Solicitation Questions and Answers.doc

DOC document 111 KB Posted

Attached to
Medium and Heavy Duty Trucks
Solicitation number
QMAE-T4-091003-N
Issued by

About this file

Solicitation Questions Answers Questions are separated by Pricing Technical Systems and Administrative. Then each section is divided into General Questions and by solicitation number. Please refer only to the solicitation number that applies.

View the file

Other files

File Type Posted
FBONotice_Delay_In_Award_QMAE_T4_091003_N.doc DOC document
Amendment 4 QMAE-T4-91003-N.doc DOC document
Amendment 3 QMAE-T4-09003-N.doc DOC document
Amendment 2 QMAE-T4-091003-N.doc DOC document
Pre-Proposal Conference Transcript.pdf PDF
Amendment1 QMAE-T4-091003-N.doc DOC document
PreProposal Conference UPDATE 7.22.09.doc DOC document
Pre Proposal Conference Information.doc DOC document
Attachment F8 -Schedule of Items Navistar.pdf PDF
Attachment K - Dealers Layout Form.xls XLS spreadsheet
Attachment L - Med Heavy Option Analysis Report.pdf PDF
Attachment F1- Schedule of Items Damiler.pdf PDF
Attachment A - Small Business Subcontracting Plan.doc DOC document
Attachment F6 -Schedule of Items EVI-USA.pdf PDF
Attachment F5 -Schedule of Items Boyer —
Attachment B - Proposal Checklist.doc DOC document
Attachment F3 - Schedule of Items Kenworth.pdf PDF
Attachment F7 - Schedule of Items Hino.pdf PDF
Attachment E - Weekly Status Report.doc DOC document
Attachment G - Fed Std 794AC.pdf PDF
Attachment F4 - Schedule of Items Smith Electric.pdf PDF
Attachment H - Fed Std 807R.pdf PDF
Attachment I - Monthly Status Report.xls XLS spreadsheet
Attachment D- AutoChoice Online Ordering Procedures.doc DOC document
Attachment C - Exceptions Spreadsheet.xls XLS spreadsheet
Attachment J - Inspection Points Template.xls XLS spreadsheet
Medium Heavy Vehicles 2010 Solicitation.doc DOC document
Attachment F2 - Schedule of Items Mack Volvo.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION QUESTIONS AND ANSWERS

SOLICITATION QUESTIONS AND ANSWERS

PRICING

GENERAL QUESTIONS: PERTAINING TO THE FOLLOWING SOLICITATIONS

QMAA-M8-091001-N, QMAA-FJ-091002-N, QMAE-T4-091003-N, AND QMAA-M8-091004-N

Question Will there be a Best and Final Offer (BAFO) opportunity?

Answer In section E.2 it states, that the Government reserves the right to evaluate offers and award a contract without discussions. Therefore, the initial offer should contain the Offerors best terms from both a price and technical standpoint.

Question How does Price proposal (Volume 3) differ from AUTOBID pricing entries?

Answer There is no difference in the Price proposal (Volume 3) and AutoBid. Volume 3 will be your Autobid pricing. Reference Section E.2, Addendum to 52.212-1 – Instructions to Offerors, Commercial Items C, AUTOBID - Offerors are required to submit their pricing information in GSA’s AUTOBID. Offerors AUTOBID entry shall be printed and submitted under this section as their pricing proposal. Offerors AUTOBID entry must match the pricing information submitted for this factor.

Question It appears that no price adjustment will be made if the PPI does not move at least 10%. I cannot find that the PPI has ever increased or decreased 10% annually.

Also, the PPI will not take in account the change in emissions. The price for the new emissions will not be available until well after this bid is due. Is there any plan to deal with this?

Answer The solicitation has been amended to change from 10 percent to 1 percent. Section D.14, permit adjustments based on market conditions as determined by the Contracting Officer.

In regards to the new 2010 emissions requirements, whatever engine the offeror wants to offer that is legal for sale.

Question The Draft RFP directs offerors to submit pricing via AutoBid, and to include a printout of AutoBid pricing in Volume 3. The Draft RFP states that GSA wants offerors to submit pricing information using another template as well. The balance of this question relates to the “additional” pricing information. Please identify the pricing template to be used (i.e., the template to be used in addition to AutoBid). The “Proposal Checklist” directs offerors to use the “Pricing template via Attachment E.” This attachment, however, does not include a pricing template. The “Pricing” section of the RFP (Page 52 of the RFP) directs offerors to Sections E.1 and E.2. Section E.1 does not address pricing. Section E.2 includes a section on pricing, but we cannot find a template that should be used for presenting pricing information (other than AutoBid). Page 10 of the Draft RFP lists data elements for pricing, but we are not sure whether this constitutes the format in which you want us to provide the pricing information.

