QJKL162003 - Repair_Pvmt Drawings 28 Jul 22.pdf
PDF 25 MB Posted
- Attached to
- Repair Apron & Base Roads Federal contract opportunity
- Solicitation number
- W912LM-23-R-1001
About this file
This solicitation is seeking proposals for a firm fixed price contract to repair apron and base roads at the Minnesota Army National Guard facility in Saint Paul, Minnesota. The project value is estimated between $5 million to $10 million, and is set aside for small businesses under NAICS code 237310 for heavy and civil engineering construction with a size standard of $45 million in average annual receipts. A pre-proposal conference will be held on April 18, 2023 followed by a site visit. Proposals are due in accordance with the terms outlined in solicitation number W912LM-23-R-1001 issued by the US Property and Fiscal Office in Minnesota on behalf of the Department of the Army Minnesota Army National Guard. Award will be made based on best value as defined in the solicitation.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXIT
EN
TR
Y
EXIT
EN
TR
Y
EXIT
ENT
RY
EXIT
EN
TR
Y
EXIT
EN
TR
Y
EXIT
EN
TR
Y
EXITENTRYEXITENTRY
EXITENTRY
D
A
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
MINNESOTA AIR NATIONAL GUARD
REPAIR APRON & BASE PAVEMENTS
133RD AIRLIFT WING
MSP INTERNATIONAL AIRPORT
SIGNATURE
DATE
NAME
LICENSE #
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
PROJECT MNANG PROJECT NO.
28232.07 QJKL162003
THOMAS G. THOMPSON
07/28/2022 40503
TYPE B-3 100%
GENERAL
TITLE SHEET
GI001 0
AS NOTED
28232.07
F. ZIDANI, S. HANSEN
D.J. LITTERER
JULY 28, 2022
B. FEICHTINGER
T.G. THOMPSON
0 100% SUBMITTAL FZ BF TT 07-28-22
REPAIR APRON & BASE PAVEMENTS
133rd AIR WING MINNESOTA AIR NATIONAL GUARD BASE
MINNEAPOLIS/ST. PAUL INTERNATIONAL AIRPORT
ST. PAUL, MINNESOTA
CONTRACT NO. W912LM-17-D-0004
ANG PN. QJKL162003
VICINITY MAP
NTS
LOCATION MAP
NTS
NORTH
NORTH
NORTH DAKOTA
SOUTH DAKOTA
IOWA
WISCONSIN
NORTH
PROJECT
LOCATION
PROJECT
LOCATION
MINNESOTA
MINNEAPOLIS SAINT PAUL
M
IN
NE
SO
TA
RIVER
M
ISSISSIPPI
R
IVER
MINNEAPOLIS - SAINT PAUL
INTERNATIONAL AIRPORT
MINNEAPOLIS -
SAINT PAUL AIR
NATIONAL
GUARD BASE
HENNEPIN
COUNTY
RAMSEY
COUNTY
MN-62 (CROSSTOWN HWY)
MN-62(CROSSTOWN
HIGHWAY)
M N-
M N-
M N-
M N
-5
MN-55
FOR SNELLING
STATE PARK
MN-62
M
INNEHAHA
AVENUE
AV
EN
U E
M
IN
N
EH
AH
A
AVENUE
MINNEHAHA
BL
OOMIN
GTO
N R
OAD
AI
R
LI
FT
D R
IV
E
AI
R
LI
FT
D R
AI
R
LI
FT
D R
M
IL
IT
IA
D R
IV
E
M
IL
IT
IA
D R
MILITIA DR
MINUTEMAN DR
M
IL
IT
IA
D R
M
IN
UT
EM
AN
D
R
M
IN
UT
EM
AN
D
R
M
IN
UT
EM
AN
D
R
G
EN
ER
AL
M
IL
LE
R
D R
MUSTANG AVE
MUSTANG AVE
HERCULES AVE
HERCULES AVE
SPITFIRE AVE
SPITFIRE AVE
MIN
NEHAHA S
TR
EET
MUSTANG AVE
MUSTANG AVE
INDEX OF DRAWINGS
SHEET SHEET TITLE
GI001 GENERAL TITLE SHEET
GI002 GENERAL DRAWING INDEX
GI003 GENERAL LEGEND
GI004 GENERAL CIVIL NOTES
GC100 GENERAL PHASING PLAN
BB601 GEOTECHNICAL BORING LOCATION MAP
BB610 GEOTECHNICAL BORING LOGS
BB611 GEOTECHNICAL BORING LOGS
BB612 GEOTECHNICAL BORING LOGS
BB613 GEOTECHNICAL BORING LOGS
CP100 CIVIL KEYMAP PAVEMENT REPAIR PLAN SHEETS
CP111 CIVIL PAVEMENT REPAIR PLAN
CP112 CIVIL PAVEMENT REPAIR PLAN
CP120 CIVIL PAVEMENT REPAIR PLAN
CP121 CIVIL PAVEMENT REPAIR PLAN
CP122 CIVIL PAVEMENT REPAIR PLAN
CP130 CIVIL PAVEMENT REPAIR PLAN
CP131 CIVIL PAVEMENT REPAIR PLAN
CP132 CIVIL PAVEMENT REPAIR PLAN
CP210 CIVIL PAVEMENT REPAIR PROFILES ROAD MINUTEMAN DR AND AIRLIFT DR
CP211 CIVIL PAVEMENT REPAIR PROFILES ROAD SPITFIRE AVE AND MUSTANG AVE
CP212 CIVIL PAVEMENT REPAIR PROFILES PA640:02, PA641:02, PA645:02 PA687:04, PA642:02, AND PA662:04
CP213 CIVIL PIPE PROFILES MINUTEMAN DR AND BLDG 687
CP301 CIVIL TYPICAL SECTIONS
CP410 CIVIL NEW CONCRETE PA685:02
CP411 CIVIL NEW CONCRETE
CP412 CIVIL NEW CONCRETE
CP420 CIVIL NEW CONCRETE SPOT ELEVATIONS APRON
CP421 CIVIL NEW CONCRETE SPOT ELEVATIONS APRON
CP422 CIVIL NEW CONCRETE SPOT ELEVATIONS APRON
CP501 CIVIL PAVEMENT DETAILS SHEET 1 OF 6
CP502 CIVIL PAVEMENT DETAILS SHEET 2 OF 6
CP503 CIVIL PAVEMENT DETAILS SHEET 3 OF 6
CP504 CIVIL PAVEMENT DETAILS SHEET 4 OF 6
CP505 CIVIL PAVEMENT DETAILS SHEET 5 OF 6
CP506 CIVIL PAVEMENT DETAILS SHEET 6 OF 6
CT100 CIVIL KEYMAP PAVEMENT MARKING PLAN SHEETS
CT111 CIVIL PAVEMENT MARKING PLAN
CT112 CIVIL PAVEMENT MARKING PLAN
CT120 CIVIL PAVEMENT MARKING PLAN
CT121 CIVIL PAVEMENT MARKING PLAN
CT122 CIVIL PAVEMENT MARKING PLAN
CT130 CIVIL PAVEMENT MARKING PLAN
CT131 CIVIL PAVEMENT MARKING PLAN
CT132 CIVIL PAVEMENT MARKING PLAN
CT500 CIVIL PAVEMENT MARKING DETAILS SHEET 1 OF 2
CT501 CIVIL PAVEMENT MARKING DETAILS SHEET 2 OF 2
VC100 KEYMAP HORIZONTAL CONTROL PLAN SHEETS AND SURVEY CONTROL
VC101 HORIZONTAL CONTROL TABLES ROADS
VC102 HORIZONTAL CONTROL TABLES PARKING AREAS
VC111 HORIZONTAL CONTROL PLAN
VC112 HORIZONTAL CONTROL PLAN
VC120 HORIZONTAL CONTROL PLAN
VC121 HORIZONTAL CONTROL PLAN
VC122 HORIZONTAL CONTROL PLAN
VC130 HORIZONTAL CONTROL PLAN
VC131 HORIZONTAL CONTROL PLAN
VC132 HORIZONTAL CONTROL PLAN
D
A
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
MINNESOTA AIR NATIONAL GUARD
REPAIR APRON & BASE PAVEMENTS
133RD AIRLIFT WING
MSP INTERNATIONAL AIRPORT
SIGNATURE
DATE
NAME
LICENSE #
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
PROJECT MNANG PROJECT NO.
