Attachment B - Price Schedule- Marietta National Cemetery.xlsx
XLSX spreadsheet 29 KB Posted
- Solicitation number
- QSE--36C78625Q50200
About this file
This document is a Price Schedule for Grounds Maintenance Services at Marietta National Cemetery, issued by the Department of Veterans Affairs National Cemetery Administration. The comprehensive pricing document covers a base year and four potential option years, detailing 46 distinct line items (CLIN) for cemetery maintenance services categorized into service and construction activities. Key service-related tasks include weekly mowing, edging, trimming, trash/debris removal, irrigation, mulching, plant bed maintenance, tree maintenance, weed control, insect treatment, and cleaning services. Construction-related tasks encompass gravesite repairs, headstone receiving/transport/setting, interment and disinterment operations, and related cemetery infrastructure maintenance. Each line item specifies the unit of issue, estimated quantity, and allows for pricing, though in this document the actual costs are listed as $0.00, suggesting this is a template or preliminary pricing document. The solicitation number QSE--36C78625Q50200 indicates this is a new requirement for fiscal year 2025, with a base contract plus potential four-year extension options.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
| Marietta National Cemetery - Grounds Maintenance Services | ||||||||
| BASE YEAR | ||||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Est. Qty | Est. Total | ||
| 0001 | B.4.1.1 | Mowing Turf Areas | WK | $0.00 | 38 | $0.00 | Service | |
| 0002 | B.4.1.3 | EDGING OF WALKWAYS, CURBS AND OTHER HORIZONTAL SURFACES | WK | $0.00 | 38 | $0.00 | Service | |
| 0003 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS, AND OTHER VERTICLE SURFACES | WK | $0.00 | 38 | $0.00 | Service | |
| 0004 | B.4.1.5 | GRAVESITE TRASH, DEBRIS, AND DECORATION/FLORAL REMOVAL (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 0005 | B.4.1.6 | TRASH ,LEAF AND DEBRIS COLLECTION AND REMOVAL (Daily/Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 0006 | B.4.1.7 | Mass Gravesite Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 3 | $0.00 | Service | |
| 0007 | B.4.1.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | Service | |
| 0008 | B.4.1.9.1 | Irrigation of Cemetery Grounds | MO | $0.00 | 4 | $0.00 | Service | |
| 0009 | B.4.1.10 | MOWING AREAS WITH A PUSH LAWN MOWER | WK | $0.00 | 32 | $0.00 | Service | |
| 0010 | B.4.2.4 | Mulching/Install and Replenish to include all trees, shrubs, and planting beds | JB | $0.00 | 2 | $0.00 | Service | |
| 0011 | B.4.3.1 | Maintenance of All Plant Beds, Shrubs, and Bushes | MO | $0.00 | 12 | $0.00 | Service | |
| 0012 | B.4.3.2 | Tree Maintenance | JB | $0.00 | 2 | $0.00 | Service | |
| 0013 | B.4.4.1 | Casket / Vault Gravesite Sod Installation | EA | $0.00 | 10 | $0.00 | Service | |
| 0014 | B.4.4.2 | Core Aerification - Approximately +/- 23.3 acres | JB | $0.00 | 1 | $0.00 | Service | |
| 0015 | B.4.4.3 | Fertilization | JB | $0.00 | 5 | $0.00 | Service | |
| 0016 | B.4.4.4 | Weed Control: Pre-Emerge Herbicide Application- See Warm Season Flow Chart | JB | $0.00 | 2 | $0.00 | Service | |
| 0017 | B.4.4.4 | Weed Control: Post Emerge Herbicide - Blanket Application-- All Turf areas - | JB | $0.00 | 5 | $0.00 | Service | |
