATE AND TIME
Telephone inquiries regarding this solicitation should be made to the office listed below:
Leslie Corpening Salt Lake City, UT ……….………………………………………. (801) 524-3738
Solicitation No. R16PS00462 Cutter Lateral Water Treatment Plant, NGWSP Page 2
TABLE OF CONTENTS
SECTION A – SF 1442
| SECTION B – SCHEDULE |
| 6 |
| SECTION C – STATEMENT / DESCRIPTION / SPECIFICATION OF WORK |
| 9 |
| SECTION D – PACKAGING AND MARKING |
| 10 |
| SECTION E – INSPECTION AND ACCEPTANCE |
| 11 |
| E.1 |
| Inspection of Construction |
| 11 |
| SECTION F – DELIVERIES OR PERFORMANCE |
| 13 |
| F.1 |
| Commencement, Prosecution, and Completion of Work |
| 13 |
| F.2 |
| Time Extensions |
| 13 |
| F.3 |
| Suspension of Work |
| 13 |
| SECTION G – CONTRACT ADMINISTRATION DATA |
| 15 |
| G.1 |
| Authorities and Delegations |
| 15 |
| G.2 |
| Postaward Conference–Bureau of Reclamation |
| 15 |
| G.3 |
| Electronic Invoicing and Payment Requirements – Internet Payment Platform (IPP) |
| 16 |
| SECTION H – SPECIAL CONTRACT REQUIREMENTS |
| 17 |
| H.1 |
| Contractor Performance Assessment Reporting System |
| 17 |
| H.2 |
| Re-negotiation |
| 18 |
| SECTION I – CONTRACT CLAUSES |
| 19 |
| I.1 |
| Clauses By Reference |
| 19 |
| I.2 |
| Liability Insurance – Department of the Interior |
| 21 |
| I.3 |
| Restriction on Endorsements–Department of the Interior |
| 21 |
| I.4 |
| Release of Claims–Department of the Interior |
| 21 |
| I.5 |
| Examination Of Records By The Department Of The Interior |
| 21 |
| I.6 |
| Utilization of Small Business Concerns |
| 21 |
| I.7 |
| Authorization and Consent |
| 23 |
| I.8 |
| Payments under Fixed-Price Construction Contracts |
| 23 |
| I.9 |
| Prompt Payment for Construction Contracts |
| 25 |
| I.10 |
| Differing Site Conditions |
| 31 |
| I.11 |
| Site Investigation and Conditions Affecting the Work |
| 32 |
| I.12 |
| Other Contracts (DEVIATION) |
| 32 |
| I.13 |
| Changes |
| 32 |
| I.14 |
| Warranty of Construction |
| 33 |
| I.15 |
| Authorized Deviations In Clauses |
| 34 |
| I.16 |
| Safety and Health – Bureau of Reclamation |
| 34 |
| I.17 |
| Protecting Federal Employees and the Public from Exposure to Tobacco Smoke in the Federal Workplace - Bureau of Reclamation |
| 35 |
| I.18 |
| Certification of Representatives for Corporate Sureties – Bureau of Reclamation |
| 35 |
| I.19 |
| Equipment Ownership and Operating Expense – Bureau of Reclamation |
| 36 |
| I.20 |
| Other Invoice Requirements – Bureau of Reclamation |
| 37 |
| I.21 |
| Notice of Proposed Partnering – Bureau of Reclamation |
| 37 |
| I.22 |
| Preservation of Cultural Resources--Bureau of Reclamation |
| 38 |
| I.23 |
| Bid Guarantee |
| 39 |
| I.24 |
| Additional Bond Security |
| 40 |
| I.25 |
| Disputes - Alternate I |
| 40 |
| I.26 |
| Quality Surveys - Alternate I |
| 41 |
| I.27 |
| Prohibition on Release of Information – Bureau of Reclamation |
| 41 |
| I.28 |
| Asbestos-Free Warranty |
| 42 |
| I.29 |
| Modification Proposals – Bureau of Reclamation |
| 42 |
| I.30 |
| Security Requirements – Bureau of Reclamation |
| 43 |
| I.31 |
| Minimum Wages Under Executive Order 13658 |
| 46 |
| I.32 |
| Indian Preference |
| 49 |
| I.33 |
| Indian Preference Program |
| 50 |
| SECTION J – LIST OF ATTACHMENTS AND EXHIBITS |
| 53 |
| SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS |
| 63 |
| K.1 |
| Annual Representations and Certifications |
| 63 |
| K.2 |
| Preparation of Proposals – Construction |
| 65 |
| K.3 |