Answer GSA has amended the proposal checklist to show that there is no pricing template via Attachment E and only AutoBid (Volume 3) pricing should be submitted for this section. GSA has also amended section B.5 to indicate that the completed fields (data elements listed) need to be filled out in AutoBid and submitted in that format.

Question From time to time, there are manufacturer’s mid-year, model-year, and sometimes transportation pricing increases. Will these price increases be allowed to be taken into consideration and put into effect during the contract?

Answer GSA does not accept any change in pricing be it mid-year, model-year and or transportation pricing. The negotiated and awarded pricing for each Line Item will hold firm until the option year is exercised. The only change will occur with the activation of NMY option to incorporate the next model year.

Question We plan to offer 2011 MY vehicles during the 2010 MY contract. However, please clarify the new option "NMY" as related to pricing. We need to understand how to communicate our intent to exercise the option without providing a price for that option by August 21, 2009.

Answer Amendment 1 provides a full explanation of Option NMY. Awarded contract vendors can submit their pricing for Option NMY on awarded contract Line Items by no later than 4:00 pm ET on March 31, 2010.

Question Who determines the market conditions exist for change in $ cost?

Answer When requesting an Economic Price Adjustment (EPA) over the allowable amount, it is the responsibility of the vendor to provide a written justification for approval. The Contracting Officer will make the decision to accept and/or reject based on market research. Please note the entire automotive market must be affected in order to substantiate any increases above the ceiling.

Question Administrative fee. When does this take effect? Is there a grace period? (ie. Contractor loads all collisions and rebuilds the database. Pending actual vehicle ordering you are not 100% sure the collisions took.)

Answer This takes effect immediately with contract award. The Administrative fee of $150 for contractor-initiated modification requests is consistent with all other SOP programs within Automotive. Assessment of the fee is at the Contracting Officer’s discretion based on each circumstance.

Question How are manufacturer’s price increases handled and how many price increases can be submitted per year? (i.e. Model year increase)

Answer As you are aware, this is a Firm Fixed Price contract; therefore, pricing will remain firm for the base year with no allowable price increases. However, if market conditions change either upward or downward where the entire automotive manufacturing industry is affected consideration may be given for price changes.

Question Option NMY. Will the manufacturer be held to that new pricing under the next contract year? Will they have the ability to provide new pricing with the re-bid process in the AutoBid contract renewal?

Answer The pricing offered for Option NMY will be added to the current year’s base vehicle price. That total number together will be the next model year’s base vehicle price. New pricing will not be accepted in writing or in AutoBid during the potential exercising of an option year period. The below the line options may change in price. Please see Amendment 1 for all information regarding Option NMY.

Pricing Questions for QMAA-FJ-091002-N

Question Invoice net and MSRP (Manufacturer’s Suggested Retail Price) on Chassis Cabs and Pickup items only?

Answer Yes. Offerors shall provide Invoice net and MSRP for all items for solicitation QMAA-FJ-091002-N.

Pricing Questions for QMAE-T4-091003-N

Question Please clarify if the Price Proposal (volume 3) should include a completed Attachment No. F8 (284 pages) in addition to the hard copy of the AutoBid submission.

Answer Pricing template is not required. The solicitation has been amended to reflect this change. You should be submitting your AUTOBID pricing for all pages under Volume 3.

Question Page 10, This company like other bidders is an OEM not a dealer, we do not have Net MSRP, Net Invoice Pricing and we do not have MPG as in many cases Bodies are put on to our chassis. We do not have that data.

Answer This does not apply to Medium and Heavy and has been removed from the solicitation in Amendment 1.

Pricing Questions for QMAA-M8-091004-N Question Invoice net and MSRP (Manufacturer’s Suggested Retail Price) on Chassis Cabs and Pickup items only?

Answer Yes. Offerors shall provide Invoice net and MSRP for Cab and Chassis items for solicitation QMAA-M8-091004-N.

