Attachment B - Price Schedule.xlsx
XLSX spreadsheet 30 KB Posted
- Solicitation number
- QSE--36C78625Q50222
About this file
This is a Price Schedule attachment for a grounds maintenance contract for Beaufort National Cemetery, issued by the Department of Veterans Affairs National Cemetery Administration. The document details a comprehensive five-year contract (base year plus four option years) with multiple Contract Line Item Numbers (CLINs) covering extensive cemetery maintenance services.
Key services include weekly mowing and turf maintenance, debris and trash removal, landscape management (mulching, planting, tree/shrub trimming), ground repair, pest control, pressure washing, irrigation system maintenance, headstone transport and alignment, and event support. The pricing schedule is structured with detailed line items across service and construction categories, with estimated quantities for each task. Specific recurring services include monthly pest control, quarterly tree maintenance, seasonal herbicide applications, and annual core aeration and fertilization. The contract allows for both blanket and spot treatment applications for various maintenance needs, with hourly rates specified for additional as-needed repairs and services.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN - MIN & MAX
| Beaufort National Cemetery Ground Maintenance Services | ||||||||
| Base Period + 4 option years | ||||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Est. Qty | Total | ||
| 0001 | B.4.1.1, B.4.1.3 | Mowing and turf edging, To include Edging of walkways, Curbs, and other horizontal surfaces (Zeon Zoysia) | WK | 46 | Service | |||
| 0002 | B.4.1.2 | Mowing non-turf areas | WK | 46 | Service | |||
| 0003 | B.4.1.4 | Trimming of Headstone, Marker, Monument and Other Vertical Surface | WK | 46 | Service | |||
| 0004 | B.4.1.5 | Trash, Non Mineral Debris, And Grave Decoration/Floral Arrangement Removal | MO | 12 | Service | |||
| 0005 | B.4.1.6 | Sweeping/Blowing Off Walkways and Roadways | MO | 12 | Service | |||
| 0006 | B.4.2.1c | Sod Repairs and installation As needed | EA-SQFT | 9600 | Service | |||
| 0007 | B.4.3 | Leaf and debris Collection/Removal | MO | 12 | Service | |||
| 0008 | B.4.4.1 | Planting beds maintenance | MO | 12 | Service | |||
| 0009 | B.4.4.2 | Mulching - Removal, Replenish and/or Install All Areas | ||||||
| Cemetery defined | JB | 2 | Service | |||||
| 0010 | B.4.4.3 | Tree & shrub trimming / pruning / maintenace | QTR | 4 | Service | |||
| 0011 | B.4.5.1 | Supply & install sod on all Pre- placed crypt 1st & subsequent burial sites, oversized burial sites and all traditional burial sites | EA-SQFT | 20500 | Service | |||
| 0012 | B.4.5.2 | Core Aerification (Aeration) - Approx 44 acres | JB | 1 | Service | |||
| 0013 | B.4.5.3 | Fertilization- Zeon Zoysia | JB | 6 | Service | |||
| 0014 | B.4.5.4 | Gypsum Application | JB | 1 | Service | |||
| 0015 | B.4.5.5 | Weed Control: Pre-Emerge Herbicide - Blanket Application | JB | 2 | Service | |||
| 0016 | B.4.5.5a | Weed Control: Post Emerge Herbicide - Blanket Application | JB | 3 | Service | |||
| 0017 | B.4.5.5a | Weed Control: Post Emerge Herbicide Treatment - Spot Application | JB | 3 | Service | |||
| 0018 | B.4.5.5a | Post Emergent Bermuda Eradication - Blanket Application | JB | 2 | Service | |||
| 0019 | B.4.5.5a | Post Emergent Bermuda Eradication - Spot Application | JB | 5 | Service | |||
