Quote Tabulations.Bond Road.2025.pdf
PDF 84 KB Posted
- Attached to
- RFQ - Pre-Level and 2 Inch Asphalt Overlay
- Solicitation number
- S-C01510-00013411
- Issued by
- Lake County, Oregon
About this file
This document is a quote tabulation for the Linn County Road Department's Pre-Level & Overlay Work on Bond Road (Project M2503), featuring bid submissions from seven different paving contractors: North Santiam Paving, Knife River, RiverBend Materials, KNL Industries, Wildish, Double Eagle Paving, O.A.M., and Settje Sons Paving. The project involves roadway improvements with four primary pay items: mobilization, temporary traffic control, driveway paving, and hot mix asphalt concrete (HMAC or WMAC), with a total estimated quantity of 699 tons of asphalt. The bid opening was scheduled for Wednesday, April 9th at 1:00 P.M. PDT, with contractors submitting varied unit rates and total costs for each line item.
The quote tabulation includes a comprehensive comparison of each contractor's pricing, with total project costs ranging from $78,798.00 to $129,840.00, excluding the LCRD (Linn County Road Department) estimate of $95,131.00. The document provides a detailed breakdown of unit rates for each pay item across different contractors, revealing significant variation in pricing strategies. The LCRD estimate suggests budgetary expectations, with line items for mobilization at $5,500.00, temporary traffic control at $3,250.00, driveway paving at $3,200.00, and HMAC/WMAC at $83,181.00, totaling $95,131.00 for the entire project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ Bond Road Ride Quality M2503.pdf | ||
| Submittal Sheet - RFQ 2025-23 Centrate Handling Improvements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M2503
Pay Items Quantity Units Unit Rate Total Cost Unit Rate Total Cost Unit Rate Total Cost Unit Rate Total Cost
Mobilization 1 LS $3,000.00 $3,000.00 $4,797.80 $4,797.80 $4,000.00 $4,000.00 $5,000.00 $5,000.00
Temporary Traffic Control 1 LS $2,100.00 $2,100.00 $5,259.85 $5,259.85 $4,000.00 $4,000.00 $6,500.00 $6,500.00
Driveway Paving 4 Each $600.00 $2,400.00 $796.94 $3,187.76 $850.00 $3,400.00 $1,500.00 $6,000.00
HMAC or WMAC 699 Tons $102.00 $71,298.00 $97.91 $68,439.09 $107.50 $75,142.50 $100.00 $69,900.00
TOTALS: $78,798.00 $81,684.50 $86,542.50 $87,400.00
Pay Items Quantity Units Unit Rate Total Cost Unit Rate Total Cost Unit Rate Total Cost Unit Rate Total Cost
Mobilization 1 LS $6,600.00 $6,600.00 $3,200.00 $3,200.00 $7,228.00 $7,228.00 $3,000.00 $3,000.00
Temporary Traffic Control 1 LS $6,100.00 $6,100.00 $5,141.00 $5,141.00 $6,075.00 $6,075.00 $12,000.00 $12,000.00
Driveway Paving 4 Each $500.00 $2,000.00 $746.00 $2,984.00 $1,200.00 $4,800.00 $750.00 $3,000.00
HMAC or WMAC 699 Tons $110.00 $76,890.00 $119.52 $83,544.48 $130.98 $91,555.02 $160.00 $111,840.00
TOTALS: $91,590.00 $94,869.48 $109,658.02 $129,840.00
Pay Items Quantity Units Unit Rate Total Cost Unit Rate Total Cost Unit Rate Total Cost Unit Rate Total Cost
Mobilization 1 LS $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $5,500.00 $5,500.00
Temporary Traffic Control 1 LS $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,250.00 $3,250.00
Driveway Paving 4 Each $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $800.00 $3,200.00
HMAC or WMAC 699 Tons $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $119.00 $83,181.00
TOTALS: $0.00 $0.00 $0.00 $95,131.00
KNL Industries, Inc.
Settje Sons Paving
LCRD Estimate
Pre-Level & Overlay Work
Bond Road
Wednesday, April 9th 1:00 P.M. PDT
Linn County Road Department
Wildish Double Eagle Paving O.A.M.
North Santiam Paving Knife River RiverBend Materials