R15PS00361_Solicitation_Package.pdf

PDF 11 MB Posted

Attached to
Anderson Ranch Powerplant Service Station Replacement Federal contract opportunity
Solicitation number
R15PS00361
Issued by
Department of the Interior Bureau of Reclamation

About this file

Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Anderson Ranch Powerplant Service Station Replacement, newest first.
File Type Posted
Sol_R15PS00361_Amd_000006.pdf PDF
Replacement_Pages_MOD_6.pdf PDF
Replacement_Pages_MOD_005.pdf PDF
Sol_R15PS00361_Amd_000005.pdf PDF
Revised_Pages_-_MOD_004.pdf PDF
Sol_R15PS00361_Amd_000004.pdf PDF
361AndersonRanchPPStationServiceReplacement_amd_003.pdf PDF
Sol_R15PS00361_Amd_000003.pdf PDF
Pre-Bid_Sign_In.pdf PDF
Drawings.pdf PDF
Sol_R15PS00361.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of the Interior Bureau of Reclamation Technical Service Center Denver, Colorado April 2015

Solicitation No. R15PS00361

Anderson Ranch Powerplant Service Station Replacement

Boise Project, Idaho

Anderson Ranch Powerplant Service Station Replacement Boise Project, Idaho i

PART I THE SCHEDULE

SECTION A SOLICITATION/CONTRACT FORM ..................................................................... A-1

SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS ...................................................B-1

SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK ........................... C-1

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 14 10 Use of Site 01 14 30 Outages 01 14 31 Interruption of Service 01 29 00 Payment Procedures 01 31 19 Project Management and Coordination 01 32 10 Construction Program 01 33 00 Submittals 01 33 26 Electrical Drawings and Data 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 30 Contractor's Onsite Safety Personnel 01 42 10 Reference Standards 01 51 00 Temporary Utilities 01 54 20 Use of Government Crane and Forklift 01 55 00 Vehicular Access and Parking 01 56 10 Protection of Existing Installations 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 60 00 Product Requirements 01 64 40 Government-Furnished Equipment 01 74 10 Cleaning and Waste Management 01 78 30 Project Record Documents

DIVISION 02 - EXISTING CONDITIONS

02 41 21 Removal of Existing Equipment 02 82 20 Removal and Disposal of Asbestos Containing Materials 02 83 33 Removal and Disposal of Equipment with Coatings Containing Heavy Metals 02 84 40 Removal and Disposal of Polychlorinated Biphenyls

DIVISION 03 - CONCRETE

03 62 20 Nonshrink Grout for Equipment and Metalwork

DIVISION 04 – NOT USED

ii

DIVISION 05 - METALS

05 50 00 Metal Fabrications

DIVISION 06 THORUGH 25 – NOT USED

DIVISION 26 - ELECTRICAL

26 05 02 Basic Electrical Materials and Methods 26 05 10 Conductors and Cables 26 05 13 Medium-Voltage Power Cable System 26 05 20 Grounding and Bonding 26 05 33 Electrical Conduit 26 05 90 Wiring Checkout and Tests 26 11 16 Secondary Unit Substations 26 24 22 Distribution Panelboards 26 24 30 Control Boards 26 26 00 Temporary Power Distribution Units

DIVISIONS 27 THROUGH 50 – NOT USED

DIVISION 51 - INFORMATION AVAILABLE TO OFFERORS

51 00 00 Information Available to Offerors 51 00 10 Hazardous Materials Test Reports 51 00 20 Photographs

DIVISION 52 - DRAWINGS

52 00 00 Drawings

SECTION D PACKAGING AND MARKING ................................................................................. D-1

SECTION E INSPECTION AND ACCEPTANCE ..........................................................................E-1 E.1. 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984) ........................................ E-1 E.2. 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)...................................... E-1

E.3. 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994) - ALTERNATE I

APR 1984) ....................................................................................................................... E-3

E.4. WBR 1452.246-81 FAILURE TO MEET PERFORMANCE WARRANTIES--

BUREAU OF RECLAMATION (MAY 2005) ............................................................... E-4

SECTION F DELIVERIES OR PERFORMANCE ......................................................................... F-1

F.1. 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF

WORK (APR 1984) ......................................................................................................... F-1 F.2. 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEPT 2000) ................... F-1 F.3. 52.242-14 SUSPENSIONOF WORK (APR 1984) ......................................................... F-1

Boise Project, Idaho iii

SECTION G CONTRACT ADMINISTRATION DATA ................................................................ G-1

G.1. GOVERNMENT POINT OF CONTACT--BUREAU OF RECLAMATION--PN

REGION (OCT 2010) ..................................................................................................... G-1

