This Quality Assurance Surveillance Plan outlines performance monitoring for a contract to provide durable medical equipment delivery, storage, and maintenance services across Ohio. Key responsibilities include delivering all emergency orders within four hours and standard orders within two days, performing repairs within four and ten days respectively, scheduling assembly and testing within two days of equipment readiness, and submitting monthly and quarterly reports no later than ten calendar days following the periods. Performance will be evaluated quarterly on these standards through record reviews to ensure minimum 95-100% compliance. Contractors will be rated on a scale of Exceptional to Unsatisfactory with incentives potentially based on ratings. Ongoing monitoring methods incorporate record sampling, inspections, complaints tracking, and documentation verification.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D.2 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
The contractor shall be evaluated in accordance with the following:
1. PURPOSE: This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored.
• How monitoring will take place.
• Who will conduct the monitoring?
• How monitoring efforts and results will be documented.
2. GOVERNMENT ROLES AND RESPONSIBILITIES: The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer/Contract Specialist (CO/CS): The CO/CS shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO/CS shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO/CS is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO/CS: Christopher Callihan, Contract Specialist Organization or Agency: Department of Veterans Affairs, Network Contracting Office 10
b. Contracting Officer’s Representative (COR): The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR and Alternate CORs: Steven Campanello (COR), Susan Loudermilk (Alternate), and Kimberly Bernato (Alternate)
3. CONTRACTOR REPRESENTATIVES: The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.
Primary: _______________________________________
Alternate: ______________________________________
4. PERFORMANCE STANDARDS: The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.
The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
5. INCENTIVES/DEDUCTS: The Government shall use past performance as incentives. Incentives shall be based on ratings received on the performance standards (Inclusion of any monetary incentives requires approval through the Department’s Senior Procurement Executive (SPE) and will not be applicable to this procurement.).
6. METHODS OF QA SURVEILLANCE: Various methods exist to monitor performance. The COR will use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION. 100% surveillance: (if this method is used, define how surveillance will be accomplished.)
b. PERIODIC INSPECTION. Inspections scheduled and reported quarterly per COR delegation or as needed. (Define what and how often it will be inspected. For example, ten (10) randomly selected patient files will be reviewed per inspection period. All inspections and reports will be conducted in compliance with VA Privacy and Information security standards.)
c. VALIDATED USER/CUSTOMER COMPLAINTS. If this method is used, explain how data will be collected and reported.
d. RANDOM SAMPLING. If this method is used, define what and how often it will be sampled. (For example, ten (10) randomly selected patient files will be reviewed per quarter. All reviews and reports will be conducted in compliance with VA Privacy and Information security standards.)
e. VERIFICATION AND/OR DOCUMENTATION PROVIDED BY CONTRACTOR. Review PWS and if this method of surveillance is selected, define how documentation will be verified and how assessment will be conducted. (For example, off-site contracts may require the contractor to provide information on services provided to patients).
7. MEASURES:
Performance Measures
Performance Objective Standard Required
Adherence Level
Method of Surveillance and frequency Met Objective/Did Not Meet Objective
(Add comment)
The contractor shall deliver all emergency orders within 4 hours
All customers serviced (See section 3.0.11 of
PWS).
100%
The COR or designee will perform quarterly reviews of at least 5 randomly selected patient records to ensure contract compliance.
The contractor shall perform all emergency repairs within 4 hours.
All orders (See section 3.52 of
PWS).
100%
The COR or designee will perform quarterly reviews of at
The contractor shall deliver all standard orders within 2 days
All customers serviced (See section 3.11 of
PWS).
95%
The COR or designee will perform quarterly reviews of at perform all standard repair orders within 10 days
All orders (See section 3.52 of
PWS).
95% schedule ATP services within 2 days of equipment being fully assembled for delivery.
All customers serviced (see section 3.23 of
PWS)
97%
The Contractor shall provide monthly and quarterly reports no later than 10 calendar days following the end of the month/quarter
Reports (See section
3.65 of PWS).
100%
COR will use direct observation to ensure all monthly and quarterly reports are obtained in accordance with the contracted time lines.
8. Ratings:
Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used:
EXCEPTIONAL:
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the
GOVERNMENT. However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
VERY GOOD:
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the
GOVERNMENT. Also, there should have been NO significant weaknesses identified.
SATISFACTORY:
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also, there should have been NO significant weaknesses identified.
MARGINAL:
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g. Management, Quality, Safety or Environmental Deficiency Report or letter).
UNSATISFACTORY:
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).
9. DOCUMENTING PERFORMANCE: The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR). If contractor performance does not meet the Acceptable Quality level, the CO/CS shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO/CS shall document the discussion and place it in the contract file. When the COR and the CO/CS determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to CO/CS. The CO/CS will in turn review and will present to the contractor's program manager for corrective action. The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the CO/CS.
The Government shall review the contractor's corrective action plan to determine acceptability. The CO/CS shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO/CS is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan. Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO/CS.
10. FREQUENCY OF MEASUREMENT: The frequency of measurement is defined in the contract or otherwise in this document. The government (COR or CO/CS) will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.
Frequency of Performance Reporting: The COR shall communicate with the Contractor and will provide written reports to the Contracting Officer quarterly (or as outlined in the contract or COR delegation) to review Contractor performance.
11. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP
SIGNED:
Steven Campanello, COR DATE
Susan Loudermilk, COR DATE
Kimberly Bernato, COR DATE
SIGNED:
CONTRACTOR NAME/TITLE DATE