TECHNICAL

GENERAL QUESTIONS: PERTAINING TO THE FOLLOWING SOLICITATIONS

QMAA-M8-091001-N, QMAA-FJ-091002-N, QMAE-T4-091003-N, AND QMAA-M8-091004-N

Question I am requesting to adjust a vehicle warranty – is this possible?

Answer Reference Section E.2, Addendum to 52.212-1 – Instructions to Offerors, Commercial Items, Tab B, Exceptions to Federal Vehicle Stands. Offerors shall submit a statement indicating that no exceptions are taken, if exceptions are necessary, any and all must be addressed under this section. Exceptions should be submitted clarifying the offer’s product with their offer.

Question Will GSA accept trucks compliant with 2007 EPA emissions standards for orders placed in 2009 and built in 2009?

Answer GSA’s Federal Vehicle Standards are for 2010 model year products. The products that we are looking for have to be legal for sale at the time of order placement. GSA is looking at buying complete 2010 model year vehicles.

Question Will GSA accept trucks built in 2010 equipped with 2007 EPA compliant engines built in 2009?

Answer GSA’s Federal Vehicle Standards are for 2010 model year products. The products that we are looking for have to be legal for sale at the time of order placement. GSA is looking at buying complete 2010 model year vehicles.

Question Will GSA accept trucks built in 2010 based on credits with the EPA?

Answer GSA’s Federal Vehicle Standards are for 2010 model year products. The products that we are looking for have to be legal for sale at the time of order placement. GSA is looking at buying complete 2010 model year vehicles.

Question Will GSA require all trucks to be built in full compliance with 2010 EPA emissions standards?

Answer GSA’s Federal Vehicle Standards are for 2010 model year products. The products that we are looking for have to be legal for sale at the time of order placement. GSA is looking at buying complete 2010 model year vehicles.

Question How do I get to see the specs for the above solicitation!

Answer All specifications are contained in the vehicle standards and are included in the solicitation.

Question Technical Approach. Like a milestone chart in previous requirements?

Answer Yes, however, please ensure that each offeror demonstrates in their response that your firm has the technical capability to perform the work solicited.

Question MPG, GREENHOUSE SCORE. Is this applicable to vehicles over 8800# GVWR?

Answer The Green House Gas Number is applicable to all vehicles up to 10,500lbs.

Question Prices offered must cover delivery FOB destination toUnited States. Is the contractor correct in assuming that this covers only the Continental United States (CONUS) as there are options for shipping to Alaska and Hawaii.

Answer Prices offered must cover delivery f.o.b. destination (FAR 52.247-34) to the United States. United States is defined as the Continental United States (CONUS).

Technical Questions for QMAA-M8-091001-N Question Shipment is required within 90 calendar days after receipt of order. This is different from our prior contracts and company is unable to agree to shipping vehicles in this time frame.

Answer The time of shipment has been revised in Amendment 1 of solicitation QMAA-M8-091001-N.

Question What is the Time of Shipment? Is it (90) days from receipt of order? (For Ambulances and Cab & Chassis vehicles) Answer The time of shipment has been revised in Amendment 1 of solicitation QMAA-M8-091001-N.

Question Are Wheels-Off-Ground, C.19, delivery required?

Answer Wheels-Off-Ground has been revised in Amendment 1 of solicitation QMAA-M8-091001-N.

Technical Question for QMAA-FJ-091002-N

Question We are seeking clarification of the Draft RFP’s instructions on page 53 related to “Inspection Point/Place of Performance.” After we produce and inspect a vehicle at the point of production, we disconnect certain items before loading the vehicle onto the carrier. It is quite easy for the dealer (or even the purchaser, in cases of direct delivery) to re-connect these items. The items are easily accessible and can be re-attached in approximately one minute, requiring no tools. Under a contract with GSA, if there is an inspection at the point of production, will this suffice for the purposes of satisfying requirements for “Government source inspection (if required)”?

Answer Dealers should be able to make the vehicle operable, CNS delivery has to include simplified instructions for receiving agencies to make the vehicle operable.

Question In the solicitation posted on July 18, 2009, Attachment G, Federal Standard 122BB is provided. This is the draft version for automobiles. However, Attachment H, Federal Standard 307AN, for trucks is the final version. Should the offeror refer to the final version of Standard 122BB, which can be reached via the GSA home site?

Answer The solicitation has been amended via Amendment 1 to display the Federal Standard 122BB Final Version.

