Electrical Systems and Equipment Repairs, Replacement and/or Rehabilitation - ID
Solicitation number
R15PS00148
Issued by

About this file

Amendment 0002 Package

View the file

Other files

File Type Posted
R15PS00148_0001_Amendment_Package.pdf PDF
R15PS00148_Solicitation_Package.pdf PDF
Sol_R15PS00148.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sign In Sheet Site Visit

Solicitation No. R15PS00148 – Electrical Systems and Equipment Repairs, Replacement and/or Rehabilitation IDIQ Date: Tuesday, January 20, 2015 - 10:00 A.M. PT

Represent Representative’s Name & Job Title

Firm’s Name & Address Tel/Fax Numbers Email Address

� PRIME

� SUB

� SUPPLIER

X GOVT.

Kelli Adams

Contract Specialist

U.S. Bureau of Reclamation

P.O. Box 61470 (LC-10204)

Boulder City, NV 89006

TEL.: 702-293-8363

FAX: 702-293-8332

Email: kadams@usbr.gov

� PRIME

� SUB

� SUPPLIER

X GOVT.

Jennalyn Schilke

Procurement Technician

U.S. Bureau of Reclamation

P.O. Box 61470 (LC-10207)

Boulder City, NV 89006

TEL.: 702-293-8030

FAX: 702-293-8332

Email: jschilke@usbr.gov

� SUPPLIER

X GOVT.

Enrique Ornelas

Electrical Engineer

U.S. Bureau of Reclamation

P.O. Box 61470 (LC-6310)

Boulder City, NV 89006

TEL.: 702-293-8398

FAX: 702-293-8330

Email: eornelas@usbr.gov

� SUPPLIER

X GOVT.

Corey Dickson

Electrician

U.S. Bureau of Reclamation

P.O. Box 61470 (LC-3346)

Boulder City, NV 89006

TEL.: 702-293-8252

FAX: 702-293-8558

Email: cdickson@usbr.gov

� SUPPLIER

X GOVT.

Scott Wells

IMG Manager

U.S. Bureau of Reclamation

P.O. Box 61470 (LC-3500)

Boulder City, NV 89006

TEL.: 702-293-8071

FAX: 702-293-8558

Email: swells@usbr.gov

X PRIME

� SUPPLIER

� GOVT.

Javanna Conover

Industrial Control Systems, LLC

1570 Foothill Drive

Boulder City, NV 89005

TEL.: 702-987-0363

FAX: 702-529-0340

Email: preston@icsnv.net

Solicitation No. R15PS00148 – Electrical Systems and Equipment Repairs, Replacement and/or Rehabilitation IDIQ

Represent Representative’s Name & Job Title

Firm’s Name & Address Tel/Fax Numbers Email Address

X PRIME

� SUB

� SUPPLIER

� GOVT.

Frosty Shanks

Contractor

Shanks Electric Corporation

P.O. Box 542

Helendale, CA 92342

TEL.: 760-952-2085

FAX: 760-952-2645

Email: shankselectric@verizon.net

X PRIME

� SUPPLIER

� GOVT.

Tom Foster

President/Electrical Engineer

Professional Design Associates, Inc.

108 Market Street

Henderson, NV 89015

TEL.: 702-567-1022 Ext.102

FAX: 702-567-1025

Email: tom@pdacorp.com

� SUPPLIER

TEL.:

FAX:

Email:

experience, including at least three projects in the past three years similar in scope to the work subject to this contract.

1.3.3 Contractor Employees. Provide employees that are fully trained for this project.

1.3.3.1 Employee Training and Certification. The contractor is responsible for providing personnel of an adequate skill and education level. Personnel selected by the contractor must already have the necessary education, training and certifications required to perform the requirements of this contract prior to being assigned to work under this contract. Reclamation shall be advised in writing of the names of designated employees that will be performing services.

Reclamation shall also be informed in writing of any change in service personnel.

1.3.3.2 The contractor must not employ persons for work on this contract if such employee is considered by the contracting officer to be a potential threat to the health, safety, security, general well-being, or operational mission of the government and its employees and visitors.

