Amendment 2 to Solicitation QMAE-T4-091003-N

View the file

Other files

File Type Posted
FBONotice_Delay_In_Award_QMAE_T4_091003_N.doc DOC document
Amendment 4 QMAE-T4-91003-N.doc DOC document
Amendment 3 QMAE-T4-09003-N.doc DOC document
Solicitation Questions and Answers.doc DOC document
Pre-Proposal Conference Transcript.pdf PDF
Amendment1 QMAE-T4-091003-N.doc DOC document
PreProposal Conference UPDATE 7.22.09.doc DOC document
Pre Proposal Conference Information.doc DOC document
Attachment F8 -Schedule of Items Navistar.pdf PDF
Attachment K - Dealers Layout Form.xls XLS spreadsheet
Attachment L - Med Heavy Option Analysis Report.pdf PDF
Attachment F1- Schedule of Items Damiler.pdf PDF
Attachment A - Small Business Subcontracting Plan.doc DOC document
Attachment F6 -Schedule of Items EVI-USA.pdf PDF
Attachment F5 -Schedule of Items Boyer —
Attachment B - Proposal Checklist.doc DOC document
Attachment F3 - Schedule of Items Kenworth.pdf PDF
Attachment F7 - Schedule of Items Hino.pdf PDF
Attachment E - Weekly Status Report.doc DOC document
Attachment G - Fed Std 794AC.pdf PDF
Attachment F4 - Schedule of Items Smith Electric.pdf PDF
Attachment H - Fed Std 807R.pdf PDF
Attachment I - Monthly Status Report.xls XLS spreadsheet
Attachment D- AutoChoice Online Ordering Procedures.doc DOC document
Attachment C - Exceptions Spreadsheet.xls XLS spreadsheet
Attachment J - Inspection Points Template.xls XLS spreadsheet
Medium Heavy Vehicles 2010 Solicitation.doc DOC document
Attachment F2 - Schedule of Items Mack Volvo.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment #2 to Solicitation QMAE-T4-091003-N

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. Contract ID Code
Page of Pages
1
9

2. AMENDMENT/MODIFICATION NO.

AMENDMENT # 2

3. Effective Date See Block 16C.

4. Requisition/Purchase Req. No.

5. Project No. (If applicable)

6. Issued By
Code
7. ADMINISTERED BY (If other than Item 6)
Code

General Services Administration

Federal Acquisition Service (FAS)

Automotive Acquisition Support Division (QMAA)

Crystal Plaza #4 Room 1006

Arlington, VA 22202

8. Name and Address of Contractor (No., street, county, State and ZIP Code
(x)
9A. Amendment of Solicitation No.

QMAE-T4-091003-N

9B. Dated (See Item 11)

8/19/2009

10A. Modification of Contract/Order No.

10B. Dated (See Item 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers
X
is extended

is not extended.

Offer's must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning ___2_____copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X)
A.

THIS CHANGE ORDER IS ISSUED PURSUANT TO : (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B.

THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C.

THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF :

D.

OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor

is not,
X
is required to sign this document and return _2 (TWO)_ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

THE ABOVE REFERENCED SOLICITATION FOR MEDIUM AND HEAVY DUTY TRUCKS 4X2, 4X4, 6X4, AND 6X6 IN ACCORDANCE WITH FEDERAL STANDARDS 794 AND 807 MOST CURRENT ISSUES, IS HEREBY AMENDED.

