1. Will there be an area available onsite to dispose of leaves. Under leaf removal the scope of work states “The COR can designate a disposal spot on cemetery grounds”.

Answer: For leaves we will be able to dispose of on grounds. The COR will designate.

2. Under leaf removal, what is the maximum size for branch removal?

Answer: Nothing more than a 2in branch. It’s a lite prune, so mowers can fit underneath.

3. How many headstones are currently on ALNC and how many will be added annually? Annually about 3500 added a year.

Answer: How many are currently.. rough estimate 45,000 currently

4. What is the square footage of storage area in the garage is available to the contractor for equipment?

Answer: 900 SQF

5. What is the square footage of storage provided to the contractor to store bulk salt and palletized salt for the purposes of snow/ice removal?

Answer: Palletized salt will have to go in the 900 SQF, no bulk salt storage.

6. Are there restrooms available for contractor use?

Answer: NO restrooms, the port a johns are paid for by the contractor.

7. Can the contractor leave a dumpster on site?

Answer: Yes, on the PAD where the COR will designate.