G.2. 1452.201-70 AUTHORITIES AND DELEGATIONS--DEPARTMENT OF THE

INTERIOR (MAY 2010) ................................................................................................ G-1

G.3. ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS-INVOICE

PROCESSING PLATFORM (IPP) (APRIL 2013) ........................................................ G-2

SECTION H SPECIAL CONTRACT REQUIREMENTS ............................................................. H-1

H.1. AUTHORIZED WORKERS NOTICE TO POTENTIAL BUREAU OF

RECLAMATION CONTRACTORS (SEP 2002).......................................................... H-1

H.2. CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM

(JULY 2010) ................................................................................................................... H-2

PART II CONTRACT CLAUSES

SECTION I CONTRACT CLAUSES ................................................................................................ I-1 I.1. 52.202-1 DEFINITIONS (NOV 2013) ............................................................................. I-1 I.2. *52.203-3 GRATUITIES (APR 1984) ............................................................................. I-1 I.3. *52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)...................... I-2

I.4. *52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE

GOVERNMENT (SEPT 2006)......................................................................................... I-2 I.5. *52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014) ........................................ I-3

I.6. *52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS

FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014) ........................................... I-4

I.7. *52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER

ACTIVITY (MAY 2014) .................................................................................................. I-5

I.8. *52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN

FEDERAL TRANSACTIONS (OCT 2010) .................................................................... I-6

I.9. 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND

REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER

RIGHTS (APR 2014) ...................................................................................................... I-10

I.10. 1452.203-70 RESTRICTION ON ENDORSEMENTS--DEPARTMENT OF THE

INTERIOR (JUL 1996) .................................................................................................. I-11

I.11. *52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER

FIBER CONTENT PAPER (MAY 2011) ...................................................................... I-11

I.12. 52.204-7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013) ............................... I-11

I.13. 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR

PERSONNEL (JAN 2011) ............................................................................................. I-13

I.14. 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER

SUBCONTRACT AWARDS (JUL 2013) ..................................................................... I-14

I.15. 52.204-12 DATA UNIVERSAL NUMBERING SYSTEM NUMBER

MAINTENANCE (DEC 2012)....................................................................................... I-17

Boise Project, Idaho iv

I.16. 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE. (JUL

2013) ............................................................................................................................... I-18

I.17. 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS

AND CERTIFICATIONS (DEC 2014) .......................................................................... I-20

I.18. 1452.204-70 RELEASE OF CLAIMS -- DEPARTMENT OF THE INTERIOR

(JUL 1996) ...................................................................................................................... I-20

I.19. 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION

REGARDING RESPONSIBILITY MATTERS (JUL 2013) ......................................... I-20

I.20. 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED

DOMESTIC CORPORATIONS (DEC 2014) ................................................................ I-21

I.21. 52.215-2 AUDIT AND RECORDS--NEGOTIATION (OCT 2010) ............................. I-22

I.22. *52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT

(OCT 1997) ..................................................................................................................... I-24

I.23. 52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR

PRICING DATA--MODIFICATION (AUG 2011) ....................................................... I-24

I.24. *52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA--

MODIFICATIONS (OCT 2010) .................................................................................... I-26

I.25. *52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA

AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA—

MODIFICATIONS (OCT 2010) .................................................................................... I-27

I.26. 1452.215-70 EXAMINATION OF RECORDS BY THE DEPARTMENT OF

THE INTERIOR (AUG 1996) (DEVIATION) ............................................................... I-28

I.27. *52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011) ....... I-28

I.28. 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2014) ............ I-29 I.29. *52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2011) .......................... I-31

I.30. 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM

REREPRESENTATION (JUL 2013) ............................................................................. I-32 I.31. *52.222-3 CONVICT LABOR (JUNE 2003) ................................................................ I-33

I.32. *52.222-4 CONTRACT WORK HOURS AND SAFETY

STANDARDS -OVERTIME COMPENSATION (MAY 2014) ................................... I-34

I.33. *52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (MAY 2014) .......... I-35

I.34. 52.222-7 WITHHOLDING OF FUNDS (MAY 2014) .................................................. I-38 I.35. *52.222-8 PAYROLLS AND BASIC RECORDS (MAY 2014) ................................... I-38 I.36. 52.222-9 APPRENTICES AND TRAINEES (JULY 2005) .......................................... I-40

I.37. 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB

1988) ............................................................................................................................... I-41 I.38. *52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014) ..................... I-42 I.39. 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014) ................... I-43

I.40. *52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE

REQUIREMENTS AND RELATED REGULATIONS (MAY 2014) .......................... I-43

I.41. 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988) .............. I-44 I.42. *52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2014) .................................. I-44

Boise Project, Idaho v

I.43. *52.222-21 PROHIBITION OF SEGREGATED FACILITIES (FEB 1999) ................ I-44 I.44. *52.222-26 EQUAL OPPORTUNITY (MAR 2007) ..................................................... I-45

I.45. 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR

CONSTRUCTION (FEB 1999) ...................................................................................... I-47 I.46. 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUL 2014) ........................... I-52

