QUALIFICATIONREQUIREMENTSFORCONTRACTORAllingGC.pdf
PDF 149 KB Posted
- Solicitation number
- 2027-ITB-387
- Issued by
- New Haven County, Connecticut
About this file
This is a qualification requirements document for a golf course construction contractor submitted to the City of New Haven, Connecticut for the Alling Memorial Golf Course Renovation Project. The project involves the renovation of sand bunkers on holes #1, 8, 9, 10, and 18, as well as construction of a new 4,000 square foot putting green. A total of twelve sand bunkers will be rebuilt with new internal 4-inch perforated drainage and capillary concrete base installation. The new putting green will be approximately 100 feet by 52 feet and classified as a "California Green" rather than a standard USGA-specified green. All sand bunker designs must accommodate existing irrigation systems, with the average sand bunker measuring 1,150 square feet and including 100 linear feet of perforated pipe, two catch basins, capillary concrete, and sand installation. The contractor is responsible for providing all project materials including drainage, sod, bunker sand, fill, and topsoil, as well as fixing any irrigation equipment damage caused during construction.
Contractors bidding on this prevailing wage project must demonstrate a minimum of five years of golf course construction experience and must have completed start-to-finish construction of a minimum of two greens and thirty sand bunkers within the past three years. Contractors must possess specific experience installing capillary concrete liners in sand bunkers, with the project supervisor required to hold equivalent qualifications. Bidders must submit a completed qualifications form listing at least two golf courses where they have installed drainage and rebuilt sand bunkers, including course name, address, golf course architect, and contact information. Contractors must also identify any subcontractors to be used on the project, including their names, phone numbers, and scope of work responsibilities. Payment will be invoiced on AIA Payment Certificate Forms based on the required project schedule of values.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Alling GC Specifications Golf Design Unlimited, LLC Page 36
QUALIFICATION REQUIREMENTS FOR CONTRACTOR
Qualifications for the project the Contractor must meet: the Contractor shall have golf course construction experience with a minimum of five years. The Contractor must have completed start to finish construction minimum 2 greens & 30 (thirty) sand bunkers in the past 3 (three) years. The Contractor MUST have experience installing Capillary Concrete liners in sand bunkers. The supervisor for this project must have the same experience. Make sure to fill out form concerning qualifications and submit with bid and do not include more info.
Contractor (submitting bid) _____________________________________________________
Please list golf courses where you have installed drainage and rebuilt sand bunkers:
Golf Course:_____________________________________________
Address:________________________________________________
Golf Course Architect:_____________________________________________
Contact at Course:_________________________________________
Golf Course:_____________________________________________
Address:________________________________________________
Golf Course Architect:_____________________________________________
Contact at Course:_________________________________________
The Contractor shall also list any important sub-contractors he will be using.
Sub-Contractor _____________________________________ phone ______________for _______________
Sub-Contractor _____________________________________ phone ______________for _______________
File details come from the government source that posted it. Updated .