1.3.3.3 Workforce Professional Qualifications

1.3.3.3.1 Electrical Engineers may be direct or sub-contract employees, but shall be (a) licensed in the State of Nevada as Electrical Engineers, and (b) qualified by additional training and experience to provide evaluation reports for components or conditions under evaluation including (but not limited to) power system studies that include: short-circuit studies; coordination studies; arc flash hazard analysis; load flow studies; stability studies; and harmonic analysis; transformer assessments, evaluation of service capacity and age of existing electrical system and components, infrastructure analysis and assessment, and other areas of engineering interest. Copy of current certifications/licenses shall be provided concurrently with cost/schedule/task proposals for Task Orders, when engineering analysis is required as part of the statement of work.

1.3.3.3.2 Electricians shall be licensed by the State of Nevada or appropriate subordinate jurisdiction to perform work as electricians. Facilities subject to this contract are located generally in Clark County, Nevada; skilled electrical trade work under this contract shall generally be performed by a Journeyman Electrician, and in some specific task orders may require services of a Master Electrician. Electricians appropriately certified under International Code Council standards as implemented by Clark County, NV, shall perform all work, at the level of certification/qualification specified in individual task orders. Current certification/license of leading electricians performing the work shall be included with other documentation in the technical portion of each task order proposal at the time of submittal.

1.3.3.3.3 Work is generally assumed to require services of electrical engineers and electricians; however, where other specialties and trades may become required on specific task orders, similar levels of qualification as craft journeyman or master worker shall be identified in the task orders, and documented by providing appropriate certificates/licenses at the time of proposing cost and technical performances of such task orders.

1.3.3.3.4 Safety Certifications. Effective January 1, 2010, construction workforce in Nevada is required to complete the Supervisor 30-hour Safety Training, and workers on-site must complete the Construction Worker 10-hour Safety Training. Each individual worker’s safety certificate must be provided prior to beginning work on site for the first time.

1.3.4 Security Requirements. Performance of this contract requires Contractor personnel to have a Federal Government issued Personal Identification Verification (PIV) Card before being allowed unsupervised access to a Federally-controlled facility or information system. Requirements are defined in the clause at WBR 1452.237-80, Security Requirements. Costs of compliance with this requirement shall be allocated within the Contractor’s cost of mobilization and preparation for sitework, consistently with the Contractor’s accounting practice for similar general jobsite/customer requirements compliance cost.

1.4 Physical Security

1.4.1 General. The contractor must be responsible for safeguarding government property in the Contractor’s possession off-site, and for safekeeping, protection, and compliance with access controls for all areas and equipment authorized when working on-site. Opening of locked areas by contractor employees to permit entrance of persons other than contractor employees engaged in performance of contract work requirements in those areas is prohibited.

1.4.2 Sensitive Area Escort Requirements. All employees/representatives will be required to be escorted by a designated Reclamation employee when accessing certain sensitive areas, including but not limited to telecommunications and network service spaces. Routine non-emergency access to these areas will require notification no later than the duty day prior to the requested day of access so qualified escorts can be arranged. Advance notice will not be required for emergency access to sensitive areas; however, qualified escorts will still be assigned.

1.4.3 Access Device Controls. The contractor must establish and implement methods of making sure all access devices issued to the contractor by the government, if any, are not lost or misplaced and are not used by unauthorized persons, in accordance with requirements of WBR 1452.237-80, Security Requirements, and instructions/guidance provided by the Contracting Officer or designated representative. The contractor must not duplicate any access devices issued by the government. Lost or duplicated devices must be reported to the COR immediately. The contractor must prohibit the use of keys issued by the government by any persons other than the contractor’s employees.

1.5 Hours of Operation

1.5.1 Normal Hours of Operation. All of the buildings and facilities operate on a normal duty week of five eight-hour days, Monday through Friday. The contractor must perform any on-site services required under this contract in concert with this established duty day, between the hours of 6:00AM and 5:00PM local time. Exceptions for work on-site outside of these hours must be approved by both the CO and the facility manager to ensure coordinated access and escorts.

