This document contains Questions and Answers related to the Surrey Bus Seat Conversion solicitation (FA468624Q0024) issued by the Department of the Air Force Air Combat Command.

The key details are:

  • The bus seats must be re-utilized and as many as possible reinstalled in a new orientation. The desired floor is non-slip and neutral/matte in color.
  • There is no designated workspace for the contractor, and the work can be performed at the contractor's location. The vehicle will be used on highways and may transport children, but it does not have shoulder seatbelts.
  • This is a Firm Fixed Price solicitation. The government acknowledges that the 14-calendar day timeline may need to be adjusted if the contractor encounters unknown issues during the work.

View the file

Other files

File Type Posted
RFQ-Surrey Bus Conversion UPDATED.pdf PDF
Bus_Desired Seating.PNG PNG image
3.jpg JPG image
RFQ-Surrey Bus Conversion UPDATED.pdf PDF
Bus_Current Seating.PNG PNG image
4.jpg JPG image
Statement of Work (SOW) 2 April 2024 REDACTED.pdf PDF
7.jpg JPG image
1.jpg JPG image
2.jpg JPG image
6.jpg JPG image
8.jpg JPG image
5.jpg JPG image
Wage Determination.pdf PDF
Questions and Answers.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

-Will the same seatbelts be used? Yes -Has the bus been modified previously? No, there are no mods to the bus. It is factory condition.

-How many seats are desired? After removal of the seats the seats should be re-utilized and as many seats as possible shall be re installed in the new orientation -Desired floors are non-slip and neutral/matte in color -Where is the "designated work space"? No space for contractor to perform work.

-Does the work need to be performed at Beale AFB? The work can be performed at contractor location.

-Will this vehicle be used on the highway? Yes -Will children be riding in the shuttle bus? UNK

-Do the seats have shoulder seat belts? No

-Is this a fixed price bid or will you accept a time and material bid? This is a Firm Fixed Price We would need time to procure materials before we could start/finish. What happens if we can't finish in 14 calendar days because we encountered an unknown?

We can work with a timeline alteration if needed.