R15PS00148_0001_Amendment_Package.pdf

PDF 204 KB Posted

Attached to
Electrical Systems and Equipment Repairs, Replacement and/or Rehabilitation - ID
Solicitation number
R15PS00148
Issued by

About this file

Amendment 0001 Package

View the file

Other files

File Type Posted
R15PS00148_0002_Amendment_Package.pdf PDF
R15PS00148_Solicitation_Package.pdf PDF
Sol_R15PS00148.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Foreword Document No.

R15PS00148

Document Title

Electrical Systems and Equipment Repairs, Replacements and/or Rehabilitation – IDIQ

Amendment 00001

FOREWORD

The Bureau of Reclamation has an on-going requirement for electrical services and intends to award a 5 year Indefinite Delivery/Indefinite Quantity (IDIQ) Contract. This project provides for scheduled maintenance and rehabilitation of facility electrical infrastructure and related and dependent equipment and components. Work under this contract will result in suitable repairs, rehabilitations, upgrades, and/or replacements leading to safe operating conditions of extant equipment including but not limited to code-compliant systems, systems with capacity to meet operational and functional needs for the agency’s activities, and safe arc flash zone definition where needed. Guiding public standards for this work include National Fire Protection Association (NFPA) Code 70B on electrical maintenance practice, including but not limited to Chapter 9 (Studies and Analyses) and Chapter 11 (Testing Procedures Standards); NFPA 70, the National Electric Code (NEC); NFPA 101, Life Safety Code; and, International Building Code, 2014 – all as amended for Southern Nevada/Clark County.

This acquisition is being procured under Federal Acquisition Regulations Part 15, Contracting by Negotiation. Offerors are cautioned to carefully review the offer submission requirements contained in Section L and the evaluation criteria and standards contained in Section M. In order to be considered qualified for this work, offerors must fully address all evaluation factors. Reference Section L, paragraphs L.10 through L.12 for instructions and Section M, paragraph M.3 for evaluation factors and acceptability standards. The Government anticipates making award without discussions and will not seek clarifications. The award decision will be based on the offeror’s initial proposal in response to the IDIQ and the exemplar Task Order.

A site visit will be held prior to the proposal due date which will allow offerors to walk the campus where services/construction will take place under the Task Orders. Reference Section L.7, Site Visit (Construction). The site visit will be held on Tuesday, January 20, 2015 at 10:00 a.m. PT. Please contact Ms. Kelli Adams at kadams@usbr.gov prior to the day of the site visit, if you plan to attend. All attendees shall meet at the North Hoover Rd. Parking Lot located at 500 Date Street, Boulder City, NV 89005.

Offerors are urged and expected to inspect the site where service/construction is to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

The Department of Labor determines any contract that requires the alteration of real property over $2,000 shall include construction clauses. Therefore, the installation is considered construction and is subject to the construction clauses herein. The Contractor's employees performing installation shall be paid in accordance with Davis-Bacon wage rates.

Note to Offerors: This procurement involves both service and construction portions of work. Service and construction clauses are included in the solicitation and are designated by “S” for service or “C” for construction. The “S” or “C” is used to identify when the clause applies to one or the other only and will immediately follow the clause number. Clauses which do not designate an “S” or “C” are applicable to both.

Reclamation will only accept written questions for this solicitation. Please submit all written questions pertaining to this solicitation to Kelli Adams via email kadams@usbr.gov no later than 4:00 P.M., local time, Friday, January 23, 2015. The subject line shall clearly reference the Solicitation Number associated with this solicitation. No other questions will be entertained after this date. All questions and answers will be posted through an amendment on or about Tuesday, January 27, 2015.

Foreword Document No.

R15PS00148

Document Title

Electrical Systems and Equipment Repairs, Replacements

For date of receipt of offerors, reference Block 9 of the Standard Form 33 (Solicitation, Offer and Award) in Section A: The place of receipt of offers is Bureau of Reclamation, Lower Colorado Regional Office, Acquisition and Assistance Management Office, P.O. Box 61470, Attn: Kelli Adams (LC-10204), Boulder City, NV 89006-1470. For overnight or express delivery the proposals shall be addressed to Bureau of Reclamation, Lower Colorado Regional Office, Attn: Kelli Adams (LC-10204), 500 Date Street, Building 200, Boulder City, NV 89005. Hand carried proposals shall be delivered to Bureau of Reclamation, Lower Colorado Regional Office, Attention: Kelli Adams (LC- 10204), 500 Date Street, Building 1400, Boulder City, NV 89005.

