This is a quotation request form from Main Street Crystal Springs for Back Street Park improvements in downtown Crystal Springs, Mississippi. The project involves installing a new pop-up park area between two buildings along Back Street, with work including concrete removal, new concrete installation, and utility adjustments. The scope encompasses 38 SY of concrete sidewalk removal, 6 LF of concrete curb and gutter removal, 28 LF of new concrete curb and gutter, 30 SY of 4" thick concrete sidewalk, 158 SY of 5" thick colored stamped concrete pavement, and one water valve adjustment. Quotes are due by 10:00 a.m. on Tuesday, December 13, 2024, and can be submitted via email to either Felicia Thompson or Brandon McKay. The contract period ends January 10th, with Notice to Proceed expected within 7 days of quote opening.

The pricing structure is unit-price based, with contractors required to provide prices for eight line items including mobilization, various concrete work, and utility adjustments. All quoted prices must include labor, materials, equipment, and supplies needed to complete the specified work. Questions about the work can be directed to Brandon McKay at (601) 925-4444. The form requires contractors to provide their business information, including company name, address, and authorized signature.

View the file

Other files

File Type Posted
13361-20241125112925 MSCS.pdf PDF
7928-20241203153208 JACKSON.docx DOCX document
11110-20241127142039 MATHISTON.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUOTATION FOR BACK STREET PARK IMPROVEMENTS

Main Street Crystal Springs is inviting you to submit a written quote for the work described below.

Main Street Crystal Springs wishes to install a new pop-up park area between two buildings along Back Street in downtown Crystal Springs as shown on the plans. Contract time will end on January 10th.

Contractor should anticipate a Notice to Proceed to be issued within 7 days of quote opening.

This work will be compensated under the following Unit Price items, which will include payment for all labor, materials, equipment, supplies, etc. to complete the following described work.

ITEM

NO.

ITEM DESCRIPTION

ITEM

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

1 Mobilization LS 1.0

2 Removal of Concrete Sidewalk (Saw Cut)(All Depths) SY 38

3 Removal of Concrete Curb & Gutter (Saw Cut)(All Depths) LF 6

4 Removal of Obstructions LS 1

5 Concrete Curb and Gutter (Match Existing) LF 28

6 Concrete Sidewalk (4" Thick) SY 30

7 Colored, Stamped Concrete Pavement (5" Thick) SY 158.0

8 Water Valve Adjustment EA 1

TOTAL

CONTRACTOR:

ADDRESS:

CITY/STATE/ZIP:

SIGNATURE:

PRINTED NAME/TITLE:

Quotes should be emailed to Felicia Thompson at mainstreetcrystalsprings@gmail.com by 10:00 a.m. on

Tuesday, December 13, 2024 or via email to bmckay@wgkengineers.com.

If there are any questions about the work required, please contact Brandon McKay at (601) 925-4444.

mailto:bmckay@wgkengineers.com