Attachment B - Price Schedule- Marietta National Cemetery.xlsx
XLSX spreadsheet 29 KB Posted
- Solicitation number
- QSE--36C78625Q50200
About this file
This is a Price Schedule for Grounds Maintenance Services at Marietta National Cemetery, covering a base year and four potential option years for the Department of Veterans Affairs National Cemetery Administration. The comprehensive price schedule includes 46 line items across service and construction categories, such as turf mowing, edging, debris removal, headstone maintenance, irrigation, pest control, landscaping, and burial support services. Each line item specifies the quantity, unit of measure, and estimated frequency, though the current document shows $0.00 for all pricing, suggesting this is a template or preliminary document awaiting final cost inputs. The solicitation (QSE--36C78625Q50200) represents a new requirement for complete grounds maintenance at the cemetery, with the potential for a five-year contract term if all option years are exercised.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
| Marietta National Cemetery - Grounds Maintenance Services | ||||||||
| BASE YEAR | ||||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Est. Qty | Est. Total | ||
| 0001 | B.4.1.1 | Mowing Turf Areas | WK | $0.00 | 38 | $0.00 | Service | |
| 0002 | B.4.1.3 | EDGING OF WALKWAYS, CURBS AND OTHER HORIZONTAL SURFACES | WK | $0.00 | 38 | $0.00 | Service | |
| 0003 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS, AND OTHER VERTICLE SURFACES | WK | $0.00 | 38 | $0.00 | Service | |
| 0004 | B.4.1.5 | GRAVESITE TRASH, DEBRIS, AND DECORATION/FLORAL REMOVAL (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 0005 | B.4.1.6 | TRASH ,LEAF AND DEBRIS COLLECTION AND REMOVAL (Daily/Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 0006 | B.4.1.7 | Mass Gravesite Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 3 | $0.00 | Service | |
| 0007 | B.4.1.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | Service | |
| 0008 | B.4.1.9.1 | Irrigation of Cemetery Grounds | MO | $0.00 | 4 | $0.00 | Service | |
| 0009 | B.4.1.10 | MOWING AREAS WITH A PUSH LAWN MOWER | WK | $0.00 | 32 | $0.00 | Service | |
| 0010 | B.4.2.4 | Mulching/Install and Replenish to include all trees, shrubs, and planting beds | JB | $0.00 | 2 | $0.00 | Service | |
| 0011 | B.4.3.1 | Maintenance of All Plant Beds, Shrubs, and Bushes | MO | $0.00 | 12 | $0.00 | Service | |
| 0012 | B.4.3.2 | Tree Maintenance | JB | $0.00 | 2 | $0.00 | Service | |
| 0013 | B.4.4.1 | Casket / Vault Gravesite Sod Installation | EA | $0.00 | 10 | $0.00 | Service | |
| 0014 | B.4.4.2 | Core Aerification - Approximately +/- 23.3 acres | JB | $0.00 | 1 | $0.00 | Service | |
| 0015 | B.4.4.3 | Fertilization | JB | $0.00 | 5 | $0.00 | Service | |
| 0016 | B.4.4.4 | Weed Control: Pre-Emerge Herbicide Application- See Warm Season Flow Chart | JB | $0.00 | 2 | $0.00 | Service | |
| 0017 | B.4.4.4 | Weed Control: Post Emerge Herbicide - Blanket Application-- All Turf areas - | JB | $0.00 | 5 | $0.00 | Service | |
| 0018 | B.4.4.4 | Weed Control: Post Emerge Herbicide- Spot Application-- All Turf areas - | EA | $0.00 | 50 | $0.00 | Service | |
| 0019 | B.4.4.5 | Gypsum or Dolomitic Lime Application - | ||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | Service | |||