28232.07 QJKL162003
THOMAS G. THOMPSON
07/28/2022 40503
TYPE B-3 100%
GENERAL
DRAWING INDEX
GI002 0
NONE
28232.07
F. ZIDANI, S. HANSEN
D.J. LITTERER
JULY 28, 2022
B. FEICHTINGER
T.G. THOMPSON
0 100% SUBMITTAL FZ BF TT 07-28-22
ABBREVIATIONS
ADJ
APPROX
BLDG
BMP
BOC
CF
CJ
CL
CMP
CO
CONC
CP
CY
D
DIP
DIA
DR
EA
EJ
EL
EQ
(E)
EX
FL
FT
GA
H
HH
HMA
HT
INV
LB
LF
LS
LT
MAX
MH
MIN
ADJACENT; ADJOINING
APPROXIMATE
BUILDING
BEST MANAGEMENT PRACTICE
BACK OF CURB
CUBIC FOOT
CONSTRUCTION JOINT
CENTERLINE
CORRUGATED METAL PIPE
CLEANOUT
CONCRETE
CONTROL POINT
CUBIC YARD
DEEP
DUCTILE IRON PIPE
DIAMETER
DRAIN
EACH
EXPANSION JOINT
ELEVATION
EQ
EXISTING
EXISTING
FLOW LINE
FEET; FOOT
GAUGE (GAGE)
HIGH
HANDHOLE
HOT MIX ASPHALT
HEIGHT
INVERT
POUND(S)
LINEAL FEET
LUMP SUM
LEFT
MAXIMUM
MANHOLE
MINIMUM
MISC
MN MUTCD
MNDOT
MOD
MPCA
MUTCD
NTS
OC
PA
PCC
PH
PSI
PVC
R
RCP
ROW
RR
RT
SAN
SCI
SPEC
SQ FT
STD
STS
SWPPP
SY
TEMP
TOC
TRM
TYP
UG
W W/ W/O
MISCELLANEOUS
MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
MINNESOTA DEPARTMENT OF TRANSPORTATION
MODIFIED
MINNESOTA POLLUTION CONTROL AGENCY
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
NOT TO SCALE
ON CENTER
PARKING AREA
PORTLAND CEMENT CONCRETE
PHASE
POUNDS PER SQUARE INCH
POLYVINYL CHLORIDE
RADIUS
REINFORCED CONCRETE PIPE
RIGHT OF WAY
RAILROAD
RIGHT
SANITARY SEWER
STANLEY CONSULTANTS
SPECIFICATION(S)
SQ FT
STANDARD; STORM DRAIN
STORM SEWER
STORMWATER POLLUTION PREVENTION PLAN
SQUARE YARDS
TEMPORARY
TOP OF CONCRETE; TOP OF CURB
TURF REINFORCEMENT MAT
TYPICAL
UNDERGROUND
WIDE
WITH
WITHOUT
GENERAL NOTES
GUARDRAIL/HANDRAIL
FIELD MEASUREMENT NOTES
SAND
ROCK
EARTH
CRUSHED ROCK
CONCRETE
GRANULAR FILL
GENERAL MATERIALS LEGEND
DIMENSIONS AND SCALE
VIEW MARKERS GENERAL SYMBOLS
DRAWING NUMBER(S)
ON WHICH VIEW IS
CALLED OUT
VIEW IDENTIFICATION
NUMBER
DESIGNATES LOCATION
OF DETAIL
DESIGNATES DIRECTION
FROM WHICH PLAN OR
ELEVATION IS VIEWED
DESIGNATES CUTTING
PLANE OF SECTION
EL 100'-0"
REVISION IDENTIFICATION SYMBOL:
THE NUMBER IN THE TRIANGLE INDICATES THE REVISION
NUMBER IDENTIFIED. THE LETTER "A" IMMEDIATELY TO
THE RIGHT OF THE TRIANGLE INDICATES THE REVISION
IS PART OF A CONTRACT ADDENDUM. WHEN REVISIONS
INVOLVE LESS THAN ENTIRE DRAWING, PRINCIPAL
ASPECTS OF REVISIONS ARE "CLOUDED".
OUTLINE OF NEW OR RELOCATED OBJECT
EXISTING OBJECT TO BE REMOVED OR RELOCATED
EXISTING OBJECT LINE
MATCH LINE
MATERIAL BREAK LINE
SURFACE BREAK LINE
HIDDEN LINE
CENTER LINE
ELEVATION DESIGNATION
1. ALL DIMENSIONS OF EXISTING CONSTRUCTION ARE APPROXIMATE. CONTRACTOR SHALL SURVEY AND MAKE ALL NECESSARY FIELD MEASUREMENTS OF EXISTING STRUCTURES AND EQUIPMENT TO VERIFY DIMENSIONS SHOWN ON DRAWINGS, AND TO PROVIDE DIMENSIONS NOT SHOWN, PRIOR TO FABRICATION. ERRORS, INCONSISTENCIES OR OMISSIONS DISCOVERED SHALL BE REPORTED IN WRITING TO THE DESIGN PROFESSIONAL AND OWNER'S REPRESENTATIVE WITHIN TWENTY-FOUR (24) HOURS. COSTS FOR MODIFICATIONS OF NEW CONSTRUCTION, DUE TO LACK OF CONFIRMATION OF DIMENSIONS BY FIELD
MEASUREMENTS, SHALL BE BORNE BY CONTRACTOR.