| Organizational Conflict of Interest – Bureau of Reclamation |
| 65 |
| K.4 |
| Certification Regarding a Felony Conviction Under Any Federal Law or an Unpaid Federal Tax Liability |
| 66 |
| SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS |
| 67 |
| L.1 |
| Clauses By Reference |
| 67 |
| L.2 |
| Use and Disclosure of Proposal Information – Department of the Interior |
| 67 |
| L.3 |
| Type Of Contract |
| 68 |
| L.4 |
| Service Of Protest – Department of the Interior (DEVIATION) |
| 68 |
| L.5 |
| Site Visit (Construction) Alternative I |
| 69 |
| L.6 |
| General Proposal Instructions – Bureau of Reclamation |
| 69 |
| L.7 |
| Pricing Proposal Instructions – Bureau of Reclamation |
| 81 |
| L.8 |
| Authorized Deviations in Provisions |
| 82 |
| L.9 |
| Notice of Intent to Acquire Metric Products and Services – Bureau of Reclamation |
| 82 |
| L.10 |
| Source Evaluation and Selection Procedures |
| 83 |
| L.11 |
| Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction |
| 85 |
| L.12 |
| Non-Discrimination Notice to U.S. Department of the Interior Contractors, Subcontractors, and Lessors |
| 86 |
| L.13 |
| Authorized Workers Notice to Potential Bureau of Reclamation Contractors |
| 86 |
| L.14 |
| Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements |
| 88 |
| SECTION M – EVALUATION FACTORS FOR AWARD |
| 89 |
| M.1 |
| Evaluation Factors for Award - Quality Predominance - Bureau of Reclamation |
| 89 |
| M.2 |
| Notice of World trade Organizations Government Procurement Agreement Evaluations |
| 94 |
| M.3 |
| Notice of Buy American Act Requirement - Construction Materials |
| 94 |
| Solicitation No. R16PS00462 Cutter Lateral Water Treatment Plant, NGWSP | |
| Page 8 |
SECTION A – SF-1442
INSERT SF-1442
SECTION B – SCHEDULE
SCHEDULE
Offerors shall furnish the items identified in this Section, in accordance with the terms, conditions, and specifications contained in the contract.
Offerors are cautioned to carefully review the proposal submission requirements contained in Section L. Failure to comply with these requirements may result in an offer being determined technically unacceptable.
Offerors shall complete Table A, Price Schedule A, and Price Schedule B with their proposal in response to the Phase 2 RFP. No Price Schedules shall be submitted with Phase 1 Request for Qualifications / Statement of Qualifications.
In Phase 2, offerors shall complete Table A – Overhead and Profit to submit with Price Schedule A.
The contract will be awarded to the offeror as detailed in Sections L and M. The award of the contract will be based upon the combination of Price Schedule A, Overhead and Profit, and technical proposals which provides the best value to the Government.
The offeror awarded the contract shall complete Price Schedule B after completing the 60 percent design as detailed in Section C – Technical Criteria Package and Summary of Work. See Section H for the re-negotiation clause for more information on Schedule B.
Definitions:
CLIN – Contract Line Item Number
CONTINUATION OF SECTION B OF THE SF-1442
Purpose: The following Schedules (continuation of Section B of the SF-1442) provides a pricing breakdown of the CLINs for the purpose of tracking work completed and preparing invoices.
PHASE 1
No pricing information shall be submitted with the Phase 1 Request for Qualifications / Statement of Qualifications
PHASE 2
All of the following (Table A, Price Schedule A, and Price Schedule B) shall be submitted by the offerors on the short list for Phase 2.
