Amendment1 QMAE-T4-091003-N.doc

DOC document 241 KB Posted

Attached to
Medium and Heavy Duty Trucks
Solicitation number
QMAE-T4-091003-N
Issued by

About this file

Amendment 1 to Solicitation QMAE-T4-091003-N

View the file

Other files

File Type Posted
FBONotice_Delay_In_Award_QMAE_T4_091003_N.doc DOC document
Amendment 4 QMAE-T4-91003-N.doc DOC document
Amendment 3 QMAE-T4-09003-N.doc DOC document
Amendment 2 QMAE-T4-091003-N.doc DOC document
Solicitation Questions and Answers.doc DOC document
Pre-Proposal Conference Transcript.pdf PDF
PreProposal Conference UPDATE 7.22.09.doc DOC document
Pre Proposal Conference Information.doc DOC document
Attachment F8 -Schedule of Items Navistar.pdf PDF
Attachment K - Dealers Layout Form.xls XLS spreadsheet
Attachment L - Med Heavy Option Analysis Report.pdf PDF
Attachment F1- Schedule of Items Damiler.pdf PDF
Attachment A - Small Business Subcontracting Plan.doc DOC document
Attachment F6 -Schedule of Items EVI-USA.pdf PDF
Attachment F5 -Schedule of Items Boyer —
Attachment B - Proposal Checklist.doc DOC document
Attachment F3 - Schedule of Items Kenworth.pdf PDF
Attachment F7 - Schedule of Items Hino.pdf PDF
Attachment E - Weekly Status Report.doc DOC document
Attachment G - Fed Std 794AC.pdf PDF
Attachment F4 - Schedule of Items Smith Electric.pdf PDF
Attachment H - Fed Std 807R.pdf PDF
Attachment I - Monthly Status Report.xls XLS spreadsheet
Attachment D- AutoChoice Online Ordering Procedures.doc DOC document
Attachment C - Exceptions Spreadsheet.xls XLS spreadsheet
Attachment J - Inspection Points Template.xls XLS spreadsheet
Medium Heavy Vehicles 2010 Solicitation.doc DOC document
Attachment F2 - Schedule of Items Mack Volvo.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment #1 to Solicitation QMAE-T4-091003-N

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. Contract ID Code
Page of Pages
1
14

2. AMENDMENT/MODIFICATION NO.

AMENDMENT # 1

3. Effective Date See Block 16C.

4. Requisition/Purchase Req. No.

5. Project No. (If applicable)

6. Issued By
Code
7. ADMINISTERED BY (If other than Item 6)
Code

General Services Administration

Federal Acquisition Service (FAS)

Automotive Acquisition Support Division (QMAA)

Crystal Plaza #4 Room 1006

Arlington, VA 22202

8. Name and Address of Contractor (No., street, county, State and ZIP Code
(x)
9A. Amendment of Solicitation No.

QMAE-T4-091003-N

9B. Dated (See Item 11)

8/6/2009

10A. Modification of Contract/Order No.

10B. Dated (See Item 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers
X
is extended

is not extended.

Offer's must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning ___2_____copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X)
A.

THIS CHANGE ORDER IS ISSUED PURSUANT TO : (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B.

THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C.

THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF :

D.

OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor

is not,
X
is required to sign this document and return _2 (TWO)_ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

THE ABOVE REFERENCED SOLICITATION FOR MEDIUM AND HEAVY DUTY TRUCKS 4X2, 4X4, 6X4, AND 6X6 IN ACCORDANCE WITH FEDERAL STANDARDS 794 AND 807 MOST CURRENT ISSUES, IS HEREBY AMENDED.