| 0018 | B.4.4.4 | Weed Control: Post Emerge Herbicide- Spot Application-- All Turf areas - | EA | $0.00 | 50 | $0.00 | Service | |
| 0019 | B.4.4.5 | Gypsum or Dolomitic Lime Application - | ||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | Service | |||
| 0020 | B.4.5.1 | Insecticide Treatment/ Applicaton (Other than fire ant, such as, Army worm, Grub worm) Blanket application | JB | $0.00 | 2 | $0.00 | Service | |
| 0021 | B.4.5.2 | Fire Ant Control Blanket Appication | JB | $0.00 | 1 | $0.00 | Service | |
| 0022 | B.4.5.2 | Spot Treatment for Fire Ant Control /monitoring | EA | $0.00 | 50 | $0.00 | Service | |
| 0023 | B.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 1 | $0.00 | Service | |
| 0024 | B.4.8.4 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | EA | $0.00 | 1000 | $0.00 | Service | |
| 0025 | B.4.9.1 | CASKET TRANSPORTATION AND CHAIN OF CUSTODY | EA | $0.00 | 5 | $0.00 | Service | |
| 0026 | B.4.10.1 | Headstone Cleaning | JB | $0.00 | 2 | $0.00 | Service | |
| 0027 | B.4.10.2 | Curbs, Parking Lots, Parking Blocks | JB | $0.00 | 2 | $0.00 | Service | |
| 0028 | B.4.10.6 | Committal Shelter | QTR | $0.00 | 4 | $0.00 | Service | |
| 0029 | B.4.10.7 | Buildings and Surrounding Concrete Surfaces | JB | $0.00 | 2 | $0.00 | Service | |
| 0030 | B.4.10.8 | Floral Vase Bin and Trash Receptacle Cleaning | QTR | $0.00 | 4 | $0.00 | Service | |
| 0031 | B.4.11.1 | Commital Service Set-Up, Take Down, and Cleaning | EA | $0.00 | 15 | $0.00 | Service | |
| 0032 | B.4.11.2 | Weekend/Holiday Burial Support | EA | $0.00 | 7 | $0.00 | Service | |
| 0033 | B.4.11.3 | Ceremony Support to include Gravesite Flag Placement and Removal, set-up and take-down | EV | $0.00 | 2 | $0.00 | Service | |
| 0034 | B.4.11.4 | Janitorial Services for th Lodge and Maintenance Building | MO | $0.00 | 12 | $0.00 | Service | |
| 0035 | B.4.2.1 | Sunken Grave Repair and Turf Repair(Casket Sites) | EA | $0.00 | 50 | $0.00 | Construction | |
| 0036 | B.4.2.2 | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | EA | $0.00 | 50 | $0.00 | Construction | |
| 0037 | B.4.2.3 | SOD REPAIRS AND INSTALLATION | SQFT | $0.00 | 3750 | $0.00 | Construction | |
| 0038 | B.4.8.1 | HEADSTONE RECEIVING (ALL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 0039 | B.4.8.1 | HEADSTONE TRANSPORT (ALL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 0040 | B.4.8.2 | HEADSTONE SETTING of All Headstones (INITIAL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 0041 | B.4.8.2 | HEADSTONE SETTING (REPLACEMENT) | EA | $0.00 | 5 | $0.00 | Construction | |
| 0042 | B.4.8.3 | HEADSTONE Raise/Realign | EA | $0.00 | 250 | $0.00 | Construction | |
| 0043 | B.4.9.a | Interment Operations Casket | EA | $0.00 | 5 | $0.00 | Construction | |
| 0044 | B.4.9.b | Interment Operations Cremains | EA | $0.00 | 10 | $0.00 | Construction | |
| 0045 | B.4.9.c | Disinternment Operations Casket | EA | $0.00 | 1 | $0.00 | Construction | |
| 0046 | B4.9.d | Disinternment Operations Cremains | EA | $0.00 | 1 | $0.00 | Construction | |
| Base Year Total Cost | $0.00 |
| OPTION YEAR 1 | |||||||||
| CLIN | SOW | Description | Unit of issue | Cost | Qty | Total | |||
| 1001 | B.4.1.1 | Mowing Turf Areas | WK | $0.00 | 38 | $0.00 | Service | ||
| 1002 | B.4.1.3 | EDGING OF WALKWAYS, CURBS AND OTHER HORIZONTAL SURFACES | WK | $0.00 | 38 | $0.00 | Service | ||