TABLE A – OVERHEAD AND PROFIT
| ITEM # |
| CATEGORY |
| DESIGN (%) |
| CONSTRUCTION (%) |
| 1 |
| Job Management/General/Field Overhead Costs |
| 2 |
| Bonds & Insurance |
| 3 |
| Home Office Overhead (General & Administrative) |
| 4 |
| Profit |
PRICE SCHEDULE A
| CLIN |
| SECTION |
| SUPPLIES OR SERVICE |
| QUANTITY & UNIT |
| UNIT PRICE |
| AMOUNT |
| A1 |
| 01 81 05 (1.01 A) |
| 60% Design of Water Treatment Plant and Reach 21 Associated Items* |
| For the lump sum of |
| $ |
| TOTAL FOR PRICE SCHEDULE A |
| $ |
PRICE SCHEDULE B
| CLIN |
| SECTION |
| SUPPLIES OR SERVICE |
| QUANTITY & UNIT |
| UNIT PRICE |
| AMOUNT |
| B1 |
| 01 81 05 (1.01 B-C) |
01 86 46
| Final Design, Construction of Water Treatment Plant and Reach 21 Associated Items, Operations & Maintenance of Water Treatment Plant for Initial 6-month Period, and Training |
| For the lump sum of* |
| $ |
| TOTAL FOR PRICE SCHEDULE B |
| $ |
*The total for Price Schedule B is $37,000,000.00 subtract Price Schedule A. Price Schedule B will be re-negotiated at 60% design for a guaranteed maximum price (see Section H for the re-negotiation clause).
| TOTAL FOR PRICE SCHEDULE A & B (TARGET PRICE) |
| $37,000,00.00 |
SECTION C – STATEMENT / DESCRIPTION / SPECIFICATION OF WORK
See the following website for the statement of work, including Technical Criteria Package (performance specifications) in its entirety. Also, see Section J.
http://www.usbr.gov/uc/progact/contracts/temp/R16PS00462/index.html
SECTION D – PACKAGING AND MARKING
There are no clauses included in this section.
SECTION E – INSPECTION AND ACCEPTANCE
| E.1 |
| 52.246-12 |
| INSPECTION OF CONSTRUCTION |
| AUGUST 1996 |
(a) Definition - “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not –
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may –
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
SECTION F – DELIVERIES OR PERFORMANCE
| F.1 |
| 52.211-10 |
| COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK |
| APRIL 1984 |
The Contractor shall be required to
(a) commence design work under this contract within 15 calendar days after the date the Contractor receives the notice of award, and commence on-site construction work after Price Schedule B has been re-negotiated and agreement reached and necessary approvals given for components of the construction;
(b) prosecute the work diligently, and
(c) complete the construction of the Water Treatment Plant and Reach 21 associated items ready for use not later than 30 months from the design work award, and complete the Operation and Maintenance of the Water Treatment Plant and Training for the initial 6-month period after the completion of the construction. The time stated for completion shall include final cleanup of the premises.
| F.2 |
| 52.211-13 |
| TIME EXTENSIONS |
| SEPTEMBER 2000 |
Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule.
| F.3 |
| 52.242-14 |
| SUSPENSION OF WORK |
| APRIL 1984 |
(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.
(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1) by an act of the Contracting Officer in the administration of this contract, or (2) by the Contracting Officer's failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly. However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.
(c) A claim under this clause shall not be allowed--
(1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order); and
(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.
SECTION G – CONTRACT ADMINISTRATION DATA
| G.1 |
| 1452.201-70 |
| AUTHORITIES AND DELEGATIONS |
| SEPTEMBER 2011 |
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
| G.2 |
| WBR 1452.242-80 |
| POSTAWARD CONFERENCE – BUREAU OF RECLAMATION |
| JULY 1993 |
(a) Prior to the Contractor starting work, a Postaward conference (as described in FAR Subpart 42.5), will be convened by the contracting activity or contract administration office. The Contractor's Project Manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.
(b) The conference will be held at the Four Corners Construction Office, Farmington, New Mexico.
(c) The Contracting Officer and the Contractor will agree to the date and time of the conference after award of the contract. In event of a conflict in schedules, the Contracting Officer shall establish the date for the conference.
(d) The Contractor shall include any associated costs for attendance at the conference in its offer.
| G.3 |
| DOI AAAP 0028 |
| ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INTERNET PAYMENT PLATFORM (IPP) |
| APRIL 2013 |
Payment requests must be submitted electronically through the U. S. Department of the Treasury’s Invoice Processing Platform System (IPP).
"Payment requests" means any request for contract financing payment or invoicing payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions-Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
The Contractor shall also submit an electronic copy of the IPP invoice to the Contract Specialist/Contracting Officer, Leslie Corpening, at lcorpening@usbr.gov and Walter Shaw, wshaw@usbr.gov once the invoice has been submitted to IPP. Failure to email the invoice may cause significant delay or possible rejection of your payment request.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in CCR) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3-5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
SECTION H – SPECIAL CONTRACT REQUIREMENTS
| H.1 |
| DOI AAP 0050 |
| CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM |
| DEC 2015 |
1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2) The past performance evaluation process is a totally paperless processing using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
3) We request that you furnish to Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to your firms' past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The information in the report must be protected as source selection sensitive information not releasable to the public.