This notice states that Department's non-discrimination policy and encourages the same from its contractors, subcontractors, and lessors. With the exception of categories protected by law, compliance is voluntary and no extraordinary enforcement or protection mechanisms on the part of the Government are implied. Based upon law, Executive Order, or internal policy, the Department of the Interior prohibits discrimination in the workplace, including sexual harassment, based on race, color, national origin, sex, religion, disability, age, or sexual orientation. The Department urges its contractors, subcontractors, and lessors to develop and enforce comprehensive anti-discrimination policies for their places of work.

Part I – Section B – Supplies or Services and Prices/Costs

Document No.

R15PS00148

Document Title

Electrical Systems and Equipment Repairs, Replacements

B-1

SECTION B – SUPPLIES OR SERVICES AND PRICES/COST

B.1 THE REQUIREMENTS - NEGOTIATION

(a) The Contractor shall furnish the items identified in this Section, in accordance with the terms, conditions, and specifications contained in the contract.

(b) Offerors are cautioned to carefully review the proposal submission requirements contained in Section L. Failure to comply with these requirements may result in an offer being determined technically unacceptable.

(c) Under this solicitation, the offeror is required to propose Fixed Rate Pricing that will apply to each of the 5 ordering periods for each of the labor categories and line items identified.

(d) Offeror shall complete Section B.2 Schedule, Section B.3 Fixed Labor Rates and Attachment 4 Exemplar Task Order Bid Schedule including the Task Order Requirements (Reference L.9(e)).

(e) Offers will be considered for award on the following price schedule, but no offer will be considered for award on only a part of the price schedule.

(f) Offers are subject to the terms and conditions of this solicitation.

(g) Quantities in the price schedule are estimated quantities only. Estimated quantities are based on the Government’s best estimate of the work to be completed each year and will be used for comparison of offers. The Contractor will only be paid on the actual work completed. No claim shall be made against the Government for overruns or underruns.

(h) This solicitation has five (5) one-year ordering periods. Each Schedule reflects the Government’s “best estimate” in regards to the dollar value of services that Reclamation anticipates purchasing during the specified time period. The estimated quantities reflect the goals and budget for each of the 5 year performance terms.

B.2 THE SCHEDULE

CLIN Supplies or Services Qty Unit Estimated Dollar Value

1 Electrical Systems and Equipment Repairs, Replacements and/or Rehabilitation – Ordering Period April 2015-March 2016

1 AU $ 320,000.00

2 Electrical Systems and Equipment Repairs, Replacements and/or Rehabilitation – Ordering Period April 2016- March 2017

1 AU $ 320,000.00

3 Electrical Systems and Equipment Repairs, Replacements and/or Rehabilitation – Ordering Period April 2017- March 2018

1 AU $ 320,000.00

4 Electrical Systems and Equipment Repairs, Replacements and/or Rehabilitation – Ordering Period April 2018- March 2019

1 AU $ 320,000.00

5 Electrical Systems and Equipment Repairs, Replacements and/or Rehabilitation – Ordering Period April 2019- March 2020

1 AU $ 320,000.00

5 Year Total Not to Exceed $1,600,000.00

Services and Prices/Costs

Document No.

R15PS00148

Document Title

Electrical Systems and Equipment Repairs, Replacements

B-2

B.3 FIXED LABOR RATES AND MINIMUM REQUIREMENTS

(a) The fixed rates, inclusive of all direct, indirect and profit, shall apply for the duration of each performance period associated with the schedules.

CLIN 1 – April 1, 2015 – March 31, 2016 Item No.