I.47. 52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES

(JUL 2014) ...................................................................................................................... I-52 I.48. 52.222-37 EMPLOYMENT REPORTS VETERANS (JUL 2014) ............................... I-53

I.49. 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE

NATIONAL LABOR RELATIONS ACT (DEC 2010) ................................................ I-54 I.50. 52.222-50 COMBATING TRAFFICKING IN PERSONS (FEB 2009) ........................ I-55 I.51. 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (AUG 2013)................. I-58

I.52. 52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC

2014) ............................................................................................................................... I-61

I.53. 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS

UNDER SERVICE AND CONSTRUCTION CONTRACTS (SEPT 2013) ................. I-65

I.54. 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL

SAFETY DATA (JAN 1997) ALTERNATE I (JUL 1995) ........................................... I-66

I.55. *52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW

INFORMATION (MAY 2011)....................................................................................... I-68 I.56. 52.223-6 DRUG-FREE WORKPLACE (MAY 2001) ................................................... I-68

I.57. 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS

IN SERVICE AND CONSTRUCTION CONTRACTS (MAY 2008) .......................... I-70

I.58. 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT

MESSAGING WHILE DRIVING (AUG 2011) ............................................................ I-71

I.59. *WBR 1452.223-80 ASBESTOS-FREE WARRANTY--BUREAU OF

RECLAMATION (OCT 1992) ....................................................................................... I-72

I.60. WBR 1452.223-81 SAFETY AND HEALTH -- BUREAU OF RECLAMATION

(MAY 2010).................................................................................................................... I-72

I.61. WBR 1452.223-82 PROTECTING FEDERAL EMPLOYEES AND THE

PUBLIC FROM EXPOSURE TO TOBACCO SMOKE IN THE FEDERAL

WORKPLACE–BUREAU OF RECLAMATION (DEC 2009) .................................... I-73

I.62. 52.225-9 BUY AMERICAN-CONSTRUCTION MATERIALS (MAY 2014) ............ I-73

I.63. *52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUNE

2008) ............................................................................................................................... I-77 I.64. 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007) ...................................... I-77

I.65. 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND

COPYRIGHT INFRINGEMENT (DEC 2007) .............................................................. I-78

I.66. 52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS (DEC

2007) ............................................................................................................................... I-78 I.67. 52.227-17 RIGHTS IN DATA - SPECIAL WORKS (DEC 2007) ................................ I-78 I.68. 52.228-1 BID GUARANTEE (SEP 1996) ..................................................................... I-80

Boise Project, Idaho vi

I.69. 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997) ........................................... I-80

I.70. *52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION

(JAN 1997)...................................................................................................................... I-81 I.71. 52.228-11 PLEDGE OF ASSETS (JAN 2012) .............................................................. I-81

I.72. 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS

(MAY 2014).................................................................................................................... I-82 I.73. 52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014) ................................ I-82

I.74. 52.228-15 PERFORMANCE AND PAYMENT BONDS-CONSTRUCTION

(OCT 2010) ..................................................................................................................... I-86

I.75. 1452.228-70 LIABILITY INSURANCE-DEPARTMENT OF THE INTERIOR

(JUL 1996) ...................................................................................................................... I-87 I.76. 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013) .............................. I-88

I.77. *WBR 1452.231-81 EQUIPMENT OWNERSHIP AND OPERATING

EXPENSE -- BUREAU OF RECLAMATION (JUL 1998) .......................................... I-89

I.78. 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION

CONTRACTS (MAY 2014) ........................................................................................... I-91 I.79. *52.232-17 INTEREST (MAY 2014) ............................................................................ I-94 I.80. *52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014) ............................................... I-95

I.81. 52.232-27 PROMPT PAY FOR CONSTRUCTION CONTRACTS (MAY 2014) ....... I-96

I.82. 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-SYSTEM FOR

AWARD MANAGEMENT (JUL 2013) ...................................................................... I-104

I.83. 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS

(JUN 2013).................................................................................................................... I-106

I.84. 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL

BUSINESS SUBCONTRACTORS (DEC 2013) ......................................................... I-107

I.85. WBR 1452.232-81 PAYMENT FOR MOBILIZATION AND PREPARATORY

WORK --BUREAU OF RECLAMATION (MAY 2000) ............................................ I-107

I.86. WBR 1452.232-82 OTHER INVOICE REQUIREMENTS -- BUREAU OF

RECLAMATION (DEC 2002) ..................................................................................... I-109 I.87. 52.233-1 DISPUTES (MAY 2014) ALTERNATE I (DEC 1991) ............................... I-109 I.88. *52.233-3 PROTEST AFTER AWARD (AUG 1996) ................................................. I-110

I.89. 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT

2004) ............................................................................................................................. I-112 I.90. *52.236-2 DIFFERING SITE CONDITIONS (APR 1984) ......................................... I-112

I.91. *52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE

WORK (APR 1984) ...................................................................................................... I-112 I.92. 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984) ................. I-113 I.93. 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991) ................................... I-113