| 0020 | B.4.5.1 | Insecticide Treatment/ Applicaton (Other than fire ant, such as, Army worm, Grub worm) Blanket application | JB | $0.00 | 2 | $0.00 | Service | |
| 0021 | B.4.5.2 | Fire Ant Control Blanket Appication | JB | $0.00 | 1 | $0.00 | Service | |
| 0022 | B.4.5.2 | Spot Treatment for Fire Ant Control /monitoring | EA | $0.00 | 50 | $0.00 | Service | |
| 0023 | B.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 1 | $0.00 | Service | |
| 0024 | B.4.8.4 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | EA | $0.00 | 1000 | $0.00 | Service | |
| 0025 | B.4.9.1 | CASKET TRANSPORTATION AND CHAIN OF CUSTODY | EA | $0.00 | 5 | $0.00 | Service | |
| 0026 | B.4.10.1 | Headstone Cleaning | JB | $0.00 | 2 | $0.00 | Service | |
| 0027 | B.4.10.2 | Curbs, Parking Lots, Parking Blocks | JB | $0.00 | 2 | $0.00 | Service | |
| 0028 | B.4.10.6 | Committal Shelter | QTR | $0.00 | 4 | $0.00 | Service | |
| 0029 | B.4.10.7 | Buildings and Surrounding Concrete Surfaces | JB | $0.00 | 2 | $0.00 | Service | |
| 0030 | B.4.10.8 | Floral Vase Bin and Trash Receptacle Cleaning | QTR | $0.00 | 4 | $0.00 | Service | |
| 0031 | B.4.11.1 | Commital Service Set-Up, Take Down, and Cleaning | EA | $0.00 | 15 | $0.00 | Service | |
| 0032 | B.4.11.2 | Weekend/Holiday Burial Support | EA | $0.00 | 7 | $0.00 | Service | |
| 0033 | B.4.11.3 | Ceremony Support to include Gravesite Flag Placement and Removal, set-up and take-down | EV | $0.00 | 2 | $0.00 | Service | |
| 0034 | B.4.11.4 | Janitorial Services for th Lodge and Maintenance Building | MO | $0.00 | 12 | $0.00 | Service | |
| 0035 | B.4.2.1 | Sunken Grave Repair and Turf Repair(Casket Sites) | EA | $0.00 | 50 | $0.00 | Construction | |
| 0036 | B.4.2.2 | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | EA | $0.00 | 50 | $0.00 | Construction | |
| 0037 | B.4.2.3 | SOD REPAIRS AND INSTALLATION | SQFT | $0.00 | 3750 | $0.00 | Construction | |
| 0038 | B.4.8.1 | HEADSTONE RECEIVING (ALL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 0039 | B.4.8.1 | HEADSTONE TRANSPORT (ALL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 0040 | B.4.8.2 | HEADSTONE SETTING of All Headstones (INITIAL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 0041 | B.4.8.2 | HEADSTONE SETTING (REPLACEMENT) | EA | $0.00 | 5 | $0.00 | Construction | |
| 0042 | B.4.8.3 | HEADSTONE Raise/Realign | EA | $0.00 | 250 | $0.00 | Construction | |
| 0043 | B.4.9.a | Interment Operations Casket | EA | $0.00 | 5 | $0.00 | Construction | |
| 0044 | B.4.9.b | Interment Operations Cremains | EA | $0.00 | 10 | $0.00 | Construction | |
| 0045 | B.4.9.c | Disinternment Operations Casket | EA | $0.00 | 1 | $0.00 | Construction | |
| 0046 | B4.9.d | Disinternment Operations Cremains | EA | $0.00 | 1 | $0.00 | Construction | |
| Base Year Total Cost | $0.00 |
| OPTION YEAR 1 | |||||||||
| CLIN | SOW | Description | Unit of issue | Cost | Qty | Total | |||
| 1001 | B.4.1.1 | Mowing Turf Areas | WK | $0.00 | 38 | $0.00 | Service | ||
| 1002 | B.4.1.3 | EDGING OF WALKWAYS, CURBS AND OTHER HORIZONTAL SURFACES | WK | $0.00 | 38 | $0.00 | Service | ||
| 1003 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS, AND OTHER VERTICLE SURFACES | WK | $0.00 | 38 | $0.00 | Service | ||