In addition, occupied buildings may not be de-energized during regular business hours, Monday through Friday, 6:00AM to 5:00PM; therefore, the Contractor shall plan scheduled power outages after 5:00PM on week days or during weekends. All power-outages shall be coordinated through the Government’s Management Services Office (MSO) to coordinate with the City of Boulder City and facilitate adequate oversight of the buildings involved. The Government will coordinate the power outage requests with the City of Boulder City. The City’s normal business hours are Monday through Thursday 7:00AM to 6:00PM and the point of contact is Rory Dwyer (702) 293- 9231. The Regional Data center located in the Administration building must remain operational 24 hours/7 days a week to ensure mission critical systems remain on-line, if the Contractor's planned power outage is for the Administration building and the outage will exceed a 3 hour window, the Government will coordinate emergency generator back-up power for the Regional Data Center.

The Government’s safety standards outlined in the Reclamation Safety and Health Standards manual (RSHS), do not allow for work on energized systems, therefore the electrical system shall be de-energized during the execution of the work and the Contractor shall plan on providing their own temporary power source for lighting, tools, etc.

1.5.3 Federal Holidays. Contractor services will not generally be required on the following federal holidays: New Year’s Day, Martin Luther King’s Birthday, Presidents Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving and Christmas Day.

2. Definitions and Acronyms

2.1 Definitions

2.1.1 Contract Discrepancy Report (CDR): A report initiated by the Government, which the Contractor is required to complete, whenever performance is unsatisfactory. The CDR requires the Contractor to explain in writing why performance was unsatisfactory, how performance will be returned to satisfactory levels, and the corrective action that will be taken to prevent recurrence.

2.1.2 Contracting Officer: An individual with the appointed authority and so designated in the contract to enter into, administer, and/or terminate contracts and make related determinations and findings. (FAR 2.101)

2.1.3 Customer Complaint Inspection: Unscheduled surveillance of Contractor’s work prompted by people receiving the service. The CO may receive customer complaints about the Contractor’s performance or quality of service. The CO may review the alleged unsatisfactory performance, verify the contract requirement and provide the Contractor notification of deficiencies, if applicable.

2.1.4 Defect: Each instance of non-compliance with a contract requirement. A defect may be caused by either non-performance or poor performance. Each defect is subject to deductions from the Contractor’s payment if performance requirement or maximum error rate is exceeded.

2.1.5 Inspection: Inspection means examining and testing supplies or services (including, when appropriate, raw materials, components, and intermediate assemblies) to determine whether they conform to contract requirements. (FAR 2.101)

2.1.6 Paragraph: For the purpose of this contract, all occurrences within the contract text of the term “paragraph” shall be understood to include the stated or referenced paragraph and all levels of subparagraphs below the stated or referenced paragraph.

2.1.7 Quality Assurance (QA): Those actions taken by the Government to determine that the Contractor’s quality control process and activities are effective in ensuring that the performed services received satisfy the contract/task order requirements. QA evaluators are Government employees responsible for checking Contractor performance, in accordance with FAR 52.246- 4, Inspection of Services.

2.1.8 Quality Control (QC): Those actions taken by the Contractor to ensure that the standards and requirements of the contract are met.

2.1.9 Services: For quality assurance and control purposes, “services” includes all services performed, workmanship, and material furnished or utilized in the performance of services.

(FAR 52.246-4(a).)

2.2 Acronyms

Acronym Meaning

BOR = Bureau of Reclamation CDR = Contract Discrepancy Report CO = Contracting Officer COR = Contracting Officer’s Representative CR = Contractor’s Representative POC = Point of Contact PRS = Performance Requirements Summary QA = Quality Assurance QAE = Quality Assurance Evaluators QASP = Quality Assurance Surveillance Plan QC = Quality Control TAO = Technical Approvals Officer TE = Technical Exhibit

3. Contractor-Furnished Services.

3.1 Scheduled Rehabilitation and Minor Improvements. As part of the multi-year program of building and facility electrical systems maintenance, the Government intends to accomplish planned rehabilitations, including repairs, replacements, and associated minor improvements required due to system deterioration, code-compliance needs, and operational obsolescence, by means of negotiated, pre-priced task orders.

3.1.1 Ordering Scheduled Tasks. The Contractor shall review all planning information and requirements and provide a detailed technical work plan and cost proposal in accordance with the Contract’s task ordering procedures at Section 4.3 of the work statement.