4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically-generated email with detailed login instructions. Further details, system requirements, and training information for CPARS is available at http://www.cpars.gov.
5) Within 60 days after the end of a performance period, the Contracting Officer will complete an interim or final past performance evaluation and the report will be accessible at http://www.cpars.gov/.
a) Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.
b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
c) All information provided should be reviewed for accuracy prior to submission.
d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in Block 22, and then selecting “Accept the Ratings and Close the Evaluation”.
e) Your response is due 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f) If you do not sign and submit the CPAR within 630 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6) The following guidelines apply concerning your use of the past performance evaluation:
a. Protect the evaluation as "source selection information." After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS< contact the Contracting Officer for instructions.
b. Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c. Prohibit the use of or reference to evaluation data for advertised, promotional material, preaward surveys, responsibility determinations, production readiness reviews, or other similar purposes.
7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the Contracting Officer no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60 - day review period.
8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
H.2
RE-NEGOTIATION
At 60% design, or sooner if both parties are in agreement, a firm fixed price will be re-negotiated for the items in Price Schedule B which includes final design, construction of the Water Treatment Plant and Reach 21 associated items, operations & maintenance of water treatment plant for the initial 6-month period post construction, and training.
SECTION I – CONTRACT CLAUSES
| I.1 |
| 52.252-02 |
| CLAUSES INCORPORATED BY REFERENCE |
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following addresses:
FAR Clauses - https://www.acquisition.gov/far/ DOI Clauses - http://www.doi.gov/pam/aindex.html
| Clause |
| Title |
| Date |
| 52.201-01 |
| Definitions |
| November 2013 |
| 52.203-03 |
| Gratuities |
| April 1984 |
| 52.203-05 |
| Covenant Against Contingent Fees |
| May 2014 |
| 52.203-06 |
| Restrictions on Subcontractor Sales to the Government |
| Sep 2006 |
| 52.203-07 |
| Anti-Kickback Procedures |
| May 2014 |
| 52.203-08 |
| Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity |
| May 2014 |
| 52.203-10 |
| Price Or Fee Adjustment For Illegal Or Improper Activity |
| May 2014 |
| 52.203-12 |
| Limitation On Payments To Influence Certain Federal Transactions |
| October 2010 |
| 52.203-13 |
| Contractor Code of Business Ethics and Conduct |
| April 2010 |
| 52.203-14 |
| Display of Hotline Poster(s) |
| December 2007 |
| 52.203-17 |
| Contractor Employee Whistleblower Rights and Requirements To Inform Employees of Whistleblower Rights |
| April 2014 |
| 52.203-99 |
| Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements (Deviation 2015-02) |
| March 2015 |
| 52.204-04 |
| Printed or Copied Double-Sided on Post Consumer Fiber Content Paper |
| May 2011 |
| 52.204-10 |
| Reporting Executive Compensation and First-Tier Subcontract Awards |
| July 2013 |
| 52.204-13 |
| System for Award Management Maintenance |
| July 2013 |
| 52.209-06 |
| Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment |
| August 2013 |
| 52.215-02 |
| Audit and Records--Negotiation |
| October 2010 |
| 52.215-08 |
| Order of Precedence--Uniform Contract Format |
| October 1997 |
| 52.222-01 |
| Notice To The Government Of Labor Disputes |
| February 1997 |
| 52.222-03 |
| Convict Labor |
| June 2003 |
| 52.222-04 |
| Contract Work Hours and Safety Standards Act - Overtime Compensation |
| May 2014 |
| 52.222-06 |
| Construction Wage Rate Requirements |
| May 2014 |
| 52.222-07 |
| Withholding of Funds |
| May 2014. |
| 52.222-08 |
| Payrolls and Basic Records |
| May 2014 |
| 52.222-09 |
| Apprentices and Trainees |
| July 2005 |
| 52.222-10 |
| Compliance with Copeland Act Requirements |
| February 1988 |
| 52.222-11 |
| Subcontracts (Labor Standards) |
| May 2014 |
| 52.222-12 |
| Contract Termination-Debarment |
| February 1988 |
| 52.222-13 |
| Compliance with Construction Wage Rate Requirements |
| May 2014 |
| 52.222-14 |
| Disputes Concerning Labor Standards |
| February 1988 |
| 52.222-15 |
| Certification of Eligibility |