I.94. *52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES,

EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984) ........................... I-113 I.95. 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984) ............................. I-114

I.96. *52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984) ....... I-114

Boise Project, Idaho vii

I.97. 52.236-12 CLEANING UP (APR 1984) ...................................................................... I-114

I.98. 52.236-13 ACCIDENT PREVENTION (NOV 1991) - ALTERNATE I (NOV

1991) ............................................................................................................................. I-115 I.99. 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984) ....... I-116

I.100. *WBR 1452.228-84 CERTIFICATION OF REPRESENTATIVES FOR

CORPORATE SURETIES--BUREAU OF RECLAMATION (SEP 1996) ................ I-116

I.101. 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB

1997)- ALTERNATE I (APR 1984)............................................................................. I-116 I.102. 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995) ................................ I-118

I.103. *WBR 1452.236-84 PRESERVATION OF CULTURAL RESOURCES –

BUREAU OF RECLAMATION (FEB 2000) .............................................................. I-118

I.104. WBR 1452.237-80 SECURITY REQUIREMENTS – BUREAU OF

RECLAMATION (FEBRUARY 2011) ALTERNATE I (OCT 2006) ........................ I-120

I.105. PN REGION IMPLEMENTATION OF SECURITY REQUIREMENTS –

CONSTRUCTION CONTRACTS ............................................................................... I-132 I.106. 52.242-13 BANKRUPTCY (JUL 1995)....................................................................... I-133

I.107. *WBR 1452.243-80 MODIFICATION PROPOSALS -- BUREAU OF

RECLAMATION (DEC 2001) ALTERNATE III (JUL 1998) .................................... I-133 I.108. 52.243-4 CHANGES (JUNE 2007) .............................................................................. I-134

I.109. *WBR 1452.243-80 MODIFICATION PROPOSALS -- BUREAU OF

RECLAMATION (DEC 2001) ALTERNATE III (JUL 1998) .................................... I-135 I.110. 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (OCT 2014) ................. I-136 I.111. 52.245-1 GOVERNMENT PROPERTY (APR 2012) ................................................. I-138 I.112. 52.245-9 USE AND CHARGES (APR 2012) .............................................................. I-151

I.113. 52.248-3 VALUE ENGINEERING—CONSTRUCTION (OCT 2010) -

ALTERNATE I (APR 1984) ........................................................................................ I-153

I.114. 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT

(FIXED-PRICE) (APR 2012)-ALTERNATE I (SEP 1996) ........................................ I-156 I.115. *52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)................. I-160 I.116. 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984) ........................ I-161 I.117. *52.253-1 COMPUTER GENERATED FORMS (JAN 1991) .................................... I-161

PART III LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J LIST OF ATTACHMENTS ......................................................................................... J-1

PART IV REPRESENTATIONS AND INSTRUCTIONS

SECTION K REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS

OF OFFERORS OR RESPONDENTS ....................................................................... K-1

K.1. 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC

2014) ............................................................................................................................... K-1

Boise Project, Idaho viii

K.2. 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL

2013) ............................................................................................................................... K-5

SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR

RESPONDENTS ............................................................................................................L-1

L.1. 52.204-6 DATA UNIVERSAL NUMBERING SYSTEM (DUNS) NUMBER

(JUL 2013) ....................................................................................................................... L-1

L.2. 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE

REPORTING (NOV 2014) .............................................................................................. L-2

L.3. 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE

MAINTENANCE (NOV 2014) ....................................................................................... L-3

L.4. 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA

INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND

COMMERCIAL ITEM DESCRIPTIONS, FPMR PART 101-29 (AUG 1998) ............. L-4

L.5. 52.211-6 BRAND NAME OR EQUAL (AUG 1999) (DEVIATION) ........................... L-4

L.6. *WBR 1452.211-80 NOTICE OF INTENT TO ACQUIRE METRIC

PRODUCTS AND SERVICES - BUREAU OF RECLAMATION (MAR 1993) ......... L-5

L.7. 52.215-1 INSTRUCTIONS TO OFFERORSBCOMPETITIVE ACQUISITION

(JAN 2004)....................................................................................................................... L-6

L.8. 1452.215-71 USE AND DISCLOSURE OF PROPOSAL

INFORMATION--DEPARTMENT OF THE INTERIOR (APR 1984) ....................... L-10

L.9. WBR 1452.215-80 SOURCE EVALUATION AND SELECTION

PROCEDURES--BUREAU OF RECLAMATION (MAY 2005) ................................ L-12

L.10. WBR 1452.215-81 GENERAL PROPOSAL INSTRUCTIONS--BUREAU OF

RECLAMATION (JAN 1998) ...................................................................................... L-14

L.11. *WBR 1452.215-82 TECHNICAL PROPOSAL INSTRUCTIONS--BUREAU

OF RECLAMATION (APR 2001) ................................................................................ L-16

L.12. WBR 1452.215-83 PRICING PROPOSAL INSTRUCTIONS--BUREAU OF

RECLAMATION (JAN 1998) ...................................................................................... L-17

L.13. FACSIMILE ACKNOWLEDGMENT OF AMENDMENTS, MODIFICATIONS

TO OFFERS, AND WITHDRAWALS OF OFFERS-BUREAU OF

RECLAMATION--PN REGION (APR 2007) .............................................................. L-19

L.14. 52.216-1 TYPE OF CONTRACT (APR 1984) ............................................................. L-20

L.15. 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY

SITE OF THE WORK (MAY 2014) ............................................................................. L-20

L.16. 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO

ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION

(FEB 1999)..................................................................................................................... L-20