| 1003 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS, AND OTHER VERTICLE SURFACES | WK | $0.00 | 38 | $0.00 | Service | ||
| 1004 | B.4.1.5 | GRAVESITE TRASH, DEBRIS, AND DECORATION/FLORAL REMOVAL (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | ||
| 1005 | B.4.1.6 | TRASH ,LEAF AND DEBRIS COLLECTION AND REMOVAL (Daily/Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | ||
| 1006 | B.4.1.7 | Mass Gravesite Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 3 | $0.00 | Service | ||
| 1007 | B.4.1.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | Service | ||
| 1008 | B.4.1.9.1 | Irrigation of Cemetery Grounds | MO | $0.00 | 4 | $0.00 | Service | ||
| 1009 | B.4.1.10 | MOWING AREAS WITH A PUSH LAWN MOWER | WK | $0.00 | 32 | $0.00 | Service | ||
| 1010 | B.4.2.4 | Mulching/Install and Replenish to include all trees, shrubs, and planting beds | JB | $0.00 | 2 | $0.00 | Service | ||
| 1011 | B.4.3.1 | Maintenance of All Plant Beds, Shrubs, and Bushes | MO | $0.00 | 12 | $0.00 | Service | ||
| 1012 | B.4.3.2 | Tree Maintenance | JB | $0.00 | 2 | $0.00 | Service | ||
| 1013 | B.4.4.1 | Casket / Vault Gravesite Sod Installation | EA | $0.00 | 10 | $0.00 | Service | ||
| 1014 | B.4.4.2 | Core Aerification - Approximately +/- 23.3 acres | JB | $0.00 | 1 | $0.00 | Service | ||
| 1015 | B.4.4.3 | Fertilization | JB | $0.00 | 5 | $0.00 | Service | ||
| 1016 | B.4.4.4 | Weed Control: Pre-Emerge Herbicide Application- See Warm Season Flow Chart | JB | $0.00 | 2 | $0.00 | Service | ||
| 1017 | B.4.4.4 | Weed Control: Post Emerge Herbicide - Blanket Application-- All Turf areas - | JB | $0.00 | 5 | $0.00 | Service | ||
| 1018 | B.4.4.4 | Weed Control: Post Emerge Herbicide- Spot Application-- All Turf areas - | EA | $0.00 | 50 | $0.00 | Service | ||
| 1019 | B.4.4.5 | Gypsum or Dolomitic Lime Application - | |||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | Service | ||||
| 1020 | B.4.5.1 | Insecticide Treatment/ Applicaton (Other than fire ant, such as, Army worm, Grub worm) Blanket application | JB | $0.00 | 2 | $0.00 | Service | ||
| 1021 | B.4.5.2 | Fire Ant Control Blanket Appication | JB | $0.00 | 1 | $0.00 | Service | ||
| 1022 | B.4.5.2 | Spot Treatment for Fire Ant Control /monitoring | EA | $0.00 | 50 | $0.00 | Service | ||
| 1023 | B.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 1 | $0.00 | Service | ||
| 1024 | B.4.8.4 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | EA | $0.00 | 1000 | $0.00 | Service | ||
| 1025 | B.4.9.1 | CASKET TRANSPORTATION AND CHAIN OF CUSTODY | EA | $0.00 | 5 | $0.00 | Service | ||
| 1026 | B.4.10.1 | Headstone Cleaning | JB | $0.00 | 2 | $0.00 | Service | ||
| 1027 | B.4.10.2 | Curbs, Parking Lots, Parking Blocks | JB | $0.00 | 2 | $0.00 | Service | ||
| 1028 | B.4.10.6 | Committal Shelter | QTR | $0.00 | 4 | $0.00 | Service | ||
| 1029 | B.4.10.7 | Buildings and Surrounding Concrete Surfaces | JB | $0.00 | 2 | $0.00 | Service | ||
| 1030 | B.4.10.8 | Floral Vase Bin and Trash Receptacle Cleaning | QTR | $0.00 | 4 | $0.00 | Service | ||
| 1031 | B.4.11.1 | Commital Service Set-Up, Take Down, and Cleaning | EA | $0.00 | 15 | $0.00 | Service | $900.00 | |
| 1032 | B.4.11.2 | Weekend/Holiday Burial Support | EA | $0.00 | 7 | $0.00 | Service | ||