| 0020 | B.4.5.6 | Fungicide Application - Blanket Application | JB | 2 | Service | |||
| 0021 | B.4.5.6 | Fungicide Application - Spot Application | JB | 5 | Service | |||
| 0022 | B.4.5.7 | Wetting Agent Applcation - Blanket Application | JB | 2 | Service | |||
| 0023 | B.4.6.1 | Pest Control: Armadillos, moles, and other pest | MO | 12 | Service | |||
| 0024 | B.4.6.2 | Control of fire ants and mole crickets - Blanket Application | JB | 2 | Service | |||
| 0025 | B.4.6.2 | Control of fire ants and mole crickets - Spot Application | JB | 20 | Service | |||
| 0026 | B.4.6.3 | Insect/Pest/Disease control-Blanket Application | JB | 2 | Service | |||
| 0027 | B.4.6.3 | Insect/Pest/Disease control-Spot Application | JB | 1 | Service | |||
| 0028 | B.4.7 | Extreme Weather Storm Damage and debris clean-up | HR | 96 | Service | |||
| 0029 | B.4.8 | Ceremony Event Support (set-up and take-down) | JB | 2 | Service | |||
| 0030 | B.4.8.1 | Holiday Décor upkeep | JB | 4 | Service | |||
| 0031 | B.4.10.1 | Pressure Washing Cleaning of headstones and markers, Niches and Columbaria | JB | 2 | Service | |||
| 0032 | B.4.10.2 | Pressure/Power Washing: Committal Shelters | JB | 2 | Service | |||
| 0033 | B.4.10.3 | Pressure Washing of Administration and Maintenance Buildings | JB | 2 | Service | |||
| 0034 | B.4.10.4 | Pressure Washing of Walkways, Curbs, Signage, and Front & Side Gates/Entryways | JB | 2 | Service | |||
| 0035 | B.4.10.5 | Pressure/Power Washing: BRICK BOUNDARY WALL (Interior and Exterior) | JB | 1 | Service | |||
| 0036 | B.4.1.7 | Underground sprinkler system operation, Inspection, and maintenance | MO | 12 | Construction | |||
| 0037 | B.4.1.7 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis - All Parts and Supplies Provided By Government. | EA (15 MIN) | 200 | Construction | |||
| 0038 | B.4.2.1a | Sunken Grave and Grounds Repair ( Casket Sites) | EA | 24 | Construction | |||
| 0039 | B.4.2.1b | Sunken Cremation and small area grounds repairs | EA | 12 | Construction | |||
| 0040 | B.4.9 | Headstone transport, Setting, Raise And Realigement | EA | 200 | Construction | |||
| 0041 | B.4.9.1 | Headstone transport, Setting All first, Subsequent and Replacement Headstones | EA | 600 | Construction | |||
| 0042 | B.4.9.2 | Headstone Fine Tune Alignment ( Bump & Run) | EA | 2000 | Construction | |||
| Base Year Total Estimate COST |
| Option Year One (1) | ||||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Est. Qty | Total | ||
| 1001 | B.4.1.1, B.4.1.3 | Mowing and turf edging, To include Edging of walkways, Curbs, and other horizontal surfaces (Zeon Zoysia) | WK | 46 | Service | |||
| 1002 | B.4.1.2 | Mowing non-turf areas | WK | 46 | Service | |||
| 1003 | B.4.1.4 | Trimming of Headstone, Marker, Monument and Other Vertical Surface | WK | 46 | Service | |||
| 1004 | B.4.1.5 | Trash, Non Mineral Debris, And Grave Decoration/Floral Arrangement Removal | MO | 12 | Service | |||
| 1005 | B.4.1.6 | Sweeping/Blowing Off Walkways and Roadways | MO | 12 | Service | |||
| 1006 | B.4.2.1c | Sod Repairs and installation As needed | EA-SQFT | 9600 | Service | |||
| 1007 | B.4.3 | Leaf and debris Collection/Removal | MO | 12 | Service | |||
| 1008 | B.4.4.1 | Planting beds maintenance | MO | 12 | Service | |||
| 1009 | B.4.4.2 | Mulching - Removal, Replenish and/or Install All Areas | ||||||