Technical Questions for QMAE-T4-091003-N

Question Shipment is required within 90 calendar days after receipt of order. This is different from our prior contracts and company is unable to agree to shipping vehicles in this time frame.

Answer The time of shipment has been revised in Amendment 1 of solicitation QMAE-T4-091003-N.

Question Page 54; FACTOR 1; Tab B – should this reference Federal Vehicle Standards 794 & 807?

Answer The solicitation has been amended to reference Federal Vehicle Standards 794 and 807 in solicitation QMAE-T4-091003-N.

Question

Paragraph D.17 on page 32 of the solicitation requires destination inspection. Why is this paragraph in the solicitation when origin inspection points are being requested? (Reference QMAE-T4-091003-N)

Answer Solicitation QMAE-T4-091003-N will be amended to clarify.

Technical Questions for QMAA-M8-091004-N

Question Shipment time for AWDC and CNG items needs to be 180 in lieu of 120.

Answer The time of shipment has been revised in Amendment 2 of solicitation QMAA-M8-091004-N.

Question Shipment is required within 90 calendar days after receipt of order. This is different from our prior contracts and company is unable to agree to shipping vehicles in this time frame.

Answer The time of shipment has been revised in Amendment 2 of solicitation QMAA-M8-091004-N.

Question On Page 163 of Schedule of Items the MFG code shows F4H and it should be F5H, 160001 GVWR MIN Answer This technical requirement has been revised in Amendment 2 of solicitation QMAA-M8-091004-N.

Question I’m in Autochoice Item 82, what does this option determine? NMY - NEXT MODEL YEAR VEHICLE with fill in of “Standard” “Package” “Not available” “Standalone”. Is that where we indicate we are providing 2011’s in lieu of 2010 models?

Answer Please see the Amendment 1 for full explanation of Option NMY.

SYSTEMS

GENERAL QUESTIONS: PERTAINING TO THE FOLLOWING SOLICITATIONS

QMAA-M8-091001-N, QMAA-FJ-091002-N, QMAE-T4-091003-N, AND QMAA-M8-091004-N

Question TAB H- Dealer's Layout Form, I have listed all the dealers that have handled GSA delivers for me over the last 2 years, but I do not have there DUNS number, will it still be acceptable?

Answer The DUNS number is not required for this dealer’s layout document. If the DUNS is available please provide it, however if it not the offeror may submit the Dealer’s Layout Form without it.

Question Problems with Auto Bid. When loading info it is not saving on some options. Who should I contact on this issue?

Answer If anyone is experiencing difficulty inputting information into Autobid, please contact your prospective Contracting Officer, this information will be given to our Systems team in order to resolve this matter.

If the comparable model differs from the Government’s minimum requirements, the Offeror’s proposal must identify those differences for each respective make and model on a separate sheet of paper as noted below. Please note that submission of representative makes and models does not ensure that they will be accepted.

Question The solicitation requires an electronic submission of Volumes 1, 2, & 3. The financial data required in Volume 1, Tab B can not be provided to GSA electronically on a CD. Additionally, I am unsure if AutoBid will provide a means to copy the pricing to a CD.

Answer The solicitation has been amended to reflect that AutoBid pricing (Volume 3) will not be required to be submitted via CD ROM. All other information required in Volumes 1 and 2 is required to be submitted electronically via CD ROM in addition to the one (1) original and three (3) copies.

Question AutoBid contains a data field titled “Miles per Gallon.” We will be offering vehicles that do not use gasoline. What should we enter in the “Miles per Gallon” field in AutoBid? Also, there is a data field for “number of cylinders which electric motors do not have cylinders.

Answer The vendor needs to insert the MPG for their vehicle. There is a field for him/her to designate the type of fuel for each item bid (drop down box) If vendor does not have cylinders they needs to insert N/A or 0.

Question As a first time offeror to GSA’s Automotive Acquisition Support Division, we are not familiar with AutoBid and its formats and requirements. We are currently waiting for our User ID and password to access AutoBid. In the meantime, can GSA make available some examples of screen shots from AutoBid, and an instruction manual, as we wait for our registration? This would be of immense help as we prepare our pricing information under the tight timelines established by the RFP.

Answer This information is only available once the offeror has registered and been assigned a log-on and password. If you have questions regarding uploading and or entering information via AutoBid, please contact your Contracting Officer (CO). The CO will gather responses in conjunction with the Automotive Systems Branch.