| 1004 | B.4.1.5 | GRAVESITE TRASH, DEBRIS, AND DECORATION/FLORAL REMOVAL (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | ||
| 1005 | B.4.1.6 | TRASH ,LEAF AND DEBRIS COLLECTION AND REMOVAL (Daily/Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | ||
| 1006 | B.4.1.7 | Mass Gravesite Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 3 | $0.00 | Service | ||
| 1007 | B.4.1.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | Service | ||
| 1008 | B.4.1.9.1 | Irrigation of Cemetery Grounds | MO | $0.00 | 4 | $0.00 | Service | ||
| 1009 | B.4.1.10 | MOWING AREAS WITH A PUSH LAWN MOWER | WK | $0.00 | 32 | $0.00 | Service | ||
| 1010 | B.4.2.4 | Mulching/Install and Replenish to include all trees, shrubs, and planting beds | JB | $0.00 | 2 | $0.00 | Service | ||
| 1011 | B.4.3.1 | Maintenance of All Plant Beds, Shrubs, and Bushes | MO | $0.00 | 12 | $0.00 | Service | ||
| 1012 | B.4.3.2 | Tree Maintenance | JB | $0.00 | 2 | $0.00 | Service | ||
| 1013 | B.4.4.1 | Casket / Vault Gravesite Sod Installation | EA | $0.00 | 10 | $0.00 | Service | ||
| 1014 | B.4.4.2 | Core Aerification - Approximately +/- 23.3 acres | JB | $0.00 | 1 | $0.00 | Service | ||
| 1015 | B.4.4.3 | Fertilization | JB | $0.00 | 5 | $0.00 | Service | ||
| 1016 | B.4.4.4 | Weed Control: Pre-Emerge Herbicide Application- See Warm Season Flow Chart | JB | $0.00 | 2 | $0.00 | Service | ||
| 1017 | B.4.4.4 | Weed Control: Post Emerge Herbicide - Blanket Application-- All Turf areas - | JB | $0.00 | 5 | $0.00 | Service | ||
| 1018 | B.4.4.4 | Weed Control: Post Emerge Herbicide- Spot Application-- All Turf areas - | EA | $0.00 | 50 | $0.00 | Service | ||
| 1019 | B.4.4.5 | Gypsum or Dolomitic Lime Application - | |||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | Service | ||||
| 1020 | B.4.5.1 | Insecticide Treatment/ Applicaton (Other than fire ant, such as, Army worm, Grub worm) Blanket application | JB | $0.00 | 2 | $0.00 | Service | ||
| 1021 | B.4.5.2 | Fire Ant Control Blanket Appication | JB | $0.00 | 1 | $0.00 | Service | ||
| 1022 | B.4.5.2 | Spot Treatment for Fire Ant Control /monitoring | EA | $0.00 | 50 | $0.00 | Service | ||
| 1023 | B.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 1 | $0.00 | Service | ||
| 1024 | B.4.8.4 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | EA | $0.00 | 1000 | $0.00 | Service | ||
| 1025 | B.4.9.1 | CASKET TRANSPORTATION AND CHAIN OF CUSTODY | EA | $0.00 | 5 | $0.00 | Service | ||
| 1026 | B.4.10.1 | Headstone Cleaning | JB | $0.00 | 2 | $0.00 | Service | ||
| 1027 | B.4.10.2 | Curbs, Parking Lots, Parking Blocks | JB | $0.00 | 2 | $0.00 | Service | ||
| 1028 | B.4.10.6 | Committal Shelter | QTR | $0.00 | 4 | $0.00 | Service | ||
| 1029 | B.4.10.7 | Buildings and Surrounding Concrete Surfaces | JB | $0.00 | 2 | $0.00 | Service | ||
| 1030 | B.4.10.8 | Floral Vase Bin and Trash Receptacle Cleaning | QTR | $0.00 | 4 | $0.00 | Service | ||
| 1031 | B.4.11.1 | Commital Service Set-Up, Take Down, and Cleaning | EA | $0.00 | 15 | $0.00 | Service | $900.00 | |
| 1032 | B.4.11.2 | Weekend/Holiday Burial Support | EA | $0.00 | 7 | $0.00 | Service | ||
| 1033 | B.4.11.3 | Ceremony Support to include Gravesite Flag Placement and Removal, set-up and take-down | EV | $0.00 | 2 | $0.00 | Service | ||
| 1034 | B.4.11.4 | Janitorial Services for th Lodge and Maintenance Building | MO | $0.00 | 12 | $0.00 | Service | ||
