52_00_00_-_Drawings.docx

DOCX document 26 KB Posted

Attached to
Design Build Water Treatment Plant Federal contract opportunity
Solicitation number
R16PS00462
Issued by
Department of the Interior Bureau of Reclamation

About this file

52 00 00 Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Design Build Water Treatment Plant, newest first.
File Type Posted
00_00_02_-_Drawings_(1).pdf PDF
00_00_01_-_Specifications.pdf PDF
01_86_46_-_Water_Treatment_Performance_Requirements.docx DOCX document
SF-30.pdf PDF
01_20_05_-_Cost_Estimating_Requirements.docx DOCX document
R16PS00462_Solicitation_Amendment_5_(2).docx DOCX document
R16PS00462_Questions_and_Answers_Amendment_5.docx DOCX document
SF-30.pdf PDF
R16PS00462_Solicitation_Amendment_4.docx DOCX document
Email_-_Re__Phase_2_R16PS00462.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Navajo Gallup Water Supply Project Cutter Lateral - Water Treatment Plant and Reach 21 Solicitation No.

SECTION 52 00 00

DRAWINGS

GENERAL

DISCREPANCIES, ERRORS, OR OMISSIONS

Inform the CO of discrepancies discovered on drawings in accordance with clause at FAR 52.236-21, Specifications and Drawings for Construction. Promptly inform the CO of discrepancies discovered on the drawings. The CO will make a determination in writing. Any adjustment by the Contractor without such a determination shall be at its own risk and expense.

PROJECT CONDITIONS

Where there are differences as determined by the CO between details and dimensions shown on drawings and details and dimensions of existing features at jobsite, use details and dimensions of existing features at jobsite.

INFORMATION DRAWINGS

Drawings marked "For Information Only" in the drawing list are included to show existing features about which knowledge is required to perform work under this contract. These drawings do not show work to be performed under this contract.

If there are differences as determined by the CO between details and dimensions shown on these drawings and those of existing features at jobsite, use details and dimensions of existing features at jobsite.

STANDARD DRAWINGS

Standard drawings may show details which are not a part of work under this contract. Disregard details shown on these drawings which are not applicable to work under this contract.

COPIES OF DRAWINGS

One set of fullsize (22 inches by 34 inches) drawings, except standard drawings, will be furnished to the Contractor.

Upon request, additional half-size (11 inches by 17 inches) copies of standard drawings will be furnished to the Contractor.

LIST OF DRAWINGS

Drawings listed in Table 52 00 00A - List of Drawings, are made a part of Section C - Description/Specifications.

PRODUCTS

Not Used

EXECUTION

Not Used

Table 52 00 00A - List of Drawings

Sheet No.
Drawing No.
Title

General:

1
1695-529-401
General Map
2
1695-529-2101
Project Location Map
3
1695-529-2103
Reach 21 – Right-of-Way Exhibit Maps

Information Drawings:

4
1695-D-Figure 1
Line Pipe – Site Plan
5
1695-D-Figure 2
System Profile – Plan and Profile – Beginning to Sta. 23100+00 – Sheet 1 of 5
6
1695-D-Figure 3
Plan and Profile – Sta. 23100+00 to Sta. 23150+00 – Sheet 2 of 5
7
1695-D-Figure 4
Plan and Profile – Station 23150+00 to Sta. 23200+00 – Sheet 3 of 5
8
1695-D-Figure 5
Plan and Profile – Station 23200+00 to Sta. 23250+00 – Sheet 4 of 5
9
1695-D-Figure 6
Plan and Profile – Sta. 23250+00 to End – Sheet 5 of 5
10
1695-D-Figure 7
Phase 3 Connection – Steel Pipe - Plan
10A
C-12
Eastern Navajo Water Pipeline - Cutter Lateral Phase 3 – As-Built Plan and Profile –

Sta 0+00 to 25+00

10B
C-13
Eastern Navajo Water Pipeline - Cutter Lateral Phase 3 – As-Built Plan and Profile –

Sta 25+00 to 51+25

10C
C-48
Eastern Navajo Water Pipeline - Cutter Lateral Phase 3 – As-Built – DZ Tanks Piping Plan
11
1695-D-355
Cathodic Protection - Test Station and Junction Box
11A
1695-D-60095
Cutter Lateral SCADA Systems Integration Overview

Process Instrumentation and Sampling Plan Schematic Example

Cutter Reservoir – Water Quality Data

Pipe Schedule

Standard Drawings:

15
40-D-6032
Induction Motors – Design and Nameplate Data to be Furnished by Contractor

END OF SECTION

Drawings 52 00 00 - 1