Quality Assurance Surveillance Plan (HVAC) .pdf
PDF 138 KB Posted
- Solicitation number
- 36C24222Q0026
About this file
This document contains a Quality Assurance Surveillance Plan (QASP) and related federal contract opportunity notice for heating, ventilation and air conditioning (HVAC) maintenance services. The QASP outlines performance standards and monitoring methods for an indefinite delivery/indefinite quantity contract to provide preventative maintenance, testing and repair of HVAC systems at three campuses of the New York Harbor Healthcare System. Key details include services are to be performed at Manhattan, Brooklyn and St. Albans VA facilities, a 12-month base period and four 12-month option periods, evaluation of contractor accuracy, turnaround times and quality control, and surveillance methods such as direct observation, periodic inspections and random sampling. The competitive federal contract opportunity is set aside for Service-Disabled Veteran Owned Small Businesses, with anticipated release of solicitation number 36C24222Q0026 in October 2021 for HVAC maintenance at the same three locations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24222Q0026 0004.docx | DOCX document | |
| 36C24222Q0026 0003.docx | DOCX document | |
| FINAL STATEMENT OF WORK.pdf | ||
| 36C24222Q0026 0002.docx | DOCX document | |
| 36C24222Q0026 0001.docx | DOCX document | |
| Past Performance Evaluation Questionnaire.docx | DOCX document | |
| Limitations on Subcontracting - Certification.docx | DOCX document | |
| 36C24222Q0026.docx | DOCX document | |
| Wage Determination No. 2015-4187.pdf | ||
| Davis-Bacon Act WD NY20210001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan
For: Heating, Ventilation and Air Conditioning Maintenance (HVAC)
Contract Number: Pending
Contract Description: Heating, Ventilation and Air Conditioning Maintenance (HVAC)
Contractor’s name: Pending
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored?
• How monitoring will take place.
• Who will conduct the monitoring?
• How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis.
However, the Government shall coordinate changes with the contractor. Copies of the original
QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
A. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Rachel Beason
Assigned CS: Safa Shleiwet
Organization or Agency: Department of Veterans Affairs, RPO East, VISN 2
B. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Michael Mazzelli, Maintenance and Repair Supervisor
Organization or Agency: Brooklyn VAMC, New York Harbor Healthcare System, Brooklyn, NY
Assigned COR: Amer Romhen, Assistant Chief
Organization or Agency: Manhattan VAMC, New York Harbor Healthcare System, New
York, NY
Assigned COR: Jose Flores, Maintenance and Repair Supervisor
Organization or Agency: St. Albans CLC, New York Harbor Healthcare System, Brooklyn, NY
C. Other Key Government Personnel: NA
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract:
A. Program Manager: To Be Determined upon vendor selection
B. Other: To Be Determined, if applicable
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The Performance Requirements Summary Matrix, paragraph (N/A) in the Statement of Work
(SOW), includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level
(AQL).
Contractor agrees to maintain an on-going Quality Management/Assurance Program which include the following activities Quality Assurance: The contractor will be evaluated throughout the contract period in regard to their compliance with all VA quality performance measures and monitors as it pertains to Heating, Ventilation and Air Conditioning Maintenance (HVAC).
Task ID Indicator Standard
Acceptab le Quality
Level
Method of
Surveillance
Incentive /
Penalty
Accuracy 1
Maintenance and repair efforts shall ensure that all equipment serviced operates properly with no malfunctions
(at least until the next scheduled service visit).
The
Contractor shall accurately diagnose issues with
HVAC
equipment.
95% Direct Observation N/A
Turnaround
Time
Contractor performs routine service in accordance with manufacturer’s prescribed schedules.
Contractor responds to emergency calls within the time limits included in the Scope of Work.
Contractor shall meet the turnaround time established on the task order.
95% Direct Observation N/A
Quality
Control
Equipment maintenance performed under the contract shall be reviewed in detail against the manufacturer’s guidelines to ensure that work completed conforms with the guidelines.
Perform on-going quality assessment of not less than 5% of all HVAC
95% Random Sampling N/A
5. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
A. DIRECT OBSERVATION. (Can be performed periodically or through 100% surveillance.)
B. PERIODIC INSPECTION. (Evaluates outcomes on a periodic basis. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)
C. 100% INSPECTION. (Evaluates all outcomes.)
D. RANDOM SAMPLING. (Designed to evaluate performance by randomly selecting and inspecting a sample of cases).
6. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used for measurement will be: meets standards/does not meet standards
7. DOCUMENTING PERFORMANCE
A. Acceptable Performance
The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
B. Unacceptable Performance
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the
COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a
Contract Discrepancy Report (CDR) and present it to the contractor's program manager.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The
Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
8. FREQUENCY OF MEASUREMENT
A. Frequency of Measurement: During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
B. Frequency of Performance Assessment Meetings: The COR shall meet with the contractor monthly to assess performance, discuss concerns, and troubleshoot existing problems.
File details come from the government source that posted it. Updated .