All other Terms and Conditions remain the same, except as indicated below:

(NOTE: By signing this amendment, Offeror has agreed to and incorporated by reference all the changes into the solicitation)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

CHERYL HARRIS

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED

BY ______________________________________________

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

30-105

STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE

Prescribed by GSA, (Note: This is an FSS reproduction ususing word processing software

FAR (48 CFR) 53.243

FAS, QMAE

Crystal Plaza 4 2200 Crystal Drive, Suite 1006 Arlington, VA 22202 Phone 703-605-2775 or Sherise.Doyle-Brown@gsa.gov

SOLICITATION AMENDMENT 2

8/19/09

SOLICITATION NUMBER AND TITLE: QMAE-T4-091003-N

AMENDMENT NUMBER: 2

The above referenced solicitation is hereby amended as follows:

1. The following changes are made to the subject solicitation:

SF 1449, Block 8 is revised from:

08/28/2009 2:30 p.m. Eastern Time

TO

09/03/2009 2:30 p.m. Eastern Time Section A, paragraph A.1, last paragraph is revised:

FROM:

Hard copy Technical and Price Proposals are due August 28, 2009 at 2:30 p.m. Eastern Time. Autobid pricing is due August 27, 2009 at 5:00 p.m. Eastern Time.

TO:

Hard copy Technical and Price Proposals are due September 03, 2009 at 2:30 p.m. Eastern Time. Autobid pricing is due September 02, 2009 at 5:00 p.m. Eastern Time.

Paragraph D.12 is revised

FROM:

(a) Shipment is required within 120 calendar days after receipt of order.

(b) Each delivery order will specify that shipment is required no later than the number of days shown above. If such order also states that "Early Shipment is Precluded," the Contractor agrees to make shipment no sooner than 120 calendar days after receipt of order. Earlier shipments may result in nonacceptance of the supplies at the delivery point at the time of arrival.

TO:

(a) Shipment is required within 150 to 210 calendar days after receipt of order based on standard item number as identified below.

(b) Each delivery order will specify that shipment is required no later than the number of days shown above. If such order also states that "Early Shipment is Precluded," the Contractor agrees to make shipment no sooner than 150 to 210 calendar days after receipt of order. Earlier shipments may result in nonacceptance of the supplies at the delivery point at the time of arrival.

The following Standard Items are required to ship with in 150 days after receipt of order:

414.1, 414.1F, 414.2F, 434.1, 444.1, 474.1, 484.1, 511.1, 511.1F, 513.1, 513.1F, 514.1, 522.1, 523.1, 524.1, 524.1M, 531.1, 533.1, 541.1, 543.1, 544.1, 571.1, 571E.1, 573.1, 581.1, 583.1, 612A.1, 613A.1, 613B.1, 614.1, 615.1, 615.1M, 615.1V, 622B.1, 623B.1, 624.1, 624.1M, 624.1V, 624C.1, 624C.1V, 624C.1M, 625C.1, 632A.1, 633B.1, 643A.1, 644.1, 645.1, 712.1, 712.1F, 714.1, 714.1F, 824.1, 95E.1 The following Standard Items are required to ship with in 180 days after receipt of order:

434.1, 474.1, 484.1, 434.1F, 474.1F, 484.1F, 531.1, 531.1F, 533.1, 533.1F, 571.1, 571.1F, 573.1, 573.1F, 581.1, 581.1F, 583.1, 583.1F The following Standard Items are required to ship with in 210days after receipt of order:

444.1F, 541.1F, 541.2F, 543.1F, 544.1F, 583.1, 614.1M, 644.1M, 645.1M, 645.1V, 632A.1F, 633B.1F, 643A.1F, 645.1F, 732.1F, 734.1F, 742.1F, 744.1F, 745.1F, 824.1F, 833A.1F, 843B.1F, 844.1F, 845.1F Clause 52.246-2 previously incorporated by reference in section D.7 Insert 52.246-2 as full text in section D.30 52.246-2 Inspection of Supplies—Fixed-Price. (Aug 1996)

(a) Definition. “Supplies,” as used in this clause, includes but is not limited to raw materials, components, intermediate assemblies, end products, and lots of supplies.