| 1033 | B.4.11.3 | Ceremony Support to include Gravesite Flag Placement and Removal, set-up and take-down | EV | $0.00 | 2 | $0.00 | Service | ||
| 1034 | B.4.11.4 | Janitorial Services for th Lodge and Maintenance Building | MO | $0.00 | 12 | $0.00 | Service | ||
| 1035 | B.4.2.1 | Sunken Grave Repair and Turf Repair(Casket Sites) | EA | $0.00 | 50 | $0.00 | Construction | ||
| 1036 | B.4.2.2 | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | EA | $0.00 | 50 | $0.00 | Construction | ||
| 1037 | B.4.2.3 | SOD REPAIRS AND INSTALLATION | SQFT | $0.00 | 3750 | $0.00 | Construction | ||
| 1038 | B.4.8.1 | HEADSTONE RECEIVING (ALL) | EA | $0.00 | 10 | $0.00 | Construction | ||
| 1039 | B.4.8.1 | HEADSTONE TRANSPORT (ALL) | EA | $0.00 | 10 | $0.00 | Construction | ||
| 1040 | B.4.8.2 | HEADSTONE SETTING of All Headstones (INITIAL) | EA | $0.00 | 10 | $0.00 | Construction | ||
| 1041 | B.4.8.2 | HEADSTONE SETTING (REPLACEMENT) | EA | $0.00 | 5 | $0.00 | Construction | ||
| 1042 | B.4.8.3 | HEADSTONE Raise/Realign | EA | $0.00 | 250 | $0.00 | Construction | ||
| 1043 | B.4.9.a | Interment Operations Casket | EA | $0.00 | 5 | $0.00 | Construction | ||
| 1044 | B.4.9.b | Interment Operations Cremains | EA | $0.00 | 10 | $0.00 | Construction | ||
| 1045 | B.4.9.c | Disinternment Operations Casket | EA | $0.00 | 1 | $0.00 | Construction | ||
| 1046 | B4.9.d | Disinternment Operations Cremains | EA | $0.00 | 1 | $0.00 | Construction | ||
| Option Year 1 Total Cost | $0.00 |
| OPTION YEAR 2 | ||||||||
| CLIN | SOW | Description | Unit of issue | Cost | Qty | Total | ||
| 2001 | B.4.1.1 | Mowing Turf Areas | WK | $0.00 | 38 | $0.00 | Service | |
| 2002 | B.4.1.3 | EDGING OF WALKWAYS, CURBS AND OTHER HORIZONTAL SURFACES | WK | $0.00 | 38 | $0.00 | Service | |
| 2003 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS, AND OTHER VERTICLE SURFACES | WK | $0.00 | 38 | $0.00 | Service | |
| 2004 | B.4.1.5 | GRAVESITE TRASH, DEBRIS, AND DECORATION/FLORAL REMOVAL (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 2005 | B.4.1.6 | TRASH ,LEAF AND DEBRIS COLLECTION AND REMOVAL (Daily/Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 2006 | B.4.1.7 | Mass Gravesite Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 3 | $0.00 | Service | |
| 2007 | B.4.1.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | Service | |
| 2008 | B.4.1.9.1 | Irrigation of Cemetery Grounds | MO | $0.00 | 4 | $0.00 | Service | |
| 2009 | B.4.1.10 | MOWING AREAS WITH A PUSH LAWN MOWER | WK | $0.00 | 32 | $0.00 | Service | |
| 2010 | B.4.2.4 | Mulching/Install and Replenish to include all trees, shrubs, and planting beds | JB | $0.00 | 2 | $0.00 | Service | |
| 2011 | B.4.3.1 | Maintenance of All Plant Beds, Shrubs, and Bushes | MO | $0.00 | 12 | $0.00 | Service | |
| 2012 | B.4.3.2 | Tree Maintenance | JB | $0.00 | 2 | $0.00 | Service | |
| 2013 | B.4.4.1 | Casket / Vault Gravesite Sod Installation | EA | $0.00 | 10 | $0.00 | Service | |
| 2014 | B.4.4.2 | Core Aerification - Approximately +/- 23.3 acres | JB | $0.00 | 1 | $0.00 | Service | |
| 2015 | B.4.4.3 | Fertilization | JB | $0.00 | 5 | $0.00 | Service | |
| 2016 | B.4.4.4 | Weed Control: Pre-Emerge Herbicide Application- See Warm Season Flow Chart | JB | $0.00 | 2 | $0.00 | Service | |
| 2017 | B.4.4.4 | Weed Control: Post Emerge Herbicide - Blanket Application-- All Turf areas - | JB | $0.00 | 5 | $0.00 | Service | |
