This is a questions and answers document from a mandatory pre-bid walk-through for DQ DOR17004 UPS-Distribution System conducted on August 17, 2016. The project involves the removal and replacement of UPS and Liebert equipment, with new equipment installation permitted in an alternative location within the room without requiring demolition. The current system includes deep cell 12V batteries (BAT L-A 12V 284 w/cell Plyprop), 36 cells in total, which are replaced every 4 to 5 years. The existing bypass switch is currently off due to previous short-circuiting issues, and the agency does not possess wiring diagrams for the bypass system. The sole breaker is labeled UPS-AC Input, and the bypass is believed to tie into the PDU, though the original installation details are uncertain. New equipment may remain in a temporary location until fully operational while old equipment is removed, with elevator access permitted for equipment transport, provided batteries are moved separately. The agency retains responsibility for floor tile replacement in areas where equipment was previously located.
Background checks are required for both bidders and sub-contractors, with costs not to exceed amounts listed in the DQ documents unless special circumstances warrant exceptions. An error regarding 208-4 wire plugs specifications was identified on page 6, section 3g of the DQ and has been corrected in an updated version posted to VSS. Photographers are permitted during site visits with the restriction that computer equipment cannot be photographed. The document does not address pricing terms, set-asides, incumbent information, or funding sources related to this contract opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final DQ DOR170000-UPS-Distribution System .pdf | ||
| (8) DQ DOR170000-UPS-Distribution System.docx | DOCX document | |
| Questions asked at walk through Final (1)..docx | DOCX document | |
| Modification Final DQ DOR170000-UPS-Distribution System .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DQ DOR17004 UPS-Distribution System Questions/Answers asked at mandatory pre-bid walk-through 08/17/16 10:00 AM
1. Are we allowed to take photos?
A. Yes,, but not of the computer equipment.
2. Is the current bypass switch on?
A. It is currently off because when it was switched on it short circuited.
3. Are there diagrams of wiring of the ByPass?
A. We do not have diagrams of the ByPass wiring.
4. Is the sole breaker the one labeled UPS-AC Input?
A. Yes.
5. The bypass wraps around and ties in how? Breaker or Input?
A. We believe it ties into the PDU, but are not certain as we did not originally install it.
6. What type of batteries do we currently have?
A. Deep cell 12V.
7. How long do we go before replacing the batteries?
A. We replace them every 4 to 5 years.
8. Are the background checks more than what is listed in the DQ?
A. They should not go above that price but if there are special circumstances it may.
9. Do they do background checks on sub-contractors also?
A. Yes.
10. Does the new equipment have to be where the old equipment currently is?
A. No, the new equipment may be put somewhere else in the room as long as there is no demo.
11. Are they removing the UPS & Liebert only? Does the panel stay?
A. Yes
12. Can they use the elevator to move the equipment?
A. Yes but the batteries will have to be a separate trip.
13. There is an error on pg 6 3g. of the DQ.
A. It should say 208 – 4 wire plugs. This error has been corrected in the document and an updated version is posted to VSS.
14. If we install the new equipment in a new location can the old equipment stay where it is located until the new equipment is up and running.
A. Yes
15. What is the manufacturer and number the batteries? Do you know the weight?
We do not know the weight the batteries are BAT L-A 12V 284 w/cell Plyprop and there are 36 of them.
16. After removal is the vendor responsible for replacement of floor tiles.
A. No, we have extra floor tiles and will work with the landlord to fill the openings.