This document is a summary of amendments to a federal contract solicitation for the CFM Healthcare A-E IDIQ (Architect-Engineer Indefinite Delivery Indefinite Quantity) program, dated February 10, 2026.

Attachment A – Key Personnel and Minimum Qualifications modifications relaxed credential requirements by removing the mandate that Senior Project Managers and Regional Project Managers hold professional licensure as registered architects or engineers. The degree requirement was adjusted to allow any bachelor's degree in engineering fields, provided candidates meet experience requirements for Civil Site/Sanitary, Electrical, Mechanical, Structural, Environmental, and Fire Protection engineering disciplines. The Transportation Engineer position description was expanded to include design and specification of elevators, escalators, and material handling systems. Cost Estimator degree requirements were eliminated, and Historical Preservation qualifications were entirely redefined.

CFM Healthcare A-E IDIQ Scope of Work renamed the Program Manager position to Regional Project Manager in Paragraph 5.1. Request for SF330s updates include acceptance of previously completed Past Performance Questionnaires (PPQs) from other federal formats (NAVFAC or GSA) if they contain contract and task order numbers, current contact information with phone numbers and emails, and are complete and signed. Font size requirements were modified to allow size 10 font in Submission Requirements 5.c.1)a)2. Joint venture prime contractors are prohibited from simultaneously serving as subcontractors to other prime proposals. Request for Information Responses includes edits to nine existing questions and four new questions (50-53) added following a virtual industry day.

View the file

Other files

File Type Posted
Request for SF330s_CFM Healthcare A-E IDIQ_20260210.pdf PDF
Virtual Industry Day Attendance Roster.pdf PDF
Past Performance Questionnaire_CFM Healthcare A-E IDIQ_20260114.docx DOCX document
Request for Information Responses Update 20260210.pdf PDF
CFM Healthcare A-E IDIQ Scope of Work_20260210.pdf PDF
Attachment A - Key Personnel and Minimum Qualifications_20260210.pdf PDF
Past Performance Questionnaire_CFM Healthcare A-E IDIQ_20260114.docx DOCX document
Request for SF330s_CFM Healthcare A-E IDIQ_20260204.pdf PDF
Request for Information Responses 20260206.pdf PDF
Attachment A - Key Personnel and Minimum Qualifications_20260114.pdf PDF
CFM Healthcare A-E IDIQ Scope of Work_20260114.pdf PDF
TeamsLink.docx DOCX document
Request for SF330s_CFM Healthcare A-E IDIQ_20260204.pdf PDF
Attachment A - Key Personnel and Minimum Qualifications_20260114.pdf PDF
Past Performance Questionnaire_CFM Healthcare A-E IDIQ_20260114.docx DOCX document
CFM Healthcare A-E IDIQ Scope of Work_20260114.pdf PDF
Attachment A - Key Personnel and Minimum Qualifications_20260114.pdf PDF
CFM Healthcare A-E IDIQ Scope of Work_20260114.pdf PDF
Request for SF330s_CFM Healthcare A-E IDIQ_ 20260114.pdf PDF
Past Performance Questionnaire_CFM Healthcare A-E IDIQ_20260114.docx DOCX document
Attachment A - Key Personnel and Minimum Qualifications_20260114.pdf PDF
CFM Healthcare A-E IDIQ Scope of Work_20260114.pdf PDF
Past Performance Questionnaire_CFM Healthcare A-E IDIQ_20260114.docx DOCX document
Request for SF330s_CFM Healthcare A-E IDIQ_ 20260114.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary of Amendment 0001 Changes to Documents Dated 20260210

Attachment A – Key Personnel and Minimum Qualifications

• Removed requirements for Senior Project Manager and Regional Project Manager(s) to be a registered architect or engineer.

• Adjusted degree type to be a bachelor’s degree in any engineering field as long as the position meets the experience required for the following disciplines:

o Civil Site/Sanitary Engineer(s) o Electrical Engineer(s) o Mechanical Engineer(s) o Structural Engineer(s) o Environmental Engineer(s) o Fire Protection Engineer(s)

• Updated Transportation Engineer(s) description to include design and specification of elevators, escalators, and material handling systems.

• Removed requirement for Cost Estimator(s) to have a bachelor's degree in architecture or engineering field.

• Redefined Historical Preservation requirements in its entirety.

CFM Healthcare A-E IDIQ Scope of Work

• Paragraph 5.1 renames Program Manager to Regional Project Manager.

Request for SF330s

• Updated the Past Performance section (last paragraph of Selection Criterion 3) to accept previously completed PPQs (including those using other federal formats such as NAVFAC or GSA) so long as they include the contract and task order number (if applicable), current Point of Contact Information (including phone numbers and emails), and are complete and signed.

• Submission Requirements 5.c.1)a)2. updated allow size 10 font.

• Submission Requirements 5.e.3 updated to note that a firm that participates in a JV prime proposal cannot also be a subcontractor to another prime in response to this Request for SF330s.

Request for Information Responses

• Questions 1, 9, 10, 25, 27, 28, 33, 41, and 49 have been edited.

• Questions 50-53 have been added following the virtual industry day.