| 2018 | B.4.4.4 | Weed Control: Post Emerge Herbicide- Spot Application-- All Turf areas - | EA | $0.00 | 50 | $0.00 | Service | |
| 2019 | B.4.4.5 | Gypsum or Dolomitic Lime Application - | ||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | Service | |||
| 2020 | B.4.5.1 | Insecticide Treatment/ Applicaton (Other than fire ant, such as, Army worm, Grub worm) Blanket application | JB | $0.00 | 2 | $0.00 | Service | |
| 2021 | B.4.5.2 | Fire Ant Control Blanket Appication | JB | $0.00 | 1 | $0.00 | Service | |
| 2022 | B.4.5.2 | Spot Treatment for Fire Ant Control /monitoring | EA | $0.00 | 50 | $0.00 | Service | |
| 2023 | B.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 1 | $0.00 | Service | |
| 2024 | B.4.8.4 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | EA | $0.00 | 1000 | $0.00 | Service | |
| 2025 | B.4.9.1 | CASKET TRANSPORTATION AND CHAIN OF CUSTODY | EA | $0.00 | 5 | $0.00 | Service | |
| 2026 | B.4.10.1 | Headstone Cleaning | JB | $0.00 | 2 | $0.00 | Service | |
| 2027 | B.4.10.2 | Curbs, Parking Lots, Parking Blocks | JB | $0.00 | 2 | $0.00 | Service | |
| 2028 | B.4.10.6 | Committal Shelter | QTR | $0.00 | 4 | $0.00 | Service | |
| 2029 | B.4.10.7 | Buildings and Surrounding Concrete Surfaces | JB | $0.00 | 2 | $0.00 | Service | |
| 2030 | B.4.10.8 | Floral Vase Bin and Trash Receptacle Cleaning | QTR | $0.00 | 4 | $0.00 | Service | |
| 2031 | B.4.11.1 | Commital Service Set-Up, Take Down, and Cleaning | EA | $0.00 | 15 | $0.00 | Service | |
| 2032 | B.4.11.2 | Weekend/Holiday Burial Support | EA | $0.00 | 7 | $0.00 | Service | |
| 2033 | B.4.11.3 | Ceremony Support to include Gravesite Flag Placement and Removal, set-up and take-down | EV | $0.00 | 2 | $0.00 | Service | |
| 2034 | B.4.11.4 | Janitorial Services for th Lodge and Maintenance Building | MO | $0.00 | 12 | $0.00 | Service | |
| 2035 | B.4.2.1 | Sunken Grave Repair and Turf Repair(Casket Sites) | EA | $0.00 | 50 | $0.00 | Construction | |
| 2036 | B.4.2.2 | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | EA | $0.00 | 50 | $0.00 | Construction | |
| 2037 | B.4.2.3 | SOD REPAIRS AND INSTALLATION | SQFT | $0.00 | 3750 | $0.00 | Construction | |
| 2038 | B.4.8.1 | HEADSTONE RECEIVING (ALL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 2039 | B.4.8.1 | HEADSTONE TRANSPORT (ALL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 2040 | B.4.8.2 | HEADSTONE SETTING of All Headstones (INITIAL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 2041 | B.4.8.2 | HEADSTONE SETTING (REPLACEMENT) | EA | $0.00 | 5 | $0.00 | Construction | |
| 2042 | B.4.8.3 | HEADSTONE Raise/Realign | EA | $0.00 | 250 | $0.00 | Construction | |
| 2043 | B.4.9.a | Interment Operations Casket | EA | $0.00 | 5 | $0.00 | Construction | |
| 2044 | B.4.9.b | Interment Operations Cremains | EA | $0.00 | 10 | $0.00 | Construction | |
| 2045 | B.4.9.c | Disinternment Operations Casket | EA | $0.00 | 1 | $0.00 | Construction | |
| 2046 | B4.9.d | Disinternment Operations Cremains | EA | $0.00 | 1 | $0.00 | Construction | |
| Option Year 2 Total Cost | $0.00 |
| OPTION YEAR 3 | ||||||||
| CLIN | SOW | Description | Unit of issue | Cost | Qty | Total | ||
| 3001 | B.4.1.1 | Mowing Turf Areas | WK | $0.00 | 38 | $0.00 | Service | |
| 3002 | B.4.1.3 | EDGING OF WALKWAYS, CURBS AND OTHER HORIZONTAL SURFACES | WK | $0.00 | 38 | $0.00 | Service | |
