Building 52 Window Drawing Set REVISION1-08292024.pdf

PDF 5 MB Posted

Attached to
Amend 02 B-52 Windows Questions & Answers Federal contract opportunity
Solicitation number
W91QF4-24-B-0005
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis

About this file

This document is a set of drawings and specifications for the Building 52 Window Replacement project at Fort Leavenworth. The drawings provide floor plans, elevations, and window schedules for the phased replacement of existing wood windows with new aluminum-clad wood windows at multiple buildings, including Sheridan Hall, Sherman Hall, Grant Hall, and Wagner Hall. The specifications detail the performance requirements, materials, and fabrication for the new windows, which must be double-pane, aluminum-clad wood windows in a colonial red color. The solicitation for this project, W91QF4-24-B-0005, is being amended to add questions and answers, a revised Statement of Work, updated drawings, and a hazardous materials report. Bids are due on September 10, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to Amend 02 B-52 Windows Questions & Answers, newest first.
File Type Posted
Questions Answers_W91QF4 24 B 0005 B 52 Windows.pdf PDF
SOW- B52 Window Replacement_REVISION 1-08292024.pdf PDF
Amend 02_W91QF4-24-B-0005 B-52 Windows Rpl.pdf PDF
B-52 Hazardous Material Report.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORT LEAVENWORTH

DPW

SHEET ID

A-100

C O

V

ER

S H

EE

T

M cC

LE

LL

A N

A V E, FO

R T

LE

A V

EN

W O

R

TH

K S

7-

D R A W

N B

Y:

D

ES

IG

N

ED

B

Y:

S

IZ

E:

C H

EC

K

ED

B Y:

A N

S I

'D

IS

S U

E D

A

TE

PR

O

JE

C T

N O

M A R K

D

ES

C R

IP

TI

O

N D

A

TE

1 2 3 4 5

D

C

B

A

D

IR

EC

TO

R A

TE

O F

PU

B

LI

C W

O R K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R A N

C H

N

ET

N

ET

B U

IL

D

IN

G

W

IN

D O

W S

SHEET LIST

A-100 COVER SHEET

A-101 OVERALL FLOOR PLAN AND SOUTH ELEVATION

A-102 PHASE 1 FLOOR PLAN

A-103 SHERIDAN ANNEX - WEST AND SOUTH (PHASE 1)

A-104 SHERIDAN ANNEX - EAST (PHASE 1)

A-105 SHERIDAN HALL - SOUTH (PHASE 1)

A-106 PHASE 2 FLOOR PLAN

A-107 GRANT HALL - SOUTH (PHASE 2)

A-108 SHERMAN HALL - SOUTH (PHASE 2)

A-109 SHERMAN ANNEX - SOUTH AND WEST (PHASE 2)

A-110 SHERMAN ANNEX - EAST (PHASE 2)

A-111 SHERIDAN HALL - EAST AND WAGNER HALL -

SOUTH (PHASE 2)

A-112 PHASE 3 FLOOR PLAN

A-113 SHERMAN HALL - WEST AND NORTH ANNEX

(PHASE 3)

A-114 WINDOW SCHEDULE

A-115 WINDOW SCHEDULE CONTINUED

A-116 NEW WINDOW DETAILS AND SPECIFICATIONS

A-117 SPECIFICATIONS

BUILDING 52 WINDOW PROJECT

DRAWING SUBMITTAL: RFP

DATE: 7/19/2024

REVISION 1 - PRE-BID ANSWERS

FORT LEAVENWORTH

DPW

AREA OF

CONSTRUCTION

G

RA

NT

A

VE

NU

E

SH

ER

M A

N A

VE

N

U

EMEADE AVENUE

2.

3.

THE BUILDING SHALL REMAIN OPERATIONAL AND AVAILABLE FOR PUBLIC ACCESS AT ALL TIMES.

4. CONTRACTOR MUST VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN THE DRAWINGS AND EXISTING CONDITIONS SHALL BE BROUGHT IMMEDIATELY TO THE ATTENTION OF THE CONTRACTOR OFFICER'S REPRESENTATIVE PRIOR TO CONSTRUCTION. WHERE

DISCREPANCIES, THE MOST STRINGENT OR HIGHEST QUALITY SHALL APPLY.

5. CONTRACTOR SHALL TAKE PRECAUTION DURING CONSTRUCTION TO NOT DAMAGE EXISTING ADJACENT CONSTRUCTION, WITHOUT ADDITIONAL COST TO THE GOVERNMENT. PROTECT ALL MATERIALS AND ASSEMBLIES ADJACENT TO THE WORK AREA. ANY DAMAGE DONE TO EXISTING FACILITIES DURING CONSTRUCTION SHALL

BE REPAIRED TO THE SATISFACTION OF THE GOVERNMENT BY THE CONTRACTOR.

6. WHERE EXISTING MECHANICAL, ELECTRICAL, PLUMBING, AND LIGHTING SYSTEMS NEED TO BE REMOVED AND REINSTALLED, DO NOT INTERRUPT SERVICE WITHOUT CONSENT FROM THE GOVERNMENT. PROVIDE TEMPORARY CONNECTIONS AND LIGHTING WHERE REQUESTED. PROVIDE ONE WEEK MINIMUM PRIOR TO POSSIBLE UTILITY DISRUPTION

AS APPROVED BY DPW.

7. CONTRACTOR SHALL PROVIDE A SEQUENCING PLAN AND GAIN GOVERNMENT APPROVAL BEFORE STARTING ANY WORK. PROVIDE A MINIMUM TWO WEEKS NOTICE TO THE

GOVERNMENT PRIOR TO STARTING WORK IN A NEW AREA OF THE BUILDING.

GENERAL NOTES

1. WORK REQUIRED AS PART OF THIS PROJECT SHALL BE PERFORMED IN THE BUILDING AND ON THE GROUNDS WHILE OCCUPIED AND UNDER NORMAL OPERATIONS. THE CONTRACTOR AND SUBCONTRACTORS SHALL COMPLY WITH SCHEDULING REQUIREMENTS AS

OUTLINED IN THESE DOCUMENTS.

WORK SHALL BE SEQUENCED SO THAT THE MEANS OF EGRESS ARE OPEN AT ALL TIMES. PROVIDE OVERHEAD PROTECTION AND ENCLOSURES TO

ISOLATE WORK AREA FROM BUILDING USERS.

2.

3.

CAREFULLY REMOVE AND PROTECT EXISTING INTERIOR CASING AND TRIM AS NECESSARY TO REPLACE THE WINDOW. ANY DAMAGE MUST BE

REPAIRED TO THE ORIGINAL CONDITION PRIOR TO DEMOLITION, BY THE CONTRACTOR..

4.

FILL ALL VOIDS ONCE THE NEW WINDOW CASING IS INSTALLED.

5.

6.

WINDOW REPLACEMENT NOTES

1.

PROVIDE ALL NECESSARY EQUIPMENT, MATERIALS, AND LABOR REQUIRED TO REMOVE AND REPLACE THE EXISTING WOOD WINDOWS WITH A DOUBLE PANE, ALUMINUM-CLAD WOOD WINDOW. WINDOWS SHALL BE COLONIAL RED IN COLOR TO MATCH EXISTING. INSTALL THE WINDOWS PER THE MANUFACTURERS SPECIFICATIONS. SEE SCHEDULE AND SPECIFICATIONS

FOR WINDOW DETAILS.

THE WINDOWS SHALL BE TREATED AS IF THEY CONTAIN LEAD-BASED PAINT. THE CONTRACTOR SHALL ADHERE TO ALL APPLICABLE REGULATIONS WHEN PERFORMING

THE WORK. NO OCCUPANT SHALL BE EXPOSED TO HAZARDOUS MATERIALS.

7.

REPLACE THE MECHANICAL/BOARDED UP WINDOW OPENINGS WITH A MAPES-R TYPE PANEL (OR EQUIVALENT). LOUVERS AND MESH SCREENS

ARE TO BE TAKEN OFF AND POWDER-COATED. COLOR TO MATCH THE NEW WINDOWS.

ALL WINDOWS, MECHANICAL/BOARDED UP OPENINGS NOTED ON ELEVATIONS HEREIN AND THEIR ENTIRE RELATED FRAMES ON BOTH INTERIOR AND EXTERIOR ARE TO BE MEASURED, CAREFULLY REMOVED AND REPLACED AS SHOWN BY THE CONTRACTOR.

MEASUREMENTS PROVIDED IN THE SCHEDULE ARE FOR REFERENCE ONLY.

WINDOWS MUST BE REMOVED AND REPLACED WITHIN THE SAME DAY. A TEMPORARY WEATHER TIGHT COVERING MUST BE INSTALLED WHEN THE WINDOW OPENING IS LEFT UNATTENDED. DOORS TO ROOMS WHERE WINDOWS ARE BEING WORKED ON MUST

BE CLOSED WHEN OPENING IS OPEN TO THE WEATHER.

THE INTERIOR SIDE OF THE NEW WINDOW FRAME MUST MATCH THE EXISTING WINDOW FRAME AND TRIM COLOR. CONTRACTOR TO VERIFY THE CORRECT PAINT AND STAIN COLOR BEFORE CONSTRUCTION. SEE SCHEDULE AND SPECIFICATIONS FOR INTERIOR FINISH DETAILS.

8.