Question The pull-down menu for the new "NMY" option allows the offeror to select from "stand-alone, standard, not available and package." The options should really reflect "available and not available."

Answer The system is set up for the inputting of all options. If a potential offeror is not providing a price-the only option is “not available”, if they are furnishing the option they need to provide the price in this field and select “stand alone.”

Question On the FedBizOpps website, how can we register to receive only updates for this solicitation?

Answer FedBizOpps notifies potential vendors of acquisition opportunities based upon the company’s NAICS code that they register with at FBO.gov. Interested parties can “Watch This Opportunity” to receive notifications on a particular solicitation.

Question If a vendor already has a password, do they have to request a new one?

Answer All vendors’ current contract holders and new vendors must request a new password. A password can be retrieved by submitting an email request to automotiveedi.partnerships@gsa.gov.

Question In the RFP Light Vehicles, the “Estimates of Quantities & Pricing Paid” and “Options Sales across Program” does not print out. Can you make copies of those two documents available?

Answer These attachments can be opened with Windows’ EXCEL XP Professional version or comparable versions. If a potential vendor is having difficulty with attachments please contact the Contracting Officer for assistance.

Systems Questions for QMAE-T4-091003-N

Question I noticed on the schedule of items you listed the items for individual bidders such as Navistar, Boyer Ford, Hino, etc, we will be new on this solicitation this year. Do you have a particular schedule of items that you would want us to follow?

Answer Reference section E.2, Addendum to 52.212-1, Instructions to Offerors – Commercial Items, if an interested Offeror has a representative make and model comparable to the models identified herein, Offerors will need to contact GSA to provide those representative makes and models per the Schedule of Items and obtain an account and password from GSA’s Systems Branch (QMDBE) at automotiveedi.partnerships@gsa.gov.

ADMINISTRATIVE

GENERAL QUESTIONS PERTAINING TO THE FOLLOWING SOLICITATIONS

QMAA-M8-091001-N, QMAA-FJ-091002-N, QMAE-T4-091003-N, AND QMAA-M8-091004-N

Question What is MPG, Greenhouse Score and 1122?

-MPG is Miles Per Gallon

-Greenhouse Score, Energy Act requires number OEMs report to EPA

-1122 Program was established by section 1122 of the National Defense Authorization Act to allow State and Local Governments to purchase vehicles for counter-drug, homeland security, and emergency response activities

Question What is a Dealer’s layout? Dealers participating in GSA deliveries?

Answer Dealer delivery is standard under all solicitations with the exception of the medium and heavy and ambulance solicitations. Dealers layouts need to be filled out in order to ensure customers can select dealers when placing their orders. Please provide any dealerships you currently have relationships with.

Question Original and three copies of Volumes 1, 2, 3 and CDROM of same?

Answer The solicitation has been amended to reflect that AutoBid pricing (Volume 3) will not be required to be submitted via CD ROM. All other information required in Volumes 1 and 2 is required to be submitted electronically via CD ROM in addition to the one (1) original and three (3) copies.

Question Can we submit the financials separate from the bid? How should this be handled?

Answer In accordance with Section E.2, 4A, Offerors must submit information to demonstrate their financial resources in accordance with the FAR Part 9.104-1. Since this is a new solicitation, any financial data previously submitted for any other reason is not acceptable. Submit the information that you have. We will accept a letter of credit in addition to the current company’s/owners’ financial documentation. If the company does not want to release the financial information to its employees, it cannot be submitted separately. Whoever is privy to this information will have to submit the entire proposal package.

Question How will Factor 1 and especially Factor 2 be determined? What information is provided?

Answer Technical Approach is the primary determining factor of an offerors ability to perform. Offerors shall describe how they meet or plan to meet the specifications, process orders, produce and deliver the vehicles. Provide a projected project plan showing significant actions/events in the build process for each time of shipment identified in this solicitation. Significant steps to be identified in the project plan shall include at the minimum: date of completion or proposed build order; order placement with all significant subcontractors (cab and chassis, body and etc.); delivery date of subcontracted items; planned completion; and planned inspection date.

Question The Draft RFP’s Provision C.6.B (3) addresses carrier damage. It states: “Product dealer shall make any repairs necessitated by carrier damage and shall replace any equipment lost in transit.” Please clarify the elapsed time that the government will allow for such repairs or for replacement of lost equipment. What types of penalties would the government impose or what types of concessions would be required in the event that the deadline is not met? For example, would procedures described in Provision C.7 (Shipment Delays) also apply in such cases?