L.17. NON-DISCRIMINATION NOTICE TO U.S. DEPARTMENT OF THE

INTERIOR CONTRACTORS, SUBCONTRACTORS, AND LESSORS --

BUREAU OF RECLAMATION -- PN REGION (JAN 2000) ..................................... L-21

L.18. 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—

CONSTRUCTION MATERIALS (MAY 2014) ........................................................... L-21

Boise Project, Idaho ix

L.19. 52.233-2 SERVICE OF PROTEST – DEPARTMENT OF THE INTERIOR

(SEPT 2006) (DEVIATION) ......................................................................................... L-23

L.20. 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB

1995) .............................................................................................................................. L-23

L.21. 52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997) ....... L-23

L.22. WBR 1452.236-85 INSTRUCTION FOR MOBILIZATION AND

PREPARATORY WORK SCHEDULE LINE ITEM -- BUREAU OF

RECLAMATION (MAY 2000) .................................................................................... L-24

L.23. SITE VISIT ATTENDANCE RESTRICTIONS - BUREAU OF

RECLAMATION - PN REGION (MAY 2004) ............................................................ L-24

L.24. 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984) ................... L-24

SECTION M EVALUATION FACTORS FOR AWARD .............................................................. M-1

M.1. WBR 1452.215-85 EVALUATION FACTORS FOR AWARD QUALITY

PREDOMINANCE -- BUREAU OF RECLAMATION (MAY 2005)

ALTERNATE I (DEC 2001) .......................................................................................... M-1

M.2. *WBR 1452.225-82 NOTICE OF WORLD TRADE ORGANIZATION

GOVERNMENT PROCUREMENT AGREEMENT EVALUATIONS--

BUREAU OF RECLAMATION (MAY 2005) .............................................................. M-2

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040185317

Bureau of Reclamation

Pacific Northwest Region

Regional Office Acquisition Management Division

R10

000001

1150 N. Curtis Road, Ste. 100

Boise ID 83706-1234

Susanne Clark, Contract Specialist, PN-37-16

Bureau of Reclamation 1150 N. Curtis Rd., Suite 100 Boise, ID 83706-1234

Susanne Clark 208-378-5039

1x 04/14/2015

R15PS00361

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Project Title: Anderson Ranch Powerplant Service Station Replacement, Boise Project, Idaho

Solicitation No. R15PS00361

Estimated Price Range of Work: $1,000,000 to $5,000,000

THIS SOLICITATION IS A TOTAL SMALL BUSINESS SET-ASIDE.

In Block 11 below, the number of days stated to complete after receipt of Notice to

Proceed is estimated. The actual completion date is not a number of days after receipt of Notice to Proceed, but March 31, 2017 as stated in Clause F.1.

Block 14 below, it states provide 5 copies of your proposal--please review provision

WBR 1452.215-81, General Proposal Instructions for number of copies of the proposal, for each requested volume to be submitted.

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 600 calendar days and complete it within ________________ ________________ calendar days after receiving

F.1

05/14/2015

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Bureau of Reclamation Pacific Northwest Region

Regional Office Acquisition Management Division

R10

1150 N. Curtis Road, Ste. 100

Boise ID 83706-1234

Clay W. Wright

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

R15PS00361/000001

Due to system complications, the initial attempt to post the Pre-Solicitation Notice failed. As a result the SF-1442 posted on March 11, 2015 in error. The complete solicitation is being posted as Amendment 001.

Suggested COR: BMCCARTH

Delivery: 03/31/2017

Delivery Location Code: 0009906760

Bureau of Reclamation-PN-SRAOW

Black Canyon Dam

Emmett ID 83617-9503 US

FOB: Destination

Period of Performance: 07/01/2015 to 03/31/2017

(a) Offers will be considered for award on the following price schedule, but no offer will be considered for award on only a part of the price schedule.

(b) Offers are subject to the terms and conditions of this solicitation.

