This document is a Question and Answer (Q&A) Set #1 related to an Invitation for Bid (IFB) issued by the State of California, Department of General Services, Procurement Division (DGS-PD) for Extractors and Dryers to meet the requirements of the California Department of Forestry and Fire Protection (CAL FIRE). The contract resulting from this solicitation will be mandatory for CAL FIRE and available for use by all State of California Departments and participating local agencies, including Alameda County. The IFB covers the product specifications, delivery, installation, inspection, and ordering requirements for the Extractors and Dryers. Awards will be made by individual line item for the North and South areas.

The pricing terms require the contractor to provide installation services at the time of delivery or at a later date agreed upon by the ordering agency, with an option for a trip charge fee if installation is scheduled for a later date. The IFB will replace the original Attachment 1 Pricing Workbook with an Addendum 1 that will include line items for both soft mount and hard mount installations.

View the file

Other files

File Type Posted
Addendum_Cover_Sheet_Addendum_3.docx DOCX document
Attachment_2A_-_Technical_Questionnaire_3510-TQ-0189764.xlsx XLSX spreadsheet
Attachment_3_-_Narrative_Response.docx DOCX document
APP_Cover_Page.docx DOCX document
Attachment_2_-_Bid_Specification_3510-BS-0189764.pdf PDF
IFB_Event_ID_0000030279_Addendum_2.docx DOCX document
Addendum_Cover_Sheet_Addendum_4.docx DOCX document
Question___Answer_Set_2.docx DOCX document
Addendum_Cover_Sheet_Addendum_2.docx DOCX document
IFB_Event_ID_0000030279_Addendum_4.docx DOCX document
Attachment_1_-_Pricing_Workbook.xlsx XLSX spreadsheet
IFB_Event_ID_0000030279.docx DOCX document
Addendum_Cover_Sheet_Addendum_1.docx DOCX document
Attachment_1_addendum_1-_Pricing_Workbook.xlsx XLSX spreadsheet
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP DGS 56956Question and Answer (Q&A) Set #1
DRAFT (rev 4/8/2009)
Event ID #: 0000030279Extractors and Dryers
10/4/2024

Question and Answer (Q&A) Set # 1

Item
IFB Section
Question
State’s Response
1-1
Attachment 2 Specification 3510-BS-0189764
Does the capacity have to be exactly as listed in the product description?
Yes, it must match the product description.
1-2
IFB Section 57 Installations
Who will drill into the floor to install the hard mount washers?
It is the contractor’s responsibility.
1-3
IFB Section 57 Installations
Who will drill into the wall to install the pumps used on all washers
It is the contractor’s responsibility.
1-4
IFB Section 58 Inspection and Acceptance
Who will inspect the unit when it arrives by freight to the desired shipping location?
It will be the ordering agencies responsibility to inspect the units.
1-5
IFB section 48 Contractor Ordering Information
How are orders submitted?
Ordering agencies will submit orders by Email, FAX or Mail.
1-6
IFB Section 4 Method of Award
How will the awards be made?
Awards will be made by individual line item for each specified (North and South) area .
1-7
IFB section 55 Free on Board (FOB) Destination
Would the State be willing to separate the installation and freight for the soft mounts compared to the hard mounts.
All freight is FOB. Attachment 1 pricing workbook will be replaced with Attachment 1 addendum 1 pricing workbook. Addendum 1 will include line items with both Soft Mount and Hard Mount installations.
1-8
IFB section 53 Delivery Schedules and 57 Installation.
Will the installation be completed at the delivery day.
Contractor shall offer installation of Extractor and Dryer units at time of delivery or at a later date agreed upon by the ordering agency and the Contractor…Ordering agencies may purchase installation at the time of delivery, or at a later date agreed upon by the ordering agency and the Contractor, at the cost per unit proposed in Attachment 1 – Pricing Workbook. If ordering agency schedules installation at a later date, the Contractor may require a trip charge fee at the cost proposed in Attachment 1 – Pricing Workbook.