Questions and Answers 1~8.pdf
PDF 2 MB Posted
- Solicitation number
- S-73000-00016379
- Issued by
- Crook County, Oregon
About this file
This is a Questions and Answers document issued by the Oregon Department of Transportation (ODOT) in response to vendor inquiries regarding RFCQ #S-73000-00016379 for the 2026 ESB US101 Fence Replacement project in Gold Beach, Curry County. The project requires the reconstruction of 726 feet of Type 2 barbed and woven wire fence along US Highway 101 at milepost 324.5. The scope of work specifies that metal T-posts must be installed to match the existing installation, with concrete footings and braces required only where two previously compromised braces need reinstallation; all other sections require only line post installation per standard drawings. The fence will be installed in straight alignment with provisions to shift the line slightly toward the highway if tree stumps interfere with alignment. Installation extends from an intermediate end post on the south end to a gate post on the north side, with connections to existing T-posts marked with orange ribbon. The bid submission deadline is April 16, 2026, with substantial completion required by June 15, 2026, and final completion by June 26, 2026.
The project is restricted to Emerging Small Business (ESB) certified contractors registered with Oregon's Certification Office for Business Inclusion and Diversity (COBID), with contractors required to perform at least 51 percent of labor using their own workforce. Award will be made to the lowest responsive, responsible offeror, with quotes remaining firm for a minimum of 30 calendar days from closing. Contractors must hold a current State Construction Contractors Board (CCB) license, maintain a Public Works bond, and submit certificates of commercial general liability insurance with per-occurrence limits of $1,000,000 and annual aggregate limits of $2,000,000, along with commercial automobile liability insurance at $1,000,000 per occurrence. Performance and payment bonds equal to the contract price are required throughout project duration. Liquidated damages are assessed at $50.00 per calendar day for delays beyond the substantial completion date. No specific budget is disclosed, with contract price determined by competitive quotes for unit-priced items subject to potential retainage not exceeding five percent in accordance with Oregon Revised Statutes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers 3.pdf | ||
| 00016379 ESB_RFCQ.pdf | ||
| Att B Exhibit 6 Standard Drawing.pdf | ||
| 00016379 ESB_Sample_Contract.pdf | ||
| 00016379 Prelim Bid Results.xlsx | XLSX spreadsheet | |
| Att B Exhibit 5 Specifications.pdf | ||
| Questions and Answers 2~2.pdf | ||
| Att B Exhibit 7 Location Photos.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers #1
RFCQ # S-73000-00016379
2026 ESB US101 Fence Replacement (Gold Beach) Project
Question 1: What type of post is required for Type 2 fence. Wood or Metal? T-Post or Rounded?
Please Specify.
Answer 1: Metal T-posts are required for the fence replacement, as they match the existing installation.
Question 2: Are we (vendor) responsible to clean all buses and brunches along the path?
Answer 2: If bushes or branches are impeding the fence installation, they should be moved aside as needed. Removal and disposal of the brush or branches is not required.
Question 3: Are we (vendor) only placing T-posts on the ground, or you (ODOT) want concrete footings and braces as shown in drawings? It’s not clear the metal post application.
Answer 3: If two of the braces have been compromised and need to be reinstalled. For the rest of the fence only the line post (t-post) should be installed according to the metal post section in the standard drawing below.
S-73000-00016379 1/2
• The fence will be in installed in a straight alignment with no angle points. If a tree stump interferes with the alignment, the fence line will be shifted slightly towards the highway to accommodate the obstruction.
GATE POST – (NORTH SIDE)
INTERMEDIATE END POST – (SOUTH END OF PROJECT)
REATTACH BRACE TO GATE POST.
REATTACH BOTH BRACES TO POST.
REINSTALL BRACE WITH NEW CONCRETE FOOTING.
REMOVE AS MUCH OF THE OLD CONCRETE FOOTING
AS POSSIBLE WITHOUT DAMAGING THE BRACE.
FENCE TO BE INSTALLAED FROM
INTERMEDIATE END POST TO
SOUTH END OF GATE.
FENCE TO BE INSTALLAED FROM GATE
HEADING NORTH TOWARDS EXISTING T-
POST MARKED WITH ORANGE RIBBON
AS SHOWN ON ATT B - EXHIBIT 7.