About this file

This document is a Quality Assurance Surveillance Plan (QASP) for the Bighorn and Shoshone National Forests Heritage Indefinite Delivery/Indefinite Quantity (IDIQ) contract. The QASP outlines the systematic methods the US Department of Agriculture will use to monitor and evaluate contractor performance for heritage resource inventory and site evaluation services across multiple Wyoming counties. The plan details performance standards, acceptable quality levels (AQLs), surveillance methods, and responsibilities of both the contractor and government representatives, with a focus on ensuring high-quality deliverables through rigorous inspection and documentation processes.

Key elements include performance monitoring through draft and final deliverable reviews, with specific emphasis on timeliness, accuracy, and consistency with the Statement of Work. The QASP allows for adaptive surveillance, where monitoring intensity can be adjusted based on contractor performance, and provides a structured approach for identifying and addressing any deficiencies. The surveillance methods include reviewing project deliverables against professional standards, with the Contracting Officer Representative (COR) responsible for analyzing contractor performance and ensuring the government receives high-quality products and services.

View the file

Other files for this federal contract opportunity

Other files attached to BGHNF SNF Heritage IDIQ, newest first.
File Type Posted
WD 2015-5409 r24.pdf PDF
WD 2015-5407 r 24.pdf PDF
WD 2015-5411 r24.pdf PDF
Pre-Bid Conference info.docx DOCX document
Map_IDIQ.pdf PDF
_Task Order Proposal instructions.pdf PDF
Fire Plan.pdf PDF
_ 1240LP25R0005_RFP fe.pdf PDF
_BGNF_SNF_IDIQ_PWS_r1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Quality Assurance Surveillance Plan

Contents

Project Name3
Solicitation / Contract Number3
Section 1: Introduction3
1.1Purpose3
1.2QASP Relation to the Contract3
1.2.1QASP Revisions3
1.2.2Surveillance of Performance Progression3
1.3QASP Relation to the Quality Control Plan (QCP)3
Section 2: Performance Description3
2.1Performance Standards and Acceptable Quality Levels (AQLs)3
2.1.1Allowable Deviation4
2.1.2Substantially Complete4
2.2Non-Performance4
2.2.1Documentation4
2.2.2Remedial Actions4
Section 3: Contractor and Government Responsibilities4
3.1Contractor Responsibility4
3.2Government Responsibility5
3.2.1Contracting Officer (CO)5
3.2.2Contracting Officer Representative (COR)5
3.2.3Customers5
Section 4: Surveillance Methods to Perform Quality Assurance5
4.1Surveillance Methods5
4.2Analysis and Results6
Appendix A: Performance Requirement Summaries8
Appendix B: Discrepancy Report9

Project Name Shoshone and Bighorn National Forests Heritage IDIQ

Solicitation / Contract Number N/A

Section 1: Introduction This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in 2025 BHNF/SNF Heritage IDIQ Statement of Work (SOW). This plan sets forth the procedures and guidelines that the USDA, Bighorn and Shoshone National Forests will use in ensuring the required performance standards or services levels are achieved by the contractor.

1.1 Purpose

The purpose of the QASP is to describe the systematic methods used to measure performance and to identify the reports required and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards identified in the PWS. This QASP is designed to define roles and responsibilities, identify the performance objectives, define the methodologies used to monitor and evaluate the contractor’s performance, describe quality assurance reporting, and describe the analysis of quality assurance monitoring results.

1.2 QASP Relation to the Contract

1.2.1 QASP Revisions

The Contracting Officer Representative (COR) may make revisions or changes to the QASP procedures and surveillance methods or increase or decrease the degree of surveillance methods at any time during the contract performance period. Changes to the Metric must be incorporated into the SOW, Performance Requirement Summary (PRS) and QASP by a bilateral modification to contract that is issued by the Contracting Officer (CO). A copy of the QASP is provided to the contractor to enable the contractor to enhance its Quality Control (QC) program to perform in accordance with its Quality Control Plan (QCP).

1.2.2 Surveillance of Performance Progression

As the performance period progresses, the levels of surveillance may be altered for service areas where performance is either consistently excellent or unsatisfactory. If consistently good performance, then the amount of surveillance may be reduced. If observations reveal consistent deficiencies, increased surveillance may be implemented.