| 1035 | B.4.2.1 | Sunken Grave Repair and Turf Repair(Casket Sites) | EA | $0.00 | 50 | $0.00 | Construction | ||
| 1036 | B.4.2.2 | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | EA | $0.00 | 50 | $0.00 | Construction | ||
| 1037 | B.4.2.3 | SOD REPAIRS AND INSTALLATION | SQFT | $0.00 | 3750 | $0.00 | Construction | ||
| 1038 | B.4.8.1 | HEADSTONE RECEIVING (ALL) | EA | $0.00 | 10 | $0.00 | Construction | ||
| 1039 | B.4.8.1 | HEADSTONE TRANSPORT (ALL) | EA | $0.00 | 10 | $0.00 | Construction | ||
| 1040 | B.4.8.2 | HEADSTONE SETTING of All Headstones (INITIAL) | EA | $0.00 | 10 | $0.00 | Construction | ||
| 1041 | B.4.8.2 | HEADSTONE SETTING (REPLACEMENT) | EA | $0.00 | 5 | $0.00 | Construction | ||
| 1042 | B.4.8.3 | HEADSTONE Raise/Realign | EA | $0.00 | 250 | $0.00 | Construction | ||
| 1043 | B.4.9.a | Interment Operations Casket | EA | $0.00 | 5 | $0.00 | Construction | ||
| 1044 | B.4.9.b | Interment Operations Cremains | EA | $0.00 | 10 | $0.00 | Construction | ||
| 1045 | B.4.9.c | Disinternment Operations Casket | EA | $0.00 | 1 | $0.00 | Construction | ||
| 1046 | B4.9.d | Disinternment Operations Cremains | EA | $0.00 | 1 | $0.00 | Construction | ||
| Option Year 1 Total Cost | $0.00 |
| OPTION YEAR 2 | ||||||||
| CLIN | SOW | Description | Unit of issue | Cost | Qty | Total | ||
| 2001 | B.4.1.1 | Mowing Turf Areas | WK | $0.00 | 38 | $0.00 | Service | |
| 2002 | B.4.1.3 | EDGING OF WALKWAYS, CURBS AND OTHER HORIZONTAL SURFACES | WK | $0.00 | 38 | $0.00 | Service | |
| 2003 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS, AND OTHER VERTICLE SURFACES | WK | $0.00 | 38 | $0.00 | Service | |
| 2004 | B.4.1.5 | GRAVESITE TRASH, DEBRIS, AND DECORATION/FLORAL REMOVAL (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 2005 | B.4.1.6 | TRASH ,LEAF AND DEBRIS COLLECTION AND REMOVAL (Daily/Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 2006 | B.4.1.7 | Mass Gravesite Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 3 | $0.00 | Service | |
| 2007 | B.4.1.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | Service | |
| 2008 | B.4.1.9.1 | Irrigation of Cemetery Grounds | MO | $0.00 | 4 | $0.00 | Service | |
| 2009 | B.4.1.10 | MOWING AREAS WITH A PUSH LAWN MOWER | WK | $0.00 | 32 | $0.00 | Service | |
| 2010 | B.4.2.4 | Mulching/Install and Replenish to include all trees, shrubs, and planting beds | JB | $0.00 | 2 | $0.00 | Service | |
| 2011 | B.4.3.1 | Maintenance of All Plant Beds, Shrubs, and Bushes | MO | $0.00 | 12 | $0.00 | Service | |
| 2012 | B.4.3.2 | Tree Maintenance | JB | $0.00 | 2 | $0.00 | Service | |
| 2013 | B.4.4.1 | Casket / Vault Gravesite Sod Installation | EA | $0.00 | 10 | $0.00 | Service | |
| 2014 | B.4.4.2 | Core Aerification - Approximately +/- 23.3 acres | JB | $0.00 | 1 | $0.00 | Service | |
| 2015 | B.4.4.3 | Fertilization | JB | $0.00 | 5 | $0.00 | Service | |
| 2016 | B.4.4.4 | Weed Control: Pre-Emerge Herbicide Application- See Warm Season Flow Chart | JB | $0.00 | 2 | $0.00 | Service | |
| 2017 | B.4.4.4 | Weed Control: Post Emerge Herbicide - Blanket Application-- All Turf areas - | JB | $0.00 | 5 | $0.00 | Service | |
| 2018 | B.4.4.4 | Weed Control: Post Emerge Herbicide- Spot Application-- All Turf areas - | EA | $0.00 | 50 | $0.00 | Service | |