2. CONTRACTOR SHALL REVIEW CONTRACT DOCUMENTS TO DETERMINE THE EXACT LOCATION OF ALL WORK AND VERIFY SPATIAL RELATIONSHIPS OF ALL WORK. ANY QUESTION CONCERNING LOCATION OR SPATIAL RELATIONSHIPS SHALL BE SUBMITTED TO THE OWNER'S REPRESENTATIVE. SPECIFIC LOCATIONS FOR EQUIPMENT, PIPELINES, DUCTWORK AND OTHER SUCH ITEMS OF WORK, WHERE NOT DIMENSIONED ON DRAWINGS, SHALL BE DETERMINED IN CONSULTATION WITH OWNER'S REPRESENTATIVE AND DESIGN PROFESSIONAL. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER FITTING OF THE
WORK IN PLACE.
ELEVATION B-S1
SF1,SF2
DETAIL C-S1
SF1,SF2
SECTION A-S1
SF1,SF2
A-S1
C-S1
B-S1
1 A
DIMENSIONS AND/OR ELEVATIONS MARKED THUS ( ) ARE APPROXIMATE. OBTAIN FINAL DIMENSIONS FOR CONSTRUCTION
FROM THE ENGINEER.
DIMENSIONS AND/OR ELEVATIONS MARKED THUS ( ) ARE ASSUMED AND SHALL BE VERIFIED OR MODIFIED AS REQUIRED BY THE CONTRACTOR TO SUIT EQUIPMENT FURNISHED. FINAL DIMENSIONS ARE SUBJECT TO THE REVIEW OF THE ENGINEER.
DIMENSIONS AND/OR ELEVATIONS MARKED THUS (+/-) MUST BE VERIFIED IN THE FIELD BY THE CONTRACTOR.
DIMENSIONS ARE GENERALLY TO SCALE, BUT SHOULD NOT BE SCALED. USE DIMENSIONS SHOWN. NTS (NOT TO SCALE) IS
SHOWN ONLY WHERE DIMENSION IS OBVIOUSLY OUT OF SCALE.
NUMERIC SCALE VALUES (1/4"=1'-0", ETC) APPLY ONLY AT FULL SIZE.
1. ALL SYMBOLS AND ABBREVIATIONS SHOWN ON THIS LEGEND MAY NOT APPEAR
ON THIS SET OF DRAWINGS.
2. THESE LEGENDS ARE COMPOSED OF STANDARD SYMBOLS AND ARE PERTINENT
TO THE CONDITIONS ON THIS SET OF DRAWINGS TO THE EXTENT APPLICABLE.
3. ADDITIONAL LEGENDS AND/OR ANOTHER LEGEND SHEET MAY APPEAR IN THIS
SET OF DRAWINGS TO INDICATE SPECIFIC CONDITIONS IN LIEU OF SYMBOLS
SHOWN ON THIS SHEET.
OR CL
OR PL
CENTERLINE
PROPERTY LINE
DIAMETER
SANITARY SEWER
STORM DRAIN
DRAIN PIPE
Ø
ST
CV
WATERMAINWM
CULVERTCV
TEMPORARY EROSION
CONTROL SYMBOLS
EROSION CONTROL STONE
CONCRETE WASHOUT
SILT FENCESF
INLET PROTECTION
STABILIZED
CONSTRUCTION ENTRANCE
EROSION CONTROL MAT
CULVERT
LIGHT POLE
GAS VALVE
SIGN
MANHOLE
GUARD POST / BOLLARD
AIR CONDITIONERAC
ELECTRIC MANHOLE
CONTROL POINT
STORM MANHOLE
GAS METER
SANITARY MANHOLE
POST INDICATOR VALVE
WATER VALVE
STOP BOX
MONITOR WELL
TELEPHONE MANHOLE
CO CLEAN OUT
CATCH BASIN
SOIL BORING
CONCRETE SURFACE
BITUMINOUS SURFACE
HANDHOLE
STORM SEWER
FENCE
120.0 EXISTING SPOT ELEVATION
GUTTER OR GROUND ELEVATION
TOP OF CURB ELEVATION
PROPOSED SPOT ELEVATION
110.00 110.50
110.50
GENERAL PLAN SYMBOLS
MAJOR PROPOSED CONTOUR
MINOR PROPOSED CONTOUR
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
PAVEMENT MARKING SYMBOLS
TRAFFIC FLOW ARROW
(STRAIGHT ONLY)
TRAFFIC FLOW ARROW
(TURN ONLY)
TRAFFIC FLOW ARROW
(STRAIGHT OR TURN ONLY)
HANDICAP PAVEMENT MARKING
PAINTED TRAFFIC STRIPE
RIPRAP
PEDESTRIAN CROSSING
2.0%
SLOPE
HYDRANT
BUILDING OUTLINE
D
A
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
MINNESOTA AIR NATIONAL GUARD
REPAIR APRON & BASE PAVEMENTS
133RD AIRLIFT WING
MSP INTERNATIONAL AIRPORT
SIGNATURE
DATE
NAME
LICENSE #
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
PROJECT MNANG PROJECT NO.
28232.07 QJKL162003
THOMAS G. THOMPSON
07/28/2022 40503
TYPE B-3 100%
GENERAL
LEGEND
GI003 0
NONE
28232.07
F. ZIDANI, S. HANSEN
D.J. LITTERER
JULY 28, 2022
B. FEICHTINGER
GENERAL NOTES FOREIGN OBJECT DAMAGE (FOD) PROTECTION - APRON AREA
CIVIL NOTES
SITE DEMOLITION NOTES - APRON AREA
1. ACCESS TO THE SITE IS CONTROLLED BY BASE SECURITY. WORK
WITH BASE SECURITY FOR ACCESS CLEARANCE FOR
CONTRACTOR/SUBCONTRACTOR EMPLOYEES PRIOR TO STARTING ANY
WORK.
2. ACCESS TO THE APRON AREA IS WITHIN HIGHER
SECURITY/CONTROLLED AREA ON THE BASE. COORDINATE ACCESS
AND CONSTRUCTION TIMES FOR THE APRON AREA WITH THE
CONTRACTING OFFICER, AND BASE SECURITY.
3. TEMPORARY TRAFFIC CONTROL TO CONFORM TO THE LATEST
VERSION OF “MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL
DEVICES”, MN MUTCD AND AS DIRECTED BY CONTRACTING OFFICER.
TRAFFIC CONTROL LAYOUTS, INSTALLATION AND MAINTENANCE ARE
THE RESPONSIBILITY OF THE CONTRACTOR AND REQUIRE MULTIPLE
LAYOUTS FOR CONSTRUCTION PHASING.
4. MAINTAIN PEDESTRIAN ROUTES THROUGH CONSTRUCTION.
5. REMOVE AND PROVIDE TEMPORARY STREET SIGNS IMPACTED BY
CONSTRUCTION. REPLACE SIGNS AFTER CONSTRUCTION IS
COMPLETE.
6. THE EXISTING UTILITIES SHOWN ARE LEVEL D. NOT ALL EXISTING
UTILITY LOCATIONS WERE AVAILABLE FOR DEPICTION ON THIS PLAN
SET. PERFORM UTILITY LOCATE PRIOR TO STARTING ANY WORK
(GOPHER STATE ONE CALL). FOR PRIVATE ONSITE UTILITIES
COORDINATE WITH CONTRACTING OFFICER AND FACILITY STAFF FOR
LOCATE MARKING.