1.3 QASP Relation to the Quality Control Plan (QCP)

The QCP is a required element of contract and the Contractor shall adhere to its established quality control processes and procedures in managing and performing work as described in the contract. While the QCP represents the way in which the Contractor will ensure its quality and timeliness of services, as defined in the SOW, the QASP represents the way in which the Government personnel specified in Section 3: Contractor and Government Responsibilities, Paragraph 3.2, Government Responsibilities will evaluate the contractor’s performance. The contractor’s QC program and the residual organization’s QASP should be complementary programs that ensure successful contractor performance.

Section 2: Performance Description Performance of the contractor will be monitored through the surveillance methods described in Section 4: Surveillance Methods to Perform Quality Assurance to assess the Contractor’s performance against SOW requirements.

2.1 Performance Standards and Acceptable Quality Levels (AQLs) For selected activities in the SOW, the PRS provides a performance standard and an AQL. A performance standard is the expected level of contractor performance. An AQL defines the level of performance that is satisfactory. Depending on the service evaluated and the evaluation method selected, performance standards and AQLs may be stated as a number of occurrences or as a percentage. Performance standards and AQLs for random sampling and 100 percent inspection are generally stated as percentages. For periodic inspections, performance standards may be stated as either percentages or as absolute numbers.

The contract requires the Contractor to perform all work as specified. Any inaccuracies or omissions in services or products are referred to as “defects” on the part of the Contractor. The Contractor shall be responsible for all identified defects and may be required to perform the work at no cost to the government. The AQLs take into account that in some instances an allowable level of deficiencies (deviations) is possible while overall performance continues to meet the government’s desired level of service.

2.1.1 Allowable Deviation

The AQLs define the level or number of performance deficiencies the Contractor is permitted to reach under this contract. AQLs take into account the difference between an occasional defect and a gross number of defects. AQLs can be expressed as a percentage of or as an absolute number (e.g., three per month). There may be instances where 100 percent compliance is required, and no deviation is acceptable (e.g., where safety is involved).

2.1.2 Substantially Complete

In some cases, service outputs are evaluated using subjective values (e.g., excellent, satisfactory, unsatisfactory). The criteria for acceptable performance and for defects must be defined for these service outputs. The concept of “substantially complete” should be the basis for inspections based on subjective scales. Work is considered “substantially complete” where there has been no significant departure from the terms of the contract and no omission of essential work. In addition, the Contractor has performed the work required to the best of its ability and the only variance consists of minor omissions or deficiencies.

2.2 Non-Performance

Non-performance occurs when the contractor’s performance does not meet the AQL for a given requirement. Requirements may contain multiple performance elements, and therefore, deficiencies may occur in one or more aspects of performance (e.g., timeliness, accuracy, completeness, etc.) or subject areas of effort.

When surveillance indicates that the contractor's service output is not in compliance with the contract requirements, the Contracting Officer’s Representative (COR) must determine whether the Contractor or the Government caused the deficiency. If the cause of the defect rests with the Government, corrective action must be taken through Government channels. If the cause of the defect is due to action or inaction by the contractor, the contractor is responsible for correction of the problem at no additional expense to the Government.

2.2.1 Documentation

Documentation of work non-performed or unacceptable work is essential for tracking Contractor performance. The COR will document deficient work by compiling facts describing the inspection methods and results and to substantiate nonconformance with the contract. A sample documentation reporting form is provided in Appendix B: Example Discrepancy Report. The documentation, with any recommendations, will be forwarded to the CO. In the case of the Contractor, the COR will decide whether to elevate the problem to the CO for corrective action.

2.2.2 Remedial Actions

The Federal Acquisition Regulation allows for penalties in the event that the Contractor fails to perform the required services. Penalties are defined as those actions taken under the direction of the CO against the contractor within the general provisions of the contract for nonconformance to the SOW and PRS.

Section 3: Contractor and Government Responsibilities

3.1 Contractor Responsibility

The Contractor is responsible for delivering products or services in accordance with the contract. Implementing its QCP, which describes the Contractor’s methods for ensuring all products and services under the contract meet established performance standards and AQLs. Maintaining, and providing for audit, quality control records and reports and all records associated with the investigation and complaint resolutions. Appointing a single quality control point-of-contact to act as a central recipient of communication from the COR or CO.