| Cemetery defined | JB | 2 | Service | |||||
| 1010 | B.4.4.3 | Tree & shrub trimming / pruning / maintenace | QTR | 4 | Service | |||
| 1011 | B.4.5.1 | Supply & install sod on all Pre- placed crypt 1st & subsequent burial sites, oversized burial sites and all traditional burial sites | EA-SQFT | 20500 | Service | |||
| 1012 | B.4.5.2 | Core Aerification (Aeration) - Approx 44 acres | JB | 1 | Service | |||
| 1013 | B.4.5.3 | Fertilization- Zeon Zoysia | JB | 6 | Service | |||
| 1014 | B.4.5.4 | Gypsum Application | JB | 1 | Service | |||
| 1015 | B.4.5.5 | Weed Control: Pre-Emerge Herbicide - Blanket Application | JB | 2 | Service | |||
| 1016 | B.4.5.5a | Weed Control: Post Emerge Herbicide - Blanket Application | JB | 3 | Service | |||
| 1017 | B.4.5.5a | Weed Control: Post Emerge Herbicide Treatment - Spot Application | JB | 3 | Service | |||
| 1018 | B.4.5.5a | Post Emergent Bermuda Eradication - Blanket Application | JB | 2 | Service | |||
| 1019 | B.4.5.5a | Post Emergent Bermuda Eradication - Spot Application | JB | 5 | Service | |||
| 1020 | B.4.5.6 | Fungicide Application - Blanket Application | JB | 2 | Service | |||
| 1021 | B.4.5.6 | Fungicide Application - Spot Application | JB | 5 | Service | |||
| 1022 | B.4.5.7 | Wetting Agent Applcation - Blanket Application | JB | 2 | Service | |||
| 1023 | B.4.6.1 | Pest Control: Armadillos, moles, and other pest | MO | 12 | Service | |||
| 1024 | B.4.6.2 | Control of fire ants and mole crickets - Blanket Application | JB | 2 | Service | |||
| 1025 | B.4.6.2 | Control of fire ants and mole crickets - Spot Application | JB | 20 | Service | |||
| 1026 | B.4.6.3 | Insect/Pest/Disease control-Blanket Application | JB | 2 | Service | |||
| 1027 | B.4.6.3 | Insect/Pest/Disease control-Spot Application | JB | 1 | Service | |||
| 1028 | B.4.7 | Extreme Weather Storm Damage and debris clean-up | HR | 96 | Service | |||
| 1029 | B.4.8 | Ceremony Event Support (set-up and take-down) | JB | 2 | Service | |||
| 1030 | B.4.8.1 | Holiday Décor upkeep | JB | 4 | Service | |||
| 1031 | B.4.10.1 | Pressure Washing Cleaning of headstones and markers, Niches and Columbaria | JB | 2 | Service | |||
| 1032 | B.4.10.2 | Pressure/Power Washing: Committal Shelters | JB | 2 | Service | |||
| 1033 | B.4.10.3 | Pressure Washing of Administration and Maintenance Buildings | JB | 2 | Service | |||
| 1034 | B.4.10.4 | Pressure Washing of Walkways, Curbs, Signage, and Front & Side Gates/Entryways | JB | 2 | Service | |||
| 1035 | B.4.10.5 | Pressure/Power Washing: BRICK BOUNDARY WALL (Interior and Exterior) | JB | 1 | Service | |||
| 1036 | B.4.1.7 | Underground sprinkler system operation, Inspection, and maintenance | MO | 12 | Construction | |||
| 1037 | B.4.1.7 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis - All Parts and Supplies Provided By Government. | EA (15 MIN) | 200 | Construction | |||
| 1038 | B.4.2.1a | Sunken Grave and Grounds Repair ( Casket Sites) | EA | 24 | Construction | |||
| 1039 | B.4.2.1b | Sunken Cremation and small area grounds repairs | EA | 12 | Construction | |||
| 1040 | B.4.9 | Headstone transport, Setting, Raise And Realigement | EA | 200 | Construction | |||
| 1041 | B.4.9.1 | Headstone transport, Setting All first, Subsequent and Replacement Headstones | EA | 600 | Construction | |||
| 1042 | B.4.9.2 | Headstone Fine Tune Alignment ( Bump & Run) | EA | 2000 | Construction | |||