S

ER

7/

/2

R

EV

IS

IO

N

P

R E-

B

ID

A N

S W

ER

S

8/

/2

SHERIDAN HALL

SHERIDAN ANNEX

GRANT HALL SHERMAN HALL

SHERMAN ANNEX

WAGNER HALL

WS202

WS101

WS306

WS201

WS301 WS302 WS303 WS304 WS305

SDS301 SDS302 SDS303 SDS304

SDS201 SDS202 SDS203 SDS204

SDAS401 SDAS402 SDAS403 SDAS404

SDAS301 SDAS302 SDAS303 SDAS304 SDAS305 SDAS306

SDAS206SDAS205SDAS203

SDAS204

SDAS201 SDAS202

SDAS101 SDAS102 SDAS104SDAS103

SDS308 SDS309 SDS310 SDS311

SDS208 SDS209 SDS210 SDS211

SDS101 SDS102

SDS401 SDS405 SDS406

GS201

GS301

GS401

GS501 GS502

GS503 GS504

GS302 GS303 GS304 GS305 GS306

SMS201 SMS202 SMS203 SMS209 SMS210 SMS211 SMS212

SMS301 SMS302 SMS303 SMS309 SMS310 SMS311 SMS312SMS304

SMS401 SMS402 SMS403 SMS405 SMS406SMS404

SMS101

SMAS301 SMAS302 SMAS303 SMAS304

SMAS201 SMAS202 SMAS203 SMAS204

SMAS101 SMAS102

SHERIDAN HALL GRANT HALL SHERMAN HALL WAGNER HALL

SHERIDAN HALL ANNEX SHERMAN HALL ANNEX

GRANT HALL

FORT LEAVENWORTH

DPW

SHEET ID

A-101

O V

ER

A

LL

F

LO

O R P

LA

N

A N

D S

O U

TH

E

LE

V A

TI

O N

M cC

LE

LL

A N

A V E, FO

R T

LE

A V

EN

W O

R

TH

K S

7-

D R A W

N B

Y:

D

ES

IG

N

ED

B

Y:

S

IZ

E:

C H

EC

K

ED

B Y:

A N

S I

'D

IS

S U

E D

A

TE

PR

O

JE

C T

N O

M A R K

D

ES

C R

IP

TI

O

N D

A

TE

1 2 3 4 5

D

C

B

A

D

IR

EC

TO

R A

TE

O F

PU

B

LI

C W

O R K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R A N

C H

N

ET

N

ET

A2

SCALE: 1/16" = 1'-0"A-101

B52 - SOUTH

B U

IL

D

IN

G

W

IN

D O

W S

A1

NTSA-101

B52 FLOOR PLAN

S

ER

7/

/2

SHERIDAN HALL ANNEX

GRANT HALL

SHERIDAN HALL ANNEX

GRANT HALL

SHERIDAN HALL ANNEX

GRANT HALL

SHERIDAN HALL ANNEX

FORT LEAVENWORTH

DPW

SHEET ID

A-102

PH

A S E

FL

O O

R P

LA

N

M cC

LE

LL

A N

A V E, FO

R T

LE

A V

EN

W O

R

TH

K S

7-

D R A W

N B

Y:

D

ES

IG

N

ED

B

Y:

S

IZ

E:

C H

EC

K

ED

B Y:

A N

S I

'D

IS

S U

E D

A

TE

PR

O

JE

C T

N O

M A R K

D

ES

C R

IP

TI

O

N D

A

TE

1 2 3 4 5

D

C

B

A

D

IR

EC

TO

R A

TE

O F

PU

B

LI

C W

O R K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R A N

C H

N

ET

N

ET

A2

SCALE: 1/16" = 1'-0"A-102

SECOND FLOOR PLAN - PHASE 1

B U

IL

D

IN

G

W

IN

D O

W S

A1

SCALE: 1/16" = 1'-0"A-102

FIRST FLOOR PLAN - PHASE 1

A4

SCALE: 1/16" = 1'-0"A-102

FOURTH FLOOR PLAN - PHASE 1A3

SCALE: 1/16" = 1'-0"A-102

THIRD FLOOR PLAN - PHASE 1

START

START

FINISH

START

START

FINISH FINISH

FINISH

S

ER

7/

/2

A

BRICK

ELEVATOR

SHAFT, NIC

SDAW101

SDAW103SDAW102 SDAW104 SDAW105 SDAW106 SDAW107 SDAW108 SDAW109

SDAW203SDAW202 SDAW204 SDAW205 SDAW208 SDAW209 SDAW210 SDAW211SDAW206 SDAW207

SDAW303SDAW302 SDAW304 SDAW305 SDAW308 SDAW309 SDAW310 SDAW311SDAW306 SDAW307

SDAW403SDAW402 SDAW404 SDAW405 SDAW408 SDAW409 SDAW410 SDAW411SDAW406 SDAW407

SDAW301

SDAW401

SDAW201

PHASE 3

A

SDAS201

SDAS101 SDAS102 SDAS103 SDAS104

SDAS202 SDAS203 SDAS204 SDAS205

SDAS301 SDAS302 SDAS303 SDAS304 SDAS305

SDAS401 SDAS402 SDAS403 SDAS404

FORT LEAVENWORTH

DPW

SHEET ID

A-103

S H

ER

ID

A N

A N

N

EX

W

ES

T

A N

D S

O U

TH

PH

A S E

1)

M cC

LE

LL

A N

A V E, FO

R T

LE

A V

EN

W O

R

TH

K S

7-

D R A W

N B

Y:

D

ES

IG

N

ED

B

Y:

S

IZ

E:

C H

EC

K

ED

B Y:

A N

S I

'D

IS

S U

E D

A

TE

PR

O

JE

C T

N O

M A R K

D

ES

C R

IP

TI

O

N D

A

TE

1 2 3 4 5

D

C

B

A

D

IR

EC

TO

R A

TE

O F

PU

B

LI

C W

O R K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R A N

C H

N

ET

N

ET

A1

SCALE: 3/16" = 1'-0"A-103

SHERIDAN ANNEX - WEST ELEVATION (PHASE 1)

A2

SCALE: 3/16" = 1'-0"

SHERIDAN ANNEX - SOUTH ELEVATION (PHASE 1)

A-103

B U

IL

D

IN

G

W

IN

D O

W S

1. NO WORK, NOT IN CONTRACT

KEYNOTES

1 1

S

ER

7/

/2

C

SDAE101 SDAE102 SDAE103 SDAE104 SDAE105 SDAE106 SDAE107

SDAE201 SDAE202 SDAE203 SDAE204 SDAE205 SDAE206 SDAE207 SDAE208 SDAE209 SDAE2010

SDAE301 SDAE302 SDAE303 SDAE304 SDAE305 SDAE306 SDAE307 SDAE308 SDAE309 SDAE3010

SDAE401 SDAE402 SDAE403 SDAE404 SDAE405 SDAE406 SDAE407 SDAE408 SDAE409 SDAE4010

FORT LEAVENWORTH

DPW

SHEET ID

A-104

S H

ER

ID

A N

A N

N

EX

EA

S T

(P H

A S E

1)

M cC

LE

LL

A N

A V E, FO

R T

LE

A V

EN

W O

R

TH

K S

7-

D R A W

N B

Y:

D

ES

IG

N

ED

B

Y:

S

IZ

E:

C H

EC

K

ED

B Y:

A N

S I

'D

IS

S U

E D

A

TE

PR

O

JE

C T

N O

M A R K

D

ES

C R

IP

TI

O

N D

A

TE

1 2 3 4 5

D

C

B

A

D

IR

EC

TO

R A

TE

O F

PU

B

LI

C W

O R K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R A N

C H

N

ET

N

ET

A1

SCALE: 3/16" = 1'-0"A-104

SHERIDAN ANNEX - EAST ELEVATION (PHASE 1)

B U

IL

D

IN

G

W

IN

D O

W S

1. NO WORK, NOT IN CONTRACT

KEYNOTES

S

ER

7/

/2

SHERIDAN ANNEX

CHIMNEY

TUNNEL

1C

SDS307 SDS308 SDS309 SDS310

SDS207 SDS208 SDS209 SDS210

SDS103 SDS104

SDS301 SDS302

SDS201 SDS202 SDS203 SDS204

SDS401

SDS205 SDS206

SDS305 SDS306

SDS402 SDS403

SDS101

SDS404 SDS405

SDS303 SDS304

PHASE 3

SDS102

FORT LEAVENWORTH

DPW

SHEET ID

A-105

S H

ER

ID

A N

H A

LL

S

O U

TH

PH

A S E

1)

M cC

LE

LL

A N

A V E, FO

R T

LE

A V

EN

W O

R

TH

K S

7-

D R A W

N B

Y:

D

ES

IG

N

ED

B

Y:

S

IZ

E:

C H

EC

K

ED

B Y:

A N

S I

'D

IS

S U

E D

A

TE

PR

O

JE

C T

N O

M A R K

D

ES

C R

IP

TI

O

N D

A

TE

1 2 3 4 5

D

C

B

A

D

IR

EC

TO

R A

TE

O F

PU

B

LI

C W

O R K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R A N

C H

N

ET

N

ET

A1

SCALE: 3/16" = 1'-0"A-105

SHERIDAN HALL - SOUTH ELEVATION (PHASE 1)

B U

IL

D

IN

G

W

IN

D O

W S

1. NO WORK, NOT IN CONTRACT

KEYNOTES

S

ER

7/

/2

U

PD

A

TE

D S

C H

ED

U

LE

R

EM

O V

ED

T

IN

T

FR

O M

S

PE

C S

8/

/2

SHERMAN HALL ANNEX

SHERMAN HALL ANNEX

GRANT HALL

SHERMAN HALL ANNEX

GRANT HALL

SHERMAN HALL ANNEX

GRANT HALL

FORT LEAVENWORTH

DPW

SHEET ID

A-106

PH

A S E

FL

O O

R P

LA

N

M cC

LE

LL

A N

A V E, FO

R T

LE

A V

EN

W O

R

TH

K S

7-

D R A W

N B

Y:

D

ES

IG

N

ED

B

Y:

S

IZ

E:

C H

EC

K

ED

B Y:

A N

S I

'D

IS

S U

E D

A

TE

PR

O

JE

C T

N O

M A R K

D

ES

C R

IP

TI

O

N D

A

TE

1 2 3 4 5

D

C

B

A

D

IR

EC

TO

R A

TE

O F

PU

B

LI

C W

O R K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R A N

C H

N

ET

N

ET

A3

SCALE: 1/16" = 1'-0"A-106

THIRD FLOOR PLAN - PHASE 2

B U

IL

D

IN

G

W

IN

D O

W S

A1

SCALE: 1/16" = 1'-0"A-106

FIRST FLOOR PLAN - PHASE 2

A4

SCALE: 1/16" = 1'-0"A-106

FOURTH FLOOR PLAN - PHASE 2

A2

SCALE: 1/16" = 1'-0"A-106

SECOND FLOOR PLAN - PHASE 2

FINISH

START

FINISH

START

FINISH

START

FINISH

START

S

ER

7/

/2

GS201

GS301

GS401

GS501 GS502

GS503 GS504

GS302 GS303 GS304 GS305 GS306

GE501

GE301

GW501

GW301

FORT LEAVENWORTH

DPW

SHEET ID

A-107

M cC

LE

LL

A N

A V E, FO

R T

LE

A V

EN

W O

R

TH

K S

7-

D R A W

N B

Y:

D

ES

IG

N

ED

B

Y:

S

IZ

E:

C H

EC

K

ED

B Y:

A N

S I

'D

IS

S U

E D

A

TE

PR

O

JE

C T

N O

M A R K

D

ES

C R

IP

TI

O

N D

A

TE

1 2 3 4 5

D

C

B

A

D

IR

EC

TO

R A

TE

O F

PU

B

LI

C W

O R K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R A N

C H

N

ET

N

ET

G R A N

T H

A

LL

S

O U

TH

PH

A S E

2)

A2

SCALE: 3/16" = 1'-0"

GRANT HALL - SOUTH ELEVATION (PHASE 2) A3

SCALE: 3/16" = 1'-0"A-107

GRANT HALL - SOUTHEAST (PHASE 2)A1

SCALE: 3/16" = 1'-0"

GRANT HALL - SOUTHWEST (PHASE 2)

A-107A-107

B U

IL

D

IN

G

W

IN

D O

W S

1. NO WORK, NOT IN CONTRACT

KEYNOTES

S

ER

7/

/2

SHERMAN HALL ANNEX

SMS201 SMS202 SMS203 SMS209 SMS210 SMS211 SMS212

SMS301 SMS302 SMS303 SMS309 SMS310 SMS311 SMS312SMS304

SMS401 SMS402 SMS403 SMS406 SMS407SMS405

SMS101

SMS305 SMS306

SMS204 SMS205 SMS206 SMS207

SMS307 SMS308

SMS208

SMS404

SMS102 SMS103

PHASE 3

FORT LEAVENWORTH

DPW

SHEET ID

A-108

S H

ER

M

A N

H A

LL

S

O U

TH

PH

A S E

2)

M cC

LE

LL

A N

A V E, FO

R T

LE

A V

EN

W O

R

TH

K S

7-

D R A W

N B

Y:

D

ES

IG

N

ED

B

Y:

S

IZ

E:

C H

EC

K

ED

B Y:

A N

S I

'D

IS

S U

E D

A

TE

PR

O

JE

C T

N O

M A R K

D

ES

C R

IP

TI

O

N D

A

TE

1 2 3 4 5

D

C

B

A

D

IR

EC

TO

R A

TE

O F

PU

B

LI

C W

O R K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R A N

C H

N

ET

N

ET

A1

SCALE: 3/16" = 1'-0"A-108

SHERMAN HALL - SOUTH ELEVATION (PHASE 2)

B U

IL

D

IN

G

W

IN

D O

W S

S

ER

7/

/2

SMAS201 SMAS202 SMAS203 SMAS204

SMAS101 SMAS102

SMAW101 SMAW102 SMAW103 SMAW104

SMAW105 SMAW106

SMAW202 SMAW203 SMAW204 SMAW205 SMAW206 SMAW207 SMAW208 SMAW209 SMAW210

SMAW301 SMAW302 SMAW303 SMAW304 SMAW305 SMAW306 SMAW307 SMAW308 SMAW309 SMAW310

SMAW107

FORT LEAVENWORTH

DPW

SHEET ID

A-109

M cC

LE

LL

A N

A V E, FO

R T

LE

A V

EN

W O

R

TH

K S

7-

D R A W

N B

Y:

D

ES

IG

N

ED

B

Y:

S

IZ

E:

C H

EC

K

ED

B Y:

A N

S I

'D

IS

S U

E D

A

TE

PR

O

JE

C T

N O

M A R K

D

ES

C R

IP

TI

O

N D

A

TE

1 2 3 4 5

D

C

B

A

D

IR

EC

TO

R A

TE

O F

PU

B

LI

C W

O R K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R A N

C H

N

ET

N

ET

SCALE: 3/16" = 1'-0"

A2

SCALE: 3/16" = 1'-0"A-109

SHERMAN ANNEX - SOUTH ELEVATION (PHASE 2)A1

SCALE: 3/16" = 1'-0"A-109

SHERMAN ANNEX - WEST ELEVATION (PHASE 2)

S H

ER

M

A N

A N

N

EX

S

O U

TH

A

N D

W

ES

T (P

H A S E

2)

B U

IL

D

IN

G

W

IN

D O

W S

1. NO WORK, NOT IN CONTRACT

KEYNOTES

S

ER

7/

/2

SMAE101 SMAE102 SMAE103 SMAE104

SMAE201 SMAE202 SMAE203 SMAE204 SMAE205 SMAE206 SMAE207 SMAE208 SMAE209

SMAE301 SMAE302 SMAE303 SMAE304 SMAE305 SMAE306 SMAE307 SMAE308 SMAE309 SMAE310

SMAE210

SMAE105 SMAE106

FORT LEAVENWORTH

DPW

SHEET ID

A-110

M cC

LE

LL

A N

A V E, FO

R T

LE

A V

EN

W O

R

TH

K S

7-

D R A W

N B

Y:

D

ES

IG

N

ED

B

Y:

S

IZ

E:

C H

EC

K

ED

B Y:

A N

S I

'D

IS

S U

E D

A

TE

PR

O

JE

C T

N O

M A R K

D

ES

C R

IP

TI

O

N D

A

TE

1 2 3 4 5

D

C

B

A

D

IR

EC

TO

R A

TE

O F

PU

B

LI

C W

O R K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R A N

C H

N

ET

N

ET

A1

SCALE: 3/16" = 1'-0"A-110

SHERMAN ANNEX - EAST ELEVATION (PHASE 2)

S H

ER

M

A N

A N

N

EX

E

A S T

(P H

A S E

2)

B U

IL

D

IN

G

W

IN

D O

W S

1. NO WORK, NOT IN CONTRACT

KEYNOTES

S

ER

7/

/2

WAGNER HALL

SME301

SME201

SME401 SME402

SME101

PHASE 3

WS202

WS101

WS306

WS201

WS301 WS302 WS303 WS304 WS305

FORT LEAVENWORTH

DPW

SHEET ID

A-111

M cC

LE

LL

A N

A V E, FO

R T

LE

A V

EN

W O

R

TH

K S

7-

D R A W

N B

Y:

D

ES

IG

N

ED

B

Y:

S

IZ

E:

C H

EC

K

ED

B Y:

A N

S I

'D

IS

S U

E D

A

TE

PR

O

JE

C T

N O

M A R K

D

ES

C R

IP

TI

O

N D

A

TE

1 2 3 4 5

D

C

B

A

D

IR

EC

TO

R A

TE

O F

PU

B

LI

C W

O R K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R A N

C H

N

ET

N

ET

A1

SCALE: 3/16" = 1'-0"

A2

SCALE: 3/16" = 1'-0"

WAGNER HALL - SOUTH ELEVATION (PHASE 2)

A-111

A1

SCALE: 3/16" = 1'-0"A-111

SHERMAN HALL - EAST ELEVATION (PHASE 2)

S H

ER

M

A N

H A

LL

E

A S T

A N

D W

A G

N

ER

H A

LL

S

O U

TH

PH

A S E

2)

B U

IL

D

IN

G

W

IN

D O

W S

1. NO WORK, NOT IN CONTRACT

KEYNOTES

S

ER

7/

/2

SHERIDAN HALL GRANT HALL SHERMAN HALL

SHERIDAN HALL GRANT HALL SHERMAN HALL

GRANT HALL

SHERIDAN HALL GRANT HALL SHERMAN HALL

GRANT HALL

SHERIDAN HALL GRANT HALL SHERMAN HALL

GRANT HALL

FORT LEAVENWORTH

DPW

SHEET ID

A-112

PH

A S E

FL

O O

R P

LA

N

M cC

LE

LL

A N

A V E, FO

R T

LE

A V

EN

W O

R

TH

K S

7-

D R A W

N B

Y:

D

ES

IG

N

ED

B

Y:

S

IZ

E:

C H

EC

K

ED

B Y:

A N

S I

'D

IS

S U

E D

A

TE

PR

O

JE

C T

N O

M A R K

D

ES

C R

IP

TI

O

N D

A

TE

1 2 3 4 5

D

C

B

A

D

IR

EC

TO

R A

TE

O F

PU

B

LI

C W

O R K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R A N

C H

N

ET

N

ET

B U

IL

D

IN

G

W

IN

D O

W S

A1

NTSA-112

FIRST FLOOR PLAN - PHASE 3 A2

NTSA-112

SECOND FLOOR PLAN - PHASE 3

A4

NTSA-112

FOURTH FLOOR PLAN - PHASE 3A3

NTSA-112

THIRD FLOOR PLAN - PHASE 3

START

FINISH

START

FINISH

START

FINISH

START

(ONLY 4TH

FLOOR

TYPE 2/2.1

WINDOWS)

FINISH

S

ER

7/

/2

SDW301 SDW302 SDW303

SDW401 SDW402

SDW201 SDW202 SDW203

SDW101

SDAW31

SDAW41

SDW102 SDW103

SHERIDAN HALL

SDAN201 SDAN202

SDAN301 SDAN302

SDAN401 SDAN402

FORT LEAVENWORTH

DPW

SHEET ID

A-113

M cC

LE

LL

A N

A V E, FO

R T

LE

A V

EN

W O

R

TH

K S

7-

D R A W

N B

Y:

D

ES

IG

N

ED

B

Y:

S

IZ

E:

C H

EC

K

ED

B Y:

A N

S I

'D

IS

S U

E D

A

TE

PR

O

JE

C T

N O

M A R K

D

ES

C R

IP

TI

O

N D

A

TE

1 2 3 4 5

D

C

B

A

D

IR

EC

TO

R A

TE

O F

PU

B

LI

C W

O R K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R A N

C H

N

ET

N

ET

S H

ER

ID

A N

H A

LL

W

ES

T

A N

D N

O R

TH

A N

N

EX

PH

A S E

3)

A1

SCALE: 3/16" = 1'-0"A-113

SHERIDAN HALL - WEST ELEVATION (PHASE 3) A2

SCALE: 3/16" = 1'-0"A-113

SHERIDAN ANNEX - NORTH ELEVATION (PHASE 3)

B U

IL

D

IN

G

W

IN

D O

W S

1. NO WORK : NOT IN CONTRACT

KEYNOTES

S

ER

7/

/2

SHEET ID

A-114

W

IN

D O

W S

C H

ED

U

LE

M cC

LE

LL

A N

A V E, FO

R T

LE

A V

EN

W O

R

TH

K S

7-

D R A W

N B

Y:

D

ES

IG

N

ED

B

Y:

S

IZ

E:

C H

EC

K

ED

B Y:

A N

S I

'D

IS

S U

E D

A

TE

PR

O

JE

C T

N O

M A R K

D

ES

C R

IP

TI

O

N D

A

TE

1 2 3 4 5

D

C

B

A

D

IR

EC

TO

R A

TE

O F

PU

B

LI

C W

O R K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R A N

C H

N

ET

N

ET

03_THIRD FLOOR

SDS310 C 3 3'-1" 6'-6"

SDS309 C 3 3'-1" 6'-6"

SDS308 C 3 3'-1" 6'-6"

SDS307 C 3 3'-1" 6'-6"

SDAE310 A 1 2'-10" 6'-2"

SDAE309 A 1 2'-10" 6'-2"

SDAE308 A 1 2'-10" 6'-2"

SDAE307 A 1 2'-10" 6'-2"

SDAE306 A 1 2'-10" 6'-2"

SDAE305 A 1 2'-10" 6'-2"

SDAE304 A 1 2'-10" 6'-2"

SDAE303 A 1 2'-10" 6'-3"

SDAE302 A 1 2'-10" 6'-2"

SDAE301 A 1 2'-10" 6'-2"

SDAS305 A 1 2'-10" 6'-2"

SDAS304 A 1 2'-10" 6'-2"

SDAS303 A 1 2'-10" 6'-2"

SDAS302 A 1 2'-10" 6'-2"

SDAS301 A 1 2'-10" 6'-2"

SDAW311 A 1 2'-10" 6'-2"

SDAW310 A 1 2'-10" 6'-2"

SDAW309 A 1 2'-10" 6'-2"

SDAW308 A 1 2'-10" 6'-2"

SDAW307 A 1 2'-10" 6'-2"

SDAW306 A 1 2'-10" 6'-2"

SDAW305 A 1 2'-10" 6'-2"

SDAW304 A 1 2'-10" 6'-2"

SDAW303 A 1 2'-10" 6'-2"

SDAW302 A 1 2'-10" 6'-2"

PHASE 1 WINDOW SCHEDULE - SHERIDAN

EXISTING NEW

MARK

FRM

TYPE

SASH

TYPE

SASH

WIDTH

SASH

HEIGHT

01_FIRST FLOOR

SDS104 D 3 3'-5" 6'-6"

SDS103 D 3 3'-5" 6'-6"

SDAE107 E 1 2'-10" 5'-8"

SDAE106 E 1 2'-10" 5'-8"

SDAE105 E 1 2'-10" 5'-8"

SDAE104 E 1 2'-10" 5'-8"

SDAE103 E 1 2'-10" 5'-8"

SDAE102 E 1 2'-10" 5'-8"

SDAE101 E 1 2'-10" 5'-8"

SDAS104 E 1 2'-10" 5'-8"

SDAS103 E 1 2'-10" 5'-8"

SDAS102 E 1 2'-10" 5'-8"

SDAS101 E 1 2'-10" 5'-8"

SDAW109 E 1 2'-10" 5'-8"

SDAW108 E 1 2'-10" 5'-8"

SDAW107 E 1 2'-10" 5'-8"

SDAW106 E 1 2'-10" 5'-8"

SDAW105 E 1 2'-10" 5'-8"

SDAW104 E 1 2'-10" 5'-8"

SDAW103 E 1 2'-10" 5'-8"

SDAW102 E 1 2'-10" 5'-8"

02_SECOND FLOOR

SDS210 A 3 3'-1" 6'-6"

SDS209 A 3 3'-1" 6'-6"

SDS208 A 3 3'-1" 6'-6"

SDS207 A 3 3'-1" 6'-6"

SDAE210 E 1 2'-10" 6'-9"

SDAE209 E 1 2'-10" 6'-9"

SDAE208 E 1 2'-10" 6'-9"

SDAE207 E 1 2'-10" 6'-9"

SDAE206 E 1 2'-10" 6'-9"

SDAE205 E 1 2'-10" 6'-9"

SDAE204 E 1 2'-10" 6'-9"

SDAE203 E 1 2'-10" 6'-9"

SDAE202 E 1 2'-10" 6'-9"

SDAE201 E 1 2'-10" 6'-9"

SDAS205 E 1 2'-10" 6'-9"

SDAS204 E 1 2'-10" 6'-9"

SDAS203 E 1 2'-10" 6'-9"

SDAS202 E 1 2'-10" 6'-9"

SDAS201 E 1 2'-10" 6'-9"

SDAW211 E 1 2'-10" 6'-9"

SDAW210 E 1 2'-10" 6'-9"

SDAW209 E 1 2'-10" 6'-9"

SDAW208 E 1 2'-10" 6'-9"

SDAW207 E 1 2'-10" 5'-3"

SDAW206 E 1 2'-10" 5'-3"

SDAW205 E 1 2'-10" 6'-9"

SDAW204 E 1 2'-10" 6'-9"

SDAW203 E 1 2'-10" 6'-9"

SDAW202 E 1 2'-10" 6'-9"

WINDOW IDENTIFICATION

SDN101

EXAMPLE - HALL (W, SM, G, SD. ADD A IF IT IS AN ANNEX), ELEVATION, FLOOR

LEVEL, # (LEFT TO RIGHT)

SDAN101

SHERIDAN

ANNEX

NORTH

1ST FLOOR

1ST WINDOW

SHERIDAN

NORTH

1ST FLOOR

1ST WINDOW

04_FOURTH FLOOR

A 1 2'-10" 5'-0" A 1 2'-10" 5'-0" A 1 2'-10" 5'-0" A 1 2'-10" 5'-0" A 1 2'-10" 5'-0" A 1 2'-10" 5'-0" A 1 2'-10" 5'-0" A 1 2'-10" 5'-0" A 1 2'-10" 5'-0" A 1 2'-10" 5'-0" A 1 2'-10" 5'-0" A 1 2'-10" 5'-0" A 1 2'-10" 5'-0" A 1 2'-10" 5'-0"

A 1 2'-10" 5'-0" A 1 2'-10" 5'-0" A 1 2'-10" 5'-0" A 1 2'-10" 5'-0" A 1 2'-10" 5'-0" A 1 2'-10" 5'-0" A 1 2'-10" 5'-0" A 1 2'-10" 5'-0" A 1 2'-10" 5'-0"

A 1 2'-10" 5'-0"SDAW402

SDAW403

SDAW404

SDAW405

SDAW406

SDAW407

SDAW408

SDAW409

SDAW410

SDAW411

SDAS401

SDAS402

SDAS403

SDAS404

SDAE401

SDAE402

SDAE403

SDAE404

SDAE405

SDAE406

SDAE407

SDAE408

SDAE409

SDAE410

MARK

SASH

TYPE

INT.

FINISH

GLASS

TYPE

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

EXISTING

FRM

TYPE

SASH

TYPE

SASH

WIDTH

SASH

HEIGHT

SASH

TYPE

INT.

FINISH

GLASS

TYPE

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

WINDOW

TYPE

B U

IL

D

IN

G

W

IN

D O

W S

NOTES

WINDOW

TYPE NOTES

NEW

PHASE 1 WINDOW SCHEDULE - SHERIDAN

SHERIDAN HALL - SD

SHERIDAN ANNEX - SDA

GRANT HALL - G

SHERMAN HALL - SM

SHERMAN ANNEX - SMA

WAGNER HALL - W

LEGEND

01_FIRST FLOOR

SMAE105 J 6 3'-5" 4'-5"

SMAE104 J 5 3'-5" 4'-5"

SMAE103 - - 3'-5" 4'-6"

SMAE102 J 5 2'-8" 4'-6"

SMAE101 J 5 3'-4 1/2" 5'-4"

SMAS102 K 7 2'-6" 5'-1 1/2"

SMAS101 K 7 2'-6" 5'-1 1/2"

SMAW106 K 7 2'-11" 7'-1"

SMAW105 K 7 2'-11" 7'-1"

SMAW104

SMAW103 J 6 3'-5" 4'-5"

SMAW102 J 6 3'-5" 4'-5"

SMAW101 I 3 2'-8 1/2" 5'-7"

SMS102 L 6 3'-4 1/2" 4'-6"

02_SECOND FLOOR

SMS212 I 3 2'-9" 6'-9"

SMS211 I 3 2'-9" 6'-9"

SMS210 U 2'-10 1/2" 7'-0"

SMS209 U 2'-10 1/2" 7'-0"

SMS208 U 2'-10 1/2" 7'-0"

SMS207 U 2'-10 1/2" 7'-0"

SMAE209 I 3 2'-9" 6'-9"

SMAE208 I 3 2'-9" 6'-9"

SMAE207 I 3 2'-9" 6'-9"