3.2 Government Responsibility

3.2.1 Contracting Officer (CO)

The CO is responsible for administering and monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by COR and the contractor’s performance. The CO may delegate various day-to-day contract administration duties to a Administering ACO (ACO) and/or the COR for performance management and administrative actions such as invoice approval and issuance of Contract Discrepancy Reports may be, and normally are, delegated by the CO to the COR. The CO shall approve any revisions to the QASP processes or standards.

3.2.2 Contracting Officer Representative (COR)

The COR, is designated in writing, by the CO. The COR will ensure that the QA function is properly executed, plays a key role in contract administration and performs the contract surveillance and monitoring. Some key contract administration duties include, but are not limited to, performs surveillance as required by this QASP; make recommendations to the CO for issuance of Contract Discrepancy Reports or letters of commendation and acceptance or rejection of completed work and for administrative actions based on unsatisfactory or non-performed work, and revisions or changes to the QASP; and assists the CO in identifying necessary contract modifications and preparing reports of Contractor performance and cost.

The COR may use the form(s) included in the Appendices to perform the inspection or other forms as approved by the CO. The Contractor overall guidance is also provided by FAR clause 52.246-4 Inspection of Services in Section E of the contract.

Section 4: Surveillance Methods to Perform Quality Assurance

4.1 Surveillance Methods

The surveillance methods used in the QA process are the Government’s tools to monitor the Contractor’s products and services. The best means of determining whether the Contractor has met all contract requirements is to inspect the Contractor’s service products and analyze the results. Further, documented inspection results are an effective tool in contract administration that can confirm the successful achievement of all performance requirements or highlight areas where defects exist and improvements are necessary.

4.1.1 Inspection of Services and Deliverables

Quality inspection shall be determined during review of project deliverables using the Performance Standards Summary described in Section C.12 of the SOW. Deliverables will be reviewed using current professional standards and deficiencies identified will be submitted to the Contractor for correction.

4.2 Analysis and Results

When the inspections and validations have been completed, the COR will perform an analysis of the Contractor’s performance. The purpose of the analysis is to ensure Government is receiving high-quality products and services from the Contractor. The COR will review the results, rate the Contractor’s compliance with the performance standards and AQLs, and characterize the Contractor’s overall performance.

Appendix A: Performance Requirement Summaries

PERFORMANCE REQUIREMENT SUMMARY

Performance Task

Performance Indicator

Performance Standard

Acceptable Quality Level (AQL)

Method of Surveillance

Timeliness and accuracy of draft deliverables

Deliverables completed as required and consistent with the SOW
Delivery meets established deadlines and requirements from SOW
Draft deliverables submitted with minimal corrections needed/identified

Review of draft deliverables

Timeliness and accuracy of final deliverables
Deliverables completed as required and consistent with the SOW
Delivery meets established deadlines and requirements from SOW
Final deliverables submitted with identified corrections made and no other corrections needed
Review of final deliverables

Appendix B: Discrepancy Report

DISCREPANCY REPORT
1. DISCREPENCY REPORT NO.
2. TO: (Contractor / Project Manager Name)
3. FROM: (Name of COR)

CONTRACT NUMBER: DATE:

PREPARED
ORAL NOTIFICATION
RETURNED BY CONTRACTOR
ACTION COMPLETE

4. DISCREPENCY OR PROBLEM (Describe in Detail. Include PWS references. Attach Continuation Sheet if Necessary)

5. SIGNATURE OF COR

6. TO: (Name of COR)
7. FROM: (Contractor / Project Manager)

8. CONTRACTOR RESPONSE AS TO CAUSE, EFFECT, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE (Attach Continuation Sheet if necessary. Cite applicable Contractor QC program procedures or new QC procedures)

9. SIGNATURE OF CONTRACTOR REPRESENTIVE
10. DATE

11. GOVERNMENT EVALUATION (Acceptance, partial acceptance, or rejection. Attach Coordination Sheet if necessary)

12. GOVERNMENT ACTIONS (Cure notice, show cause, other)

CLOSE OUT

KTR NOTIFIED

NAME AND TITLE
SIGNATURE
DATE

COR