Quote DRL - IDNR WFG Sailboat Harbor - CXT Vault Toilet~1.pdf

PDF 276 KB Posted

Attached to
EMERGENCY NOTICE - DNR Wayne Fitzgerrell SRA - Replace Vault Toilet at Sailboat Harbor
Solicitation number
26-422DNR-REALT-B-50828
Issued by
Fulton County, Illinois

About this file

This is a vendor quote from DRL Sales, Inc. for the Illinois Department of Natural Resources (IDNR) emergency vault toilet replacement project at the Sailboat Harbor Boat Ramp in Wayne Fitzgerrell State Recreation Area, Whittington, Illinois. The project scope includes supplying and installing a CXT Precast Concrete Tioga Special double vault toilet style restroom with polyethylene-lined concrete vaults, simulated barn wood textured walls, and cedar shake textured roof. The proposal encompasses comprehensive site preparation and construction services, including pumping out and demolition of the existing vault toilet structure, excavation to solid ground with 12 inches of compacted CA-6 aggregate base, crane services for equipment placement, formation and pouring of a 5-foot wide concrete apron surrounding the building, a concrete sidewalk extending to handicap-accessible warning signage at the parking lot, and final backfill, grading, seeding, and straw application. The Tioga standard features include white plastic toilet risers with lids, stainless steel grab bars, ADA-compliant signage with Braille, toilet paper holders, coat hooks, and door stops.

The base bid total is $110,099 with two alternate add options available: Alternate 1 for upgrading the two toilet risers to stainless steel for an additional $6,900, and Alternate 2 for adding two solar light kits for $3,500. The quote explicitly excludes necessary permits, power company fees, overtime labor, errors and omissions, unforeseen conditions, and any items not listed in the included scope. The quote is dated January 15, 2026, and was submitted by Mark Albert, Project Manager at DRL Sales, Inc., located in St. Libory, Illinois.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRL Sales, Inc.

P.O. Box 406 St. Libory, Illinois 62282

Phone: (618) 824-6606, Fax: (618) 824-6680 e-mail address: drlsales@egyptian.net

January 15, 2026

Re: Quote / Proposal Wayne Fitzgerrell State Recreation Area Emergency Vault Toilet Replacement at Sailboat Harbor Boat Ramp

DRL Sales, Inc. is pleased to quote all materials, labor and equipment required for construction of the above referenced project. Please note the following clarifications to our bid.

INCLUDES:

1. Supplying and Installing a CXT Precast Concrete – Tioga Special double vault toilet style restroom.

Includes two polyethylene lined concrete vaults, simulated barn wood textured walls, simulated cedar shake textured roof, offloaded and set up on site.

2. Pumping out existing vaults by a sanitary waste disposal service

3. Demo of existing vault toilet, vaults and concrete apron.

4. Removal and disposal of demo debris.

5. Excavate to solid ground and place 12” compacted CA-6 Aggregate base

6. Includes crane for setting off and setting the vaults and building.

7. After installation, backfill all over dig with compacted CA-6 Aggregate rock.

8. Form and pour 5’ wide concrete apron on the front, both sides and the back the building.

9. Form and pour 5’ wide sidewalk from front apron to HC detachable warning at parking lot.

10. Backfill ,grade, seed and straw.

CXT Tioga Standard Included Base Bid Features The Tioga standard features are listed below. Also available are a variety of added cost options available to suit your particular needs. See alternates add options & cost for added Options.

• Simulated barnwood texture walls with simulated cedar shake texture roof.

• White plastic toilet risers with lids.

• Stainless steel grab bars and ADA-compliant signage with Braille.

• Toilet paper holders, coat hooks, and door stops.

• Polyethylene lined concrete vault.

EXCLUDES:

1. The necessary permits

2. Power company fees

3. Overtime man hours

4. Errors and Omissions

5. Any Unforeseen Conditions

6. Anything not listed as included in above

Total Base Bid = $110,099

Alternate Add Options:

Alternate 1 : Upgrade the (2) toilet risers to stainless steel - Add $6,900

Alternate 2 : Add (2) Solar light kits - Add $3,500

Sincerely, Mark Albert Project Manager

Mark Image

File details come from the government source that posted it. Updated .