Supplies or Service Estimated Quantities

Unit Unit Price Amount

1-1 Principal Engineer or Electrician (Corporate)

16 Hours $__________ $__________

1-2 Senior Engineer (Electrical) 16 Hours $__________ $__________ 1-3 Engineer (Electrical) 40 Hours $__________ $__________ 1-4 Project Manager 40 Hours $__________ $__________ 1-5 Electrician, Master (Licensed) 40 Hours $__________ $__________ 1-6 Electrician, Master (Licensed) - Overtime 16 Hours $__________ $__________

1-7 Foreman/Lead Electrician, Journeyman (Licensed)

160 Hours $__________ $__________

1-8 Foreman/Lead Electrician, Journeyman (Licensed) - Overtime

16 Hours $__________ $__________

1-9 Electrician, Journeyman (Licensed) 320 Hours $__________ $__________

1-10 Electrician, Journeyman (Licensed) - Overtime

32 Hours $__________ $__________

1-11 Electrician, Apprentice 160 Hours $__________ $__________ 1-12 Electrician, Apprentice - Overtime 16 Hours $__________ $__________ 1-13 Laborer, Journeyman 160 Hours $__________ $__________ 1-14 Laborer, Journeyman - Overtime 16 Hours $__________ $__________ 1-15 Laborer, Apprentice 80 Hours $__________ $__________ 1-16 Laborer, Apprentice - Overtime 16 Hours $__________ $__________ 1-17 CADD Technician, Senior 10 Hours $__________ $__________ 1-18 CADD Technician, Senior - Overtime 8 Hours $__________ $__________ 1-19 CADD Technician 40 Hours $__________ $__________ 1-20 CADD Technician - Overtime 16 Hours $__________ $__________ 1-21 Administrative Assistant 40 Hours $__________ $__________ 1-22 Administrative Assistant - Overtime 4 Hours $__________ $__________

TOTAL SCHEDULE PRICE

CLIN 2 – April 1, 2016 – March 31, 2017

No.

Supplies or Service Estimated Quantities

Unit Unit Price Amount

2-1 Principal Engineer or Electrician (Corporate)

16 Hours $__________ $__________

2-2 Senior Engineer (Electrical) 16 Hours $__________ $__________ 2-3 Engineer (Electrical) 40 Hours $__________ $__________ 2-4 Project Manager 40 Hours $__________ $__________ 2-5 Electrician, Master (Licensed) 40 Hours $__________ $__________ 2-6 Electrician, Master (Licensed) - Overtime 16 Hours $__________ $__________

2-7 Foreman/Lead Electrician, Journeyman (Licensed)

160 Hours $__________ $__________

2-8 Foreman/Lead Electrician, Journeyman (Licensed) - Overtime

16 Hours $__________ $__________

2-9 Electrician, Journeyman (Licensed) 320 Hours $__________ $__________

Services and Prices/Costs

Document No.

R15PS00148

Document Title

Electrical Systems and Equipment Repairs, Replacements

B-3

CLIN 2 – April 1, 2016 – March 31, 2017

No.

Supplies or Service Estimated Quantities

Unit Unit Price Amount

2-10 Electrician, Journeyman (Licensed) - Overtime

32 Hours $__________ $__________

2-11 Electrician, Apprentice 160 Hours $__________ $__________ 2-12 Electrician, Apprentice - Overtime 16 Hours $__________ $__________ 2-13 Laborer, Journeyman 160 Hours $__________ $__________ 2-14 Laborer, Journeyman - Overtime 16 Hours $__________ $__________ 2-15 Laborer, Apprentice 80 Hours $__________ $__________ 2-16 Laborer, Apprentice - Overtime 16 Hours $__________ $__________ 2-17 CADD Technician, Senior 10 Hours $__________ $__________ 2-18 CADD Technician, Senior - Overtime 8 Hours $__________ $__________ 2-19 CADD Technician 40 Hours $__________ $__________ 2-20 CADD Technician - Overtime 16 Hours $__________ $__________ 2-21 Administrative Assistant 40 Hours $__________ $__________ 2-22 Administrative Assistant - Overtime 4 Hours $__________ $__________

CLIN 3 – April 1, 2017 – March 31, 2018

No.

Supplies or Service Estimated Quantities

Unit Unit Price Amount

3-1 Principal Engineer or Electrician (Corporate)

16 Hours $__________ $__________

3-2 Senior Engineer (Electrical) 16 Hours $__________ $__________ 3-3 Engineer (Electrical) 40 Hours $__________ $__________ 3-4 Project Manager 40 Hours $__________ $__________ 3-5 Electrician, Master (Licensed) 40 Hours $__________ $__________ 3-6 Electrician, Master (Licensed) - Overtime 16 Hours $__________ $__________

3-7 Foreman/Lead Electrician, Journeyman (Licensed)