(b) The Contractor shall provide and maintain an inspection system acceptable to the

Government covering supplies under this contract and shall tender to the Government for acceptance only supplies that have been inspected in accordance with the inspection system and have been found by the Contractor to be in conformity with contract requirements. As part of the system, the Contractor shall prepare records evidencing all inspections made under the system and the outcome. These records shall be kept complete and made available to the Government during contract performance and for as long afterwards as the contract requires. The Government may perform reviews and evaluations as reasonably necessary to ascertain compliance with this paragraph. These reviews and evaluations shall be conducted in a manner that will not unduly delay the contract work. The right of review, whether exercised or not, does not relieve the Contractor of the obligations under the contract.

(c) The Government has the right to inspect and test all supplies called for by the contract, to the extent practicable, at all places and times, including the period of manufacture, and in any event before acceptance. The Government shall perform inspections and tests in a manner that will not unduly delay the work. The Government assumes no contractual obligation to perform any inspection and test for the benefit of the Contractor unless specifically set forth elsewhere in this contract.

(d) If the Government performs inspection or test on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties. Except as otherwise provided in the contract, the Government shall bear the expense of Government inspections or tests made at other than the Contractor’s or subcontractor’s premises; provided, that in case of rejection, the Government shall not be liable for any reduction in the value of inspection or test samples.

(e)(1) When supplies are not ready at the time specified by the Contractor for inspection or test, the Contracting Officer may charge to the Contractor the additional cost of inspection or test.

(2) The Contracting Officer may also charge the Contractor for any additional cost of inspection or test when prior rejection makes reinspection or retest necessary.

(f) The Government has the right either to reject or to require correction of nonconforming supplies. Supplies are nonconforming when they are defective in material or workmanship or are otherwise not in conformity with contract requirements. The Government may reject nonconforming supplies with or without disposition instructions.

(g) The Contractor shall remove supplies rejected or required to be corrected. However, the Contracting Officer may require or permit correction in place, promptly after notice, by and at the expense of the Contractor. The Contractor shall not tender for acceptance corrected or rejected supplies without disclosing the former rejection or requirement for correction, and, when required, shall disclose the corrective action taken.

(h) If the Contractor fails to promptly remove, replace, or correct rejected supplies that are required to be removed or to be replaced or corrected, the Government may either (1) by contract or otherwise, remove, replace, or correct the supplies and charge the cost to the Contractor or (2) terminate the contract for default. Unless the Contractor corrects or replaces the supplies within the delivery schedule, the Contracting Officer may require their delivery and make an equitable price reduction. Failure to agree to a price reduction shall be a dispute.

(i)(1) If this contract provides for the performance of Government quality assurance at source, and if requested by the Government, the Contractor shall furnish advance notification of the time—

(i) When Contractor inspection or tests will be performed in accordance with the terms and conditions of the contract; and

(ii) When the supplies will be ready for Government inspection.

(2) The Government’s request shall specify the period and method of the advance notification and the Government representative to whom it shall be furnished. Requests shall not require more than 2 workdays of advance notification if the Government representative is in residence in the Contractor’s plant, nor more than 7 workdays in other instances.

(j) The Government shall accept or reject supplies as promptly as practicable after delivery, unless otherwise provided in the contract. Government failure to inspect and accept or reject the supplies shall not relieve the Contractor from responsibility, nor impose liability on the Government, for nonconforming supplies.

(k) Inspections and tests by the Government do not relieve the Contractor of responsibility for defects or other failures to meet contract requirements discovered before acceptance. Acceptance shall be conclusive, except for latent defects, fraud, gross mistakes amounting to fraud, or as otherwise provided in the contract.

