This is a Question and Answer document from a mandatory pre-bid conference for the Illinois Department of Mental Health's Elgin Mental Health Center, addressing vendor inquiries regarding water damage and mold remediation services for the Old FTP One South building. The project encompasses approximately 3,900 square feet of remediation work resulting from roof leaks caused by raccoon damage and sprinkler system failure. The mandatory pre-bid conference was held on August 4, 2026, at 10:00 a.m., with proposals due August 7, 2026. Key clarifications from the conference include confirmation that air clearance testing is not required due to the building's unoccupancy, water and electricity are available on site, minor demolition will be performed as necessary, and the project start date will be scheduled following completion of roof repairs. Vendors are permitted to request a fire exit map, which will be provided upon receipt of mold testing results.
The bid has been extended to allow Elgin Mental Health Center to obtain mold testing results prior to award. The winning vendor must self-perform 100 percent of the work with no subcontracting permitted and must comply with IICRC standards (S500 and S520), Illinois regulations, and local building codes. Comprehensive scope requirements include onsite assessment, containment establishment, water extraction, air movement and dehumidification, debris removal and disposal, HEPA vacuuming, removal of mold-infected materials, and antimicrobial treatment. Vendors must maintain general commercial liability insurance of $1,000,000 per occurrence and $2,000,000 annual aggregate, comply with facility security protocols and traffic regulations, and perform daily safety and security cleanup. All labor, materials, equipment, testing, and disposal services are vendor-supplied. The contract may be funded partially or wholly with federal funds, with questions directed to Chief Engineer Brad Carroll.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Scope of Services B-53527~2.docx | DOCX document | |
| Standards terms and conditions EMHC~39.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question and Answer at the Mandatory Pre-Bid Conference scheduled for 08/04/2026 at 10:00 AM
Questions and Answers:
1. Is air clearance testing required for mold or encapsulation?
Answer: No. The building is currently unoccupied, so air clearance testing is not required.
2. Are water and electricity available on site?
Answer: Yes, both water and electricity are available.
3. When will the start date be?
Answer: The start date will be scheduled after the roof repairs are completed. We are currently working on coordinating those repairs.
4. Will demolition be required?
Answer: Minor demolition will be required as necessary.
5. Can we request a copy of the map showing fire exits?
Answer: Yes. The map will be included in this attachment when the test results are received.
Note: This bid is being extended to allow Elgin MHC to obtain the results for mold testing. The results will be posted to this bid when available.