160 Hours $__________ $__________

3-8 Foreman/Lead Electrician, Journeyman (Licensed) - Overtime

16 Hours $__________ $__________

3-9 Electrician, Journeyman (Licensed) 320 Hours $__________ $__________

3-10 Electrician, Journeyman (Licensed) - Overtime

32 Hours $__________ $__________

3-11 Electrician, Apprentice 160 Hours $__________ $__________ 3-12 Electrician, Apprentice - Overtime 16 Hours $__________ $__________ 3-13 Laborer, Journeyman 160 Hours $__________ $__________ 3-14 Laborer, Journeyman - Overtime 16 Hours $__________ $__________ 3-15 Laborer, Apprentice 80 Hours $__________ $__________ 3-16 Laborer, Apprentice - Overtime 16 Hours $__________ $__________ 3-17 CADD Technician, Senior 10 Hours $__________ $__________ 3-18 CADD Technician, Senior - Overtime 8 Hours $__________ $__________ 3-19 CADD Technician 40 Hours $__________ $__________ 3-20 CADD Technician - Overtime 16 Hours $__________ $__________ 3-21 Administrative Assistant 40 Hours $__________ $__________ 3-22 Administrative Assistant - Overtime 4 Hours $__________ $__________

Services and Prices/Costs

Document No.

R15PS00148

Document Title

Electrical Systems and Equipment Repairs, Replacements

B-4

CLIN 4 – April 1, 2018 – March 31, 2019

No.

Supplies or Service Estimated Quantities

Unit Unit Price Amount

4-1 Principal Engineer or Electrician (Corporate)

16 Hours $__________ $__________

4-2 Senior Engineer (Electrical) 16 Hours $__________ $__________ 4-3 Engineer (Electrical) 40 Hours $__________ $__________ 4-4 Project Manager 40 Hours $__________ $__________ 4-5 Electrician, Master (Licensed) 40 Hours $__________ $__________ 4-6 Electrician, Master (Licensed) - Overtime 16 Hours $__________ $__________

4-7 Foreman/Lead Electrician, Journeyman (Licensed)

160 Hours $__________ $__________

4-8 Foreman/Lead Electrician, Journeyman (Licensed) - Overtime

16 Hours $__________ $__________

4-9 Electrician, Journeyman (Licensed) 320 Hours $__________ $__________

4-10 Electrician, Journeyman (Licensed) - Overtime

32 Hours $__________ $__________

4-11 Electrician, Apprentice 160 Hours $__________ $__________ 4-12 Electrician, Apprentice - Overtime 16 Hours $__________ $__________ 4-13 Laborer, Journeyman 160 Hours $__________ $__________ 4-14 Laborer, Journeyman - Overtime 16 Hours $__________ $__________ 4-15 Laborer, Apprentice 80 Hours $__________ $__________ 4-16 Laborer, Apprentice - Overtime 16 Hours $__________ $__________ 4-17 CADD Technician, Senior 10 Hours $__________ $__________ 4-18 CADD Technician, Senior - Overtime 8 Hours $__________ $__________ 4-19 CADD Technician 40 Hours $__________ $__________ 4-20 CADD Technician - Overtime 16 Hours $__________ $__________ 4-21 Administrative Assistant 40 Hours $__________ $__________ 4-22 Administrative Assistant - Overtime 4 Hours $__________ $__________

CLIN 5 – April 1, 2019 – March 31, 2020

No.

Supplies or Service Estimated Quantities

Unit Unit Price Amount

5-1 Principal Engineer or Electrician (Corporate)

16 Hours $__________ $__________

5-2 Senior Engineer (Electrical) 16 Hours $__________ $__________ 5-3 Engineer (Electrical) 40 Hours $__________ $__________ 5-4 Project Manager 40 Hours $__________ $__________ 5-5 Electrician, Master (Licensed) 40 Hours $__________ $__________ 5-6 Electrician, Master (Licensed) - Overtime 16 Hours $__________ $__________

5-7 Foreman/Lead Electrician, Journeyman (Licensed)

160 Hours $__________ $__________

5-8 Foreman/Lead Electrician, Journeyman (Licensed) - Overtime

16 Hours $__________ $__________

5-9 Electrician, Journeyman (Licensed) 320 Hours $__________ $__________

5-10 Electrician, Journeyman (Licensed) - Overtime

32 Hours $__________ $__________

Services and Prices/Costs

Document No.

R15PS00148

Document Title

Electrical Systems and Equipment Repairs, Replacements

B-5

CLIN 5 – April 1, 2019 – March 31, 2020

No.