7. VERIFY ELEVATIONS OF EXISTING UTILITIES AND LOCATIONS
REQUIRING POTHOLE. NOTIFY CONTRACTING OFFICER OF CONFLICTS.
8. MAINTAIN ACCESS TO BUILDINGS ON THE BASE DURING
CONSTRUCTION. PHASED CONSTRUCTION IS REQUIRED TO MAINTAIN
A MAIN ACCESS ROUTE THROUGH THE BASE. COORDINATE WITH
CONTRACTING OFFICER IN ADVANCE OF CONSTRUCTION AT LEAST 14
DAYS PRIOR TO ANY ROAD CLOSURES,
9. OBTAIN/PROVIDE ALL PERMITS REQUIRED FOR THE WORK SHOWN.
10. PROVIDE AND MAINTAIN STORM WATER POLLUTION PREVENTION PLAN
IN CONFORMANCE WITH MPCA AND STATE OF MN GUIDELINES
THROUGHOUT CONSTRUCTION.
11. PROTECT CATCH BASINS AND STORM SEWER INLETS WITH SEDIMENT
BARRIERS UNTIL FINAL RESTORATION IS ESTABLISHED ON ALL
DISTURBED AREAS.
12. RESTORE GRASSED AREAS WITH MIN 4" TOPSOIL AND SOD.
13. EXISTING CURB AND APRONS NOT CALLED OUT FOR REPLACEMENT
ARE TO BE PROTECTED IN PLACE.
1. PROVIDE FOD ORIENTATION BRIEFING TO ALL EMPLOYEES HAVING
ACTIVITY ON OR ADJACENT TO THE APRON, TAXIWAYS, HANGARS,
AND AROUND ANY AIRCRAFT.
2. NO CONSTRUCTION MATERIALS OR CONTRACTOR EQUIPMENT
SHALL BE STORED OR PLACED OUTSIDE OF THE TEMPORARY
CONSTRUCTION FENCING WITHOUT APPROVAL FROM THE
CONTRACTING OFFICER.
3. SECURE ALL MATERIALS STORED ON THE PROJECT SITE TO
PREVENT IT FROM BEING CARRIED BY THE WIND OR AIRCRAFT
EXHAUST ON THE AIRFIELD SURFACES.
4. KEEP THE PROJECT SITE CLEAN AND, IN A CONDITION,
SATISFACTORY TO THE CONTRACTING OFFICER. SPECIAL
ATTENTION TO DUST CONTROL IS REQUIRED WHEN CONCRETE
SAWING, GRINDING, AND DEMOLITION OPERATIONS ARE IN
PROGRESS OR WHEN WIND AND WATER CONDITIONS CAUSE
EXCESSIVE BLOWING OF DUST.
5. REMOVE DEBRIS OUTSIDE OF THE LAY DOWN AREA IMMEDIATELY.
6. REMOVE OR CONTAIN DEBRIS INSIDE THE LAY DOWN AREA ON A
DAILY BASIS.
1. IMPLEMENT PRECAUTIONS TO PRESERVE AND PROTECT EXISTING
PAVEMENTS FROM DAMAGE BY CONSTRUCTION EQUIPMENT AND
OPERATIONS. NO TRACKED CONSTRUCTION EQUIPMENT SHALL BE
ALLOWED ON EXISTING CONCRETE APRON AREAS WITHOUT PRIOR
WRITTEN APPROVAL OF THE CONTRACTING OFFICER.
2. PROVIDE TWO FULL DEPTH SAW CUTS IN CONCRETE AND ONE FULL
DEPTH SAW CUT IN BITUMINOUS TO PROTECT PAVEMENT TO REMAIN IN
PLACE. DO NOT UNDERMINE EXISTING PAVEMENTS TO REMAIN IN
PLACE.
3. THE LOCATION OF EXISTING UTILITIES SHOWN ON THE PLANS IS
APPROXIMATE AND SHALL BE VERIFIED BY THE CONTRACTOR IN THE
FIELD PRIOR TO CONSTRUCTION.
4. TAKE PRECAUTIONS DURING THE PERIOD OF WORK TO AVOID ANY
EXISTING ABOVE GROUND LIGHTING OR NAVIGATIONAL AIDS OR
UNDERGROUND CABLE OR UTILITIES WHICH TRAVERSE THE AREA.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE DUE TO
THEIR NEGLIGENCE. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO NOTIFY THE FAA, WEATHER BUREAU, TELEPHONE
COMPANY, MINNESOTA AIR NATIONAL GUARD, POWER, UTILITIES, AND
MSP MAINTENANCE PERSONNEL BEFORE ANY WORK IS STARTED
WHICH COULD AFFECT ABOVE GROUND OR BELOW GROUND
FACILITIES. ANY CABLES OR OTHER UTILITIES DETERMINED TO BE IN
USE, WHICH ARE DAMAGED BY THE CONTRACTOR, SHALL BE REPAIRED
BY THE CONTRACTOR AT THEIR OWN EXPENSE AND IN A MANNER,
WHICH IS APPROVED AND INSPECTED BY THE CONTRACTING OFFICER.
D
A
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
MINNESOTA AIR NATIONAL GUARD
REPAIR APRON & BASE PAVEMENTS
133RD AIRLIFT WING
MSP INTERNATIONAL AIRPORT
SIGNATURE
DATE
NAME
LICENSE #
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
PROJECT MNANG PROJECT NO.
28232.07 QJKL162003
THOMAS G. THOMPSON
07/28/2022 40503
TYPE B-3 100%
GENERAL
CIVIL NOTES
GI004 0
NONE
28232.07
F. ZIDANI, S. HANSEN
D.J. LITTERER
JULY 28, 2022
B. FEICHTINGER
H
ENTR
Y
EXIT
EN
TR
Y
EXIT
ENTRY
NORTH
D
A
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
MINNESOTA AIR NATIONAL GUARD
REPAIR APRON & BASE PAVEMENTS
133RD AIRLIFT WING
MSP INTERNATIONAL AIRPORT
SIGNATURE
DATE
NAME
LICENSE #
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
PROJECT MNANG PROJECT NO.