| 3003 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS, AND OTHER VERTICLE SURFACES | WK | $0.00 | 38 | $0.00 | Service | |
| 3004 | B.4.1.5 | GRAVESITE TRASH, DEBRIS, AND DECORATION/FLORAL REMOVAL (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 3005 | B.4.1.6 | TRASH ,LEAF AND DEBRIS COLLECTION AND REMOVAL (Daily/Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 3006 | B.4.1.7 | Mass Gravesite Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 3 | $0.00 | Service | |
| 3007 | B.4.1.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | Service | |
| 3008 | B.4.1.9.1 | Irrigation of Cemetery Grounds | MO | $0.00 | 4 | $0.00 | Service | |
| 3009 | B.4.1.10 | MOWING AREAS WITH A PUSH LAWN MOWER | WK | $0.00 | 32 | $0.00 | Service | |
| 3010 | B.4.2.4 | Mulching/Install and Replenish to include all trees, shrubs, and planting beds | JB | $0.00 | 2 | $0.00 | Service | |
| 3011 | B.4.3.1 | Maintenance of All Plant Beds, Shrubs, and Bushes | MO | $0.00 | 12 | $0.00 | Service | |
| 3012 | B.4.3.2 | Tree Maintenance | JB | $0.00 | 2 | $0.00 | Service | |
| 3013 | B.4.4.1 | Casket / Vault Gravesite Sod Installation | EA | $0.00 | 10 | $0.00 | Service | |
| 3014 | B.4.4.2 | Core Aerification - Approximately +/- 23.3 acres | JB | $0.00 | 1 | $0.00 | Service | |
| 3015 | B.4.4.3 | Fertilization | JB | $0.00 | 5 | $0.00 | Service | |
| 3016 | B.4.4.4 | Weed Control: Pre-Emerge Herbicide Application- See Warm Season Flow Chart | JB | $0.00 | 2 | $0.00 | Service | |
| 3017 | B.4.4.4 | Weed Control: Post Emerge Herbicide - Blanket Application-- All Turf areas - | JB | $0.00 | 5 | $0.00 | Service | |
| 3018 | B.4.4.4 | Weed Control: Post Emerge Herbicide- Spot Application-- All Turf areas - | EA | $0.00 | 50 | $0.00 | Service | |
| 3019 | B.4.4.5 | Gypsum or Dolomitic Lime Application - | ||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | Service | |||
| 3020 | B.4.5.1 | Insecticide Treatment/ Applicaton (Other than fire ant, such as, Army worm, Grub worm) Blanket application | JB | $0.00 | 2 | $0.00 | Service | |
| 3021 | B.4.5.2 | Fire Ant Control Blanket Appication | JB | $0.00 | 1 | $0.00 | Service | |
| 3022 | B.4.5.2 | Spot Treatment for Fire Ant Control /monitoring | EA | $0.00 | 50 | $0.00 | Service | |
| 3023 | B.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 1 | $0.00 | Service | |
| 3024 | B.4.8.4 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | EA | $0.00 | 1000 | $0.00 | Service | |
| 3025 | B.4.9.1 | CASKET TRANSPORTATION AND CHAIN OF CUSTODY | EA | $0.00 | 5 | $0.00 | Service | |
| 3026 | B.4.10.1 | Headstone Cleaning | JB | $0.00 | 2 | $0.00 | Service | |
| 3027 | B.4.10.2 | Curbs, Parking Lots, Parking Blocks | JB | $0.00 | 2 | $0.00 | Service | |
| 3028 | B.4.10.6 | Committal Shelter | QTR | $0.00 | 4 | $0.00 | Service | |
| 3029 | B.4.10.7 | Buildings and Surrounding Concrete Surfaces | JB | $0.00 | 2 | $0.00 | Service | |
| 3030 | B.4.10.8 | Floral Vase Bin and Trash Receptacle Cleaning | QTR | $0.00 | 4 | $0.00 | Service | |
| 3031 | B.4.11.1 | Commital Service Set-Up, Take Down, and Cleaning | EA | $0.00 | 15 | $0.00 | Service | |
| 3032 | B.4.11.2 | Weekend/Holiday Burial Support | EA | $0.00 | 7 | $0.00 | Service | |
| 3033 | B.4.11.3 | Ceremony Support to include Gravesite Flag Placement and Removal, set-up and take-down | EV | $0.00 | 2 | $0.00 | Service | |