(l) If acceptance is not conclusive for any of the reasons in paragraph (k) hereof, the Government, in addition to any other rights and remedies provided by law, or under other provisions of this contract, shall have the right to require the Contractor (1) at no increase in contract price, to correct or replace the defective or nonconforming supplies at the original point of delivery or at the Contractor’s plant at the Contracting Officer’s election, and in accordance with a reasonable delivery schedule as may be agreed upon between the Contractor and the Contracting Officer; provided, that the Contracting Officer may require a reduction in contract price if the Contractor fails to meet such delivery schedule, or (2) within a reasonable time after receipt by the Contractor of notice of defects or nonconformance, to repay such portion of the contract as is equitable under the circumstances if the Contracting Officer elects not to require correction or replacement. When supplies are returned to the Contractor, the Contractor shall bear the transportation cost from the original point of delivery to the Contractor’s plant and return to the original point when that point is not the Contractor’s plant. If the Contractor fails to perform or act as required in paragraph (l)(1) or (l)(2) of this clause and does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure, the Government shall have the right by contract or otherwise to replace or correct such supplies and charge to the Contractor the cost occasioned the Government thereby.

Paragraph D.17 is revised

FROM:

E-FSS-522 INSPECTION AT DESTINATION (MAR 1996)

(a) Inspection by the Government. It is anticipated that the supplies purchased under this contract will be inspected at destination by the Government to ensure conformance with technical requirements as specified herein.

(b) Responsibility for Rejected Supplies. If, after due notice of rejection, the Contractor fails to remove or provide instructions for the removal of rejected supplies pursuant to the Contracting Officer's instructions, the Contractor shall be liable for all costs incurred by the Government in taking such measures as are expedient to avoid unnecessary loss to the Contractor. In addition to any other remedies which may be available under this contract, the supplies may be stored for the Contractor's account or sold to the highest bidder on the open market and the proceeds applied against the accumulated storage and other costs, including the cost of the sale.

(c) Additional Costs for Inspection and Testing. When prior rejection makes reinspection or retesting necessary, the following charges are applicable. When inspection or testing is performed by or under the direction of GSA, charges will be at the rate of $62.06 per man-hour or fraction thereof if the inspection is at a GSA distribution center; $62.06 per man-hour or fraction thereof, plus travel costs incurred, if the inspection is at another location; and $62.06 per man-hour or fraction thereof for laboratory testing, except that when a testing facility other than a GSA laboratory performs all or part of the required tests, the Contractor shall be assessed the actual cost incurred by the Government as a result of testing at such facility. When inspection is performed by or under the direction of any agency other than GSA, the charges indicated above may be used, or the agency may assess the actual cost of performing the inspection and testing.

TO:

552.246-71 Source Inspection by Government. (SEP 1999)

(a) Inspection by Government personnel.

(1) Supplies to be furnished under this contract will be inspected at source by the Government before shipment from the manufacturing plant or other facility designated by the Contractor, unless the Contractor is otherwise notified in writing by the Contracting Officer or a designated representative. Notwithstanding the foregoing, the Government may perform any or all tests contained in the contract specifications at a Government facility without prior written notice by the Contracting Officer before release of the supplies for shipment. Samples sent to a Government resting facility will be disposed of as follows: Samples from an accepted lot, not damaged in the testing process, will be returned promptly to the Contractor after completion of tests. Samples damaged in the testing process will be disposed of as requested by the Contractor. Samples from a rejected lot will be returned to the Contractor or disposed of in a time and manner agreeable to both the Contractor and the Government.

(2) Government inspection responsibility will be assigned to the GSA quality assurance office which has jurisdiction over the State in which the Contractor's subcontractor's plant or other designated point for inspection is located. The Contractor shall notify or arrange for subcontractors to notify the designated GSA quality assurance office 7 workdays before the date when supplies will be ready for inspection. Shipment shall not be made until after inspection by the Government is completed and shipment is authorized by Government.

(b) Inspection and receiving reports. For each shipment, the Contractor shall be responsible for preparation and distribution of inspection documents as follows: (1) DD Form 250, Material Inspection and Receiving Report, or computer formatted equivalent for deliveries to military agencies; or (2) GSA Form 308, Notice of Inspection for deliveries to GSA or other civilian agencies. When required, the Contractor will be furnished a supply of GSA Form 308 and/or DD Form 250, and complete instructions for their reparation and distribution.