| May 2014 |
| 52.222-21 |
| Prohibition of Segregated Facilities |
| April 2015 |
| 52.222-26 |
| Equal Opportunity |
| April 2015 |
| 52.222-27 |
| Affirmative Action Compliance Requirements for Construction |
| April 2015 |
| 52.222-35 |
| Equal Opportunity for Veterans |
| October 2015 |
| 52.222-36 |
| Affirmative Action For Workers with Disabilities |
| July 2014 |
| 52.222-37 |
| Employment Reports Veterans |
| February 2016 |
| 52.222-40 |
| Notification of Employee Rights Under the National Labor Relations Act |
| December 2010 |
| 52.222-50 |
| Combating Trafficking in Persons |
| March 2015 |
| 52.222-54 |
| Employment Eligibility Verification |
| October 2015 |
| 52.222-55 |
| Minimum Wages Under Executive Order 13658 |
| December 2015 |
| 52.223-02 |
| Affirmative Procurement of Biobased Products Under Service and Construction Contracts |
| September 2013 |
| 52.223-03 A1 |
| Hazardous Material Identification and Material Safety Data (Jan 1997) - Alternate I |
| July 1995 |
| 52.223-05 |
| Pollution Prevention and Right-to-Know Information |
| May 2011 |
| 52.223-06 |
| Drug Free Workplace |
| May 2001 |
| 52.223-18 |
| Encouraging Contractor Policies to Ban text Messaging While Driving |
| August 2011 |
| 52.225-09 |
| Buy American Act – Construction Materials |
| May 2014 |
| 52.225-13 |
| Restrictions on Certain Foreign Purchases |
| June 2008 |
| 52.225-14 |
| Inconsistency Between English Version And Translation Of Contract |
| February 2000 |
| 52.226-01 |
| Utilization of Indian Organizations and Indian-Owned Economic Enterprises |
| June 2000 |
| 52.228-05 |
| Insurance – Work on a Government Installation |
| January 1997 |
| 52.228-11 |
| Pledges Of Assets |
| January 2012 |
| 52.228-12 |
| Prospective Subcontractor Requests for Bonds |
| May 2014 |
| 52.228-14 |
| Irrevocable Letter of Credit |
| November 2014 |
| 52.228-15 |
| Performance and Payment Bonds--Construction |
| October 2010 |
| 52.229-03 |
| Federal, State And Local Taxes |
| February 2013 |
| 52.230-02 |
| Cost Accounting Standards |
| May 2014 |
| 52.230-03 |
| Disclosure And Consistency Of Cost Accounting Practices |
| May 2014 |
| 52.230-06 |
| Administration of Cost Accounting Standards (Apr 2005) |
| June 2010 |
| 52.232-17 |
| Interest |
| May 2014 |
| 52.232-23 |
| Assignment Of Claims |
| May 2014 |
| 52.232-33 |
| Payment by Electronic Funds Transfer – System for Award Management |
| July 2013 |
| 52.232-39 |
| Unenforceability of Unauthorized Obligations |
| June 2013 |
| 52.232-40 |
| Providing Accelerated Payment to Small Business Subcontractors |
| December 2013 |
| 52.233-01 A1 |
| Disputes - Alternate I |
| May 2014 |
| 52.233-03 |
| Protest After Award |
| August 1996 |
| 52.233-04 |
| Applicable Law for Breach of Contract Claim |
| October 2004 |
| 52.236-05 |
| Material and Workmanship |
| April 1984 |
| 52.236-06 |
| Superintendence by the Contractor |
| April 1984 |
| 52.236-07 |
| Permits and Responsibilities |
| November 1991 |
| 52.236-09 |
| Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements |
| April 1984 |
| 52.236-10 |
| Operations and Storage Areas |
| April 1984 |
| 52.236-11 |
| Use and Possession Prior to Completion |
| April 1984 |
| 52.236-12 |
| Cleaning Up |
| April 1984 |
| 52.236-13 |
| Accident Prevention |
| November 1991 |
| 52.236-14 |
| Availability and Use of Utility Services |
| April 1984 |
| 52.236-15 |
| Schedules for Construction Contracts |
| April 1984 |
| 52.236-16 |
| Quantity Surveys |
| April 1984 |
| 52.236-17 |
| Layout of Work |
| April 1984 |
| 52.236-26 |
| Preconstruction Conference |
| February 1995 |
| 52.242-13 |
| Bankruptcy |
| July 1995 |
| 52.244-06 |
| Subcontracts for Commercial Items |
| February 2016 |
| 52.245-01 A1 |
| Government Property – Alternate 1 |
| April 2012 |
| 52.245-09 |
| Use and Charges |
| April 2012 |
| 52.248-03 |
| Value Engineering-Construction |
| October 2010 |
| 52.249-02 A1 |
| Termination for Convenience of the Government (Fixed-Price) - Alternate I |
| September 1996 |
| 52.249-10 |
| Default (Fixed-Price Construction) |
| April 1984 |
| 52.252-04 |
| Alterations in Contract |
| April 1984 |
| 52.253-01 |
| Computer Generated Forms |
| January 1991 |
| I.2 |
| 1452.228-70 |
| LIABILITY INSURANCE – DEPARTMENT OF THE INTERIOR |
| JULY 1996 |
(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:
| Worker’s Compensation and Employer’s Liability: | $100,000.00 each person |
| General Liability: | $500,000.00 each occurrence |
| Automotive Liability: | $200,000.00 each person, $500,000.00 each occurrence, $20,000.00 property damage |
(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.