SMAE206 I 3 2'-9" 6'-9"

SMAE205 I 3 2'-9" 6'-9"

SMAE204 I 3 2'-9" 6'-9"

SMAE203 I 3 2'-9" 6'-9"

SMAE202 I 2'-9" 6'-9"

SMAE201 I 3 2'-9" 6'-9"

SMAS204 I 3 2'-9" 6'-9"

SMAS203 I 3 2'-9" 6'-9"

SMAS202 I 3 2'-9" 6'-9"

SMAS201 I 3 2'-9" 6'-9"

I 3 2'-9" 6'-9" I 3 2'-9" 6'-9" I 3 2'-9" 6'-9" I 3 2'-9" 6'-9" I 3 2'-9" 6'-9" I 3 2'-9" 6'-9" I 3 2'-9" 6'-9"

SMAW203 I 3 2'-9" 6'-9"

SMS205 I 3 2'-9" 6'-9"

SMS204 I 3 2'-9" 6'-9"

SMS203 I 3 2'-9" 6'-9"

SMS202 I 3 2'-9" 6'-9"

SMS201 I 3 2'-9" 6'-9"

SMAE210 U 2'-9" 6'-9"

SMS206

SMAW202

SMAW204

SMAW205

SMAW206

SMAW207

SMAW208

SMAW209

SMAW210

SMS101 - - 3'-4 1/2" 4'-6"

02_SECOND FLOOR

GS201 H.1 4.1 3'-8" 5'-1"

03_THIRD FLOOR

GE301 G.1 4.2 3'-8" 6'-6"

GS306 G.1 4.2 3'-8" 6'-6"

GS305 G.1 4.2 3'-8" 6'-6"

GS304 G.1 4.2 3'-8" 6'-6"

GS303 G.1 4.2 3'-8" 6'-6"

GS302 G.1 4.2 3'-8" 6'-6"

GW301 G.1 4.2 3'-8" 6'-6"

GS301 H.1 4.1 3'-8" 6'-6"

04_FOURTH FLOOR

GS401 H.1 4.1 3'-8" 5'-0"

05_FIFTH FLOOR

GE501 12

GS504 F.3 4.2 4'-4" 10'-1"

GS503 F.3 4.2 4'-4" 10'-1"

GW501 12

GS502 F.2 4.1 3'-0" 5'-2"

GS501 F.2 4.1 3'-0" 5'-2"

PHASE 2 WINDOW SCHEDULE - GRANT

EXISTING

MARK

FRM

TYPE

SASH

TYPE

SASH

WIDTH

SASH

HEIGHT

SASH

TYPE

INT.

FINISH

GLASS

TYPE

PHASE 2 WINDOW SCHEDULE - SHERMAN

EXISTING

MARK

FRM

TYPE

SASH

TYPE

SASH

WIDTH

SASH

HEIGHT

SASH

TYPE

INT.

FINISH

GLASS

TYPE

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

CLEAR

PAINT

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

PAINT

PAINT

1- - -

CLEARPAINT

SMS103 - - 3'-4 1/2" 4'-6" 1- - -

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

I 3 2'-9" 6'-9"

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT3

CLEARPAINT6

CLEARPAINT6

1- - -

7 CLEARPAINT

SMAW107 K 7 2'-11" 7'-1"

3'-5" 4'-5"- -

7 CLEARPAINT

7 CLEARPAINT

I 3 2'-9" 6'-9" FROSTEDPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

5 CLEARPAINT

5 CLEARPAINT

5 CLEARPAINT

CLEARPAINT6

1- - -

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

SME101 M

SME201 I 3

3'-5" 4'-9"- 1- - -

2'-9" CLEARPAINT

SMAE106 - - - - -- - 1

NEW

WINDOW

TYPE NOTES

NEW

WINDOW

TYPE NOTES

WINDOW SCHEDULE NOTES

1. MECHANICAL OPENING/BOARDED UP. REPLACE WITH A MAPES-R TYPE

PANEL (OR EQUIVALENT) INFILL FOR WINDOW SASH. LOUVERS TO BE

TAKEN OFF AND POWDER-COATED. COLOR TO MATCH THE NEW

WINDOWS.

2. MESH SCREENS TO BE TAKEN OFF AND POWDER-COATED. COLOR TO

MATCH THE NEW WINDOWS.

3. HALF MECHANICAL, HALF WINDOW. REPLACE THE MECHANICAL OPENING

WITH A MAPES-R TYPE PANEL (OR EQUIVALENT) INFILL TO FIT THE

EXHAUST FAN. REPLACE THE WINDOW WITH A 2-LITE FROSTED GLASS

WINDOW. COLOR AND STYLE TO MATCH THE NEW WINDOWS.

4.3 4.3 4.3 4.3 4.3 4.3 4.3

4.3 4.3

12.1 12.1-

6'-9"

STAIN

STAIN

STAIN

STAIN

4. ONLY ACCESSIBLE FROM THE OUTSIDE.

PAINT FROSTED

A A A A A A A A A A A A A A A A A A A A A

A A A A A A A A A A A A A A A A A A A A A A A A A

A

A

A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A

B B B B

B B B B B B B B B B B B B B B B B B B B B

B B B B B B B B

B B B B B B B B B B B B B B B B B B B B B B

B B

H

H

H H

G

C C C C C C C

C C

D

D D

D D

D D

E E E

E E

G

G

G G

G

G

G

S

ER

7/

/2

SHEET ID

A-115

M cC

LE

LL

A N

A V E, FO

R T

LE

A V

EN

W O

R

TH

K S

7-

D R A W

N B

Y:

D

ES

IG

N

ED

B

Y:

S

IZ

E:

C H

EC

K

ED

B Y:

A N

S I

'D

IS

S U

E D

A

TE

PR

O

JE

C T

N O

M A R K

D

ES

C R

IP

TI

O

N D

A

TE

1 2 3 4 5

D

C

B

A

D

IR

EC

TO

R A

TE

O F

PU

B

LI

C W

O R K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R A N

C H

N

ET

N

ET

W

IN

D O

W S

C H

ED

U

LE

C

O N

TI

N

U

ED

SMS312 I 3 2'-9" 6'-9"

SMS311 I 3 2'-9" 6'-9"

SMS310 U 11 2'-10 1/2" 7'-0"

SMS309 U 11 2'-10 1/2" 7'-0"

SMS308 U 11 2'-11" 7'-0"

SMS307 U 11 2'-11" 7'-0"

SMAE309 I 3 2'-9" 6'-9"

SMAE308 I 3 2'-9" 6'-9"

SMAE307 I 3 2'-9" 6'-9"

SMAE306 I 3 2'-9" 6'-9"

SMAE305 I 3 2'-9" 6'-9"

SMAE304 I 3 2'-9" 6'-9"

SMAE303 I 3 2'-9" 6'-9"

SMAE302 I 3 2'-9" 6'-9"

SMAE301 I 3 2'-9" 6'-9"

I 3 2'-9" 6'-9" I 3 2'-9" 6'-9" I 3 2'-9" 6'-9" I 3 2'-9" 6'-9" I 3 2'-9" 6'-9" I 3 2'-9" 6'-9" I 3 2'-9" 6'-9" I 3 2'-9" 6'-9"

SMS306 I 3 2'-9" 6'-9"

SMS305 I 3 2'-9" 6'-9"

SMS304 I 3 2'-9" 6'-9"

SMS303 I 3 2'-9" 6'-9"

SMS302 I 3 2'-9" 6'-9"

SMS301 I 3 2'-9" 6'-9"

SMAE310 I 3 2'-9" 6'-10"

SMAW301 I 3 2'-9" 6'-9 1/2"

03_THIRD FLOOR

SMAW302

SMAW303

SMAW304

SMAW305

SMAW306

SMAW307

SMAW308

SMAW309

SMAW310

02_SECOND FLOOR

WS202 T 1 3'-4" 5'-10"

WINDOW IDENTIFICATION

SDN101

EXAMPLE - HALL (W, SM, G, SD. ADD A IF IT IS AN ANNEX), ELEVATION, FLOOR

LEVEL, # (LEFT TO RIGHT)

SDAS101

SHERIDAN

ANNEX

SOUTH

1ST FLOOR

1ST WINDOW

SHERIDAN

NORTH

1ST FLOOR

1ST WINDOW

PHASE 2 WINDOW SCHEDULE - WAGNER

EXISTING

MARK

FRM

TYPE

SASH

TYPE

SASH

WIDTH

SASH

HEIGHT

SASH

TYPE

INT.

FINISH

GLASS

TYPE

WS305 Q 1 2'-4" 5'-9 3/4"

WS304 Q 1 2'-4" 5'-9 3/4"

WS303 Q 1 3'-4" 5'-9 3/4"

WS302 Q 1 2'-4" 5'-9 3/4"

WS301 Q 1 2'-4" 5'-9 3/4"

03_THIRD FLOOR

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

SME301 I 3 2'-9" 6'-7" CLEARPAINT

CLEARSTAIN

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

CLEARPAINT

B3

NTSA-115

FRAME TYPE I

SHERMAN AND

SHERMAN ANNEX

FRAME TYPE J

SHERMAN AND

SHERMAN ANNEX

FRAME TYPE K

SHERMAN AND

SHERMAN ANNEX

FRAME TYPE L

SHERMAN AND

SHERMAN ANNEX

FRAME TYPE F.2

BI-PARTIDE OR TRI-PARTIDE

GRANT HALL

FRAME TYPE F.3

GRANT HALL

FRAME TYPE G.1

GRANT HALL

FRAME TYPE H.1

GRANT HALL

FRAME TYPE U

10'-1" A.F.F.

SASH TYPE 6

DOUBLE HUNG

SASH TYPE 7

FIXED

SASH TYPE 4.1

DOUBLE HUNG

NO TRANSOM

SASH TYPE 4.2

WITH FIXED

TRANSOM

SASH TYPE 3

DOUBLE HUNG

R

EF

. S C

H

ED

REF. SCHED.