| Option Year One Total Estimate COST |
| Option Year Two (2) | ||||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Est. Qty | Total | ||
| 2001 | B.4.1.1, B.4.1.3 | Mowing and turf edging, To include Edging of walkways, Curbs, and other horizontal surfaces (Zeon Zoysia) | WK | 46 | Service | |||
| 2002 | B.4.1.2 | Mowing non-turf areas | WK | 46 | Service | |||
| 2003 | B.4.1.4 | Trimming of Headstone, Marker, Monument and Other Vertical Surface | WK | 46 | Service | |||
| 2004 | B.4.1.5 | Trash, Non Mineral Debris, And Grave Decoration/Floral Arrangement Removal | MO | 12 | Service | |||
| 2005 | B.4.1.6 | Sweeping/Blowing Off Walkways and Roadways | MO | 12 | Service | |||
| 2006 | B.4.2.1c | Sod Repairs and installation As needed | EA-SQFT | 9600 | Service | |||
| 2007 | B.4.3 | Leaf and debris Collection/Removal | MO | 12 | Service | |||
| 2008 | B.4.4.1 | Planting beds maintenance | MO | 12 | Service | |||
| 2009 | B.4.4.2 | Mulching - Removal, Replenish and/or Install All Areas | ||||||
| Cemetery defined | JB | 2 | Service | |||||
| 2010 | B.4.4.3 | Tree & shrub trimming / pruning / maintenace | QTR | 4 | Service | |||
| 2011 | B.4.5.1 | Supply & install sod on all Pre- placed crypt 1st & subsequent burial sites, oversized burial sites and all traditional burial sites | EA-SQFT | 20500 | Service | |||
| 2012 | B.4.5.2 | Core Aerification (Aeration) - Approx 44 acres | JB | 1 | Service | |||
| 2013 | B.4.5.3 | Fertilization- Zeon Zoysia | JB | 6 | Service | |||
| 2014 | B.4.5.4 | Gypsum Application | JB | 1 | Service | |||
| 2015 | B.4.5.5 | Weed Control: Pre-Emerge Herbicide - Blanket Application | JB | 2 | Service | |||
| 2016 | B.4.5.5a | Weed Control: Post Emerge Herbicide - Blanket Application | JB | 3 | Service | |||
| 2017 | B.4.5.5a | Weed Control: Post Emerge Herbicide Treatment - Spot Application | JB | 3 | Service | |||
| 2018 | B.4.5.5a | Post Emergent Bermuda Eradication - Blanket Application | JB | 2 | Service | |||
| 2019 | B.4.5.5a | Post Emergent Bermuda Eradication - Spot Application | JB | 5 | Service | |||
| 2020 | B.4.5.6 | Fungicide Application - Blanket Application | JB | 2 | Service | |||
| 2021 | B.4.5.6 | Fungicide Application - Spot Application | JB | 5 | Service | |||
| 2022 | B.4.5.7 | Wetting Agent Applcation - Blanket Application | JB | 2 | Service | |||
| 2023 | B.4.6.1 | Pest Control: Armadillos, moles, and other pest | MO | 12 | Service | |||
| 2024 | B.4.6.2 | Control of fire ants and mole crickets - Blanket Application | JB | 2 | Service | |||
| 2025 | B.4.6.2 | Control of fire ants and mole crickets - Spot Application | JB | 20 | Service | |||
| 2026 | B.4.6.3 | Insect/Pest/Disease control-Blanket Application | JB | 2 | Service | |||
| 2027 | B.4.6.3 | Insect/Pest/Disease control-Spot Application | JB | 1 | Service | |||
| 2028 | B.4.7 | Extreme Weather Storm Damage and debris clean-up | HR | 96 | Service | |||
| 2029 | B.4.8 | Ceremony Event Support (set-up and take-down) | JB | 2 | Service | |||
| 2030 | B.4.8.1 | Holiday Décor upkeep | JB | 4 | Service | |||
| 2031 | B.4.10.1 | Pressure Washing Cleaning of headstones and markers, Niches and Columbaria | JB | 2 | Service | |||
| 2032 | B.4.10.2 | Pressure/Power Washing: Committal Shelters | JB | 2 | Service | |||
| 2033 | B.4.10.3 | Pressure Washing of Administration and Maintenance Buildings | JB | 2 | Service | |||