28232.07 QJKL162003
THOMAS G. THOMPSON
07/28/2022 40503
TYPE B-3 100%
GENERAL
PHASING PLAN
GC100 0
AS NOTED
28232.07
F. ZIDANI, S. HANSEN
D.J. LITTERER
JULY 28, 2022
B. FEICHTINGER
T.G. THOMPSON
0 100% SUBMITTAL FZ BF TT 07-28-22
PHASING PLAN MAP
M
IN
UT
EM
AN
D
R
M
IL
IT
IA
D R
M
IN
UT
EM
AN
D
R
M
IL
IT
IA
D R
M
IN
UT
EM
AN
D
R
M
IL
IT
IA
D R
AI
R
LI
FT
D R
AI
R
LI
FT
D R
SPITFIRE AVE
SPITFIRE AVE
HERCULES AVE
G
EN
ER
AL
M
IL
LE
R
D R
MUSTANG AVE
MUSTANG AVE
BLDG 685
BLDG 682
BLDG 680
BLDG 686
BLDG 645
BLDG 641
BLDG 641
BLDG 687
BLDG 642
BLDG 640 BLDG
BLDG 619
BLDG 612
BLDG 610
BLDG 631
BLDG
BLDG 662
BLDG 656
BLDG
BLDG 665
PA SW:02
PA SW:01
PA SW:03
PA642:01
PA685:01
PA685:02
PA682:01
PA665:02
PA665:01
PA670:01
PA619:02
PA619:01
SPITFIRE AVE
PA
7:
PA
4:
PA618:01
PA613:01
PA
9:
PA640:01
PA638:01
PA610:01
PA
0:
PA610:02
PA631:02
PA662:03
PA663:01
PA687:01
PHASING RESTRICTIONS TABLE
A B C D
A -- X O O B X -- O O C O O -- O D O O O --
PHASE A
PHASE B
PHASE C
PHASE D
PHASING LEGEND:
NOTES:
1. THE PHASING SHOWN ON THIS PLAN REPRESENTS MINIMUM REQUIREMENTS. CREATE A
DETAILED PHASING PLAN AND SUBMIT TO CONTRACTING OFFICER FOR APPROVAL. DO NOT
COMMENCE CONSTRUCTION ACTIVITIES UNTIL PHASING PLAN IS APPROVED.
2. COORDINATE EACH WORK AREA WITH CONTRACTING OFFICER TO MAINTAIN ACCESS TO
FACILITIES AND LIMIT OPERATIONAL IMPACTS TO THE AIR NATIONAL GUARD. DO NOT BEGIN WORK
IN A NEW AREA WITHOUT PRIOR APPROVAL FROM CONTRACTING OFFICER.
3. PHASE A CONSISTS OF WORK ALONG THE NORTH/SOUTH MILITIA DRIVE CORRIDOR AND BUILDING
645 ACCESS TO THE AIRFIELD VIA SPITFIRE AVE.
4. MAXIMIZE PARKING LOT AVAILABILITY DURING DRILL WEEKENDS AS PUBLISHED BY THE 133RD
AIR WING COMMANDER.
5. PHASE B CONSISTS OF WORK ALONG THE NORTH/SOUTH MINUTEMAN DR. CORRIDOR AND
BUILDING 645 ACCESS TO THE AIRFIELD VIA, MINUTEMAN DR. AND GENERAL MILLER DR..
6. PHASE C WORK CONSISTS OF WORK ON THE AIRFIELD INCLUDING APRON REPAIRS AND PCC
CONSTRUCTION. DO NOT COMMENCE PHASE C WITHOUT PRIOR WRITTEN APPROVAL FROM BOTH
THE CONTRACTING OFFICER AND AIRFIELD MANAGEMENT. DELINEATE WORK AREAS WITHIN
PHASE C WITH LOW PROFILE BARRIERS. SEE DETAIL 1 THIS SHEET.
7. PHASE D WORK CONSISTS OF WORK NOT CAPTURED IN OTHER PHASES.
8. IN ORDER TO MAINTAIN A MINIMUM OF ONE CONSTRUCTION FREE NORTH/SOUTH ROUTE AND
AIRFIELD ACCESS FROM BUILDING 645, DO NOT PERFORM PHASE A AND PHASE B WORK
CONCURRENTLY.
O : MAY BE CONSTRUCTED CONCURRENTLY
X : MAY NOT BE CONSTRUCTED CONCURRENTLY
-- : NOT APPLICABLE (SAME PHASE)
GUARD FRONT GATE
SECURELY FASTENED
FLASHING RED LIGHTS
6" (MIN) TO 1' (MAX) WIDE ORANGE AND WHITE
STRIPES, STRIPE WIDTH S TO BE EQUAL
6' TO 10'
1'
LOW PROFILE BARRICADE
DETAIL
SCALE:
GC100
NONE
NOTES:
1. BARRICADE SHALL BE SUFFICIENTLY HEAVY TO REMAIN IN PLACE OR SHALL BE
WEIGHTED DOWN.
2. LIGHTS SHALL BE A MINIMUM OF 5 CANDELAS EFFECTIVE INTENSITY AND
POSSESS A FLASH RATE OF 55 TO 160 FLASHES PER MINUTE.
3. PLACE BARRICADES AT A MAXIMUM OF 24' INTERVALS. DUAL BARRICADES SHALL
BE USED AT CORNERS AND ENDS.
150' 300'0
SCALE:1"=150'
RDAPRON
PA640:02
PA
9:
PA
9:
PA631:01
PA
PO
L:
ENTR
Y
EXIT
EN
TR
Y
EXIT
ENTRY
SB 7
SB 20
SB 21
SB 22
SB 10
SB 9
SB 11
SB 19
SB 17
SB 13
SB 14
SB 15
SB 16
SB 18
SB 1
SB 2
SB 12
SB 3
SB 4
SB 5
SB 6
SB 8
200' 400'0
SCALE:1"=200'
D
A
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
MINNESOTA AIR NATIONAL GUARD
REPAIR APRON & BASE PAVEMENTS
133RD AIRLIFT WING
MSP INTERNATIONAL AIRPORT
SIGNATURE
DATE
NAME
LICENSE #
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
PROJECT MNANG PROJECT NO.
28232.07 QJKL162003
THOMAS G. THOMPSON
07/28/2022 40503
NORTH
TYPE B-3 100%
GEOTECHNICAL
BORING LOCATION MAP
BB601 0
1" = 200'
28232.07
F. ZIDANI, S. HANSEN
D.J. LITTERER
JULY 28, 2022
B. FEICHTINGER
T.G. THOMPSON
0 100% SUBMITTAL FZ BF TT 07-28-22
BORING LOCATION MAP
BORING LOCATIONS
BORING LATITUDE
(DEGREES NORTH)
LONGITUDE
(DEGREES WEST)
1 44°53'35" 93°12'02" 2 44°53'32" 93°12'00" 3 44°53'30" 93°11'58" 4 44°53'24" 93°11'58" 5 44°53'21" 93°11'58" 6 44°53'16" 93°12'02" 7 44°53'18" 93°12'10" 8 44°53'18" 93°12'04" 9 44°53'23" 93°12'05"
10 44°53'25" 93°12'03" 11 44°53'25" 93°12'07" 12 44°53'30" 93°12'01" 13 44°53'35" 93°12'10" 14 44°53'33" 93°12'08" 15 44°53'31" 93°12'07" 16 44°53'31" 93°12'11" 17 44°53'30" 93°12'17" 18 44°53'28" 93°12'09" 19 44°53'23" 93°12'14" 20 44°53'21" 93°12'19" 21 44°53'22" 93°12'21" 22 44°53'26" 93°12'22"
M
IN
UT
EM
AN
D
R
M
IL
IT
IA
D R
M
IN
UT
EM
AN
D
R
M
IL
IT
IA
D R
M
IN
UT
EM
AN
D
R
M
IL
IT
IA
D R
AI
R
LI
FT
D R
AI
R
LI
FT
D R
SPITFIRE AVE
SPITFIRE AVE
HERCULES AVE
G
EN
ER
AL
M
IL
LE
R
D R
MUSTANG AVE
MUSTANG AVE
BLDG 685
BLDG 682
BLDG 680
BLDG 686
BLDG 645
BLDG 641
BLDG 641
BLDG 687
BLDG 642
BLDG 640 BLDG
BLDG 619
BLDG 612
BLDG 610
BLDG 631
BLDG
BLDG 662
BLDG 656
BLDG
BLDG 665
PA SW:02
PA SW:01
PA SW:03
PA642:01
PA685:01
PA685:02
PA682:01
PA665:02
PA665:01
PA670:01
RDAPRON:01
PA640:02
PA619:02 PA619:01
SPITFIRE AVE
PA
7:
PA
4:
01 PA618:01
PA613:01
PA
9:
PA
PO
L:
PA640:01
PA638:01
PA610:01
PA
0:
PA610:02
PA631:02
PA631:01
PA662:03
PA
9:
PA
9:
PA663:01
PA687:01
D
A
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
MINNESOTA AIR NATIONAL GUARD
REPAIR APRON & BASE PAVEMENTS
133RD AIRLIFT WING
MSP INTERNATIONAL AIRPORT
SIGNATURE
DATE
NAME
LICENSE #
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
PROJECT MNANG PROJECT NO.
