Questions Answers_W91QF4 24 B 0005 B 52 Windows.pdf
PDF 198 KB Posted
- Attached to
- Amend 02 B-52 Windows Questions & Answers Federal contract opportunity
- Solicitation number
- W91QF4-24-B-0005
About this file
This document contains a set of questions and answers related to Solicitation W91QF4-24-B-0005 for window replacement at Building 52 in Fort Leavenworth, Kansas. The key details are:
The solicitation is for replacing windows in Building 52, including the requirement for laminated interior glass and tempered exterior glass, without any tinted glass. The contractor will be responsible for testing all windows for asbestos and providing unit pricing for any windows over the assumed 20 that test positive. The exterior color of the windows is to be colonial red, not white as previously stated. There will be no phased work, and the contractor is responsible for disconnecting and reconnecting any utilities impacted by the window replacement. The bid submission deadline is September 10, 2024 at 2:00 PM CST. The solicitation is being issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW- B52 Window Replacement_REVISION 1-08292024.pdf | ||
| Amend 02_W91QF4-24-B-0005 B-52 Windows Rpl.pdf | ||
| B-52 Hazardous Material Report.pdf | ||
| Building 52 Window Drawing Set REVISION1-08292024.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W91QF4-24-B-0005
Windows Building 52, FORT LEAVENWORTH, KANSAS
Questions & Answers 29 August 2024
Q1. Question: Can you clarify the makeup of the insulated glass unit. Do you want both the interior and exterior light to be laminated glass or is one laminated and one tempered? Which one gets the grey tint?
A1. Answer: The laminated glass must be on the interior. The exterior can be tempered. We no longer want tint on the windows. We have taken the grey tint out of the contract documents.
Q2. Question: It looks like 6 Phase 3 windows in the Sheridan Annex North Elevation (SDAN201, SDAN202, SDAN301, SDAN302, SDN401, SDAN402) were left off the window schedule. Could they be added so we know what is required at those openings?
A2. Answer: These windows were added to the schedule on the updated drawing set.
Q3. Question: Per note 6 on Drawing A100 “some existing backer rod around windows may contain asbestos.” Please confirm this statement indicates that all windows are to be treated/removed by an abatement contractor since windows with ACM containing backer rods are not specifically called out.
A3. Answer: Contractor will be responsible for testing all the windows for asbestos. Assume there are 20 windows that are positive for asbestos. Provide a unit price for every window that tests positive over the assumed 20 windows. The attached hazardous material report only found asbestos in a few of the randomly sampled windows. The asbestos is located in some of the window caulk per the report.
Q4. Question: Can you confirm that the exterior color of all windows on the above captioned project are to be WHITE?
A4. Answer: The exterior color of all windows is to be colonial red. Refer to drawing sheet A-117, spec section 2.8. Was it stated that exterior windows are to be white somewhere else in the specs?
Q5. Question: The bid form does not provide an area for the per phase pricing. How do you wish for us to provide the per phase pricing?
A5. Answer: There will be no phases for this requirement. Price all windows listed on Window Schedule. Drawings and SOW has been updated to reflect that information.
Q6. Question: For bidding purposes, how do we quantify the amount of asbestos that may be encountered?
A6. Answer: The contractor will be responsible for testing all the windows for asbestos. Assume there are 20 windows that are positive for asbestos IAW the report. Provide a unit price for every window that tests positive over the assumed 20 windows. The attached hazardous material report only found asbestos in a few of the randomly sampled windows. The asbestos is located in some of the window caulk per the report.
Q7. Question: Who will be responsible to disconnect / reconnect the utilities, such as freon lines, electrical lines, plumbing, etc., during the installation of the Mapes panels in the new windows?
A7. Answer: The contractor will be responsible for disconnecting/reconnecting all utilities. In addition to making sure the equipment is operating correctly. (Ex.