| 2034 | B.4.10.4 | Pressure Washing of Walkways, Curbs, Signage, and Front & Side Gates/Entryways | JB | 2 | Service | |||
| 2035 | B.4.10.5 | Pressure/Power Washing: BRICK BOUNDARY WALL (Interior and Exterior) | JB | 1 | Service | |||
| 2036 | B.4.1.7 | Underground sprinkler system operation, Inspection, and maintenance | MO | 12 | Construction | |||
| 2037 | B.4.1.7 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis - All Parts and Supplies Provided By Government. | EA (15 MIN) | 200 | Construction | |||
| 2038 | B.4.2.1a | Sunken Grave and Grounds Repair ( Casket Sites) | EA | 24 | Construction | |||
| 2039 | B.4.2.1b | Sunken Cremation and small area grounds repairs | EA | 12 | Construction | |||
| 2040 | B.4.9 | Headstone transport, Setting, Raise And Realigement | EA | 200 | Construction | |||
| 2041 | B.4.9.1 | Headstone transport, Setting All first, Subsequent and Replacement Headstones | EA | 600 | Construction | |||
| 2042 | B.4.9.2 | Headstone Fine Tune Alignment ( Bump & Run) | EA | 2000 | Construction | |||
| Option Year Two Total Estimate COST |
| Option Year Three (3) | ||||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Est. Qty | Total | ||
| 3001 | B.4.1.1, B.4.1.3 | Mowing and turf edging, To include Edging of walkways, Curbs, and other horizontal surfaces (Zeon Zoysia) | WK | 46 | Service | |||
| 3002 | B.4.1.2 | Mowing non-turf areas | WK | 46 | Service | |||
| 3003 | B.4.1.4 | Trimming of Headstone, Marker, Monument and Other Vertical Surface | WK | 46 | Service | |||
| 3004 | B.4.1.5 | Trash, Non Mineral Debris, And Grave Decoration/Floral Arrangement Removal | MO | 12 | Service | |||
| 3005 | B.4.1.6 | Sweeping/Blowing Off Walkways and Roadways | MO | 12 | Service | |||
| 3006 | B.4.2.1c | Sod Repairs and installation As needed | EA-SQFT | 9600 | Service | |||
| 3007 | B.4.3 | Leaf and debris Collection/Removal | MO | 12 | Service | |||
| 3008 | B.4.4.1 | Planting beds maintenance | MO | 12 | Service | |||
| 3009 | B.4.4.2 | Mulching - Removal, Replenish and/or Install All Areas | ||||||
| Cemetery defined | JB | 2 | Service | |||||
| 3010 | B.4.4.3 | Tree & shrub trimming / pruning / maintenace | QTR | 4 | Service | |||
| 3011 | B.4.5.1 | Supply & install sod on all Pre- placed crypt 1st & subsequent burial sites, oversized burial sites and all traditional burial sites | EA-SQFT | 20500 | Service | |||
| 3012 | B.4.5.2 | Core Aerification (Aeration) - Approx 44 acres | JB | 1 | Service | |||
| 3013 | B.4.5.3 | Fertilization- Zeon Zoysia | JB | 6 | Service | |||
| 3014 | B.4.5.4 | Gypsum Application | JB | 1 | Service | |||
| 3015 | B.4.5.5 | Weed Control: Pre-Emerge Herbicide - Blanket Application | JB | 2 | Service | |||
| 3016 | B.4.5.5a | Weed Control: Post Emerge Herbicide - Blanket Application | JB | 3 | Service | |||
| 3017 | B.4.5.5a | Weed Control: Post Emerge Herbicide Treatment - Spot Application | JB | 3 | Service | |||
| 3018 | B.4.5.5a | Post Emergent Bermuda Eradication - Blanket Application | JB | 2 | Service | |||
| 3019 | B.4.5.5a | Post Emergent Bermuda Eradication - Spot Application | JB | 5 | Service | |||
| 3020 | B.4.5.6 | Fungicide Application - Blanket Application | JB | 2 | Service | |||
| 3021 | B.4.5.6 | Fungicide Application - Spot Application | JB | 5 | Service | |||
| 3022 | B.4.5.7 | Wetting Agent Applcation - Blanket Application | JB | 2 | Service | |||