Supplies or Service Estimated Quantities

Unit Unit Price Amount

5-11 Electrician, Apprentice 160 Hours $__________ $__________ 5-12 Electrician, Apprentice - Overtime 16 Hours $__________ $__________ 5-13 Laborer, Journeyman 160 Hours $__________ $__________ 5-14 Laborer, Journeyman - Overtime 16 Hours $__________ $__________ 5-15 Laborer, Apprentice 80 Hours $__________ $__________ 5-16 Laborer, Apprentice - Overtime 16 Hours $__________ $__________ 5-17 CADD Technician, Senior 10 Hours $__________ $__________ 5-18 CADD Technician, Senior - Overtime 8 Hours $__________ $__________ 5-19 CADD Technician 40 Hours $__________ $__________ 5-20 CADD Technician - Overtime 16 Hours $__________ $__________ 5-21 Administrative Assistant 40 Hours $__________ $__________ 5-22 Administrative Assistant - Overtime 4 Hours $__________ $__________

TOTAL SCHEDULE PRICE

Offeror shall propose any other applicable labor category necessary to accomplish the requirement described in the statement of work.

Minimum requirements for applicable labor categories:

Principal Engineer or Electrician (Corporate) – Company-level official with technical experience and authority as a company officer – Licensed as an Electrical Engineer, Master Electrician, or Journeyman Electrician; with 10 or more years technical experience; meeting or exceeding the technical training/education and experience/competency requirements of either the Senior Engineer (Electrical) or Licensed Master Electrician or Lead/Foreman Journeyman Electrician; and in addition authorized to represent and commit the Company in agreements and technical decisions/actions.

Senior Engineer (Electrical) – (1) B.S. with 8 years of experience, M.S. with 5 years of experience, and Professional License as an Electrical Engineer; (2) Trained and experienced in use of EasyPower software or equivalent and compatible programs for power system studies, including Arc Flash Analysis, with demonstrated experience within the past three years; and (3) For on-site work, training certification for OSHA 10-hour Construction Safety training.

Engineer (Electrical) – (1) B.S. with 5 years of experience, M.S. with 2 years of experience, and Professional License as an Electrical Engineer; (2) Trained and experienced in use of EasyPower software or equivalent and compatible programs for power system studies, including Arc Flash Analysis, with demonstrated experience within the past three years; and (3) For on-site work, training certification for OSHA 10-hour Construction Safety training.

Project Manager- (1) 10 years of experience or B.S. in Electrical Engineering with five (5) years of experience in Electrical (Buildings and Grounds, Commercial, and/or Light Industrial); (2) if working on site, training certification for OSHA 10-hour Construction Safety training.

Electrician, Master (Licensed) - (1) Ten (10) years of progressively responsible journey level electrical experience; OR, Completion of a Federal- or State-approved technical training program in electrical repair and maintenance and seven (7) years electrical experience; OR, Any equivalent combination of experience and/or education from which comparable knowledge, skills and abilities have been achieved;

(2) Current Clark County, Nevada, certification as a Master Electrician; and (3) For on-site work, training certification for OSHA 10-hour Construction Safety training.

Services and Prices/Costs

Document No.

R15PS00148

Document Title

Electrical Systems and Equipment Repairs, Replacements

B-6

Foreman/Lead Electrician, Journeyman (Licensed) - (1) Ten (10) years of progressively responsible journey level electrical experience; OR, Completion of a Federal- or State-approved technical training program in electrical repair and maintenance and seven (7) years electrical experience; OR, Any equivalent combination of experience and/or education from which comparable knowledge, skills and abilities have been achieved; (2) Current Clark County, Nevada, certification as a Journeyman Electrician;

and (3) For on-site work, training certification for OSHA 10-hour Construction Safety training.

Electrician, Journeyman (Licensed) – (1) Five (5) years of progressively responsible journey level electrical experience; OR, Completion of a Federal- or State-approved technical training program in electrical repair and maintenance and two (2) years electrical experience; OR, Any equivalent combination of experience and/or education from which comparable knowledge, skills and abilities have been achieved; (2) Current Clark County, Nevada, Certification as a Journeyman Electrician; (3) For on-site work, training certification for OSHA 10-hour Construction Safety training.