Answer The vendor needs to verify their damages and repair and rebuild as necessary. The vendor still needs to meet a reasonable time of shipment. This will be negotiated for additional shipment time through a modification with the Contracting Officer.

Question Contract Clause D.1 (a), included in the Draft RFP, and addresses the government’s post acceptance rights. In part, this clause states that the government must exercise these rights “Within a reasonable time after the defect was discovered or should have been discovered.” Can you please give us a general sense of what constitutes a “reasonable time” under these circumstances? While we certainly understand that such standards cannot be formulaic, it would be useful for us to hear a discussion of this provision at the pre-proposal conference.

Answer A reasonable time will be determined by the Contracting Officer and the Contractor.

Question How much elapsed time is acceptable in the event of a post-acceptance repair or replacement of a vehicle in the event of a breakdown? What types of penalties would the government impose under the contract or what types of concessions would be required in the event that the deadline is not met? Do we need to send the vehicle back after repairs and bring the replacement vehicle back? Our Company prefers to swap vehicles and give a replacement vehicle in cases of repair issues.

Answer Each vendor has their own commercial practices that they can offer and negotiate with the Contracting Officer in case of damages and repair/replacement needed. The concessions that may be taken are based on the GSA Fleet leasing rate. GSA still requires the vehicle to be either a) repaired or b) replaced.

Question Proof of completion of Vets-100 requirements? What is this? We have never had to do this we are a very small company of about 35, never had to do this before.

Answer The U.S. Department of Labor (DOL), Veterans' Employment and Training Service (VETS) annually collects and compiles the Federal Contractor Veterans' Employment Report (VETS-100) from Federal contractors and subcontractors who receive Federal contracts of $100,000 or more. This VETS-100 Report is due annually, on September 30. Offerors shall complete an online submission of the VETS 100 report through the following website: vets.dol.gov/vets100. Offeror shall submit proof of completion of a VETS 100 report.

Question Factor 1- Technical Capability, Tab A- Technical Approach, Tab D- Project Plan, Factor 2- Management Capabilities, Tab A- Management Approach. What are you looking for in these? These three almost seem to be what we did 2 years ago as a Projected Milestone Chart and Projected Production plans in one letter.

Answer Factor 1 - Technical Capability is the primary determining factor of an offerors ability to perform. Offerors shall describe how they meet or plan to meet the specifications, process orders, produce and deliver the vehicles. Provide a projected project plan showing significant actions/events in the build process for each time of shipment identified in this solicitation. Significant steps to be identified in the project plan shall include at the minimum: date of completion or proposed build order; order placement with all significant subcontractors (cab and chassis, body and etc.); delivery date of subcontracted items; planned completion; and planned inspection date.

Factor 2 – Management Approach - The offeror shall describe their management approach in narrative format. At a minimum, the offerors shall describe the quality assurance procedures to be employed for this effort and describe what oversight will be provided as it pertains to order processing, production and delivery of vehicles, and management of suppliers and dealers.

Question Letter of Supply? What is this or what are you looking for this in this letter?

Answer The Letter of Supply is for those other than Original Equipment Manufacturers (OEMs). This letter is required to ensure that each offeror other than OEM has the supply to meet the demand of orders placed under potential GSA contracts. GSA needs to be sure that each offer can supply what they are proposing. This letter should indicated Line Items for a particular manufacture indicating approximate quantities that will be available from that vendor for performance of this potential contract.

Question Our firm does not have a current or prior contract with GSA Automotive. Our interpretation of the “Past Performance” instruction is that we should indicate that we have no relevant past performance. Is this correct?

Answer Past performance is not just related to GSA Automotive Past Performance. Per Section E.2 Addendum to 52.212-1 – Instructions to Offerors – Commercial Items, Factor 3- Past Performance:

The Offeror shall demonstrate it has acceptable past performance history in providing the same or similar scope, size, and complexity of the products solicited and in managing projects and contracts of the kind contemplated.