(c) Inspection facilities.

(1) The inspection system required to be maintained by the Contractor in accordance with FAR 52.246–2, Inspection of Supplies—Fixed Price, may be the Contractor's own facilities or any other facilities acceptable to the Government. The facilities shall be utilized to perform all inspections and tests of materials and components before incorporation into end articles, and for the inspection of such end articles before shipment. The Government reserves the right to evaluate the acceptability and effectiveness of the Contractor's inspection system before award and periodically during the contract period.

(2) Offerors are required to specify, in the spaces provided elsewhere in the solicitation, the name and address of each manufacturing plant or other facility where supplies will be available for inspection, indicating the item number(s) to which each applies.

(3) The Contractor shall deliver the items specified in this contract from a plant or warehouse located within the United States (including Puerto Rico and the Virgin Islands) that is equipped to perform all inspections and tests required by this contract or specifications to evidence conformance therewith, or shall arrange with a testing laboratory or other facility in the United States, acceptable to the Government, to perform the required inspections and tests.

(d) Availability of records.

(1) In addition to any other requirement of this contract, the Contractor shall maintain records showing the following information for each order received under the contract: (i) order number; (ii) date order received by the Contractor; (iii) quantity ordered; (iv) date scheduled into production; (v) batch or lot number, if applicable; (vi) date inspected and/or tested; (vii) date available for shipment; (viii) date shipped or date service completed; and (ix) National Stock Number (NSN), or if none is provided in the contract, the applicable item number or other contractual identification.

(2) These records should be maintained at the point of source inspection and shall be available to the Contracting Officer, or an authorized representative, for (i) 3 years after final payment; or (ii) 4 years from the end of the Contractor's fiscal year in which the record was created, whichever period expires first.

(e) Additional cost for reinspection and testing. The Contractor will be charged for any additional cost for inspecting/testing or reinspection/retesting supplies for the reasons stated in paragraph (e) of FAR 52.246–2, Inspection of Supplies—Fixed Price. When inspection or testing is performed by or under the direction of GSA, charges will be at the rate of $62.06 per man-hour or fraction thereof if the inspection is at a GSA distribution center; $62.06 per man-hour or fraction thereof, plus travel costs incurred, if the inspection is at any other location; and $82.06 per man-hour or fraction thereof for laboratory testing, except that when a testing facility other than a GSA laboratory performs all or part of the required tests, the Contractor shall be assessed the actual cost incurred by the Government as a result of testing at such facility. When inspection is performed by or under the direction of any agency other than GSA, the charges indicated above may be used, or the agency may assess the actual cost of performing the inspection and testing.

(f) Responsibility for rejected supplies. When the Contractor fails to remove or provide instructions for the removal of rejected supplies under FAR 52.246–2(h) pursuant to the Contracting Officer's instructions, the Contractor shall be liable for all costs incurred by the Government in taking such measures as are expedient to avoid unnecessary loss to the Contractor. In addition to the remedies provided in FAR 52.246–2, supplies may be—

(1) Stored for the Contractor's account;

(2) Reshipped to the Contractor at its expense (any additional expense incurred by the Government or the freight carrier caused by the refusal of the Contractor to accept their return also shall be for the Contractor's account); or

(3) Sold to the highest bidder on the open market and the proceeds applied against the accumulated storage and other costs, including the cost of the sale.

f. The link below provides additional Instructions for inputting pricing in Autobid.

Vendors are instructed to acknowledge receipt of and compliance with this amendment by signing below and returning this acknowledgement with your bid or proposal.

Any questions regarding this amendment must be submitted in writing to the undersigned Procurement Officer.

