R-680(5)_Price_Schedule.xls

XLS spreadsheet 52 KB Posted

Attached to
Roofing; Asphalt Shingle System Repair and Replace
Solicitation number
2000016901
Issued by
Aitkin County, Minnesota

About this file

I apologize, but I cannot provide a summary of the file R-680(5)_Price_Schedule.xls because no actual file contents were uploaded with your request. The filename suggests it is an Excel spreadsheet related to a price schedule, but without seeing the actual spreadsheet data, I cannot generate a meaningful summary. To receive a comprehensive analysis, please upload the full file contents or provide the specific details within the spreadsheet.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

EXHIBIT D - PRICE SCHEDULE
ROOFING; ASPHALT SHINGLE SYSTEM REPAIR AND REPLACEMENT
CONTRACTOR COMPANY NAME:
LIST COUNTY NAMES BEING BID: (Contractors do not have to bid on all counties.)
Section 07 0150Preparation for Reroofing
SPECIFICATIONDESCRIPTION OF WORK TYPEUNIT OF MEASUREUNIT PRICE
3.2 Roof Tear-Off - Asphalt shingle removal including underlaymentSQ FT$
3.6 Base Flashing RemovalLFT$
Section 07 3113Asphalt Shingle Roof System Replacement
SPECIFICATIONDESCRIPTION OF WORK TYPEUNIT OF MEASUREUNIT PRICE
2.1 Glass-Fiber-Reinforced Asphalt Shingles
2.1 A. 1. - TYPE 1 - wind speeds of up to 60 mphSQ FT$
2.1 A. 2. - TYPE 2 - wind speeds of up to 80 mphSQ FT$
2.2Laminated Architectural Glass-Fiber-Reinforced Asphalt Shingles
2.2 A. 1. Type I Self Sealing, 250 lb.(minimum) - wind speeds of up to 90 mphSQ FT$
2.3 Underlayment
2.3 A. 1. - Type 2 - Felt: ASTM D 226 asphalt-saturated organic felts, nonperforatedSQ FT$
2.2.B. 1 - Synthetic feltSQ FT$
2.2 A. 1. - Self-Adhering Sheet Underlayment, polyethylene faced, 40 mil thick, slip-resistingSQ FT$
2.4 Ridge VentsLFT$
R61 Roof VentsEA$
2.5 Metal Flashing And Trim
Roof Edge Style D - Zinc-Coated Steel
1) Two-coat fluoropolymerLFT$
2) Clear, unfinishedLFT$
Roof Edge Style D - Aluminum
1) Two-coat fluoropolymerLFT$
2) Clear, unfinishedLFT$
Plywood decking replacement to match thickness of existingSQ FT$
Roof PenetrationsSQ FT$
Copper Valley MetalLFT$
Galvanized Valley MetalLFT$
Section 07 6500Manufactured Roof Specialties and Sheet Metal Flashing Fabrications
SPECIFICATIONDESCRIPTION OF WORK TYPEUNIT OF MEASUREUNIT PRICE
1.6 A. Repair of Manufactured Roof Specialties & Sheet Metal Fabrications
A. 3. Metal Counterflashing RepairLFT$
A. 4. Gutter Re-securementLFT$
A. 5. Downspout Re-securementEA$
A. 6. Sealant RemediationLFT$
1.6 B. 4. Metal Counterflashing and Reglet Replacement (step flashing and step flashing cover)
2.7 C. Counterflashings
a. Zinc-Coated Steel:LFT$
b. Formed Aluminum:LFT$
1.6 B. 5. Gutter Replacement
2.8.A.2 Manufactured Gutters
a. 1) Style A
b. 1.) Zinc-Coated SteelLFT$
b. 2) Aluminum Sheet
1) Two-coat fluoropolymerLFT$
2) Clear or color anodicLFT$
a. 2) Style K
2. a. Zinc-Coated SteelLFT$
2. b. Aluminum Sheet
1) Two-coat fluoropolymerLFT$
2) Clear or color anodicLFT$
1.6 B. 6. Downspout Replacement
2.8 A.3. Manufactured Downspouts
3.a. 1). rectangular corrugated
2. a. Zinc-Coated SteelLFT$
2. b. Aluminum Sheet
1) Two-coat fluoropolymerLFT$
2) Clear or color anodicLFT$
Labor and Mobilization
LABOR DEFINITIONS:
Regular Time: Monday through Friday, 7:30 a.m. to 4:00 p.m.
Non-Regular Time: Monday through Friday, 4:01 p.m. to 7:29 a.m.
Non-Regular Time Weekends and Holidays: 4:01 p.m. (Friday) to 7:29 a.m. (Monday) - includes State designated holidays.
LABOR RATES:
a) Forman
Regular Time Rate per hourHR$
Non-Regular Time Rate per hourHR$
Non-Regular Time Weekends and Holidays Rate per hourHR$
b) Journeyman
Regular Time Rate per hourHR$
Non-Regular Time Rate per hourHR$
Non-Regular Time Weekends and Holidays Rate per hourHR$
c) Apprentice
Regular Time Rate per hourHR$
Non-Regular Time Rate per hourHR$
Non-Regular Time Weekends and Holidays Rate per hourHR$
d) General Labor
Regular Time Rate per hourHR$
Non-Regular Time Rate per hourHR$
Non-Regular Time Weekends and Holidays Rate per hourHR$
MOBILIZATION RATES:
Crew, full service - per projectEA$
One person project - per projectEA$

&CPage &P of &N

File details come from the government source that posted it. Updated .