Offerors shall submit a narrative description describing their past performance in providing similar products over the past three (3) years. Describe at least three to five projects for different clients, similar in size and complexity to the effort contemplated herein and in sufficient detail for the Government to perform an evaluation of the offerors past performance. At a minimum, the offeror shall provide the following information:

Project/Contract Name

Project Description (Include quantities provided)

Dollar Amount of Project

Length of Project or Period of Performance

Point of Contact and Telephone Number

In addition:

New contractors to GSA Automotive – Offerors without a past performance record with GSA Automotive shall not be evaluated favorably or unfavorably under the 75% on time shipment benchmark. Instead, GSA shall evaluate past performance under prior commercial contracts to determining compliance with satisfactory performance. If there is no prior commercial experience, past performance shall be rated neutral for the offeror.

Question Consider a scenario under which an offeror’s proposal is found to be acceptable; the firm is found to be responsible; and the offer represents the lowest price technically acceptable offer for a particular vehicle listed in one of the RFP’s attachments. Will that offeror win an award even if it has a “neutral” Past Performance score?

Answer Generally, yes.

Question We request that you consider incorporating by reference FAR provisions 52.232-29 (Terms for Financing of Purchases of Commercial Items) and 52.232-30 (Installment Payments for Commercial Items). Under any resulting contracts, this would give the government the option of providing limited financing (e.g., down payments; installment payments) for the purchase of vehicles, if certain conditions are met. As a relatively small manufacturer, it is our standard commercial practice to require customers to make certain types of pre-payments at the time of order.

The government has already given at least one of the likely competitors on this RFP very substantial financing to help that firm with its working capital needs and other financial needs. This financial assistance is tantamount, in part, to providing advanced payments for any vehicles to be delivered under a GSA Automotive contract. If the government is providing substantial financial help to some firms that might be competitors on this RFP, we believe that this presents an unfair competitive advantage over other firms—especially relatively small ones—that have to meet all of their working capital needs under any resulting contract without assistance from the government.

In addition, we believe that inserting the FAR provisions referenced above would be to the benefit of the government. This would help ensure that relatively new manufacturers of innovative vehicles—including vehicles that help the nation achieve its environmental goals and reduce its dependence on foreign energy suppliers—can grow to the size where economies of scale will reduce the need for advance or installment payments.

Answer Answer is pending.

Question In addition to including a hard copy of AutoBid pricing in proposals, should offerors provide any type of written narrative regarding the “fairness and reasonableness” of the pricing?

No, a written narrative regarding “fairness and reasonableness” does not need to be submitted with the AutoBid pricing.

Question What methods will the Evaluation Panel use to determine whether an offeror’s proposed pricing is “fair and reasonable?”

Answer The Evaluation Panel uses competitive pricing and market research to make determinations of fair and reasonable pricing. PRICE – An evaluation of the Offerors’ price proposals will be made to determine if they are realistic for the work to be performed, reflect a clear understanding of the requirements, and are consistent with the technical proposal. Price reasonableness determinations will be made by determining if competition exists and by comparing bid prices with established commercial or GSA pricing.

Question If my firm is a current contract holder and in good standing with GSA over the time of my contract, can I simply state my performance on my past GSA contract for Factor 3, Past Performance?

Answer As addressed in the solicitation you must provide a narrative description of at least three to five projects. Offerors may use their experience with GSA as one of the projects.

Question If a potential offeror provides information regarding contracts with other commercial customers, this will create more problems than it is worth to a potential offeror. Giving more information and people that the vendor does business with outside of GSA to evaluate performance on how we would perform on a contract would create other problems for us and our customers outside of GSA.

Answer It is a standard commercial practice to check references, GSA does not disclose to the references what price or what items are offered to the government. Therefore, state governments, universities/colleges, can also be provided as references for performance purposes. The FAR requires us to check past performance.

Question We do not set dealers up until orders are placed. It would be impossible to set up dealers up front in all cases.

Answer Only provide the dealers you currently have a relationship with. This list can be updated on an as needed basis by the vendors.

Question Is it fact that an awarded contactor has 4 months to put the following in place if it does not already exist: Code of business ethics, whistle blower protection, convict labor, child labor, affirmative action plan, etc.?

Answer The clauses in the solicitation have varies time restriction to have the requirement of that clause in place. The Contractor should refer to the full text version of the clause found in FAR at www.acquisition.gov.

Question Delivery orders for destination not on the dealer’s layout. What exactly does this mean?

Answer Awarded vendors are to notify GSA within the time requirement of any delivery orders that require dealer delivery and the vendor does not have a current dealership relationship with. The vendor can add a new dealership to their dealer layout at this point or notify GSA that delivery cannot be met and force a potential modification for Consignee Delivery (if the customer accepts) or a termination of the order (if the customer determines this course of action.)