All other Terms and Conditions remain the same, except as indicated below:

(NOTE: By signing this amendment, Offeror has agreed to and incorporated by reference all the changes into the solicitation)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

CHERYL HARRIS

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED

BY ______________________________________________

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

30-105

STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE

Prescribed by GSA, (Note: This is an FSS reproduction ususing word processing software

FAR (48 CFR) 53.243

FAS, QMAE

Crystal Plaza 4 2200 Crystal Drive, Suite 1006 Arlington, VA 22202 Phone 703-605-2775 or Sherise.Doyle-Brown@gsa.gov

SOLICITATION AMENDMENT 1

8/10/09

SOLICITATION NUMBER AND TITLE: QMAE-T4-091003-N

AMENDMENT NUMBER: 1

The above referenced solicitation is hereby amended as follows:

1. The following changes are made to the subject solicitation:

a. SF 1449, Block 8 is revised from:

08/21/2009 2:30 p.m. Eastern Time

TO

08/28/2009 2:30 p.m. Eastern Time

b. Section A, paragraph A.1, last paragraph is revised:

FROM:

Hard copy Technical and Price Proposals are due August 21, 2009 at 2:30 p.m. Eastern Time. Autobid pricing is due August 20, 2009 at 5:00 p.m. Eastern Time.

TO:

Hard copy Technical and Price Proposals are due August 28, 2009 at 2:30 p.m. Eastern Time. Autobid pricing is due August 27, 2009 at 5:00 p.m. Eastern Time.

c. Section A and E, Subsection A1, A6, E2, : Revised

FROM:

“QMAE-TJ-091003-N”

TO:

“QMAE-T4-091003-N”

d. Section B.5, is revised:

FROM:

The schedule of items can be found in Attachments F1-F7 as follows:

Attachment No.
Description
F1
Schedule of Items – Daimler
F2
Schedule of Items – Forschler (Mack, Volvo)
F3
Schedule of Items – Kenworth
F4
Schedule of Items – Smith Electric
F5
Schedule of Items – Boyer (Ford)
F6
Schedule of Items – EVI -USA
F7
Schedule of Items – Hino

Offerors are instructed to complete the following fields:

· Unit price

· Total

· Miles per gallon (MPG)

· Net invoice

· Net MSRP

· Assembly point

· Destination charge included in price

· Optional equipment add ship

· Optional equipment option prices

· Any additional fill ins

TO:

The schedule of items can be found in Attachments F1-F7 as follows:

Attachment No.
Description
F1
Schedule of Items – Daimler
F2
Schedule of Items – Mack, Volvo
F3
Schedule of Items – Kenworth
F4
Schedule of Items – Smith Electric
F5
Schedule of Items – Ford
F6
Schedule of Items – EVI -USA
F7
Schedule of Items – Hino

Offerors are instructed to complete the following fields in Autobid:

· Unit price

· Total

· Net invoice

· Assembly point

· Destination charge included in price

· Optional equipment add ship

· Optional equipment option prices

· Any additional fill ins

e. Section C.1, Deliverables, “Evidence of Shipment Manuals” is listed twice in the deliverable chart – one is deleted. In addition, the title “Vendor Availability Listing” is renamed “Vehicle Availability Listing” as follows:

FROM:

Description
Due NLT
To
Weekly Status Report
Each Friday After Contract Award
automotiveedi.partnerships@gsa.gov
Shipment Delays
30 Days Prior to Shipping
Contracting Officer
Notification of Vehicle Defects
30 Days Prior to Shipping
Consignee with a copy to the Contracting Officer
Evidence of Shipment Manuals
Within 24 Hours of Shipping
Contracting Officer
1611 for Each Export Destination
30 Days in Advance of Anticipated Sate of Availability for Shipment
Transportation Office on Delivery Order
Evidence of Shipment Manuals
Within 24 Hours of Shipping
Contracting Officer
Delivery Orders for Destinations Not on the Dealer’s Layout
Every 2 weeks
Contracting Officer
Vendor Availability Listing
As required
Contracting Officer

TO:

Description
Due NLT
To
Weekly Status Report
Each Friday After Contract Award
automotiveedi.partnerships@gsa.gov
Shipment Delays
30 Days Prior to Shipping
Contracting Officer
Notification of Vehicle Defects
30 Days Prior to Shipping
Consignee with a copy to the Contracting Officer
Evidence of Shipment Manuals
Within 24 Hours of Shipping
Contracting Officer
1611 for Each Export Destination
30 Days in Advance of Anticipated Sate of Availability for Shipment
Transportation Office on Delivery Order
Delivery Orders for Destinations Not on the Dealer’s Layout
Every 2 weeks
Contracting Officer
Vehicle Availability Listing
As required
Contracting Officer

f. Paragraph C.15, Vendor Availability Listing (VAL) is revised:

FROM:

C.15 VENDOR AVAILABILITY LISTING (VAL)

Customer agencies are able to order vehicles up until the time Contractors notify GSA that vehicles are no longer available, The Contractor is advised, however, that Autochoice remains open year round for orders to be placed, subject to availability. The Contractor shall notify GSA of the time that vehicles are no longer available via a Vendor Availability Listing (VAL). GSA will communicate the VAL to customer agencies.

TO:

C.15 VEHICLE AVAILABILITY LISTING (VAL)

Customer agencies are able to order vehicles up until the time Contractors notify GSA that vehicles are no longer available. The Contractor is advised, however, that Autochoice remains open year round for orders to be placed, subject to availability. The Contractor shall notify GSA of the time that vehicles are no longer available via a Vehicle Availability Listing (VAL). The Contractor shall GSA will communicate the VAL to customer agencies. The Contractor shall provide, at minimum, a 2-week notice prior to its closing of any line items.

g. Section C.16 Revised

FROM:

C.16 ADDENDUM TO THE SOLICITATION

The following attachments are included:

Attachment No.
Description
A
Small Business Subcontracting Plan
B
Proposal Checklist
C
Exceptions Spreadsheet
D
Autochoice Online Ordering Procedures
E
Weekly Status Report
F1
Schedule of Items – Daimler
F2
Schedule of Items – Forschler (Mack, Volvo)
F3
Schedule of Items – Kenworth
F4
Schedule of Items – Smith Electric
F5
Schedule of Items – Boyer (Ford)
F6
Schedule of Items – EVI -USA
F7
Schedule of Items – Hino
F8
Schedule of Items – Navistar
G
Federal Standard 794AC
H
Federal Standard 807R
I
Monthly Status Report
J
Inspection Points Location
K
Dealer’s Layout
L
Medium & Heavy Option Analysis Report

TO:

C.16 ADDENDUM TO THE SOLICITATION

The following attachments are included:

Attachment No.
Description
A
Small Business Subcontracting Plan
B
Proposal Checklist
C
Exceptions Spreadsheet
D
Autochoice Online Ordering Procedures
E
Weekly Status Report
F1
Schedule of Items – Daimler
F2
Schedule of Items – Mack, Volvo
F3
Schedule of Items – Kenworth
F4
Schedule of Items – Smith Electric
F5
Schedule of Items –Ford
F6
Schedule of Items – EVI -USA
F7
Schedule of Items – Hino
F8
Schedule of Items – Navistar
G
Federal Standard 794AC
H
Federal Standard 807R
I
Monthly Status Report
J
Inspection Points Location
K
Dealer’s Layout
L
Medium & Heavy Option Analysis Report

h. New paragraph C.17, Next Model Year, is hereby added to Section C as follows:

The Government desires the ability to order vehicles throughout the contract period of performance. As such, it has created a new option code titled Next Model Year (NMY). NMY was established to enable contractors to offer and price new model year vehicles during each year of the contract concurrent with the current model year and/or to replace current model year vehicles as manufacturing production cycles transition to new model years.

If not offering NMY pricing at the time of initial proposal submission, indicate “NA” in Autobid for this option code. If NMY pricing is offered at the time of initial proposal submission, indicate “Stand Alone” in Autobid.

If not offering NMY pricing at the time of initial proposal submission, the Contractor may offer NMY pricing throughout each year’s contract period up until 4:00 p.m. ET, March 31 of each calendar year. Such NMY offers will NOT be considered late. To submit NMY, please contact the Contracting Officer in writing to request that the option code be activated. The request for NMY shall include:

Contract number

Line item

NMY price

Documentation that the next model year vehicle meets or exceeds the current year’s Federal Vehicle Standards and that there is no substantial change

Configuration changes (include/exclude/requires)

Color changes

Discontinue date for the current model year

Start date for the NMY option code

GSA will evaluate the NMY to ensure it meets or exceeds the current year’s Federal Vehicle Standards and that there is no substantial change. It will also review the NMY pricing and determine price reasonableness. If approved, the NMY option code will be activated and opened for ordering.