| I.3 |
| 1452.203-70 |
| RESTRICTION ON ENDORSEMENTS – DEPARTMENT OF THE INTERIOR |
| JULY 1996 |
The Contractor shall not refer to contracts awarded by the Department of the Interior in commercial advertising, as defined in FAR 31.205-1, in a manner which states or implies that the product or service provided is approved or endorsed by the Government, or is considered by the Government to be superior to other products or services. This restriction is intended to avoid the appearance of preference by the Government toward any product or service. The Contractor may request the Contracting Officer to make a determination as to the propriety of promotional material.
| I.4 |
| 1452.204-70 |
| RELEASE OF CLAIMS – DEPARTMENT OF THE INTERIOR |
| JULY 1996 |
After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.
| I.5 |
| 1452.215-70 |
| EXAMINATION OF RECORDS BY THE DEPARTMENT OF THE INTERIOR |
| APRIL 1984 |
For purposes of the Examination of Records by the Comptroller General clause of this contract (FAR 52.215-1), the Secretary of the Interior, the Inspector General, and their duly authorized representative(s) from the Department of the Interior shall have the same access and examination rights as the Comptroller General of the United States.
| I.6 |
| 52.219-08 |
| UTILIZATION OF SMALL BUSINESS CONCERNS |
| OCT 2014 |
(a) It is the policy of the United States that small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns shall have the maximum practicable opportunity to participate in performing contracts let by any Federal agency, including contracts and subcontracts for subsystems, assemblies, components, and related services for major systems. It is further the policy of the United States that its prime contractors establish procedures to ensure the timely payment of amounts due pursuant to the terms of their subcontracts with small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns.
(b) The Contractor hereby agrees to carry out this policy in the awarding of subcontracts to the fullest extent consistent with efficient contract performance. The Contractor further agrees to cooperate in any studies or surveys as may be conducted by the United States Small Business Administration or the awarding agency of the United States as may be necessary to determine the extent of the Contractor's compliance with this clause.
(c) Definitions. As used in this contract—
HUBZone small business concern means a small business concern that appears on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration.
“Service-disabled veteran-owned small business concern” —
(1) Means a small business concern —
(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans; and
(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran.
(2) Service-disabled veteran means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16). “Small business concern” means a small business as defined pursuant to Section 3 of the Small Business Act and relevant regulations promulgated pursuant thereto. “Small disadvantaged business concern” means a small business concern that represents, as part of its offer that —
(1) (i) It has received certification as a small disadvantaged business concern consistent with 13 CFR part 124, Subpart B;
(ii) No material change in disadvantaged ownership and control has occurred since its certification;
(iii) Where the concern is owned by one or more individuals, the net worth of each individual upon whom the certification is based does not exceed $750,000 after taking into account the applicable exclusions set forth at 13 CFR 124.104(c)(2); and
(iv) It is identified, on the date of its representation, as a certified small disadvantaged business in the CCR Dynamic Small Business Search database maintained by the Small Business Administration, or
(2) It represents in writing that it qualifies as a small disadvantaged business (SDB) for any Federal subcontracting program, and believes in good faith that it is owned and controlled by one or more socially and economically disadvantaged individuals and meets the SDB eligibility criteria of 13 CFR 124.1002.
