This document contains Industry Day Questions for the Army Family Housing, Phase 1 project scheduled for 12 August 2025. The document reveals key project details, including a design-bid-build approach where the contractor will not be responsible for design, but may have specific responsibilities defined in specifications. The project involves housing construction, with demolition to be performed by other parties using existing Government contracting vehicles prior to the project's commencement. Notable specifications include: no alternative structural systems permitted, no LEED certification required, ATFP requirements only applicable to the Phase 2 Community Center, and building permit approval to be provided by the Government via DOR before construction contract award. The document also indicates the design is current with existing norms and standards, using design studies from 2013 and 2018. A potential additional request for digital design documentation (CAD drawings, BIM models, topographic surveys) is under consideration and potential offerors will be advised of any resulting information during the solicitation release.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AFH CHVPH1_Pre-Bid_WIP_REV4.pdf | ||
| Attendance sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Army Family Housing, Phase 1 Industry Day 12 August 2025 Questions
1) Any design parts on contractor’s side? The proposed project is design-bid-build, as such, the Contractor will not be responsible for design of project. That said, it does not preclude the Contractor from specific responsibilities which may be defined in the specifications.
2) It seems that the design studies are from 2013 respective 2018. Is there anything that the contractor must undertake in their pricing to update these according new Norms or does the Designer takes care of all updates? The design is in accordance with current norms and standards.
3) Can we propose any other structural systems such as light gauge steel? No.
4) Who will be doing 3rd party demo? Demolition indicated to be performed by other parties will be accomplished utilizing existing Government contracting vehicles, and will be completed prior to commencement of this project’s demolition activities.
5) Does ABG75 apply in Belgium? (question asked as a result of typo on slides) No. Slides corrected as a result.
6) Are there ATFP requirements? ATFP requirements will only apply to the Community Center which is part of Phase 2. Housing units, including the multi-story apartments are exempt from AT/FP requirements.
7) Are there any LEED certifications? LEED certification is not applicable.
8) Who is responsible for the building permit process? Building permit approval will be provided by the Government via DOR prior to construction contract award.
9) Would it be possible to provide digital design and surveys in addition to usual design documentation? E.g.
CAD drawings of different housing units BIM-Model of different housing units CAD drawing of site plan (Roads and utilities) BIM Model of the site plan (Roads and utilities) Digital Topographic survey of existing conditions This question is under consideration. Potential offerors will be advised of any resulting information as part of the solicitation release.