Electrician, Apprentice – (1) Three (3) years of progressively responsible experience as an electrician apprentice; OR, Completion of at least three (3) years of a Federal- or State-approved technical training program in electrical construction, repair and maintenance; OR, Any equivalent combination of experience and/or education from which comparable knowledge, skills and abilities have been achieved;

(2) Apprentices are formally recorded and documented in a current approved Apprentice Training Program; and (3) For On-site work, training certification for OSHA 10-hour Construction Safety training.

Laborer, Journeyman – (1) Five (5) years of progressively responsible journey level laborer experience;

OR, Completion of a Federal- or State-approved Laborer technical training program and two (2) years laborer experience; OR, Any equivalent combination of experience and/or education from which comparable knowledge, skills and abilities have been achieved; (2) For on-site work, training certification for OSHA 10-hour Construction Safety training.

Laborer, Apprentice – (1) Three (3) years of progressively responsible experience as a laborer-apprentice laborer-electrician helper; OR, Completion of at least three (3) years of a Federal- or State-approved technical training program in electrical construction, repair and maintenance; OR, Any equivalent combination of experience and/or education from which comparable knowledge, skills and abilities have been achieved; (2) Apprentices are formally recorded and documented in a current approved Apprentice Training Program; and (3) For On-site work, training certification for OSHA 10-hour Construction Safety training.

CADD Technician, Senior – Associate Degree and five (5) years experience, or minimum of seven (7) years direct experience, and certified AutoCAD (or equivalent) technician.

CADD Technician – Associate Degree and one (1) year experience, or minimum of three (3) years direct experience, and certified AutoCAD (or equivalent) technician.

Administrative Assistant – Minimum of five (5) years experience at the senior support level of the firm.

Part IV – Section L – Instructions, conditions, and notices to offerors or respondents

Document No.

R15PS00148

Document Title

Electrical Systems and Equipment Repairs, Replacements and/or Rehabilitation – IDIQ

L-3

L.5 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT –

CONSTRUCTION MATERIALS

MAY 2014

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American Act--Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American Act, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers. (1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested -

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

L.6 52.233-02 SERVICE OF PROTEST SEPTEMBER 2006

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from Craig Jordahl, Bureau of Reclamation, 500 Date Street, Building 1400, Boulder City, NV 89005.

Part IV – Section L – Instructions, conditions, and notices to offerors or respondents

Document No.

R15PS00148

Document Title

Electrical Systems and Equipment Repairs, Replacements and/or Rehabilitation – IDIQ

L-4

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(c) A copy of the protest served on the Contracting Officer shall be simultaneously furnished by the protester to the Department of the Interior Assistant Solicitor for Procurement and Patents, 1849 C Street, NW, Room 6511, Washington, D.C. 20240.

L.7 52.236-27 SITE VISIT CONSTRUCTION FEBRUARY 1995

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for—

Tuesday, January 20, 2015 at 10:00 a.m. PT

(c) Participants will meet at--

All attendees shall meet at the North Hoover Rd. Parking Lot located at 500 Date Street, Boulder City, NV 89005.

L.8 52.252-05 AUTHORIZED DEVIATIONS IN PROVISIONS APRIL 1984

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any [insert regulation name] (48 CFR Chapter []) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

L.9 1452.215-71 USE AND DISCLOSURE OF PROPORAL INFORMATION APRIL 1984

(a) Definitions. For the purposes of this provision and the Freedom of Information Act (5 U.S.C. 552), the following terms shall have the meaning set forth below:

(1) "Trade Secret" means an unpatented, secret, commercially valuable plan, appliance, formula, or process, which is used for making, preparing, compounding, treating or processing articles or materials which are trade commodities.

(2) "Confidential commercial or financial information" means any business information (other than trade secrets) which is exempt from the mandatory disclosure requirement of the Freedom of Information Act, 5 U.S.C. 552. Exemptions from mandatory disclosure which may be applicable to business information contained in proposals include exemption (4), which covers "commercial and financial information obtained from a person and privileged or confidential," and exemption (9), which covers "geological and geophysical information, including maps, concerning wells."

(b) If the offeror, or its subcontractor(s), believes that the proposal contains trade secrets or confidential commercial or financial information exempt from disclosure under the Freedom of Information Act, (5 U.S.C. 552), the cover page of each copy of the proposal shall be marked with the following legend:

"The information specifically identified on pages ______ of this proposal constitutes trade secrets or