Restrictions on NMY Option Code:

A contractor may not sell both model years concurrently at the same time. Activation of the NMY option code should be coordinated with the closing of the current model year line item in order to not disrupt customer ordering. In addition, option configurations shall be updated in tandem with the activation of the NMY option code to facilitate ordering.

The Contractor shall provide, at minimum, a 2-week notice prior to its closing of the current model year line item.

Completely new models or current models with substantial changes (e.g., new engine/transmission), will be evaluated against the next year’s Federal Vehicle Standards in the next option period.

The Economic Price Adjustment clauses in the contract will NOT apply to the option code NMY, but may apply to other awarded options.

The price awarded for option NMY will carryover to the next option period of performance of the contract. As stated above, economic price adjustments (EPA) will be only be permitted on “below the line” options when the standard line item has a NMY option. For example:

(Base Period – October 1, 2009 – August 31, 2010)

Item

No.

Price Option

NMY Price

(2011 Model)

2010 Option CNS Price
2010 Option ABC Price
2010 Option XYZ Price
9A
$13,000
$700
$300
$100
$200

(Option 1 – September 1, 2010 – August 31, 2011)

Item

No.

Price Option

NMY Price

(2012 Model)

2011 Option CNS Price
2011 Option ABC Price
2011 Option XYZ Price
9A
$13,700
$800
$305
$105
$205

In the example above, the option period pricing for Item No. 9A is $13,700 (2010 price + NMY price = 2011 Price). The Contractor’s 2012 Model NMY pricing is now $800. It requested an economic price adjustment for all of its 2010 options (but is not permitted to adjust the NMY option).

An offeror must provide a listing that identifies the Vehicle Availability Dates for all line items proposed.

i. Paragraph D.12 is revised

FROM:

(a) Shipment is required within 90 calendar days after receipt of order.

(b) Each delivery order will specify that shipment is required no later than the number of days shown above. If such order also states that "Early Shipment is Precluded," the Contractor agrees to make shipment no sooner than 90 calendar days after receipt of order. Earlier shipments may result in nonacceptance of the supplies at the delivery point at the time of arrival.

TO:

(a) Shipment is required within 120 calendar days after receipt of order.

(b) Each delivery order will specify that shipment is required no later than the number of days shown above. If such order also states that "Early Shipment is Precluded," the Contractor agrees to make shipment no sooner than 120 calendar days after receipt of order. Earlier shipments may result in nonacceptance of the supplies at the delivery point at the time of arrival.

j. Paragraph D.14, subparagraph (g) is revised:

FROM:

(g) No price adjustment will be made unless the percentage change in the PPI is at least 10 percent.

TO:

(g) No price adjustment will be made unless the percentage change in the PPI is at least 1 percent.

k. Paragraph E.2, paragraph (b) is revised as follows:

FROM:

b. Offerors are requested to submit questions on the solicitation to ontheroad@gsa.gov with a copy to Sherise Doyle-Brown at Sherise.Doyle-Brown@gsa.gov no later than August 5, 2009, 12:00 P.M., EDT. Responses to all questions will be posted on www.fbo.gov.

TO:

b. Offerors are requested to submit questions on the solicitation to ontheroad@gsa.gov with a copy to Sherise Doyle-Brown at Sherise.Doyle-Brown@gsa.gov no later than August 5, 2009, 12:00 P.M., ET. Responses to all questions will be posted on www.fbo.gov.

l. Paragraph E.2, paragraph (b) is revised as follows:

Section E, Subsection E2, b. Technical Proposal, Factor 1, Tab B is revised:

FROM:

Tab B – to Federal Vehicle Standard 122 AND 307 – DOES NOT COUNT TOWARDS THE PAGE LIMITATIONS - Offerors shall submit a statement indicating that no exceptions are taken to the government’s stated technical requirements. If exceptions are necessary, any and all exceptions to the technical specifications must be identified using Attachment C, and shall be included under this tab. Any and all exceptions expressed or implied in the offerors proposal is not acceptable unless it is specifically and explicitly addressed and accepted by the Government.