| 3034 | B.4.11.4 | Janitorial Services for th Lodge and Maintenance Building | MO | $0.00 | 12 | $0.00 | Service | |
| 3035 | B.4.2.1 | Sunken Grave Repair and Turf Repair(Casket Sites) | EA | $0.00 | 50 | $0.00 | Construction | |
| 3036 | B.4.2.2 | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | EA | $0.00 | 50 | $0.00 | Construction | |
| 3037 | B.4.2.3 | SOD REPAIRS AND INSTALLATION | SQFT | $0.00 | 3750 | $0.00 | Construction | |
| 3038 | B.4.8.1 | HEADSTONE RECEIVING (ALL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 3039 | B.4.8.1 | HEADSTONE TRANSPORT (ALL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 3040 | B.4.8.2 | HEADSTONE SETTING of All Headstones (INITIAL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 3041 | B.4.8.2 | HEADSTONE SETTING (REPLACEMENT) | EA | $0.00 | 5 | $0.00 | Construction | |
| 3042 | B.4.8.3 | HEADSTONE Raise/Realign | EA | $0.00 | 250 | $0.00 | Construction | |
| 3043 | B.4.9.a | Interment Operations Casket | EA | $0.00 | 5 | $0.00 | Construction | |
| 3044 | B.4.9.b | Interment Operations Cremains | EA | $0.00 | 10 | $0.00 | Construction | |
| 3045 | B.4.9.c | Disinternment Operations Casket | EA | $0.00 | 1 | $0.00 | Construction | |
| 3046 | B4.9.d | Disinternment Operations Cremains | EA | $0.00 | 1 | $0.00 | Construction | |
| Option Year 3 Total Cost | $0.00 |
| OPTION YEAR 4 | ||||||||
| CLIN | SOW | Description | Unit of issue | Cost | Qty | Total | ||
| 4001 | B.4.1.1 | Mowing Turf Areas | WK | $0.00 | 38 | $0.00 | Service | |
| 4002 | B.4.1.3 | EDGING OF WALKWAYS, CURBS AND OTHER HORIZONTAL SURFACES | WK | $0.00 | 38 | $0.00 | Service | |
| 4003 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS, AND OTHER VERTICLE SURFACES | WK | $0.00 | 38 | $0.00 | Service | |
| 4004 | B.4.1.5 | GRAVESITE TRASH, DEBRIS, AND DECORATION/FLORAL REMOVAL (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 4005 | B.4.1.6 | TRASH ,LEAF AND DEBRIS COLLECTION AND REMOVAL (Daily/Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 4006 | B.4.1.7 | Mass Gravesite Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 3 | $0.00 | Service | |
| 4007 | B.4.1.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | Service | |
| 4008 | B.4.1.9.1 | Irrigation of Cemetery Grounds | MO | $0.00 | 4 | $0.00 | Service | |
| 4009 | B.4.1.10 | MOWING AREAS WITH A PUSH LAWN MOWER | WK | $0.00 | 32 | $0.00 | Service | |
| 4010 | B.4.2.4 | Mulching/Install and Replenish to include all trees, shrubs, and planting beds | JB | $0.00 | 2 | $0.00 | Service | |
| 4011 | B.4.3.1 | Maintenance of All Plant Beds, Shrubs, and Bushes | MO | $0.00 | 12 | $0.00 | Service | |
| 4012 | B.4.3.2 | Tree Maintenance | JB | $0.00 | 2 | $0.00 | Service | |
| 4013 | B.4.4.1 | Casket / Vault Gravesite Sod Installation | EA | $0.00 | 10 | $0.00 | Service | |
| 4014 | B.4.4.2 | Core Aerification - Approximately +/- 23.3 acres | JB | $0.00 | 1 | $0.00 | Service | |
| 4015 | B.4.4.3 | Fertilization | JB | $0.00 | 5 | $0.00 | Service | |
| 4016 | B.4.4.4 | Weed Control: Pre-Emerge Herbicide Application- See Warm Season Flow Chart | JB | $0.00 | 2 | $0.00 | Service | |
| 4017 | B.4.4.4 | Weed Control: Post Emerge Herbicide - Blanket Application-- All Turf areas - | JB | $0.00 | 5 | $0.00 | Service | |