R

EF

. S C

H

ED

REF. SCHED.

R

EF

. S C

H

ED

REF. SCHED.

R

EF

. S C

H

ED

REF. SCHED.

SASH TYPE 5

DOUBLE HUNG

R

EF

. S C

H

ED

REF. SCHED.

SASH TYPE 11

DOUBLE HUNG

R

EF

. S C

H

ED

REF. SCHED.

SASH TYPE 12

FIXED

R

EF

. S C

H

ED

REF. SCHED.

EXISTING INTERIOR FRAME TYPES

SASH TYPESA2

NTSA-115

SASH TYPE 1

DOUBLE HUNG

R

EF

. S C

H

ED

REF. SCHED.

FRAME TYPE Q

WAGNER HALL

FRAME TYPE T

WAGNER HALL

FRAME TYPE M

SHERMAN AND

SHERMAN ANNEX

B U

IL

D

IN

G

W

IN

D O

W S

NEW

WINDOW

TYPE NOTES

FRAME TYPE A

SHERIDAN AND

SHERIDAN ANNEX

FRAME TYPE B

SHERIDAN AND

SHERIDAN ANNEX

FRAME TYPE C

SHERIDAN AND

SHERIDAN ANNEX

FRAME TYPE D

SHERIDAN AND

SHERIDAN ANNEX

FRAME TYPE E

SHERIDAN AND

SHERIDAN ANNEX

PHASE 2 WINDOW SCHEDULE - SHERMAN

EXISTING

MARK

FRM

TYPE

SASH

TYPE

SASH

WIDTH

SASH

HEIGHT

SASH

TYPE

INT.

FINISH

GLASS

TYPE

NEW

WINDOW

TYPE NOTES

PHASE 3 WINDOW SCHEDULE - SHERIDAN

EXISTING

MARK

FRM

TYPE

SASH

TYPE

SASH

WIDTH

SASH

HEIGHT

SASH

TYPE

INT.

FINISH

GLASS

TYPE

NEW

WINDOW

TYPE NOTES

01_FIRST FLOOR

SDS102 3'-5" 6'-6"

SDS101 3'-5" 6'-6"

SDS206 U 11 3'-1" 6'-6"

SDS205 U 11 3'-1" 6'-6"

SDS204 U 11 3'-2 1/2" 6'-7"

SDS203 U 11 3'-2 1/2" 6'-7"

SDS202 A 3 3'-1" 6'-6"

SDS201 A 3 3'-1" 6'-6"

SDW101 - -

SDW102 - -

SDW103 - -

SDAW101 PAINT CLEAR3'-11

2" 4'-71 2" 3

3'-5" 6'-6"

3'-5" 6'-6"

3'-5" 6'-6"

- 1

1- - -

CLEAR3

CLEAR3

CLEAR3

CLEAR3

CLEAR3

CLEAR3

CLEAR3

PHASE 3 WINDOW SCHEDULE - SHERIDAN

EXISTING

MARK

FRM

TYPE

SASH

TYPE

SASH

WIDTH

SASH

HEIGHT

SASH

TYPE

INT.

FINISH

GLASS

TYPE

NEW

WINDOW

TYPE NOTES

02_SECOND FLOOR CONT.

A 3 3'-5" 6'-6"

A 3 3'-5" 6'-6"SDW201

SDW203

SDW202 A 3 3'-5" 6'-6"

SDAW201 U 11 3'-0 1/2" 6'-10" PAINT CLEAR3

03_THIRD FLOOR

SDS306 U 11 3'-3" 6'-7 1/2"

SDS305 U 11 3'-2" 6'-7 1/2"

SDS304 U 11 3'-3" 6'-7 1/2"

SDS303 U 11 3'-2" 6'-7 1/2"

SDS302 A 3 3'-1" 6'-6"

A 3 3'-1" 6'-6"SDS301 STAIN CLEAR3

STAIN CLEAR3

STAIN CLEAR3

STAIN CLEAR3

STAIN CLEAR3

STAIN CLEAR3

SDAW301 A 1 2'-10" 6'-2"

A 3 3'-5" 6'-6"

A 3 3'-5" 6'-6"SDW301

SDW302

SDW303

A 3 3'-5" 6'-6"

CLEAR3

CLEAR3

CLEAR3

STAIN CLEAR3

04_FOURTH FLOOR

SDS403 B 2 3'-4 1/2" 2'-10"

SDS402 B 2 3'-4 1/2" 2'-10"

SDS401 B 2 3'-4 1/2" 2'-10"

B 2 3'-4 1/2" 2'-10"

B 2 3'-4 1/2" 2'-10"SDS404

SDS405

PAINT CLEAR2

PAINT CLEAR

PAINT CLEAR

PAINT CLEAR

PAINT CLEAR

SDW401

SDW402

B B 2.1

2.1 3'-4 1/2" 2'-10" 3'-4 1/2" 2'-10"

CLEAR

CLEAR

A 1 2'-10" 5'-0"SDAW401 STAIN CLEAR3

PHASE 3 WINDOW SCHEDULE - SHERMAN

EXISTING

MARK

FRM

TYPE

SASH

TYPE

SASH

WIDTH

SASH

HEIGHT

SASH

TYPE

INT.

FINISH

GLASS

TYPE

NEW

WINDOW

TYPE NOTES

04_FOURTH FLOOR

3'-4 1/2" 2'-10" 3'-4 1/2" 2'-10" 3'-4 1/2" 2'-10"

3'-4 1/2" 2'-10"

PAINT CLEAR2

PAINT CLEAR

PAINT CLEAR

PAINT CLEAR

PAINT CLEAR

3'-4 1/2" 2'-10"

PAINT CLEAR

PAINT CLEARSMS407

SMS406 2'-11" 3'-0"

SMS405 3'-6" 3'-2"

SMS404 N 2

SMS403 N 2

SMS402 N 2

SMS401 N 2

N 2 N 2 N 2

SME402 N 2 3'-4 1/2" 2'-10"

SME401 N 2 3'-4 1/2" 2'-10" 2 PAINT CLEAR

2 PAINT CLEAR

FRAME TYPE N

SHERMAN AND

SHERMAN ANNEX

SASH TYPE 2

PIVOT

R

EF

. S C

H

ED

REF. SCHED.

SASH TYPE 4.3

DOUBLE HUNG

WITH FIXED

TRANSOM

R

EF

. S C

H

ED

REF. SCHED.

SASH TYPE 12.1

FIXED

R

EF

. S C

H

ED

REF. SCHED.

SASH TYPE 2.1

FIXED

R

EF

. S C

H

ED

REF. SCHED.

SHERIDAN HALL - SD

SHERIDAN ANNEX - SDA

GRANT HALL - G

SHERMAN HALL - SM

SHERMAN ANNEX - SMA

WAGNER HALL - W

LEGEND

I 3 2'-9" 6'-9 1/2"

STAIN

STAIN

STAIN

STAIN

STAIN

STAIN

CLEAR

CLEAR

CLEAR

H H

H H H

H H H H H H

E E E

E E E

E

F F F F F F F F F

F F F F F

B

B

A

A

A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A

WS306

WS101 T 1 3'-4" 5'-3"

P 1 3'-4" 5'-10"

H

WS201 T 1 3'-4" 5'-10" CLEARPAINT3

01_FIRST FLOOR

CLEARPAINT3

CLEARSTAIN3

H

H

A

A

A A A A A

F F

G

G G G

S

ER

7/

/2

WINDOW SCHEDULE NOTES

1. MECHANICAL OPENING/BOARDED UP. REPLACE WITH A MAPES-R TYPE

PANEL (OR EQUIVALENT) INFILL FOR WINDOW SASH. LOUVERS TO BE

TAKEN OFF AND POWDER-COATED. COLOR TO MATCH THE NEW

WINDOWS.

2. MESH SCREENS TO BE TAKEN OFF AND POWDER-COATED. COLOR TO

MATCH THE NEW WINDOWS.

3. HALF MECHANICAL, HALF WINDOW. REPLACE THE MECHANICAL OPENING

WITH A MAPES-R TYPE PANEL (OR EQUIVALENT) INFILL TO FIT THE

EXHAUST FAN. REPLACE THE WINDOW WITH A 2-LITE FROSTED GLASS

WINDOW. COLOR AND STYLE TO MATCH THE NEW WINDOWS.

4. ONLY ACCESSIBLE FROM THE OUTSIDE.

SDAN202

SDAN201

SDAN302

SDAN301

SDAN402

SDAN401

A 1 A 1

2'-10" 5'-0" 2'-10" 5'-0"

A 1 2'-10" 6'-2" A 1 2'-10" 6'-2"

U 11 3'-0" 6'-11" U 11 3'-0" 6'-11"

PAINT CLEAR

PAINT CLEAR

A A

B B

STAIN CLEAR

STAIN CLEAR

STAIN CLEAR B

STAIN CLEAR B

8/

/2

R

EV

IS

IO

N

P

R E-

B

ID

A N

S W

ER

S

SHEET ID

A-116

M cC

LE

LL

A N

A V E, FO

R T

LE

A V

EN

W O

R

TH

K S

7-

D R A W

N B

Y:

D

ES

IG

N

ED

B

Y:

S

IZ

E:

C H

EC

K

ED

B Y:

A N

S I

'D

IS

S U

E D

A

TE

PR

O

JE

C T

N O

M A R K

D

ES

C R

IP

TI

O

N D

A

TE

1 2 3 4 5

D

C

B

A

D

IR

EC

TO

R A

TE

O F

PU

B

LI

C W

O R K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R A N

C H

N

ET

N

ET

N

EW

W

IN

D O

W D

ET

A

IL

S A

N D

S

PE

C

IF

IC

A

TI

O N

S

JAMB DETAILA1

NTSA-116

HEAD & SILL DETAILC1

NTSA-116

TRANSOM MULL DETAILC2

NTSA-116

TRANSOM HEAD & SILL DETAILA2

NTSA-116

B U

IL

D

IN

G

W

IN

D O

W S

WESTCHESTER

WESTCHESTER

WESTCHESTER

WESTCHESTER

Building 52 Window Specifications The following specifications apply to Window Types A, B, C, D, E, F, G, AND H. Each window type has different specifications for the grille, interior wood, or interior finish.