Question Does GSA Automotive want each volume to be in a three ring binder or would you prefer each volume to be held together by a metal clip?

Answer GSA Automotive does not have standard procedures on how to submit your offer. However, the proposal must be securely fastened and are safely attached.

Question We assume that in instructions where the proposal checklist and the RFP do not agree, then the RFP’s instructions take precedence.

Answer Correct, the terms and conditions of the solicitation takes precedence over the proposal checklist.

Question With the option years starting on September 1st will the contract options information be published at least one month earlier than this year?

Answer Per clause I-FSS-168 entitled “Option to Extend the Term of the Contract (June 1996), Paragraph (a), it states “The Government may extend the term of this contract by written notice to the contractor within 30 days; provided, that the Government shall give the contractor a preliminary written notice of its intent to extend at least 60 days prior to contract expiration. The preliminary notice does not commit the Government to an extension.

Question Will the updates posted to FedBizOpps be readily apparent in the document or will we have to read the entire document to find changes?

Answer Any Amendments will reflect all necessary changes made to the solicitation. It is imperative that you read the entire Amendment to understand fully what has changed.

Question Will contractors receive a $150.00 credit for modification changes made by GSA?

Answer No.

Question Small Business Subcontracting Plan. Please clarify, estimated dollar value $550,000 is that gross revenues of the business?

Answer The estimated dollar value exceeding $550,000 is based on gross revenue of the business.

Question Do we print out all schedules F’s and do N/A (not applicable) on each page or only include Section F for the model’s being submitted?

Answer The Schedule of Items can be found in Autobid, complete only the Schedule of Items for those models in which your company will be offering to GSA. Once completed in Autobid, this is the information that should be printed and submitted as pricing, under Volume 3.

Administrative Questions for QMAE-T4-091003-N

Question There is a discrepancy on the solicitation number. FBO lists QMAE-T4-091003-N, while the text & offer mailing address has QMAE-TJ-091003-N. Will the mailing address be updated?

Answer The correct solicitation is QMAE-T4-091003-N. The solicitation has been amended to reflect this change.

Question The check list and the instructions to offerors (E.2) do not match. Please review your requirements and make the changes necessary so the check list and E.2 match. (Reference QMAE-T4-091003-N)

Answer The Solicitation (QMAE-T4-091003-N) has been amended to insure checklist matches sections requirements.

Question Section C, are status reports going to be combined (i.e. weekly and monthly) for Medium and Heavy and Light Cab & Chassis?

Answer No, the reports will not be combined, weekly status reports are sent to the Contracting Officer while monthly status reports are sent to the prospective Administrative Contracting Officer (ACO).

Question Page 31 D.17 a) It is anticipated that the supplies purchased under this contract will be inspected at destination by the Government contradicts Page 28 and FAR Clause 552.246-71 Source Inspection by the Government. Does this mean that all trucks will be inspected by the Government and the DD250 signed and then just inspected at Destination to ensure conformance with technical requirements again.

Answer Medium and Heavy Vehicles are subject to source inspection, the clause is incorporated by reference.

Administrative Questions for QMAA-M8-091004-N

Question Are cab chassis items subject to source inspection?

Answer No. Amendment 2 for Solicitation QMAA-M8-091004-N has been amended to address this requirement.

Question Invoice net and MSRP on Chassis cabs and pickup items. Is this copied from the OEM’s information last year? And if so, why is it required on the Body Truck Vendors cab chassis (no bodies) items only?

Answer Data from the previous OEM will not be copied over-this is a new solicitation, which requires the offerors to insert the data. The MSRP/Invoice data is required for all Cab and Chassis without bodies.

Question Section C, are status reports going to be combined (i.e. weekly and monthly) for Medium and Heavy and Light Cab & Chassis?

Answer No, the reports will not be combined, weekly status reports are sent to the Contracting Officer while monthly status reports are sent to the prospective Administrative Contracting Officer (ACO).

Question Is GSA leasing or buying these vehicles? How many? What is the size and does performance come high on the list; or you need a great deal?

The resultant contracts will be for purchase of new vehicles. The resultant contact will be an indefinite delivery indefinite quantity firm fixed price contract with an economical price adjustment. Past Performance is one of the evaluation factors.