R-680(5)_Price_Schedule.xls
XLS spreadsheet 52 KB Posted
- Solicitation number
- 2000016901
- Issued by
- Aitkin County, Minnesota
About this file
I apologize, but I cannot provide a summary of the file R-680(5)_Price_Schedule.xls because no actual file contents were uploaded with your request. The filename suggests it is an Excel spreadsheet related to a price schedule, but without seeing the actual spreadsheet data, I cannot generate a meaningful summary. To receive a comprehensive analysis, please upload the full file contents or provide the specific details within the spreadsheet.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| EXHIBIT D - PRICE SCHEDULE | |||||
| ROOFING; ASPHALT SHINGLE SYSTEM REPAIR AND REPLACEMENT | |||||
| CONTRACTOR COMPANY NAME: | |||||
| LIST COUNTY NAMES BEING BID: (Contractors do not have to bid on all counties.) | |||||
| Section 07 0150 | Preparation for Reroofing | ||||
| SPECIFICATION | DESCRIPTION OF WORK TYPE | UNIT OF MEASURE | UNIT PRICE | ||
| 3.2 Roof Tear-Off - Asphalt shingle removal including underlayment | SQ FT | $ | |||
| 3.6 Base Flashing Removal | LFT | $ | |||
| Section 07 3113 | Asphalt Shingle Roof System Replacement | ||||
| SPECIFICATION | DESCRIPTION OF WORK TYPE | UNIT OF MEASURE | UNIT PRICE | ||
| 2.1 Glass-Fiber-Reinforced Asphalt Shingles | |||||
| 2.1 A. 1. - TYPE 1 - wind speeds of up to 60 mph | SQ FT | $ | |||
| 2.1 A. 2. - TYPE 2 - wind speeds of up to 80 mph | SQ FT | $ | |||
| 2.2 | Laminated Architectural Glass-Fiber-Reinforced Asphalt Shingles | ||||
| 2.2 A. 1. Type I Self Sealing, 250 lb.(minimum) - wind speeds of up to 90 mph | SQ FT | $ | |||
| 2.3 Underlayment | |||||
| 2.3 A. 1. - Type 2 - Felt: ASTM D 226 asphalt-saturated organic felts, nonperforated | SQ FT | $ | |||
| 2.2.B. 1 - Synthetic felt | SQ FT | $ | |||
| 2.2 A. 1. - Self-Adhering Sheet Underlayment, polyethylene faced, 40 mil thick, slip-resisting | SQ FT | $ | |||
| 2.4 Ridge Vents | LFT | $ | |||
| R61 Roof Vents | EA | $ | |||
| 2.5 Metal Flashing And Trim | |||||
| Roof Edge Style D - Zinc-Coated Steel | |||||
| 1) Two-coat fluoropolymer | LFT | $ | |||
| 2) Clear, unfinished | LFT | $ | |||
| Roof Edge Style D - Aluminum | |||||
| 1) Two-coat fluoropolymer | LFT | $ | |||
| 2) Clear, unfinished | LFT | $ | |||
| Plywood decking replacement to match thickness of existing | SQ FT | $ | |||
| Roof Penetrations | SQ FT | $ | |||
| Copper Valley Metal | LFT | $ | |||
| Galvanized Valley Metal | LFT | $ | |||
| Section 07 6500 | Manufactured Roof Specialties and Sheet Metal Flashing Fabrications | ||||
| SPECIFICATION | DESCRIPTION OF WORK TYPE | UNIT OF MEASURE | UNIT PRICE | ||
| 1.6 A. Repair of Manufactured Roof Specialties & Sheet Metal Fabrications | |||||
| A. 3. Metal Counterflashing Repair | LFT | $ | |||
| A. 4. Gutter Re-securement | LFT | $ | |||
| A. 5. Downspout Re-securement | EA | $ | |||
| A. 6. Sealant Remediation | LFT | $ | |||
| 1.6 B. 4. Metal Counterflashing and Reglet Replacement (step flashing and step flashing cover) | |||||
| 2.7 C. Counterflashings | |||||
| a. Zinc-Coated Steel: | LFT | $ | |||
| b. Formed Aluminum: | LFT | $ | |||
| 1.6 B. 5. Gutter Replacement | |||||
| 2.8.A.2 Manufactured Gutters | |||||
| a. 1) Style A | |||||
| b. 1.) Zinc-Coated Steel | LFT | $ | |||
| b. 2) Aluminum Sheet | |||||
| 1) Two-coat fluoropolymer | LFT | $ | |||
| 2) Clear or color anodic | LFT | $ | |||
| a. 2) Style K | |||||
| 2. a. Zinc-Coated Steel | LFT | $ | |||
| 2. b. Aluminum Sheet | |||||
| 1) Two-coat fluoropolymer | LFT | $ | |||
| 2) Clear or color anodic | LFT | $ | |||
| 1.6 B. 6. Downspout Replacement | |||||
| 2.8 A.3. Manufactured Downspouts | |||||
| 3.a. 1). rectangular corrugated | |||||
| 2. a. Zinc-Coated Steel | LFT | $ | |||
| 2. b. Aluminum Sheet | |||||
| 1) Two-coat fluoropolymer | LFT | $ | |||
| 2) Clear or color anodic | LFT | $ | |||
| Labor and Mobilization | |||||
| LABOR DEFINITIONS: | |||||
| Regular Time: Monday through Friday, 7:30 a.m. to 4:00 p.m. | |||||
| Non-Regular Time: Monday through Friday, 4:01 p.m. to 7:29 a.m. | |||||
| Non-Regular Time Weekends and Holidays: 4:01 p.m. (Friday) to 7:29 a.m. (Monday) - includes State designated holidays. | |||||
| LABOR RATES: | |||||
| a) Forman | |||||
| Regular Time Rate per hour | HR | $ | |||
| Non-Regular Time Rate per hour | HR | $ | |||
| Non-Regular Time Weekends and Holidays Rate per hour | HR | $ | |||
| b) Journeyman | |||||
| Regular Time Rate per hour | HR | $ | |||
| Non-Regular Time Rate per hour | HR | $ | |||
| Non-Regular Time Weekends and Holidays Rate per hour | HR | $ | |||
| c) Apprentice | |||||
| Regular Time Rate per hour | HR | $ | |||
| Non-Regular Time Rate per hour | HR | $ | |||
| Non-Regular Time Weekends and Holidays Rate per hour | HR | $ | |||
| d) General Labor | |||||
| Regular Time Rate per hour | HR | $ | |||
| Non-Regular Time Rate per hour | HR | $ | |||
| Non-Regular Time Weekends and Holidays Rate per hour | HR | $ | |||
| MOBILIZATION RATES: | |||||
| Crew, full service - per project | EA | $ | |||
| One person project - per project | EA | $ |
&CPage &P of &N
File details come from the government source that posted it. Updated .