| 2019 | B.4.4.5 | Gypsum or Dolomitic Lime Application - | ||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | Service | |||
| 2020 | B.4.5.1 | Insecticide Treatment/ Applicaton (Other than fire ant, such as, Army worm, Grub worm) Blanket application | JB | $0.00 | 2 | $0.00 | Service | |
| 2021 | B.4.5.2 | Fire Ant Control Blanket Appication | JB | $0.00 | 1 | $0.00 | Service | |
| 2022 | B.4.5.2 | Spot Treatment for Fire Ant Control /monitoring | EA | $0.00 | 50 | $0.00 | Service | |
| 2023 | B.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 1 | $0.00 | Service | |
| 2024 | B.4.8.4 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | EA | $0.00 | 1000 | $0.00 | Service | |
| 2025 | B.4.9.1 | CASKET TRANSPORTATION AND CHAIN OF CUSTODY | EA | $0.00 | 5 | $0.00 | Service | |
| 2026 | B.4.10.1 | Headstone Cleaning | JB | $0.00 | 2 | $0.00 | Service | |
| 2027 | B.4.10.2 | Curbs, Parking Lots, Parking Blocks | JB | $0.00 | 2 | $0.00 | Service | |
| 2028 | B.4.10.6 | Committal Shelter | QTR | $0.00 | 4 | $0.00 | Service | |
| 2029 | B.4.10.7 | Buildings and Surrounding Concrete Surfaces | JB | $0.00 | 2 | $0.00 | Service | |
| 2030 | B.4.10.8 | Floral Vase Bin and Trash Receptacle Cleaning | QTR | $0.00 | 4 | $0.00 | Service | |
| 2031 | B.4.11.1 | Commital Service Set-Up, Take Down, and Cleaning | EA | $0.00 | 15 | $0.00 | Service | |
| 2032 | B.4.11.2 | Weekend/Holiday Burial Support | EA | $0.00 | 7 | $0.00 | Service | |
| 2033 | B.4.11.3 | Ceremony Support to include Gravesite Flag Placement and Removal, set-up and take-down | EV | $0.00 | 2 | $0.00 | Service | |
| 2034 | B.4.11.4 | Janitorial Services for th Lodge and Maintenance Building | MO | $0.00 | 12 | $0.00 | Service | |
| 2035 | B.4.2.1 | Sunken Grave Repair and Turf Repair(Casket Sites) | EA | $0.00 | 50 | $0.00 | Construction | |
| 2036 | B.4.2.2 | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | EA | $0.00 | 50 | $0.00 | Construction | |
| 2037 | B.4.2.3 | SOD REPAIRS AND INSTALLATION | SQFT | $0.00 | 3750 | $0.00 | Construction | |
| 2038 | B.4.8.1 | HEADSTONE RECEIVING (ALL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 2039 | B.4.8.1 | HEADSTONE TRANSPORT (ALL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 2040 | B.4.8.2 | HEADSTONE SETTING of All Headstones (INITIAL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 2041 | B.4.8.2 | HEADSTONE SETTING (REPLACEMENT) | EA | $0.00 | 5 | $0.00 | Construction | |
| 2042 | B.4.8.3 | HEADSTONE Raise/Realign | EA | $0.00 | 250 | $0.00 | Construction | |
| 2043 | B.4.9.a | Interment Operations Casket | EA | $0.00 | 5 | $0.00 | Construction | |
| 2044 | B.4.9.b | Interment Operations Cremains | EA | $0.00 | 10 | $0.00 | Construction | |
| 2045 | B.4.9.c | Disinternment Operations Casket | EA | $0.00 | 1 | $0.00 | Construction | |
| 2046 | B4.9.d | Disinternment Operations Cremains | EA | $0.00 | 1 | $0.00 | Construction | |
| Option Year 2 Total Cost | $0.00 |
| OPTION YEAR 3 | ||||||||
| CLIN | SOW | Description | Unit of issue | Cost | Qty | Total | ||
| 3001 | B.4.1.1 | Mowing Turf Areas | WK | $0.00 | 38 | $0.00 | Service | |
| 3002 | B.4.1.3 | EDGING OF WALKWAYS, CURBS AND OTHER HORIZONTAL SURFACES | WK | $0.00 | 38 | $0.00 | Service | |
| 3003 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS, AND OTHER VERTICLE SURFACES | WK | $0.00 | 38 | $0.00 | Service | |
