R10 LEC Project List.xlsx
XLSX spreadsheet 11 KB Posted
- Solicitation number
- Not on record
- Issued by
-
General Services Administration
About this file
This document is a Special Notice for a Virtual Industry Day hosted by the U.S. General Services Administration (GSA), Public Buildings Service (PBS), Arctic Region (Region 10) regarding Low Embodied Carbon (LEC) Projects funded by the Inflation Reduction Act (IRA).
The key details are:
- The Industry Day will be held on October 1, 2024 and is open to Region 10 IDV Contract holders as well as all small and large business concerns.
- The purpose is to provide an overview of GSA's IRA programs, including LEC material requirements, environmental product declarations, and embodied carbon considerations in the procurement process.
- A list of Region 10 LEC projects is provided, with estimated costs ranging from $100K to $190M+. The projects involve modernization of various land ports of entry, as well as plaza and parking lot renovations.
- Participants are required to register by September 24, 2024 to attend the virtual event.
- The attachment contains a table listing the Region 10 LEC projects, including the project location, state, and order of magnitude cost.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| R10 IRA LEC Industry Day 2024-508.pdf | ||
| GSA Inflation Reduction Act funding one-pager.pdf | ||
| GSA LEC Construction Materials Fact Sheet.pdf | ||
| R10 LEC Project List.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| IRA Region 10 IRA LEC Projects | |||
| Project | City | State | Order of Magnitude |
| Alcan Land Port of Entry Modernization | Alcan | AK | $170M-190M+ |
| Kenneth G. Ward Land Port of Entry Modernization | Lynden | WA | $90M-$100M+ |
| Pacific Highway Land Port of Entry Modernization | Blaine | WA | $25M-$35M+ |
| Sumas Land Port of Entry Modernization | Sumas | WA | $135M-$155M+ |
| Porthill Land Port of Entry Modernization | Bonners Ferry | ID | $45M-$55M+ |
| Henry M. Jackson Fed Bldg - Plaza Project | Seattle | WA | $15M-20M+ |
| Anchorage Historic Fed Bldg Sidewalk Paving | Anchorage | AK | $100-$250K |
| Ferry Land LPOE Station Bldg Structural Repairs | Curlew | WA | $100-$250K |
| David J Wheeler Fed Bldg - Reconstruct Parking Lot | Baker City | OR | $500K-$800K |
https://www.gsa.gov/real-estate/gsa-properties/land-ports-of-entry-and-the-bipartisan-infrastructure-law/bipartisan-infrastructure-law-construction-projects/alaskahttps://www.gsa.gov/real-estate/gsa-properties/land-ports-of-entry-and-the-bipartisan-infrastructure-law/bipartisan-infrastructure-law-construction-projects/washingtonhttps://www.gsa.gov/real-estate/gsa-properties/land-ports-of-entry-and-the-bipartisan-infrastructure-law/bipartisan-infrastructure-law-construction-projects/washingtonhttps://www.gsa.gov/real-estate/gsa-properties/land-ports-of-entry-and-the-bipartisan-infrastructure-law/bipartisan-infrastructure-law-construction-projects/washingtonhttps://www.gsa.gov/real-estate/gsa-properties/land-ports-of-entry-and-the-bipartisan-infrastructure-law/bipartisan-infrastructure-law-construction-projects/idahohttps://www.gsa.gov/real-estate/gsa-properties/inflation-reduction-act/lec-program-details/lowembodied-carbon-projects/jackson-federal-building
File details come from the government source that posted it. Updated .