| 4018 | B.4.4.4 | Weed Control: Post Emerge Herbicide- Spot Application-- All Turf areas - | EA | $0.00 | 50 | $0.00 | Service | |
| 4019 | B.4.4.5 | Gypsum or Dolomitic Lime Application - | ||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | Service | |||
| 4020 | B.4.5.1 | Insecticide Treatment/ Applicaton (Other than fire ant, such as, Army worm, Grub worm) Blanket application | JB | $0.00 | 2 | $0.00 | Service | |
| 4021 | B.4.5.2 | Fire Ant Control Blanket Appication | JB | $0.00 | 1 | $0.00 | Service | |
| 4022 | B.4.5.2 | Spot Treatment for Fire Ant Control /monitoring | EA | $0.00 | 50 | $0.00 | Service | |
| 4023 | B.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 1 | $0.00 | Service | |
| 4024 | B.4.8.4 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | EA | $0.00 | 1000 | $0.00 | Service | |
| 4025 | B.4.9.1 | CASKET TRANSPORTATION AND CHAIN OF CUSTODY | EA | $0.00 | 5 | $0.00 | Service | |
| 4026 | B.4.10.1 | Headstone Cleaning | JB | $0.00 | 2 | $0.00 | Service | |
| 4027 | B.4.10.2 | Curbs, Parking Lots, Parking Blocks | JB | $0.00 | 2 | $0.00 | Service | |
| 4028 | B.4.10.6 | Committal Shelter | QTR | $0.00 | 4 | $0.00 | Service | |
| 4029 | B.4.10.7 | Buildings and Surrounding Concrete Surfaces | JB | $0.00 | 2 | $0.00 | Service | |
| 4030 | B.4.10.8 | Floral Vase Bin and Trash Receptacle Cleaning | QTR | $0.00 | 4 | $0.00 | Service | |
| 4031 | B.4.11.1 | Commital Service Set-Up, Take Down, and Cleaning | EA | $0.00 | 15 | $0.00 | Service | |
| 4032 | B.4.11.2 | Weekend/Holiday Burial Support | EA | $0.00 | 7 | $0.00 | Service | |
| 4033 | B.4.11.3 | Ceremony Support to include Gravesite Flag Placement and Removal, set-up and take-down | EV | $0.00 | 2 | $0.00 | Service | |
| 4034 | B.4.11.4 | Janitorial Services for th Lodge and Maintenance Building | MO | $0.00 | 12 | $0.00 | Service | |
| 4035 | B.4.2.1 | Sunken Grave Repair and Turf Repair(Casket Sites) | EA | $0.00 | 50 | $0.00 | Construction | |
| 4036 | B.4.2.2 | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | EA | $0.00 | 50 | $0.00 | Construction | |
| 4037 | B.4.2.3 | SOD REPAIRS AND INSTALLATION | SQFT | $0.00 | 3750 | $0.00 | Construction | |
| 4038 | B.4.8.1 | HEADSTONE RECEIVING (ALL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 4039 | B.4.8.1 | HEADSTONE TRANSPORT (ALL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 4040 | B.4.8.2 | HEADSTONE SETTING of All Headstones (INITIAL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 4041 | B.4.8.2 | HEADSTONE SETTING (REPLACEMENT) | EA | $0.00 | 5 | $0.00 | Construction | |
| 4042 | B.4.8.3 | HEADSTONE Raise/Realign | EA | $0.00 | 250 | $0.00 | Construction | |
| 4043 | B.4.9.a | Interment Operations Casket | EA | $0.00 | 5 | $0.00 | Construction | |
| 4044 | B.4.9.b | Interment Operations Cremains | EA | $0.00 | 10 | $0.00 | Construction | |
| 4045 | B.4.9.c | Disinternment Operations Casket | EA | $0.00 | 1 | $0.00 | Construction | |
| 4046 | B4.9.d | Disinternment Operations Cremains | EA | $0.00 | 1 | $0.00 | Construction | |
| Option Year 4 Total Cost | $0.00 |
| TOTAL COST | |
| BASE YEAR | $0.00 |
| OPTION YEAR 1 (if exercised) | $0.00 |
| OPTION YEAR 2 (if exercised) | $0.00 |
| OPTION YEAR 3 (if exercised) | $0.00 |
| OPTION YEAR4 (if exercised) | $0.00 |
| BASE + ALL OPTIONS TOTAL | $0.00 |
File details come from the government source that posted it. Updated .