To:

Tab B – to Federal Vehicle Standard 794 AND 807 – DOES NOT COUNT TOWARDS THE PAGE LIMITATIONS - Offerors shall submit a statement indicating that no exceptions are taken to the government’s stated technical requirements. If exceptions are necessary, any and all exceptions to the technical specifications must be identified using Attachment C, and shall be included under this tab. Any and all exceptions expressed or implied in the offerors proposal is not acceptable unless it is specifically and explicitly addressed and accepted by the Government.

m. Section E Subsection E.2 d. Electronic Submission Revised

FROM:

d. ELECTRONIC SUBMISSION - In addition to the hard copy submission, one (1) electronic copy of each volume shall be submitted on a CD-ROM using Microsoft Word version 98 or later, Excel 5.0 or later, or Adobe Acrobat 5.0 or later. Offerors shall ensure that proposal disks are virus free, and free of password protection. If access to electronic proposal data is prohibited due to viruses, passwords, or wrong format, the proposal may be rejected. The electronic proposals shall be submitted on separate disks and labeled with Volume Number, Solicitation Number, name, address, and telephone number of Offeror.

TO:

d. ELECTRONIC SUBMISSION - AutoBid pricing will not be required to be submitted via CD ROM. However, all other information required in Volumes 1 and 2, is required to be submitted electronically via CD ROM in addition to the one (1) original and three (3) copies. Offerors shall ensure that proposal disks are virus free, and free of password protection. If access to electronic proposal data is prohibited due to viruses, passwords, or wrong format, the proposal may be rejected. The electronic proposals shall be submitted on separate disks and labeled with Volume Number, Solicitation Number, name, address, and telephone number of Offeror.

n. Paragraph E.7 duplicates paragraph E.6. As a result, paragraph E.7 is deleted in its entirety and replaced with the following:

E.7 RESERVED.

o. Paragraph F.1 is revised as follows:

FROM:

f.1 EVALUATION - Technical

In evaluating offerors proposal, the Government will consider:

Proposals will be evaluated and a contract awarded under the Lowest Price Technically Acceptable Approach to the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors. The significant evaluation factors are Technical Capability, Management Capabilities, Past Performance, and Price.

Offerors are on notice that proposals which are unrealistic in terms of technical commitment or lack of technical competence or indicative of failure to comprehend the complexities and risks of the solicitation requirements will be rejected. Although discussions concerning technical proposals are not planned, the procurement team reserves the right to bring unacceptable offers up to an acceptable level through negotiations.

The following represent the factors used in the evaluation of proposals to determine the acceptability of offers:

FACTOR 1: TECHNICAL CAPABILITY – The Government will evaluate the information provided for this factor to determine if the offeror demonstrates it has the technical capability to perform the work solicited. Technical capability is sound; offeror can meet delivery and performance requirements; and performance risk to government is mitigated.

FACTOR 2: MANAGEMENT CAPABILITIES – The Government will evaluate the information provided for this factor to determine if the offeror demonstrates it has the ability to successfully manage this effort. Offeror has documented quality processes to assure complete compliance with all solicitation requirements and has adequate management oversight.

FACTOR 3: PAST PERFORMANCE – The Government will evaluate the information provided for this factor to determine if the offeror demonstrates it has satisfactory past performance in same or similar scope, size, and complexity of the products solicited and in managing projects and contracts of the kind contemplated.

PRICE – Price proposals will be analyzed to ensure price reasonableness considering the specific terms and conditions and relevant commercial practices.

Technical capability, management capabilities and past performance, when combined, are more important than price. As technical proposals become more equal in merit, price becomes more important.