(c) Definitions:

(1) CLIN-Contract Line Item Number

SECTION B Supplies or Services and Prices

FOB: Destination

Item# 00010 Anderson Ranch Station Service Replacement Project 1 AU $

Period of Performance: 07/01/2015 to 03/31/2017

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Boise Project, Idaho

A-1

PART I THE SCHEDULE

SECTION A SOLICITATION/CONTRACT FORM

SClark Typewritten Text

SClark

(SEE SF-1442)

Boise Project, Idaho

B-1

SECTION B SUPPLIES OR SERVICES AND PRICE SCHEDULE

SClark

(SEE SF-1442)

Boise Project, Idaho

C-1

SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

ANDERSON RANCH POWERPLANT

SERVICE STATION REPLACEMENT

BOISE PROJECT, IDAHO

FOREWORD

Work is located approximately 27 miles northeast of Mountain Home, ID in Elmore County.

The work consists of removing existing service substation transformers and replacing them with new units. Temporary power shall be required to operate station equipment during removal and installation.

A pre-offer site visit will be conducted in accordance with the Clause in Section L entitled “Site Visit - Construction.” Offerors are strongly urged to participate in the site visit.

Failure by offerors to inspect the site will not relieve them of the responsibility of properly estimating the difficulty or cost of successfully performing the work in accordance with the specifications and within the allowed time. Attendees are to provide and wear safety boots, hard hats, and safety vests.

FOR DATE AND PLACE OF PROPOSAL SUBMISSION, SEE "SOLICITATION,

OFFER, AND AWARD," STANDARD FORM 1442, IMMEDIATELY FOLLOWING

THE "TABLE OF CONTENTS."

FOR INFORMATION REGARDING BUREAU OF RECLAMATION'S HANDBOOK

ENTITLED "RECLAMATION SAFETY AND HEALTH STANDARDS," (2009

EDITION) WHICH IS APPLICABLE TO WORK UNDER THIS CONTRACT, SEE

NOTICE IN PART II, SECTION I ENTITLED "SAFETY AND HEALTH."

DIVISION 01 - GENERAL REQUIREMENTS

Anderson Ranch Powerplant Station Service Replacement

Boise Project, Idaho

Summary of Work 01 11 00 - 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.01 LOCATION

A. Work is located approximately 27 miles northeast of Mountain Home, ID in Elmore County.

1.02 PRINCIPAL COMPONENTS OF WORK

A. Remove Station Service Unit Substation.

1. Transformers KSA and KSB.

2. Switchgear DSA including main breakers and feeder breakers.

3. Pull sections.

4. Electromechanical devices, meters, control switches, relays, fuses, cabling, and other miscellaneous devices.

B. Provide new Station Service Unit Substation.

1. Medium-voltage circuit breakers.

2. Step-down transformers.

3. Main breakers.

4. Feeder breakers.

5. Transformer differential relays.

6. CTs and PTs for protection and metering.

7. Undervoltage relays.

8. Lockout relays.

9. Meter displays for voltage and ampere.

C. Provide temporary power transformer, distribution board, conduit, supports, and conductors.

D. Replace:

1. Medium-voltage cable terminators (potheads) at Generator #1 and #2 Busses.

2. Medium-voltage cable from Generator #1 Bus to Unit Substation.

3. Medium-voltage cable from Generator #2 Bus to Unit Substation.

E. Remove exposed transite conduits.

Boise Project, Idaho

Summary of Work 01 11 00 - 2

F. Replace power cable from Switchgear DSA to downstream panels and transformers.

G. Replace distribution panels.

H. Provide a new transformer and panel for AC power feed to Control Board CSA.

I. Replace control cables and provide new cables from Station Service Substation to cable spreading room below Control Board CSA.

J. Furnish station service revenue meter and test switch for Government to install at Control Board CSA.

K. Furnish station service breaker control switches for 52A and 52B, auto/manual selector switch, and voltmeter selector switch for Government to install at Control Board CSA.

1.03 SPECIFICATIONS REQUIREMENTS

A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 52.

B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.

C. Where specifications are written in streamlined form, the words “shall be” are included by inference where a colon (:) is used within the sentence or phrase.

1.04 DEFINITIONS

A. When the specifications use a word or term defined in the Federal Acquisition Regulations (FAR), the definition of the word or term shall be in accordance with FAR sections in effect at the time the solicitation was issued.

1.05 ACRONYMS

A. The following acronyms apply to specifications Divisions 1 through 52:

1. CO: Contracting Officer.

2. COR: Contracting Officer’s Representative.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

Boise Project, Idaho

Summary of Work 01 11 00 - 3

END OF SECTION

Boise Project, Idaho

Use of Site 01 14 10 - 1

SECTION 01 14 10

USE OF SITE

PART 1 GENERAL

1.01 COST

A. Include in prices offered in the schedule for other items of work.

1.02 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 14 10-1, Land Use and Landscape Rehabilitation Plan:

1. For each Contractor use site on Government land.

a. Show use location and extent of impact. Uses include but are not limited to the following:

1) Buildings and service areas including offices, shops, warehouses, storage areas, fuel and oil storage areas, and fabrication yards.

2) Parking areas, temporary roads, and haul routes.