“Veteran-owned small business concern” means a small business concern —
(1) Not less than 51 percent of which is owned by one or more veterans (as defined at 38 U.S.C. 101(2)) or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more veterans; and
(2) The management and daily business operations of which are controlled by one or more veterans.
“Women-owned small business concern” means a small business concern —
(1) That is at least 51 percent owned by one or more women, or, in the case of any publicly owned business, at least 51 percent of the stock of which is owned by one or more women; and
(2) Whose management and daily business operations are controlled by one or more women.
(d) (1) Contractors acting in good faith may rely on written representations by their subcontractors regarding their status as a small business concern, a veteran-owned small business concern, a service-disabled veteran-owned small business concern, a small disadvantaged business concern, or a women-owned small business concern.
(2) The Contractor shall confirm that a subcontractor representing itself as a HUBZone small business concern is certified by SBA as a HUBZone small business concern by accessing the Central Contractor Registration (CCR) database or by contacting the SBA. Options for contacting the SBA include —
(i) HUBZone small business database search application Web page at http://dsbs.sba.gov/dsbs/search/dsp_searchhubzone.cfm ; or http://www.sba.gov/hubzone;
(ii) In writing to the Director/HUB, U.S. Small Business Administration, 409 3rd Street, SW., Washington DC 20416; or
(iii) The SBA HUBZone Help Desk at hubzone@sba.gov .
| I.7 |
| 52.227-01 |
| AUTHORIZATION AND CONSENT |
| DECEMBER 2007 |
(a) The Government authorizes and consents to all use and manufacture, in performing this contract or any subcontract at any tier, of any invention described in and covered by a United States patent-
(1) Embodied in the structure or composition of any article the delivery of which is accepted by the Government under this contract; or
(2) Used in machinery, tools, or methods whose use necessarily results from compliance by the Contractor or a subcontractor with
(i) Specifications or written provisions forming a part of this contract or
(ii) Specific written instructions given by the Contracting Officer directing the manner of performance. the entire liability to the Government for infringement of a United States patent shall be determined solely by the provisions of the indemnity clause, if any, included in this contract or any subcontract hereunder (including any lower-tier subcontract), and the Government assumes liability for all other infringement to the extent of the authorization and consent hereinabove granted.
(b) The Contractor shall include the substance of this clause, including this paragraph (b), in all subcontracts that are expected to exceed the simplified acquisition threshold. However, omission of this clause from any subcontract, including those at or below the simplified acquisition threshold, does not affect this authorization and consent.
| I.8 |
| 52.232-05 |
| PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS |
| MAY 2014 |
(a) Payment of price. The Government shall pay the Contractor the contract price as provided in this contract.
(b) Progress payments. The Government shall make progress payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer, on estimates of work accomplished which meets the standards of quality established under the contract, as approved by the Contracting Officer.
(1) The Contractor’s request for progress payments shall include the following substantiation:
(i) An itemization of the amounts requested, related to the various elements of work required by the contract covered by the payment requested.
(ii) A listing of the amount included for work performed by each subcontractor under the contract.
(iii) A listing of the total amount of each subcontract under the contract. (iv) A listing of the amounts previously paid to each such subcontractor under the contract.
(v) Additional supporting data in a form and detail required by the Contracting Officer.
(2) In the preparation of estimates, the Contracting Officer may authorize material delivered on the site and preparatory work done to be taken into consideration. Material delivered to the Contractor at locations other than the site also may be taken into consideration if—
(i) Consideration is specifically authorized by this contract; and
(ii) The Contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform this contract.
(c) Contractor certification. Along with each request for progress payments, the Contractor shall furnish the following certification, or payment shall not be made: (However, if the Contractor elects to delete paragraph (c)(4) from the certification, the certification is still acceptable.)
I hereby certify, to the best of my knowledge and belief, that—
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
(4) This certification is not to be construed as final acceptance of a subcontractor’s performance.
(Name)
(Title)
(Date)
(d) Refund of unearned amounts. If the Contractor, after making a certified request for progress payments, discovers that a portion or all of such request constitutes a payment for performance by the Contractor that fails to conform to the specifications, terms, and conditions of this contract (hereinafter referred to as the “unearned amount”), the Contractor shall—
(1) Notify the Contracting Officer of such performance deficiency; and
(2) Be obligated to pay the Government an amount (computed by the Contracting Officer in the manner provided in paragraph (j) of this clause) equal to interest on the unearned amount from the 8th day after the date of receipt of the unearned amount until—
(i) The date the Contractor notifies the Contracting Officer that the performance deficiency has been corrected; or
(ii) The date the Contractor reduces the amount of any subsequent certified request for progress payments by an amount equal to the unearned amount.