TO:

f.1 EVALUATION - Technical

In evaluating offerors proposal, the Government will consider:

Proposals will be evaluated and a contract awarded under the Lowest Price Technically Acceptable Approach to the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors. The significant evaluation factors are Technical Capability, Management Capabilities, Past Performance, and Price.

Offerors are on notice that proposals which are unrealistic in terms of technical commitment or lack of technical competence or indicative of failure to comprehend the complexities and risks of the solicitation requirements will be rejected. Although discussions concerning technical proposals are not planned, the procurement team reserves the right to bring unacceptable offers up to an acceptable level through negotiations.

The following represent the factors used in the evaluation of proposals to determine the acceptability of offers:

FACTOR 1: TECHNICAL CAPABILITY – The Government will evaluate the information provided for this factor to determine if the offeror demonstrates it has the technical capability to perform the work solicited. Technical capability is sound; offeror can meet delivery and performance requirements; and performance risk to government is mitigated.

FACTOR 2: MANAGEMENT CAPABILITIES – The Government will evaluate the information provided for this factor to determine if the offeror demonstrates it has the ability to successfully manage this effort. Offeror has documented quality processes to assure complete compliance with all solicitation requirements and has adequate management oversight.

FACTOR 3: PAST PERFORMANCE – The Government will evaluate the information provided for this factor to determine if the offeror demonstrates it has satisfactory past performance in same or similar scope, size, and complexity of the products solicited and in managing projects and contracts of the kind contemplated.

PRICE – An evaluation of the Offerors’ price proposals will be made to determine if they are realistic for the work to be performed, reflect a clear understanding of the requirements, and are consistent with the technical proposal. Price reasonableness determinations will be made by determining if competition exists and by comparing bid prices with established commercial or GSA pricing.

p. Attachment B, Proposal Checklist, is hereby deleted in its entirety and replaced as follows:

Vendors are instructed to acknowledge receipt of and compliance with this amendment by signing below and returning this acknowledgement with your bid or proposal.

Any questions regarding this amendment must be submitted in writing to the undersigned Procurement Officer.

Sherise Doyle-Brown

Contract Specialist

PHONE: 703-605-2775

FAX: 703-605-9871

E-MAIL: Sherise.Doyle-Brown@gsa.gov

SOLICITATION AMENDMENT

ACKNOWLEDGEMENT

SOLICITATION NUMBER AND TITLE: QMAE-T4-091003-N

AMENDMENT NUMBER: 1

By my signature below, I hereby acknowledge receipt of and compliance with this amendment to the above referenced solicitation.

NAME OF BIDDER OR OFFEROR

MAILING ADDRESS

PRINTED NAME

SIGNATURE

TITLE

DATE

PAGE

_1311413025.doc

ATTACHMENT B – PROPOSAL CHECKLIST

This proposal checklist is to assist Offerors in ensuring that proposals are complete. A copy of this completed checklist must be included with offers submitted in hard copy. Prior to preparation of your offer, be sure to read the entire solicitation. Offers shall be prepared and submitted in the format outlined below.

Volume 1—Administrative Requirements

Included/

Completed

GSA

Use

Proposal Checklist

TAB A –

Signed and dated 1449

Complete solicitation, including fill-ins

TAB B –

Financial Information

TAB C –

Proof of registration in Central Contractor Registry (CCR)

TAB D –

Proof of registration in Online Representations & Certifications Application (ORCA)

TAB E –

Proof of completion of VETS-100 requirement

TAB F –

Small Business Subcontracting Plan (Large Business Only)

TAB G – Letter of Supply

TAB H – Dealer’s Layout Form

TAB I - Inspection Point/Place of Performance

Volume 2—Technical Proposal

Included/

Completed

GSA

Use

Factor 1 – Technical Capability

TAB A – Technical Approach

TAB B – Federal Vehicle Standard 794 AND 807

Factor 2 – Management Capabilities

TAB A – Management Approach

TAB B – Key Personnel

Factor 3 – Past Performance

Projects

Price

AUTOBID Pricing

Electronic Proposal on CD Rom

Volume I

Volume 2

File details come from the government source that posted it. Updated .