| 3023 | B.4.6.1 | Pest Control: Armadillos, moles, and other pest | MO | 12 | Service | |||
| 3024 | B.4.6.2 | Control of fire ants and mole crickets - Blanket Application | JB | 2 | Service | |||
| 3025 | B.4.6.2 | Control of fire ants and mole crickets - Spot Application | JB | 20 | Service | |||
| 3026 | B.4.6.3 | Insect/Pest/Disease control-Blanket Application | JB | 2 | Service | |||
| 3027 | B.4.6.3 | Insect/Pest/Disease control-Spot Application | JB | 1 | Service | |||
| 3028 | B.4.7 | Extreme Weather Storm Damage and debris clean-up | HR | 96 | Service | |||
| 3029 | B.4.8 | Ceremony Event Support (set-up and take-down) | JB | 2 | Service | |||
| 3030 | B.4.8.1 | Holiday Décor upkeep | JB | 4 | Service | |||
| 3031 | B.4.10.1 | Pressure Washing Cleaning of headstones and markers, Niches and Columbaria | JB | 2 | Service | |||
| 3032 | B.4.10.2 | Pressure/Power Washing: Committal Shelters | JB | 2 | Service | |||
| 3033 | B.4.10.3 | Pressure Washing of Administration and Maintenance Buildings | JB | 2 | Service | |||
| 3034 | B.4.10.4 | Pressure Washing of Walkways, Curbs, Signage, and Front & Side Gates/Entryways | JB | 2 | Service | |||
| 3035 | B.4.10.5 | Pressure/Power Washing: BRICK BOUNDARY WALL (Interior and Exterior) | JB | 1 | Service | |||
| 3036 | B.4.1.7 | Underground sprinkler system operation, Inspection, and maintenance | MO | 12 | Construction | |||
| 3037 | B.4.1.7 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis - All Parts and Supplies Provided By Government. | EA (15 MIN) | 200 | Construction | |||
| 3038 | B.4.2.1a | Sunken Grave and Grounds Repair ( Casket Sites) | EA | 24 | Construction | |||
| 3039 | B.4.2.1b | Sunken Cremation and small area grounds repairs | EA | 12 | Construction | |||
| 3040 | B.4.9 | Headstone transport, Setting, Raise And Realigement | EA | 200 | Construction | |||
| 3041 | B.4.9.1 | Headstone transport, Setting All first, Subsequent and Replacement Headstones | EA | 600 | Construction | |||
| 3042 | B.4.9.2 | Headstone Fine Tune Alignment ( Bump & Run) | EA | 2000 | Construction | |||
| Option Year Three Total Estimate COST |
| OPTION YEAR Four (4) | ||||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Est. Qty | Total | ||
| 4001 | B.4.1.1, B.4.1.3 | Mowing and turf edging, To include Edging of walkways, Curbs, and other horizontal surfaces (Zeon Zoysia) | WK | 46 | Service | |||
| 4002 | B.4.1.2 | Mowing non-turf areas | WK | 46 | Service | |||
| 4003 | B.4.1.4 | Trimming of Headstone, Marker, Monument and Other Vertical Surface | WK | 46 | Service | |||
| 4004 | B.4.1.5 | Trash, Non Mineral Debris, And Grave Decoration/Floral Arrangement Removal | MO | 12 | Service | |||
| 4005 | B.4.1.6 | Sweeping/Blowing Off Walkways and Roadways | MO | 12 | Service | |||
| 4006 | B.4.2.1c | Sod Repairs and installation As needed | EA-SQFT | 9600 | Service | |||
| 4007 | B.4.3 | Leaf and debris Collection/Removal | MO | 12 | Service | |||
| 4008 | B.4.4.1 | Planting beds maintenance | MO | 12 | Service | |||
| 4009 | B.4.4.2 | Mulching - Removal, Replenish and/or Install All Areas | ||||||
| Cemetery defined | JB | 2 | Service | |||||
| 4010 | B.4.4.3 | Tree & shrub trimming / pruning / maintenace | QTR | 4 | Service | |||
| 4011 | B.4.5.1 | Supply & install sod on all Pre- placed crypt 1st & subsequent burial sites, oversized burial sites and all traditional burial sites | EA-SQFT | 20500 | Service | |||