| 3004 | B.4.1.5 | GRAVESITE TRASH, DEBRIS, AND DECORATION/FLORAL REMOVAL (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 3005 | B.4.1.6 | TRASH ,LEAF AND DEBRIS COLLECTION AND REMOVAL (Daily/Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 3006 | B.4.1.7 | Mass Gravesite Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 3 | $0.00 | Service | |
| 3007 | B.4.1.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | Service | |
| 3008 | B.4.1.9.1 | Irrigation of Cemetery Grounds | MO | $0.00 | 4 | $0.00 | Service | |
| 3009 | B.4.1.10 | MOWING AREAS WITH A PUSH LAWN MOWER | WK | $0.00 | 32 | $0.00 | Service | |
| 3010 | B.4.2.4 | Mulching/Install and Replenish to include all trees, shrubs, and planting beds | JB | $0.00 | 2 | $0.00 | Service | |
| 3011 | B.4.3.1 | Maintenance of All Plant Beds, Shrubs, and Bushes | MO | $0.00 | 12 | $0.00 | Service | |
| 3012 | B.4.3.2 | Tree Maintenance | JB | $0.00 | 2 | $0.00 | Service | |
| 3013 | B.4.4.1 | Casket / Vault Gravesite Sod Installation | EA | $0.00 | 10 | $0.00 | Service | |
| 3014 | B.4.4.2 | Core Aerification - Approximately +/- 23.3 acres | JB | $0.00 | 1 | $0.00 | Service | |
| 3015 | B.4.4.3 | Fertilization | JB | $0.00 | 5 | $0.00 | Service | |
| 3016 | B.4.4.4 | Weed Control: Pre-Emerge Herbicide Application- See Warm Season Flow Chart | JB | $0.00 | 2 | $0.00 | Service | |
| 3017 | B.4.4.4 | Weed Control: Post Emerge Herbicide - Blanket Application-- All Turf areas - | JB | $0.00 | 5 | $0.00 | Service | |
| 3018 | B.4.4.4 | Weed Control: Post Emerge Herbicide- Spot Application-- All Turf areas - | EA | $0.00 | 50 | $0.00 | Service | |
| 3019 | B.4.4.5 | Gypsum or Dolomitic Lime Application - | ||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | Service | |||
| 3020 | B.4.5.1 | Insecticide Treatment/ Applicaton (Other than fire ant, such as, Army worm, Grub worm) Blanket application | JB | $0.00 | 2 | $0.00 | Service | |
| 3021 | B.4.5.2 | Fire Ant Control Blanket Appication | JB | $0.00 | 1 | $0.00 | Service | |
| 3022 | B.4.5.2 | Spot Treatment for Fire Ant Control /monitoring | EA | $0.00 | 50 | $0.00 | Service | |
| 3023 | B.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 1 | $0.00 | Service | |
| 3024 | B.4.8.4 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | EA | $0.00 | 1000 | $0.00 | Service | |
| 3025 | B.4.9.1 | CASKET TRANSPORTATION AND CHAIN OF CUSTODY | EA | $0.00 | 5 | $0.00 | Service | |
| 3026 | B.4.10.1 | Headstone Cleaning | JB | $0.00 | 2 | $0.00 | Service | |
| 3027 | B.4.10.2 | Curbs, Parking Lots, Parking Blocks | JB | $0.00 | 2 | $0.00 | Service | |
| 3028 | B.4.10.6 | Committal Shelter | QTR | $0.00 | 4 | $0.00 | Service | |
| 3029 | B.4.10.7 | Buildings and Surrounding Concrete Surfaces | JB | $0.00 | 2 | $0.00 | Service | |
| 3030 | B.4.10.8 | Floral Vase Bin and Trash Receptacle Cleaning | QTR | $0.00 | 4 | $0.00 | Service | |
| 3031 | B.4.11.1 | Commital Service Set-Up, Take Down, and Cleaning | EA | $0.00 | 15 | $0.00 | Service | |
| 3032 | B.4.11.2 | Weekend/Holiday Burial Support | EA | $0.00 | 7 | $0.00 | Service | |
| 3033 | B.4.11.3 | Ceremony Support to include Gravesite Flag Placement and Removal, set-up and take-down | EV | $0.00 | 2 | $0.00 | Service | |