3) Utilities including air, power, water lines, fire hydrants, and compressor station.

4) Areas for processing, storing, and disposing of waste materials from construction operations.

b. Describe methods to preserve, protect, and repair if damaged, vegetation (such as trees, shrubs, and grass) and other landscape features on or adjacent to the jobsite, which are not to be removed and which do not interfere with the work required under this contract. Include methods to mark work area limits, protect disturbed areas, and prevent erosion.

c. Describe methods to protect, and repair if damaged, existing improvements and utilities at or near the jobsite.

d. Describe methods for removing temporary structures, facilities, and electrical equipment, cleanup, and rehabilitating site after completion of construction activities.

2. Submit revised drawings of changes in use of Government land made during design and erection stages or after use of Government land is in operation.

1.03 PROJECT CONDITIONS

A. Government land as listed below may be used for required construction facilities.

1. Staging Areas:

Boise Project, Idaho

Use of Site 01 14 10 - 2

a. Outside the plant: 35 feet by 16 feet area in the parking lot El. 3881.50, minimum of 4 feet northwest of switchyard fence access gate on northeast side of switchyard.

1) Shall not block access road to plant from entry gate.

2) This space may be used for a construction trailer and/or staging area.

b. Inside plant:

1) 12 feet by 12 feet area at main entrance to plant, El. 3881.50.

c. Inside plant for temporary power transformer and distribution board:

1) Generator Deck El. 3881.50 at gridlines 3 and d. In accordance with Drawing 4-D-756.

a) Space available between large metal floor grates.

2) Shall maintain egress clearance path from battery room, station service single personnel door, stairwell, and outlet works area.

B. Do not interfere with work of other contractors or the Government in vicinity, or with reservations made by the Government for use of such land.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.01 RESTORATION

A. Restore Contractor use areas to pre-construction condition.

Outages 01 14 30 - 1

SECTION 01 14 30

OUTAGES

PART 1 GENERAL

1.01 COST

A. Include cost in prices offered in the schedule for items of work for which outages are required.

1.02 REFERENCE STANDARDS

A. National Fire Protection Association (NFPA)

1. NFPA 70-14 National Electrical Code (NEC)

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals and Section 01 33 26 - Electrical Drawings and Data.

B. RSN 01 14 30-1, Outage Request:

1. Area where work will be done (by number or other description).

2. Outline procedures for accomplishing work including:

a. Specific safety precautions to be taken.

b. Type and location of barricades.

c. Warning signs.

d. Protective grounds and devices to be used.

e. Job Hazard Analysis.

3. Commencement time of work.

4. Duration of work.

5. Itemized list of panels and/or loads that will be de-energized and will remain energized during the work. Include the duration that the specific panel and/or load will be de-energized.

6. Number of personnel and their classification.

7. Information indicating that required materials are on site or data indicating shipping dates of materials not on site.

01 14 30 - 2

1.04 DEFINITIONS

A. Station Service Outage Window: Specified time of year when outages for station service equipment KSA, KSB, and DSA may occur for this project. Maximum durations of specified outages are defined in Article 1.05 Project Conditions.

B. Station Service Outage: Station service equipment KSA, KSB, and DSA are de-energized and removed from service.

C. JHA: Job Hazard Analysis.

D. Switchgear DSA: Low-voltage station service switchgear.

E. Transformer KSA: Step-down station service transformer fed from Unit 1.

F. Transformer KSB: Step-down station service transformer fed from Unit 2.

1.05 PROJECT CONDITIONS

A. Coordinate and schedule outages with COR:

1. Coordinate work with Government operations.

2. No specific outage request will be considered unless:

a. COR has reasonable assurances that materials and equipment required for work will be onsite.

b. Contractor shall be prepared to perform work on date and during period of time requested for specific outage.

3. Allowable time and available outage periods shall govern outage requests, work scheduling, onsite delivery of materials, and required drawings and data submittals.

4. Outage scheduling will depend upon power demand requirements and related operating conditions.

a. Schedule during station service allowable outage window.

b. Government reserves right to schedule outages for any period.

c. Contractor will be informed of type of outages available and restrictions prior to start of construction.

d. Outages without temporary power backup shall occur for a maximum duration of 8 hours per outage.

e. When work cannot be performed during an approved outage period, notify COR that outage is not required.

5. Station Service Outage can only be scheduled during the Station Service Outage Window of October 1 to March 1.

01 14 30 - 3

B. Contractor shall not operate units, unit breakers, switchyard breakers, existing station service breakers, and associated controls.

C. Other considerations:

1. Contractor shall schedule with COR to operate existing plant equipment and control devices per approved JHA for outage.

2. Loss of power to fire alarm/protection systems would result in automatic damper closing that may be associated with air handlers. An override of dampers would be necessary to keep them open.

3. When maximum duration per outage will be exceeded, Contractor shall provide temporary power as required by Section 26 26 00 - Temporary Power Distribution Units.