Sherise Doyle-Brown

Contract Specialist

PHONE: 703-605-2775

FAX: 703-605-9871

E-MAIL: Sherise.Doyle-Brown@gsa.gov

SOLICITATION AMENDMENT

ACKNOWLEDGEMENT

SOLICITATION NUMBER AND TITLE: QMAE-T4-091003-N

AMENDMENT NUMBER: 2

By my signature below, I hereby acknowledge receipt of and compliance with this amendment to the above referenced solicitation.

NAME OF BIDDER OR OFFEROR

MAILING ADDRESS

PRINTED NAME

SIGNATURE

TITLE

DATE

PAGE

_1312186184.pdf

GSA Office of Motor Vehicle Management Center for Automotive Acquisition

AutoBid

• AutoBid is a secure online application for submitting offers to GSA Automotive

• Vendors must have a DUNS number and should be registered in CCR.

• Vehicles based on GSA’s Federal Vehicles Standards

• AutoBid Opening and Closing dates are determined by

GSA’s Office of Acquisition Operations

• Vendor is responsible for the accuracy of data submitted

• After Final Closing, vendor cannot make changes to offer in AutoBid.

AutoBid

To access AutoBid go to the following URL:

http://fss.gsa.gov/vehicles/roads/AutoBid/Login.cfm

To request an AutoBid account, send email to automotiveedi.partnerships@gsa.gov

1. Company Name

2. DUNS Number

3. Address

4. Business Size (small or large)

5. User’s Name(s)

6. Telephone

7. Fax (unless an EDI vendor, this is the number orders will be faxed to)

8. Email

9. Standard Items and Make/Models you wish to offer Allow up to 10 business days for account creation. Don’t wait until AutoBid opening day!

http://fss.gsa.gov/vehicles/roads/AutoBid/Login.cfm

Click on a <Vehicle Type> in the left hand column

Then click on a <Standard Item Number>

MINIMUM REQUIREMENTS: This tab displays the GSA Minimum Standards and OEM provided data for each item. You cannot modify this information in AutoBid.

Contact the appropriate GSA Engineer if you have any concerns about this data.

BID DETAIL: Enter Unadjusted MPG (if applicable), Current Price (this price should include the destination charge), and Destination Charge (list separately for analysis).

OTHER FEATURES: Where applicable, this tab contains additional information commonly requested by our customers. This data is not part of the GSA Federal Vehicle Standards. Enter data as requested.

OPTIONAL EQUIPMENT

Click on the drop down box to update the Option Type:

•Stand Alone (option does not require, include or exclude other options)

•Standard (manufacturer’s standard equipment)

•Not Available (option is not available from mfg)

•Package (option requires, includes or excludes other options)

Enter Price for new model year.

COLLISIONS: For “package” options, indicate the options that are excluded, included, or required for the purchase of the selected option.

Only options that are flagged as “Package” under the Optional Equipment tab are included in the drop down box. To add an option to the drop down box, go back to the Optional Equipment tab and change the option type to “Package”.

Package Type: Excludes

1. Select the first option from the drop down box that you would like to add exclusions to.

For example AP, Adjustable Pedals.

2. Click on the Excludes button

3. From the second set of drop down boxes, select the options that cannot be ordered with the package option. For example (AP excludes YD and T6). The second set of drop down boxes will only contain available GSA options for the selected standard item.

4. Hit the <Save> button to display input.

5. You can click the Edit link next to the display to add additional excluded options or to delete a set of exclusion.

Package Type: Includes

1. Select the option from the drop down box that you would like to add inclusions to. For example AP, Adjustable Pedals.

2. Click on the Includes button

3. From the second set of drop down boxes, select the options that are included with the package option.

These are options that the customer will automatically receive with the package option. For example (AP includes CRTS, PWL, RAD, RKE, RS, SRG). The second set of drop down boxes will only contain available GSA options for the selected standard item.

5. You can click the Edit link next to the display to add additional included options or to delete a set of inclusions.

6. GSA will not assume that one inclusion implies another. You must enter inclusions in both directions if applicable. For example, if D3 includes D7. GSA will not automatically assume that D7 includes D3.