28232.07 QJKL162003
THOMAS G. THOMPSON
07/28/2022 40503
TYPE B-3 100%
GEOTECHNICAL
BORING LOGS
BB610 0
NO SCALE
28232.07
F. ZIDANI, S. HANSEN
D.J. LITTERER
JULY 28, 2022
B. FEICHTINGER
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
MINNESOTA AIR NATIONAL GUARD
REPAIR APRON & BASE PAVEMENTS
133RD AIRLIFT WING
MSP INTERNATIONAL AIRPORT
SIGNATURE
DATE
NAME
LICENSE #
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
PROJECT MNANG PROJECT NO.
28232.07 QJKL162003
THOMAS G. THOMPSON
07/28/2022 40503
TYPE B-3 100%
GEOTECHNICAL
BORING LOGS
BB611 0
NO SCALE
28232.07
F. ZIDANI, S. HANSEN
D.J. LITTERER
JULY 28, 2022
B. FEICHTINGER
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
MINNESOTA AIR NATIONAL GUARD
REPAIR APRON & BASE PAVEMENTS
133RD AIRLIFT WING
MSP INTERNATIONAL AIRPORT
SIGNATURE
DATE
NAME
LICENSE #
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
PROJECT MNANG PROJECT NO.
28232.07 QJKL162003
THOMAS G. THOMPSON
07/28/2022 40503
TYPE B-3 100%
GEOTECHNICAL
BORING LOGS
BB612 0
NO SCALE
28232.07
F. ZIDANI, S. HANSEN
D.J. LITTERER
JULY 28, 2022
B. FEICHTINGER
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
MINNESOTA AIR NATIONAL GUARD
REPAIR APRON & BASE PAVEMENTS
133RD AIRLIFT WING
MSP INTERNATIONAL AIRPORT
SIGNATURE
DATE
NAME
LICENSE #
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
PROJECT MNANG PROJECT NO.
28232.07 QJKL162003
THOMAS G. THOMPSON
07/28/2022 40503
TYPE B-3 100%
GEOTECHNICAL
BORING LOGS
BB613 0
NO SCALE
28232.07
F. ZIDANI, S. HANSEN
D.J. LITTERER
JULY 28, 2022
B. FEICHTINGER
ENTR
Y
EXIT
EN
TR
Y
EXIT
ENTRY
H
NORTH
200' 400'0
SCALE:1"=200'
D
A
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
MINNESOTA AIR NATIONAL GUARD
REPAIR APRON & BASE PAVEMENTS
133RD AIRLIFT WING
MSP INTERNATIONAL AIRPORT
SIGNATURE
DATE
NAME
LICENSE #
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
PROJECT MNANG PROJECT NO.
28232.07 QJKL162003
THOMAS G. THOMPSON
07/28/2022 40503
CP110
(NOT USED)
CP111 CP112
CP120 CP121 CP122
CP130 CP131 CP132
TYPE B-3 100%
CIVIL
KEYMAP
PAVEMENT REPAIR PLAN SHEETS
CP100 0
1" = 200'
28232.07
F. ZIDANI, S. HANSEN
D.J. LITTERER
JULY 28, 2022
B. FEICHTINGER
T.G. THOMPSON
0 100% SUBMITTAL FZ BF TT 07-28-22
M
IN
UT
EM
AN
D
R
M
IL
IT
IA
D R
M
IN
UT
EM
AN
D
R
M
IL
IT
IA
D R
M
IN
UT
EM
AN
D
R
M
IL
IT
IA
D R
AI
R
LI
FT
D R
AI
R
LI
FT
D R
SPITFIRE AVE
SPITFIRE AVE
HERCULES AVE
HERCULES AVE
G
EN
ER
AL
M
IL
LE
R
D R
MUSTANG AVE
MUSTANG AVE
BLDG 685
BLDG 682
BLDG 680
BLDG 686
BLDG 645
BLDG 641
BLDG 641
BLDG 687
BLDG 642
BLDG 640 BLDG
BLDG 619
BLDG 612
BLDG 610
BLDG 631
BLDG
BLDG 662
BLDG 656
BLDG
BLDG 665
PA SW:02
PA SW:01
PA SW:03
PA642:01
PA685:01
PA685:02
PA682:01
PA665:02
PA665:01
PA670:01
RDAPRON:01
PA640:02
PA619:02
PA619:01
SPITFIRE AVE
PA
7:
PA
4:
01 PA618:01
PA613:01
PA
9:
PA
PO
L:
PA640:01
PA638:01
PA610:01
PA
0:
PA610:02
PA631:02
PA631:01
PA662:03
PA
9:
PA
9:
PA663:01
PA687:01
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
+0
+0
+0
+0
+0
10+00
9 81
RIM=816.0
RIM=815.7
RIM=816.1
RIM=816.3
RIM=816.6
RIM=816.1
RIM=816.4
RIM=818.2
RIM=818.2
D
A
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
MINNESOTA AIR NATIONAL GUARD
REPAIR APRON & BASE PAVEMENTS
133RD AIRLIFT WING
MSP INTERNATIONAL AIRPORT
SIGNATURE
DATE
NAME
LICENSE #
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
PROJECT MNANG PROJECT NO.
28232.07 QJKL162003
THOMAS G. THOMPSON
07/28/2022 40503
TYPE B-3 100%
CIVIL
PAVEMENT REPAIR PLAN
CP111 0
1" = 40'
28232.07
F. ZIDANI, S. HANSEN
D.J. LITTERER
JULY 28, 2022
B. FEICHTINGER
T.G. THOMPSON
0 100% SUBMITTAL FZ BF TT 07-28-22
40' 80'0
SCALE:1"=40'
REMOVE AND REPLACE 140
LF ASPHALT CURB. SEE
DETAIL 4 SHEET CP502
REMOVE EX CONC
CURB & GUTTER
INSTALL 62 LF CURB
REMOVE EXISTING CMP
REPLACE WITH 47 LF - 18" RCP.