(e) Retainage. If the Contracting Officer finds that satisfactory progress was achieved during any period for which a progress payment is to be made, the Contracting Officer shall authorize payment to be made in full. However, if satisfactory progress has not been made, the Contracting Officer may retain a maximum of 10 percent of the amount of the payment until satisfactory progress is achieved. When the work is substantially complete, the Contracting Officer may retain from previously withheld funds and future progress payments that amount the Contracting Officer considers adequate for protection of the Government and shall release to the Contractor all the remaining withheld funds. Also, on completion and acceptance of each separate building, public work, or other division of the contract, for which the price is stated separately in the contract, payment shall be made for the completed work without retention of a percentage.
(f) Title, liability, and reservation of rights. All material and work covered by progress payments made shall, at the time of payment, become the sole property of the Government, but this shall not be construed as—
(1) Relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration of any damaged work; or
(2) Waiving the right of the Government to require the fulfillment of all of the terms of the contract.
(g) Reimbursement for bond premiums. In making these progress payments, the Government shall, upon request, reimburse the Contractor for the amount of premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable) after the Contractor has furnished evidence of full payment to the surety. The retainage provisions in paragraph (e) of this clause shall not apply to that portion of progress payments attributable to bond premiums.
(h) Final payment. The Government shall pay the amount due the Contractor under this contract after—
(1) Completion and acceptance of all work;
(2) Presentation of a properly executed voucher; and
(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release. A release may also be required of the assignee if the Contractor’s claim to amounts payable under this contract has been assigned under the Assignment of Claims Act of 1940 (31 U.S.C. 3727 and 41 U.S.C. 6305).
(i) Limitation because of undefinitized work. Notwithstanding any provision of this contract, progress payments shall not exceed 80 percent on work accomplished on undefinitized contract actions. A “contract action” is any action resulting in a contract, as defined in FAR Subpart 2.1, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the Changes clause, or funding and other administrative changes.
(j) Interest computation on unearned amounts. In accordance with 31 U.S.C. 3903(c)(1), the amount payable under paragraph (d)(2) of this clause shall be—
(1) Computed at the rate of average bond equivalent rates of 91-day Treasury bills auctioned at the most recent auction of such bills prior to the date the Contractor receives the unearned amount; and
(2) Deducted from the next available payment to the Contractor.
| I.9 |
| 52.232-27 |
| PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS |
| MAY 2014 |
Notwithstanding any other payment terms in this contract, the Government will make invoice payments under the terms and conditions specified in this clause. The Government considers payment as being made on the day a check is dated or the date of an electronic funds transfer. Definitions of pertinent terms are set forth in sections 2.101, 32.001, and 32.902 of the Federal Acquisition Regulation. All days referred to in this clause are calendar days, unless otherwise specified. (However, see paragraph (a)(3) concerning payments due on Saturdays, Sundays, and legal holidays).
(a) Invoice payments—
(1) Types of invoice payments. For purposes of this clause, there are several types of invoice payments that may occur under this contract, as follows:
(i) Progress payments, if provided for elsewhere in this contract, based on Contracting Officer approval of the estimated amount and value of work or services performed, including payments for reaching milestones in any project.
(A) The due date for making such payments is 14 days after the designated billing office receives a proper payment request. If the designated billing office fails to annotate the payment request with the actual date of receipt at the time of receipt, the payment due date is the 14th day after the date of the Contractor’s payment request, provided the designated billing office receives a proper payment request and there is no disagreement over quantity, quality, or Contractor compliance with contract requirements.
(B) The due date for payment of any amounts retained by the Contracting Officer in accordance with the clause at 52.232-5, Payments Under Fixed-Price Construction Contracts, is as specified in the contract or, if not specified, 30 days after approval by the Contracting Officer for release to the Contractor.
(ii) Final payments based on completion and acceptance of all work and presentation of release of all claims against the Government arising by virtue of the contract, and payments for partial deliveries that have been accepted by the Government (e.g., each separate building, public work, or other division of the contract for which the price is stated separately in the contract).
(A) The due date for making such…
This is the start of the file's text. The full file is on GovTribe.