| 4012 | B.4.5.2 | Core Aerification (Aeration) - Approx 44 acres | JB | 1 | Service | |||
| 4013 | B.4.5.3 | Fertilization- Zeon Zoysia | JB | 6 | Service | |||
| 4014 | B.4.5.4 | Gypsum Application | JB | 1 | Service | |||
| 4015 | B.4.5.5 | Weed Control: Pre-Emerge Herbicide - Blanket Application | JB | 2 | Service | |||
| 4016 | B.4.5.5a | Weed Control: Post Emerge Herbicide - Blanket Application | JB | 3 | Service | |||
| 4017 | B.4.5.5a | Weed Control: Post Emerge Herbicide Treatment - Spot Application | JB | 3 | Service | |||
| 4018 | B.4.5.5a | Post Emergent Bermuda Eradication - Blanket Application | JB | 2 | Service | |||
| 4019 | B.4.5.5a | Post Emergent Bermuda Eradication - Spot Application | JB | 5 | Service | |||
| 4020 | B.4.5.6 | Fungicide Application - Blanket Application | JB | 2 | Service | |||
| 4021 | B.4.5.6 | Fungicide Application - Spot Application | JB | 5 | Service | |||
| 4022 | B.4.5.7 | Wetting Agent Applcation - Blanket Application | JB | 2 | Service | |||
| 4023 | B.4.6.1 | Pest Control: Armadillos, moles, and other pest | MO | 12 | Service | |||
| 4024 | B.4.6.2 | Control of fire ants and mole crickets - Blanket Application | JB | 2 | Service | |||
| 4025 | B.4.6.2 | Control of fire ants and mole crickets - Spot Application | JB | 20 | Service | |||
| 4026 | B.4.6.3 | Insect/Pest/Disease control-Blanket Application | JB | 2 | Service | |||
| 4027 | B.4.6.3 | Insect/Pest/Disease control-Spot Application | JB | 1 | Service | |||
| 4028 | B.4.7 | Extreme Weather Storm Damage and debris clean-up | HR | 96 | Service | |||
| 4029 | B.4.8 | Ceremony Event Support (set-up and take-down) | JB | 2 | Service | |||
| 4030 | B.4.8.1 | Holiday Décor upkeep | JB | 4 | Service | |||
| 4031 | B.4.10.1 | Pressure Washing Cleaning of headstones and markers, Niches and Columbaria | JB | 2 | Service | |||
| 4032 | B.4.10.2 | Pressure/Power Washing: Committal Shelters | JB | 2 | Service | |||
| 4033 | B.4.10.3 | Pressure Washing of Administration and Maintenance Buildings | JB | 2 | Service | |||
| 4034 | B.4.10.4 | Pressure Washing of Walkways, Curbs, Signage, and Front & Side Gates/Entryways | JB | 2 | Service | |||
| 4035 | B.4.10.5 | Pressure/Power Washing: BRICK BOUNDARY WALL (Interior and Exterior) | JB | 1 | Service | |||
| 4036 | B.4.1.7 | Underground sprinkler system operation, Inspection, and maintenance | MO | 12 | Construction | |||
| 4037 | B.4.1.7 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis - All Parts and Supplies Provided By Government. | EA (15 MIN) | 200 | Construction | |||
| 4038 | B.4.2.1a | Sunken Grave and Grounds Repair ( Casket Sites) | EA | 24 | Construction | |||
| 4039 | B.4.2.1b | Sunken Cremation and small area grounds repairs | EA | 12 | Construction | |||
| 4040 | B.4.9 | Headstone transport, Setting, Raise And Realignment | EA | 200 | Construction | |||
| 4041 | B.4.9.1 | Headstone transport, Setting All first, Subsequent and Replacement Headstones | EA | 600 | Construction | |||
| 4042 | B.4.9.2 | Headstone Fine Tune Alignment ( Bump & Run) | EA | 2000 | Construction | |||
| Option Year Four Total Estimate COST | ||||||||
| Minimum Amounts | ||||||||
| BASE YEAR: | ||||||||
| OPTION YEAR 1: | ||||||||
| OPTION YEAR 2: | ||||||||
| OPTION YEAR 3: | ||||||||
| OPTION YEAR 4: | ||||||||
| TOTAL BASE +4 |
File details come from the government source that posted it. Updated .