SEE SECTION A
SHEET CP213 FOR PROFILE
LEGEND:
ROUTE/SEAL CRACKS AND CHIP SEAL
(SEE DETAIL A1 ON SHEET CP301)
MILL & OVERLAY
(SEE DETAIL D3 ON SHEET CP301)
LIGHT DUTY: 3.5" HMA
(SEE DETAIL A4 ON SHEET CP301)
HEAVY DUTY: 5" HMA
(SEE DETAIL A6 ON SHEET CP301)
FULL DEPTH REPAIR, PCC
(SEE DETAIL D8 ON SHEET CP301)
CONCRETE JOINT, REPAIR
(SEE SHEET CP501)
EXISTING CONCRETE
CURB REPAIR
(SEE DETAIL 1 ON SHEET CP502)
M
IN
UT
EM
AN
D
R
MUSTANG AVE
BLDG
BLDG 659
BLDG
BLDG
BLDG
PA610:02
PA631:02
PA662:03
PA
9:
PA
9:
M
IN
UT
EM
AN
D
R
MUSTANG AVE
BLDG
BLDG
BLDG
BLDG
PA
VE
HM
AI
NT
:0
1. VALVE BOX ADJUSTMENT ASSUMES 2 ADJUSTMENTS FOR
RECLAMATION - DOWN FOR PAVEMENT RECLAMATION AND UP TO
FINISH GRADE. VALVE BOX ADJUSTMENT ASSUMES 1 ADJUSTMENT
TO FINISHED GRADE FOR MILLING OPERATION. PROTECT VALVE
BOX DURING CONSTRUCTION.
2. MANHOLE ADJUSTMENT ASSUMES 2 ADJUSTMENTS FOR
RECLAMATION - DOWN FOR PAVEMENT RECLAMATION AND UP TO
FINISH GRADE. MANHOLE ADJUSTMENT ASSUMES 1 ADJUSTMENT
TO FINISHED GRADE FOR MILLING OPERATION. PROTECT MANHOLE
DURING CONSTRUCTION.
3. FOR CONCRETE CURB REMOVAL, SAW CUT AND REMOVE EXISTING
CURB TO NEAREST JOINT.
GENERAL NOTES:
KEYNOTES:
1. PROTECT EXISTING CATCH BASIN, PROVIDE INLET PROTECTION.
2. ADJUST VALVE BOX.
3. PREVENT DEBRIS FROM ENTERING MANHOLE DURING
CONSTRUCTION. DEBRIS IS TO BE IMMEDIATELY REMOVED.
4. ADJUST CASTING TO FINISH GRADE. REMOVE EXISTING CASTING
AND ADJUSTMENT RINGS, INSTALL NEW HDPE ADJUSTMENT RINGS
(MIN 2, MAX 4) AND REINSTALL CASTING. WRAP NEW RINGS/CASTING
WITH GEOTEXTILE FABRIC. SEE DETAIL 3 ON SHEET CP502.
PROTECT BOLLARDS
AND POLES DURING
CONSTRUCTION (TYP)
PROTECT MONITORING
WELLS DURING
CONSTRUCTION (TYP)
SE
E
SH
EE
T C
P1
SEE SHEET CP121
REMOVE AND REINSTALL
STOP SIGN.
PROTECT LIGHT POLE.
REMOVE AND REPLACE 10 SY
CONCRETE SWALE. PLACE 5
CY RIP RAP AROUND FES.
SEE DETAIL 2-CP503.
REMOVE AND REPLACE CONCRETE
DRIVEWAY PAVEMENT. SEE DETAIL D8 ON
SHEET CP301, MODIFYING VALUES WITH
THE FOLLOWING: 7" PCC PAVEMENT AND
5" AGGREGATE BASE COURSE.
BEGIN CONSTRUCTION
STA 10+41
END CONSTRUCTION
STA 15+65
BEGIN CONSTRUCTION
STA 16+20
END CONSTRUCTION
STA 23+87
BEGIN REPAIR
STA 11+75
OR NEAREST JOINT BEFORE
END REPAIR
STA 13+05
OR NEAREST JOINT AFTER
BEGIN REPAIR
STA 13+52
OR NEAREST JOINT BEFORE
END REPAIR AT NEAREST JOINT
AFTER 62 LF OF CURB
NORTH
18+00
19+00
20+00
21+00
22+00
+0
+0
+0
+0
+0
+0
+5
+0
+7
10+00
11+00
12+00
12+34
7 81
RIM=813.1
RIM=815.6
RIM=815.7
RIM=815.7
RIM=815.4
RIM=815.4
RIM=815.9
RIM=817.4
D
A
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
MINNESOTA AIR NATIONAL GUARD
REPAIR APRON & BASE PAVEMENTS
133RD AIRLIFT WING
MSP INTERNATIONAL AIRPORT
SIGNATURE
DATE
NAME
LICENSE #
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
PROJECT MNANG PROJECT NO.
28232.07 QJKL162003
THOMAS G. THOMPSON
07/28/2022 40503
TYPE B-3 100%
CIVIL
PAVEMENT REPAIR PLAN
CP112 0
1" = 40'
28232.07
F. ZIDANI, S. HANSEN
D.J. LITTERER
JULY 28, 2022
B. FEICHTINGER
T.G. THOMPSON
0 100% SUBMITTAL FZ BF TT 07-28-22
40' 80'0
SCALE:1"=40'
REMOVE AND REPLACE
125 LF CURB AND GUTTER
GRADE TO DRAIN
INSTALL 45 LF
SURMOUNTABLE
CONCRETE CURB
REMOVE AND REPLACE
5 LF CONCRETE CURB
AND GUTTER
MIN
UTE
MAN D
RIV
E
BLDG 631
MUSTANG AVE
BLDG
BLDG
BLDG 606
M
IL
IT
IA
D R
IV
E
M
IL
IT
IA
D R
IV
E
MUSTANG AVE
PA631:02
PA631:03
PA631:01
PA631:01
PA
6:
PA
6:
PA610:02 PA610:04
PA
PO
L:
PA
PO
L:
PAPOL:01
SEE SHEET CP122
SE
E
SH
EE
T C
P1
REMOVE EXISTING CONCRETE
PARKING STOP AND REPLACE WITH
CONCRETE PARKING STOP - 4 EA
REMOVE EXISTING PARKING
STOP AND REPLACE WITH
CONCRETE PARKING STOP - 6 EA
LEGEND:
ROUTE/SEAL CRACKS AND CHIP SEAL
(SEE DETAIL A1 ON SHEET CP301)
MILL & OVERLAY
(SEE DETAIL D3 ON SHEET CP301)
LIGHT DUTY: 3.5" HMA
(SEE DETAIL A4 ON SHEET CP301)
HEAVY DUTY: 5" HMA
(SEE DETAIL A6 ON SHEET CP301)
FULL DEPTH REPAIR, PCC
(SEE DETAIL D8 ON SHEET CP301)
CONCRETE JOINT, REPAIR
(SEE SHEET CP501)
EXISTING CONCRETE
CURB REPAIR
(SEE DETAIL 1 ON SHEET CP502)
MATCH EXISTING
CURB AND GUTTER
STA 10+68
MATCH EXISTING
CURB AND GUTTER
STA 11+92
0.9%
0.9%
REPAIR SETTLED WATER MAIN
TRENCH PRIOR TO MILL & OVERLAY.