| 3034 | B.4.11.4 | Janitorial Services for th Lodge and Maintenance Building | MO | $0.00 | 12 | $0.00 | Service | |
| 3035 | B.4.2.1 | Sunken Grave Repair and Turf Repair(Casket Sites) | EA | $0.00 | 50 | $0.00 | Construction | |
| 3036 | B.4.2.2 | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | EA | $0.00 | 50 | $0.00 | Construction | |
| 3037 | B.4.2.3 | SOD REPAIRS AND INSTALLATION | SQFT | $0.00 | 3750 | $0.00 | Construction | |
| 3038 | B.4.8.1 | HEADSTONE RECEIVING (ALL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 3039 | B.4.8.1 | HEADSTONE TRANSPORT (ALL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 3040 | B.4.8.2 | HEADSTONE SETTING of All Headstones (INITIAL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 3041 | B.4.8.2 | HEADSTONE SETTING (REPLACEMENT) | EA | $0.00 | 5 | $0.00 | Construction | |
| 3042 | B.4.8.3 | HEADSTONE Raise/Realign | EA | $0.00 | 250 | $0.00 | Construction | |
| 3043 | B.4.9.a | Interment Operations Casket | EA | $0.00 | 5 | $0.00 | Construction | |
| 3044 | B.4.9.b | Interment Operations Cremains | EA | $0.00 | 10 | $0.00 | Construction | |
| 3045 | B.4.9.c | Disinternment Operations Casket | EA | $0.00 | 1 | $0.00 | Construction | |
| 3046 | B4.9.d | Disinternment Operations Cremains | EA | $0.00 | 1 | $0.00 | Construction | |
| Option Year 3 Total Cost | $0.00 |
| OPTION YEAR 4 | ||||||||
| CLIN | SOW | Description | Unit of issue | Cost | Qty | Total | ||
| 4001 | B.4.1.1 | Mowing Turf Areas | WK | $0.00 | 38 | $0.00 | Service | |
| 4002 | B.4.1.3 | EDGING OF WALKWAYS, CURBS AND OTHER HORIZONTAL SURFACES | WK | $0.00 | 38 | $0.00 | Service | |
| 4003 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS, AND OTHER VERTICLE SURFACES | WK | $0.00 | 38 | $0.00 | Service | |
| 4004 | B.4.1.5 | GRAVESITE TRASH, DEBRIS, AND DECORATION/FLORAL REMOVAL (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 4005 | B.4.1.6 | TRASH ,LEAF AND DEBRIS COLLECTION AND REMOVAL (Daily/Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 4006 | B.4.1.7 | Mass Gravesite Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 3 | $0.00 | Service | |
| 4007 | B.4.1.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | Service | |
| 4008 | B.4.1.9.1 | Irrigation of Cemetery Grounds | MO | $0.00 | 4 | $0.00 | Service | |
| 4009 | B.4.1.10 | MOWING AREAS WITH A PUSH LAWN MOWER | WK | $0.00 | 32 | $0.00 | Service | |
| 4010 | B.4.2.4 | Mulching/Install and Replenish to include all trees, shrubs, and planting beds | JB | $0.00 | 2 | $0.00 | Service | |
| 4011 | B.4.3.1 | Maintenance of All Plant Beds, Shrubs, and Bushes | MO | $0.00 | 12 | $0.00 | Service | |
| 4012 | B.4.3.2 | Tree Maintenance | JB | $0.00 | 2 | $0.00 | Service | |
| 4013 | B.4.4.1 | Casket / Vault Gravesite Sod Installation | EA | $0.00 | 10 | $0.00 | Service | |
| 4014 | B.4.4.2 | Core Aerification - Approximately +/- 23.3 acres | JB | $0.00 | 1 | $0.00 | Service | |
| 4015 | B.4.4.3 | Fertilization | JB | $0.00 | 5 | $0.00 | Service | |
| 4016 | B.4.4.4 | Weed Control: Pre-Emerge Herbicide Application- See Warm Season Flow Chart | JB | $0.00 | 2 | $0.00 | Service | |
| 4017 | B.4.4.4 | Weed Control: Post Emerge Herbicide - Blanket Application-- All Turf areas - | JB | $0.00 | 5 | $0.00 | Service | |
| 4018 | B.4.4.4 | Weed Control: Post Emerge Herbicide- Spot Application-- All Turf areas - | EA | $0.00 | 50 | $0.00 | Service | |