4. The 120VAC power feed from MSK-2 to Control Board CSA shall be operational prior to de-energizing Switchgear DSA. Contractor may propose a temporary 120AC power feed to Control Board CSA.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Boise Project, Idaho

Interruption of Service 01 14 31 - 1

SECTION 01 14 31

INTERRUPTION OF SERVICE

PART 1 GENERAL

1.01 COST

A. Include cost in prices offered in the schedule for items of work for which interruption of services are required.

1.02 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 14 31-1, Interruption of Service Request:

1. Area where work will be done (by number or other description).

2. Outline procedures for accomplishing work including:

a. Specific safety precautions to be taken.

b. Type and location of barricades.

c. Warning signs.

d. Protective grounds and devices to be used.

e. Fire watch plan.

f. Job Hazard Analysis.

3. Add date submitted to request title.

a. If multiple requests in a day, add time of request.

4. Commencement time of work.

5. Duration of work.

6. Number of personnel and their classification.

7. Description of equipment to be used.

8. Information indicating that required materials are on site or data indicating shipping dates of materials not on site.

9. Include a back out plan to address general procedures for restoration of power if an unplanned event or condition is encountered during the interruption of service.

1.03 DEFINITIONS

A. Complete Generation Interruption of Service: Both generators are out of service due to station service power loss, lockout of unit breakers, or other circumstances.

Boise Project, Idaho

Interruption of Service 01 14 31 - 2

B. Half Generation Interruption of Service: 1 of 2 generators is out of service due to station service power loss, lockout of unit breaker, or other circumstances.

C. Individual Cutover of Station Service Loads Interruption of Service Window: Specified time frame to remove 1 station service 480V load at a time from its source of power in order to reconnect load to another source of power.

D. Interruption of Service Window: Specified time of year when interruption of service at plant may occur for project. Maximum durations of specified interruption of service are defined in Part 1.

E. Interruption of Service Window for Testing: Specified time frame to perform testing of new equipment. This does not mean that an interruption of service is required. This time frame is to account for possible failures that could occur that may cause an interruption of service or an outage.

F. JHA: Job Hazard Analysis.

G. Station Service Interruption of Service: Transformers KSA and KSB, Switchgear DSA and/or the 6 loads fed from Switchgear DSA are de-energized for less than the maximum allowable interruption of service window. This may result in a complete generation interruption of service.

H. Station Service Temporary Power Distribution Unit: Equipment used to power the 6 loads normally fed from Switchgear DSA.

I. Switchgear DSA: Low-voltage station service switchgear.

J. Transformer KSA: Step-down station service transformer fed from Unit 1.

K. Transformer KSB: Step-down station service transformer fed from Unit 2.

1.04 PROJECT CONDITIONS

A. Coordinate and schedule interruption of services with COR:

1. Coordinate work with Government operations.

2. No specific interruption of service request will be considered unless:

a. COR has reasonable assurance that materials and equipment required for work will be onsite.

b. Contractor will be prepared to perform work on date and during period of time requested for specific interruption of service.

3. Allowable time and available interruption of service periods will govern interruption of service requests, work scheduling, onsite delivery of materials, and required drawings and data submittals.

Boise Project, Idaho

Interruption of Service 01 14 31 - 3

4. Government will lockout the associated unit breaker, switchyard breaker, and station service main breakers in Switchgear DSA to accommodate Contractor-requested and approved interruption of service.

5. Interruption of service scheduling will depend upon power demand requirements and related operating conditions.

a. Interruption of services may be scheduled during off-peak periods, nights, or weekends.

b. Government reserves right to schedule interruption of services for any period during 24-hour day, any day of week.

c. Contractor will be informed of type of interruption of services available and restrictions prior to start of construction.

6. Interruptions of service can only be scheduled during the following intervals:

a. Complete generation and/or station service interruption of service window:

October 1 to March 1.

b. Half generation interruption of service window: September 15 to March 1.

c. Individual cutover of station service loads interruption of service window:

September 15 to March 1.

d. Interruption of service window for testing: October 1 to March 1.

7. Maximum interruption of service durations and quantities:

a. Complete generation interruption of service and/or station service interruption of service:

1) Eight hour duration for each.

2) Minimum 12 hours between each complete plant interruption of service and/or complete station service interruption of service.

3) Maximum of 8 complete generation interruption of service and/or station service interruption of service combined for the duration of allowable interruption of service window.

b. Half generation interruption of service:

1) Plant is allowed to operate on a half generation interruption of service for full duration of half generation allowable interruption of service window.

2) The unit providing generation to the grid will need to be switched to the other unit for following reasons:

a) Installation and removal of temporary power cables.

b) Removal and installation of medium voltage cables to generator busses.

Boise Project, Idaho

Interruption of Service 01 14 31 - 4

c) Problems with unit providing generation or associated equipment including station service equipment.

d) At Government’s discretion.

B. When work cannot be performed during an approved interruption of service period, notify COR that…