Package Type: Requires

1. Select the option from the drop down box that you would like to add requirements to. For example PT, Power Take Off Opening.

2. Click on the Requires button

3. From the second set of drop down boxes, select the options that must be ordered to obtain the package option. For example (PT requires E5 and D3).

5. After you hit the <Save> button, you will notice a new button appear on the screen.

<Add New ‘OR’ Set>. Use this feature if an option requires one set of options “or” another set. For example. T6 requires E5 or YD. PT requires(E5 and D3) or (YD and D3).

6. You can click the Edit link next to the display to update or delete your requirements list. You will also notice the new buttons <Previous Or Set> and <Next OR Set> for you to toggle through your “OR” conditions for a selected option.

CLARIFICATIONS: You may type out additional clarifications under this tab. Only use this tab for clarifications that do not involve the collision (inclusion, exclusion, requirements) of options. Examples include (but are not limited to) delayed build dates, special instructions for delivery outside the continental US, or limitation on options going to specific states. Do not use this tab to list your Exceptions.

COLORS: Enter colors that are offered to the customers at no cost. If a cost is associated with a color (such as 595F), an option code must be created for the color.

General Information about Loading Pictures/ Documentation:

Select the tab “Pictures”.

1. You can enter up to 10 pictures and/or you can also load documentation.

2. The pictures need to be in JPEG format. If you upload a picture in GIF format, it will upload as a document instead. It will not be converted to a thumbnail.

3. The first picture, sequence number 1, will be the picture you will see as a thumbnail in the AutoChoice screen.

4. You have the ability to re-arrange the sequence of the pictures.

5. You can upload/delete one or more pictures.

Loading Pictures/ Documentation The Upload Image/Doc button will upload a program, “jUpload”, in another window. This program gives you the ability to load pictures/documentation.

You also need to know that this program, jUpload, takes several minutes to upload to your computer. However, once the program has loaded, you can keep the program open for continued use. This may save you time, since it takes so long to load. Once the ‘jUpload” program has been uploaded to your PC, select the “RUN” button. If you are having trouble loading this program, please review the trouble-shooting instructions (Section 4).

Uploading Pictures:

1. Select the “Upload Image/Doc” button.

2. Pictures are organized and uploaded by contract and schedule line number.

3. The Schedule Line Drop Down list box gives you the ability to load picture and/or documents from different schedule lines under the same the same contract.

4. You can upload up to 10 pictures. Pictures will be resized as thumbnails and as a larger size. This will allow the AutoChoice customers to select a thumbnail and as a result, they will able to view any additional pictures as well as any uploaded documentation.

5. After you select the button “Select Files”, you will be prompted to select the directory and pictures you want to upload.

6. You can remove one or more of the pictures you have just added from your computer.

7. To finalize your picture selections, select the button “Upload”. You will know when you pictures have been uploaded, because the status will change to “Uploaded Success”.

8. To maintain your pictures/documentation, go back to AutoBid. Leave the “jUpload” program running, if you plan to add to more pictures/documents for this contract. You can minimize the “jUpload” program and you should see the AutoBid screen. Maintenance instructions are listed below (Section 3).

9. From AutoBid Picture tab, select the “Refresh Screen” button to see the latest uploaded pictures/documentation.

10. If you double-click a picture, you will be able to page through all of the photos you have uploaded. This is similar to how it will work when the customer sees the thumbnails in AutoChoice. After the customer double-clicks on the thumbnail, they will be able to page through the pictures uploaded in AutoBid.

Uploading Documentation:

1. If you minimized the “jUpload” program, maximize the program to upload your documentation. Otherwise, select the “Upload Image/Doc” button and wait for the program to load to your PC.

2. Pictures/documentation are organized and uploaded by contract and schedule line number.

3. You will be able to upload just about any type of documents. For example, word, excel, pdf, GIF pictures.

After you select the button “Select Files”, you will be prompted to select the directory and files you want to upload.