PART 1 GENERAL

1.1 SUMMARY

A. Related Documents: Provisions within the General and Supplementary Conditions of the contract, Division 1 General Requirements and Drawings.

B. Section includes:

1. Aluminum clad exterior/ wood interior Westchester Double/Single Hung windows with hardware, Westchester Picture and Transom windows.

C. Related Sections:

1.2 SUBMITTALS

A. Provide submittals under provisions of Division 1 B. Product Data: Include the following for each type of window required.

1. Construction details and fabrication methods

2. Profiles and dimensions of individual components

3. Data on hardware, accessories, and finishes

4. Recommendations for maintenance and cleaning of exposed surfaces

C. Shop Drawings: Include information not fully detailed in manufacturer’s product data and include the following for each type of window required.

1. Layout and installation details, including anchors.

2. Elevations at 1/4 inch = 1 foot (1:50) scale, of typical composite member, including reinforcement and stiffeners

3. Sections at 3 inch = 1 foot (1:4) scale, of typical composite members, including reinforcement and stiffeners

4. Hardware, including operators.

5. Glazing details

6. Accessories

7. Manufacturer Installation Criteria and Recommendations

D. Samples: Submit one corner section. Where finishes involve normal color variations, include sample sets showing full range of expected variations. Submit color samples as appropriate.

1.3 QUALITY ASSURANCE

A. Manufacturers Qualifications: Manufacturer shall have produced type of windows specified for a minimum of ten years, with similar projects that have been in successful use for a minimum of ten years.

B. Obtain windows through one source from a single manufacturer.

C. Safety Glass Standard: Provide products complying with testing requirements of United States Consumer Product Safety Commission’s 16 CFR, Part 1201 for Category II materials or as prescribed by local codes. Provide products complying with ANSI Z97.1.

1. Subject to compliance with project requirements, provide safety glass permanently marked with certification label of Safety Glazing Certification Council or another certification agency acceptable to authorities having jurisdiction.

D. Insulated Glass Certification: Provide insulated glass units permanently marked on spacers or on at least one component pane of units with appropriate certification label of inspecting agency.

E. WDMA Hallmark Certification: Provide products that have been certified as having been manufactured in accordance with WDMA Hallmark standards. Compliance is verified through independent third-party product testing and semi-annual inspections of the manufacturing facility.

F. Wood Components Sustainability Standards: Provide products that have been certified by independent third parties and labeled as having been produced in compliance with the accepted principles of sustainable forest management. Current certification systems that meet this standard of sustainability include the (Sustainable Forestry Initiative) SFI, the ISO 14001 EMS program, the (Forest Stewardship Council) FSC, and the CSA certification system.

1.4 DELIVERY, STORAGE, AND HANDLING

A. Ship units with both temporary and permanent NFRC labeling.

1. Temporary label shall indicate that the unit is NFRC certified and include brief product description and thermal or energy performance values.

2. Permanent label shall include manufacturer identification and performance tracking for life of product.

B. Deliver in original packaging, undamaged, with instructions.

C. Store off ground, in upright position, and protect from weather.

1.5 WARRANTY

A. Provide manufacturer’s standard warranty as follows.

1. Workmanship and Materials: 10-year limited warranty

2. Insulating Glass: 20-year limited warranty (Residential and Commercial)

3. Exterior Aluminum Clad Finish:

a. Commercial AAMA 2605 Aluminum Clad: 20-year limited warranty on aluminum clad coating against cracking, color change, chalking, or peeling (adhesion loss) in normal conditions: 10-year limited warranty on aluminum clad coating against cracking, checking, color change, chalking, or peeling (adhesion loss) in extreme conditions.

4. Interior Finish: 2-year limited warranty

5. Warranty Labor: 2-year limited warranty

PART 2 PRODUCTS

2.1 MANUFACTURERS

A. Acceptable Manufacturer: Sierra Pacific Windows, 785-331-7384;

www.sierrapacficwindows.com

B. Substitutions: Permitted. Provide submittal with window make, model, and specifications within accordance to below specifications to the COR for approval before any purchase actions.

2.2 PERFORMANCE REQUIREMENT

A. Class LC-PG50, AAMA/WDMA/CSA 101/I.S.2/A440: (48X84)

1. Air Infiltration, ASTM E 283: Maximum 0.13 cfm/ft2 at 1.57 psf

2. Water Resistance, ASTM E 547: No leakage at 7.52 psf

3. Structural Performance, ASTM E 330: Withstands up to +/-80 psf

B. Class CW-PG30, AAMA/WDMA/CSA 101/I.S.2/A440: (60X108)

1. Air Infiltration, ASTM E 283: Maximum 0.13 cfm/ft2 at 1.57 psf

2. Water Resistance, ASTM E 547: No leakage at 7.52 psf

3. Structural Performance, ASTM E 330: Withstands up to +/-45 psf

2.3 THERMAL PERFORMANCE RATING

A. Glazing Type and Finish:

1. U-Factor, NFRC 100: .43 or better

2. Solar Heat Gain Coefficient (SHGC), NFRC 200: .53 or better

3. Visible Light Transmission (VLT), NFRC 300: .56 or better

2.4 COATING PERFORMANCE

A. Primer shall comply with testing in accordance with ASTM D-3359 and ASTM D-

2.5 MATERIALS

A. Wood:

1. Species: Douglas Fir kiln dried to moisture content of 6 to 12 percent at time of fabrication; water-repellent preservative treated in accordance with WDMA I.S.4.

2. Grade:

a. Interior Exposed Wood: Solid clear, suitable for staining or painting

B. Exterior Aluminum Cladding: 0.062 inch thick extruded 6063 T5 grade aluminum.

C. Glazing: Provide manufacturer’s standard glazing material complying with ASTM C

1036.

1. Factory-Glazed Fabrication: Comply with requirements of AAMA/WDMA

101/I.S.2/NAFS

2. Glass Type:

a. Dual IG 1/4” Laminated on the interior

2.6 COMPONENTS

A. Hardware:

1. Locks and latches operated with single combination lock and tilt mechanism.

2. Standard one lock on widths up to 28”. Two locks on widths 28” and over.

3. Tilt latches concealed in the sash stile.

4. Sash lock: High-pressure zinc casting handle in antique bronze finish

5. Constant Force Balance in concealed jambliners. M-Series hybrid spiral balance for larger sizes (results in limited travel)

6. Window Opening Control Device (WOCD) in accordance with ASTM F-2090

B. Weatherstripping Units constructed with pile weatherstrip w/center fin and a compressible bulb weatherstrip designed for tight seal when sash are closed.

Pile weatherstrip on sash at checkrails; Compressible bulb weatherstrip at bottom of bottom rail, bottom sash center filler (jambliner) and head/side jamb pocket fillers.

C. Drip Cap: Extruded aluminum drip cap factory applied to frame.

D. Screen Frame: No Screen

2.7 FABRICATION

A. Fabricate wood windows in sizes indicated.

B. Overall frame thickness is 5/8”, kiln dried to a moisture content of 6-12% at time of fabrication.

C. Interior wood for head and side jambs 6/4 solid FIR D. Adjust Jamb width to match specific window to be replaced. Jamb depths available include: 4-9/16” , [4-3/4”][5”][5-1/8”][5-5/16”][6-7/16”][6-9/16”][6-11/16”][6-7/8”][7”][7- 1/8”][7-1/4”][7-3/8”][7-5-16”][8-1/8”]Custom]

E. Sash thickness: 1-3/4 inches Wood stiles and rails use a slot and tenon at the bottom rail and top rail. Checkrail wood is joined using dovetail joint for both the top and bottom sash. Stile and rails are mechanically fastened and glued with stiles running through.

Cladding: Extruded .055” Aluminum stiles and top rail, extruded .063” bottom rail fastened to the wood sash via a vinyl clip system

Fiberglass interlock on top and bottom sash Tilt-in feature on top and bottom sash.

Thermally broken, reglazable sash assembled with exterior aluminum sash and interior wood components pressure fitted with glass in between.

Narrow 2” stiles and upper sash top rail, 1-1/2” checkrail, 3-3/8” bottom sash rail

F. Glazing:

1” Dual Pane insulated glass doubled taped with silicone sealant to the exterior.

Clear, 1/4” Laminated Safety glass laminated and tempered glass with safety glazing requirements in accordance with 16 CFR 1202 for Category II materials.

S

ER

7/

/2

8/

/2

R

EV

IS

IO

N

P

R E-

B

ID

A N

S W

ER

S

SHEET ID

A-117

M cC

LE

LL

A N

A V E, FO

R T

LE

A V

EN

W O

R

TH

K S

7-

D R A W

N B

Y:

D

ES

IG

N

ED

B

Y:

S

IZ

E:

C H

EC

K

ED

B Y:

A N

S I

'D

IS

S U

E D

A

TE

PR

O

JE

C T

N O

M A R K

D

ES

C R

IP

TI

O

N D

A

TE

1 2 3 4 5

D

C

B

A

D

IR

EC

TO

R A

TE

O F

PU

B

LI

C W

O R K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R A N

C H

N

ET

N

ET

S

PE

C

IF

IC

A

TI

O N

S

B U

IL

D

IN

G

W

IN

D O

W S

2.8 FINISHES

Exterior Finish: To be manufacturer’s pre-treated aluminum surface with baked on, electrostatically applied super durable polyester powder paint, zero-VOC finish conforming to specified AAMA 2605 test procedures.

ColorStay™ Colonial Red

PART 3 EXECUTION

3.1 EXAMINATION

A. Site Verification of Conditions: Verify installation conditions previously established under other sections are acceptable for product installation in accordance with manufacturer’s instructions.