| 4019 | B.4.4.5 | Gypsum or Dolomitic Lime Application - | ||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | Service | |||
| 4020 | B.4.5.1 | Insecticide Treatment/ Applicaton (Other than fire ant, such as, Army worm, Grub worm) Blanket application | JB | $0.00 | 2 | $0.00 | Service | |
| 4021 | B.4.5.2 | Fire Ant Control Blanket Appication | JB | $0.00 | 1 | $0.00 | Service | |
| 4022 | B.4.5.2 | Spot Treatment for Fire Ant Control /monitoring | EA | $0.00 | 50 | $0.00 | Service | |
| 4023 | B.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 1 | $0.00 | Service | |
| 4024 | B.4.8.4 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | EA | $0.00 | 1000 | $0.00 | Service | |
| 4025 | B.4.9.1 | CASKET TRANSPORTATION AND CHAIN OF CUSTODY | EA | $0.00 | 5 | $0.00 | Service | |
| 4026 | B.4.10.1 | Headstone Cleaning | JB | $0.00 | 2 | $0.00 | Service | |
| 4027 | B.4.10.2 | Curbs, Parking Lots, Parking Blocks | JB | $0.00 | 2 | $0.00 | Service | |
| 4028 | B.4.10.6 | Committal Shelter | QTR | $0.00 | 4 | $0.00 | Service | |
| 4029 | B.4.10.7 | Buildings and Surrounding Concrete Surfaces | JB | $0.00 | 2 | $0.00 | Service | |
| 4030 | B.4.10.8 | Floral Vase Bin and Trash Receptacle Cleaning | QTR | $0.00 | 4 | $0.00 | Service | |
| 4031 | B.4.11.1 | Commital Service Set-Up, Take Down, and Cleaning | EA | $0.00 | 15 | $0.00 | Service | |
| 4032 | B.4.11.2 | Weekend/Holiday Burial Support | EA | $0.00 | 7 | $0.00 | Service | |
| 4033 | B.4.11.3 | Ceremony Support to include Gravesite Flag Placement and Removal, set-up and take-down | EV | $0.00 | 2 | $0.00 | Service | |
| 4034 | B.4.11.4 | Janitorial Services for th Lodge and Maintenance Building | MO | $0.00 | 12 | $0.00 | Service | |
| 4035 | B.4.2.1 | Sunken Grave Repair and Turf Repair(Casket Sites) | EA | $0.00 | 50 | $0.00 | Construction | |
| 4036 | B.4.2.2 | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | EA | $0.00 | 50 | $0.00 | Construction | |
| 4037 | B.4.2.3 | SOD REPAIRS AND INSTALLATION | SQFT | $0.00 | 3750 | $0.00 | Construction | |
| 4038 | B.4.8.1 | HEADSTONE RECEIVING (ALL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 4039 | B.4.8.1 | HEADSTONE TRANSPORT (ALL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 4040 | B.4.8.2 | HEADSTONE SETTING of All Headstones (INITIAL) | EA | $0.00 | 10 | $0.00 | Construction | |
| 4041 | B.4.8.2 | HEADSTONE SETTING (REPLACEMENT) | EA | $0.00 | 5 | $0.00 | Construction | |
| 4042 | B.4.8.3 | HEADSTONE Raise/Realign | EA | $0.00 | 250 | $0.00 | Construction | |
| 4043 | B.4.9.a | Interment Operations Casket | EA | $0.00 | 5 | $0.00 | Construction | |
| 4044 | B.4.9.b | Interment Operations Cremains | EA | $0.00 | 10 | $0.00 | Construction | |
| 4045 | B.4.9.c | Disinternment Operations Casket | EA | $0.00 | 1 | $0.00 | Construction | |
| 4046 | B4.9.d | Disinternment Operations Cremains | EA | $0.00 | 1 | $0.00 | Construction | |
| Option Year 4 Total Cost | $0.00 |
| TOTAL COST | |
| BASE YEAR | $0.00 |
| OPTION YEAR 1 (if exercised) | $0.00 |
| OPTION YEAR 2 (if exercised) | $0.00 |
| OPTION YEAR 3 (if exercised) | $0.00 |
| OPTION YEAR4 (if exercised) | $0.00 |
| BASE + ALL OPTIONS TOTAL | $0.00 |
File details come from the government source that posted it. Updated .