4. You can remove one or more of the files you have just added from your computer.

5. To finalize your picture/documentation selections, select the button “Upload”. You will know when your pictures/documentation has been uploaded, because the status will change to “Uploaded Success”.

6. To maintain your pictures/documentation, go back to AutoBid. Leave the “jUpload” program running, if you plan to add more pictures/documentation for this contract. You can minimize the “jUpload” program and you should see the AutoBid screen. Maintenance instructions are listed below (Section 3).

7. From AutoBid Picture tab, select the “Refresh Screen” button to see the latest uploaded pictures/documentation.

Pictures/Documentation Maintenance To maintain your pictures/documentation, go back AutoBid (Picture tab). When you mouse over the thumbnails displayed, you will be able to see the larger size. Every picture is uploaded as a thumbnail and as a larger picture. To page through all the pictures you have uploaded, double-click on one of the photos.

Re-Arrange Button: User can modify the sequence order of the pictures to be displayed in AutoChoice by editing the sequence number. The thumbnail in the first position is what will be displayed in the AutoChoice Choice screen.

Delete Button: User can delete unwanted pictures by selecting one or more pictures and then selecting the “Delete” button.

Refresh Screen: After loading the pictures, you will need to press the Refresh Screen button to see the latest uploaded pictures and documents.

Upload Image/Doc: Selecting this button will upload the jUpload program in another window. This program gives you the ability to load pictures and supporting documentation. This feature is described in detail in Paragraph1 and Paragraph 2 above.

Uploaded Documents: To see the documents you have uploaded, select the “Uploaded Documents” link. This link will display the list of all files uploaded for this schedule Line.

1. To delete, select one or more documents, then select the “Delete” button.

2. To view a document, double click on the document name.

jUpload Trouble-Shooting:

If the application fails after downloading the “jUpload” program, you may not have a compatible version of JAVA. To download a new version of JAVA:

1. Go to the webpage http://www.java.com/en/download/index.jsp

2. Download by selecting the button “FREE JAVA DOWNLOAD”.

General AutoBid Notes:

• The bottom of each page contains the following buttons:

– “Print Friendly”—Use to print a copy of the current page.

– “Save”—Use to save the current page.

– “Send to GSA”—Use to submit the entire item to GSA. You do not have to hit the “Send to

GSA” button on every page for a Standard Item. However, you do need to hit “Send to GSA” for each Standard Item.

• The bottom of the Bid Detail tab contains a “No Bid” button. Click this button if you wish to enter a “No Bid” for an item.

• The left column on each page contains quick links to each Vehicle Type

• The left column on each page also contains links to the following reports:

– The “Checklist Report” indicates which items have been submitted to GSA and which items are still pending.

– “Print Current Schedule Line” prints all of the tabs for the current standard item.

– “Print All (Proof Copy)” provides a report of all items. Use this report to proof your items before submitting to GSA.

– “Print All (Final Copy)” provides the hard copy submission of all items that you are required to submit to GSA. Print this report after submitting your items to GSA.

• Problems take time to investigate. Please report any problems early so that we can fix the issue before the AutoBid closing date.

Contractual questions should be directed to the appropriate GSA Contracting Officer/Contract Specialist.

Engineering and technical questions should be directed to the appropriate GSA Engineer.

Web site problems should be reported to Gina Jordan or Joan Summers .

Slide Number 1

Slide Number 2

Slide Number 3

Slide Number 4

Slide Number 5

Slide Number 6

Slide Number 7

Slide Number 8

Slide Number 9

Slide Number 10

Slide Number 11

Slide Number 12

Slide Number 13

Slide Number 14

Slide Number 15

Slide Number 16

Slide Number 17

Slide Number 18

Slide Number 19

General AutoBid Notes:

Slide Number 21

File details come from the government source that posted it. Updated .