B. Verify that field measurements are acceptable to suit window unit tolerances.

C. Verify sill plate is level.

D. Verify supports and anchors are correctly and securely positioned.

E. Verify masonry surfaces are dry and free of construction debris.

F. Verify wood frame walls are dry, clean, sound, well-nailed, free of voids, and without offsets at joints. Ensure that nail heads are driven flush with surfaces in opening and within 3 inches of corner.

G. Scheduling of installation implied that substrate and conditions are prepared and ready for product installation. Proceeding with installation implied installer’s acceptance of substrate and conditions.

3.2 PREPARATION

A. Coordinate window installation with wall flashings and other built-in components.

3.3 INSTALLATION

A. Install window units, hardware, and components in accordance with manufacturer’s instructions and approved shop drawings, in compliance with specified performance requirements, and to provide weathertight construction.

B. Anchor components securely to building structure, plumb and level, accurately fitted, and free from distortion or defects.

C. Fit exposed connections to form tight hairline joints.

3.4 ADJUSTING

A. Adjust operating sash, hardware, and weatherstripping to provide tight fit at contact points, smooth operation, and weathertight closure.

3.5 CLEANING

A. Clean interior and exterior surfaces immediately after installation in accordance with manufacturer’s recommendations for cleaning and maintenance.

B. Remove temporary labels from surfaces.

C. Remove and replace glass damaged during construction period.

3.6 PROTECTION

A. Protect window units from damage or deterioration until Substantial Completion.

END OF SECTION

TYPE “A” WINDOW: DOUBLE HUNG

"A" 2.7. G. Grilles: Fabricate window unit with [grilles between glass (GBG)][simulated divided lite

(SDL)]

1. GBG style and size: 5/8” flat

2. SDL style and size:

a. Style: Putty Exterior

b. Size: 1-1/4”

c. Fabricate interior SDL bars of wood.

d. Fabricate exterior SDL bars of extruded aluminum.

e. Fabricate IG with internal shadow bar to create appearance of true divided lites.

f. Permanently apply grille bars to both interior and exterior of glass surface using very high bonded acrylic adhesive tape

3. Pattern: Two lites divided vertically per sash (2/2)

4. Exterior Trim: Extruded flat exterior trim casing covers wood buck. Trim matches exterior paint specifications

"A" 2.8 FINISHES

B. Interior Finish:

Natural wood, species as selected: Fir Primed Wood: White Clear Coat Ultra Paint Color: White. Two-part special formulated paint durable enough to greater resist scratches and marring, and strong enough to provide advanced resistance to chemical and moisture penetration.

TYPE “B” WINDOW: DOUBLE HUNG

"B" 2.7. G. Grilles: Fabricate window unit with [grilles between glass (GBG)][simulated divided lite

(SDL)]

1. GBG style and size: 5/8” flat

2. SDL style and size:

a. Style: Putty Exterior

b. Size: 1-1/4”

c. Fabricate interior SDL bars of wood.

d. Fabricate exterior SDL bars of extruded aluminum.

e. Fabricate IG with internal shadow bar to create appearance of true divided lites.

f. Permanently apply grille bars to both interior and exterior of glass surface using very high bonded acrylic adhesive tape

3. Pattern: Two lites divided vertically per sash (2/2)

4. Exterior Trim: Extruded flat exterior trim casing covers wood buck. Trim matches exterior paint specifications

"B" 2.8 FINISHES

A. Interior Finish:

1. Natural wood, species as selected: Mahogony

2. Primed Wood:

3. Clear Coat

4. Ultra Stain: [Espresso]

TYPE “C” WINDOW: DOUBLE HUNG with TRANSOM WINDOW

"C" 2.7. G. Grilles: Fabricate window unit with [grilles between glass (GBG)][simulated divided lite

(SDL)]

1. GBG style and size: 5/8” flat

2. SDL style and size:

a. Style: Putty Exterior

b. Size: 1-1/4”

c. Fabricate interior SDL bars of wood.

d. Fabricate exterior SDL bars of extruded aluminum.

e. Fabricate IG with internal shadow bar to create appearance of true divided lites.

f. Permanently apply grille bars to both interior and exterior of glass surface using very high bonded acrylic adhesive tape

3. Pattern: Two lites divided vertically per sash (2/2). Transom Window no SDL.

4. Exterior Trim: Extruded flat exterior trim casing covers wood buck. Trim matches exterior paint specifications

"C" 2.8 FINISHES

A. Interior Finish:

1. Natural wood, species as selected: FIR

2. Primed Wood:

3. Clear Coat

4. Ultra Stain: [Toffe]

TYPE “D” WINDOW: DOUBLE HUNG

"D" 2.7. G. Grilles: Fabricate window unit with [grilles between glass (GBG)][simulated divided lite

(SDL)]

1. GBG style and size: 5/8” flat

2. SDL style and size: Match existing window

a. Style: Putty Exterior

b. Size: 5/8”

c. Fabricate interior SDL bars of wood.

d. Fabricate exterior SDL bars of extruded aluminum.

e. Fabricate IG with internal shadow bar to create appearance of true divided lites.

f. Permanently apply grille bars to both interior and exterior of glass surface using very high bonded acrylic adhesive tape

3. Pattern: Match existing window

4. Exterior Trim: Extruded flat exterior trim casing covers wood buck. Trim matches exterior paint specifications

"D" 2.8 FINISHES

A. Interior Finish:

1. Natural wood, species as selected: FIR

2. Primed Wood: White

3. Clear Coat

4. Ultra Paint Color: White. Two-part special formulated paint durable enough to greater resist scratches and marring, and strong enough to provide advanced resistance to chemical and moisture penetration.

TYPE “E” WINDOW: FIXED PICTURE WINDOW (Windows are non functional)

"E" 2.7. G. Grilles: Fabricate window unit with [grilles between glass (GBG)][simulated divided lite

(SDL)]

1. GBG style and size: 5/8” flat

2. SDL style and size: Match existing window

a. Style: Putty Exterior

b. Size: 5/8 or 1.25”

c. NO INTERIOR SDL

d. Fabricate exterior SDL bars of extruded aluminum.

e. Fabricate IG with internal shadow bar to create appearance of true divided lites.

f. Permanently apply grille bars to both interior and exterior of glass surface using very high bonded acrylic adhesive tape

3. Pattern: Match existing window

4. Exterior Trim: Extruded flat exterior trim casing covers wood buck. Trim matches exterior paint specifications

"E" 2.8 FINISHES

A. Interior Finish:

1. NO INTERIOR FINISH

TYPE “F” WINDOW: AWNING

"F" 2.7. G. Grilles: Fabricate window unit with [grilles between glass (GBG)][simulated divided lite

(SDL)]

1. GBG style and size: 5/8” flat

2. SDL style and size: Match existing window

a. Style: Putty Exterior

b. Size: 5/8”

c. Fabricate interior SDL bars of wood.

d. Fabricate exterior SDL bars of extruded aluminum.

e. Fabricate IG with internal shadow bar to create appearance of true divided lites.

f. Permanently apply grille bars to both interior and exterior of glass surface using very high bonded acrylic adhesive tape

3. Pattern: Match existing window

4. Exterior Trim: Extruded flat exterior trim casing covers wood buck. Trim matches exterior paint specifications

"F" 2.8 FINISHES

A. Interior Finish:

1. Natural wood, species as selected: FIR

2. Primed Wood: White

3. Clear Coat

4. Ultra Paint Color: White. Two-part special formulated paint durable enough to greater resist scratches and marring, and strong enough to provide advanced resistance to chemical and moisture penetration.

TYPE “G” WINDOW: SPECIALTY WINDOW

1. Window frame that matches TYPE "E" Windows.

2. MAPES-R type panel (or equivalent) infill for window sash.

3. Panel composed of exterior and interior protective skin, substrate, and insulating core. Panel thickness 34" to 1".

4. Exterior skin of panel to match Colonial Red (Sierra Pacific Brand)

5. As required: Cut penetrations through panel, attach mechanical fixtures, reinforce fixtures structurally.

TYPE “H” WINDOW: DOUBLE HUNG

"H" 2.7. G. Grilles: Fabricate window unit with [grilles between glass (GBG)][simulated divided lite

(SDL)]

1. GBG style and size: 5/8” flat

2. SDL style and size:

a. Style: Putty Exterior

b. Size: 1-1/4”

c. Fabricate interior SDL bars of wood.

d. Fabricate exterior SDL bars of extruded aluminum.

e. Fabricate IG with internal shadow bar to create appearance of true divided lites.

f. Permanently apply grille bars to both interior and exterior of glass surface using very high bonded acrylic adhesive tape

3. Pattern: Two lites divided vertically per sash (2/2)

4. Exterior Trim: Extruded flat exterior trim casing covers wood buck. Trim matches exterior paint specifications

"H" 2.8 FINISHES

A. Interior Finish:

1. Natural wood, species as selected: FIR

2. Primed Wood:

3. Clear Coat

4. Ultra Stain: [Toffe]

S

ER

7/

/2

A-100.pdf
Sheets and Views
Cover Sheet
A-101.pdf
Sheets and Views
Overall NS
A-102.pdf
Sheets and Views
Phase 1
A-103.pdf
Sheets and Views
Sheridan W
A-104.pdf
Sheets and Views
Sheridan EA
A-105.pdf
Sheets and Views
Sheridan S
A-106.pdf
Sheets and Views
Phase 2
A-107.pdf
Sheets and Views
Grant S
A-108.pdf
Sheets and Views
Sherman S
A-109.pdf
Sheets and Views
Sherman WA
A-110.pdf
Sheets and Views
Sherman E
A-111.pdf
Sheets and Views
Sherman E and Wagner S
A-112.pdf
Sheets and Views
Phase 3
A-113.pdf
Sheets and Views
Sheridan W and Annex N
A-114.pdf
Sheets and Views
Schedule
A-115.pdf
Sheets and Views
Window Schedule
A-116.pdf
Sheets and Views
Details
A-117.pdf
Sheets and Views
Details (2)

File details come from the government source that posted it. Updated .