Quote Kane Fire Cahokia Mounds 11.6.25.pdf

PDF 269 KB Posted

Attached to
DNR - Cahokia Mounds SHS Fire Suppression Piping - SPEC
Solicitation number
26-422DNR-REALT-B-50165
Issued by
Madison County, Illinois

About this file

Summary

This is a cost quote from Rapid Fire Safety & Security for fire suppression piping relocation services at Cahokia Mounds State Historic Site in Collinsville, Illinois, submitted to the Illinois Department of Natural Resources on November 6, 2025. The scope of work involves rerouting sprinkler lines in three areas, including cutting into the existing sprinkler line above the ACT ceiling and running new sprinkler lines below the ceiling to supply sprinkler heads, abandoning all sprinkler pipe above the ceiling, and removing existing sprinkler heads. The project specifies the use of Schedule 40 black pipe, brass upright sprinklers, and NFPA-compliant hangers. The quote explicitly excludes ceiling patching or repair, painting, electrical work, and any other modifications to the existing sprinkler system. Labor, materials, and boom lift rental are included in the contractor's scope.

The total cost to perform the work is $26,350.00, broken down as follows: $18,500.00 for labor, $3,950.00 for materials, and $1,200.00 for lift rental. This quote represents a small purchase with emergency conditions, indicating expedited procurement procedures. The contractor, Kane Fire Protection, Inc., provided the quote following a site discussion on October 31, 2025, demonstrating previous coordination regarding project requirements and specifications.

View the file

Other files

File Type Posted
0 standard terms and conditions V23.2~31.pdf PDF
CM Piping SOW.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rapid Fire Safety & Security, 170 East Alton Avenue, East Alton, Illinois ● Phone 618-343-6032● www.rapidfiress.com

November 6, 2025

Cahokia Mounds Following is my scope of work and price to reroute the sprinkler lines in the (3) areas as discussed on 10/31/25.

We include:

1. Cut into the existing sprinkler line above the ACT ceiling and run a new sprinkler line below the ceiling to supply the sprinkler heads.

2. We will abandon all sprinkler pipe above the ceiling

3. We will remove the existing sprinkler heads; existing holes will need to be patched by others.

4. All pipe will be schedule 40 black

5. Sprinklers will be brass upright

6. Hangers per NFPA

7. All labor and material

8. Boom Lift

We do not include:

1. Patching, replacing or repairing any ceilings

2. Painting of any kind.

3. Electrical work of any kind.

4. Any other work or modifications to the existing sprinkler system.

The cost to perform the above scope of work is $26,350.00.

- Labor $18,500.00

- Material $3,950.00

- Lift $1,200.00

If you have any questions regarding this price or scope of work, please call me at 618-781- 5105.

Sincerely, Pat Kane http://www.rapidfiress.com/