82 SY ON SHEET CP112.
61 SY ON SHEET CP122.
SEE SHEET CP122 FOR
CONCRETE SURMOUNTABLE
CURB CONSTRUCTION.
END CONSTRUCTION
STA 31+78
BEGIN CONSTRUCTION
STA 10+11
END CONSTRUCTION
STA 12+18
EN
D
C O
N
ST
R U
C
TI
O N
ST
A
+2
BE
G
IN
C
O N
ST
R
U C
TI
O
N
ST
A
+9
1. VALVE BOX ADJUSTMENT ASSUMES 2 ADJUSTMENTS FOR
RECLAMATION - DOWN FOR PAVEMENT RECLAMATION AND UP TO
FINISH GRADE. VALVE BOX ADJUSTMENT ASSUMES 1 ADJUSTMENT
TO FINISHED GRADE FOR MILLING OPERATION. PROTECT VALVE
BOX DURING CONSTRUCTION.
2. MANHOLE ADJUSTMENT ASSUMES 2 ADJUSTMENTS FOR
RECLAMATION - DOWN FOR PAVEMENT RECLAMATION AND UP TO
FINISH GRADE. MANHOLE ADJUSTMENT ASSUMES 1 ADJUSTMENT
TO FINISHED GRADE FOR MILLING OPERATION. PROTECT MANHOLE
DURING CONSTRUCTION.
3. FOR CONCRETE CURB REMOVAL, SAW CUT AND REMOVE EXISTING
CURB TO NEAREST JOINT.
GENERAL NOTES:
KEYNOTES:
1. PROTECT EXISTING CATCH BASIN, PROVIDE INLET PROTECTION.
2. ADJUST VALVE BOX.
3. PREVENT DEBRIS FROM ENTERING MANHOLE DURING
CONSTRUCTION. DEBRIS IS TO BE IMMEDIATELY REMOVED.
4. ADJUST CASTING TO FINISH GRADE. REMOVE EXISTING CASTING
AND ADJUSTMENT RINGS, INSTALL NEW HDPE ADJUSTMENT RINGS
(MIN 2, MAX 4) AND REINSTALL CASTING. WRAP NEW RINGS/CASTING
WITH GEOTEXTILE FABRIC. SEE DETAIL 3 ON SHEET CP502.
5. TRENCH SETTLEMENT AREAS TO BE CORRECTED BY REMOVING
EXISTING BASE PAVEMENT (~20 FT WIDE), AND ADDING GRAVEL
BASE (COMPACTED IN PLACE) TO ADJUST/FILL SETTLEMENT. PAVE
BITUMINOUS BASE PATCH PRIOR TO WEAR COURSE PAVING.
END REPAIR
STA 11+92
OR NEAREST JOINT AFTER
BEGIN REPAIR
STA 10+68
OR NEAREST JOINT BEFORE
BEGIN REPAIR
STA 27+43 OF MILITIA DRIVE ALIGNMENT
OR NEAREST JOINT AFTER
END REPAIR
STA 19+93 OF MUSTANG AVE ALIGNMENT
OR NEAREST JOINT AFTER
EN
TR
Y
10+00 11+00 12+00 13+00820
RIM=817.3
RIM=816.9
D
A
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
MINNESOTA AIR NATIONAL GUARD
REPAIR APRON & BASE PAVEMENTS
133RD AIRLIFT WING
MSP INTERNATIONAL AIRPORT
SIGNATURE
DATE
NAME
LICENSE #
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
PROJECT MNANG PROJECT NO.
28232.07 QJKL162003
THOMAS G. THOMPSON
07/28/2022 40503
NORTH
TYPE B-3 100%
CIVIL
PAVEMENT REPAIR PLAN
CP120 0
1" = 40'
28232.07
F. ZIDANI, S. HANSEN
D.J. LITTERER
JULY 28, 2022
B. FEICHTINGER
T.G. THOMPSON
0 100% SUBMITTAL FZ BF TT 07-28-22
40' 80'0
SCALE:1"=40'
INSTALL BITUMINOUS
CURB ALONG DRIVEWAY /
TRASH ENCLOSURE, 35 LF
SEE DETAIL 4-CP502
BLDG 680
RDAPRON:01
PA680:01
BLDG 682
BLDG 685
RDAPRON:01
PA682:03
PA682:05
PA
2:
PA
2:
PA682:04
PASW:03
PASW:04
PASW:03
PASW:02
PASW:03
PASW:03
PASW:03
PASW:02
PA685:03
SEE SHEET CP130
SE
E
SH
EE
T C
P1
APRON PCC ESTIMATED QUANTITY OF REPAIRS FOR
PURPOSES OF BIDDING. INCLUDES BOTH CP120 AND CP130.
SPALL REPAIR = 410SY
CORNER BREAK REPAIR= 20SY
JOINT SEALANT REPLACEMENT = 20,000 LF
JOINT ROUTE AND SEAL = 750 LF
REPAIR EXISTING PATCHES = 20 SY
PROTECT EXISTING OIL
/ WATER SEPARATOR
PROTECT
BUILDING
SEE SHEET CP412
SEE SHEET CP411
LEGEND:
ROUTE/SEAL CRACKS AND CHIP SEAL
(SEE DETAIL A1 ON SHEET CP301)
MILL & OVERLAY
(SEE DETAIL D3 ON SHEET CP301)
LIGHT DUTY: 3.5" HMA
(SEE DETAIL A4 ON SHEET CP301)
HEAVY DUTY: 5" HMA
(SEE DETAIL A6 ON SHEET CP301)
FULL DEPTH REPAIR, PCC
(SEE DETAIL D8 ON SHEET CP301)
CONCRETE JOINT, REPAIR
(SEE SHEET CP501)
EXISTING CONCRETE
CURB REPAIR
(SEE DETAIL 1 ON SHEET CP502)
BEGIN CONSTRUCTION
STA 10+20
1. VALVE BOX ADJUSTMENT ASSUMES 2 ADJUSTMENTS FOR
RECLAMATION - DOWN FOR PAVEMENT RECLAMATION AND UP TO
FINISH GRADE. VALVE BOX ADJUSTMENT ASSUMES 1 ADJUSTMENT
TO FINISHED GRADE FOR MILLING OPERATION. PROTECT VALVE
BOX DURING CONSTRUCTION.
2. MANHOLE ADJUSTMENT ASSUMES 2 ADJUSTMENTS FOR
RECLAMATION - DOWN FOR PAVEMENT RECLAMATION AND UP TO
FINISH GRADE. MANHOLE ADJUSTMENT ASSUMES 1 ADJUSTMENT
TO FINISHED GRADE FOR MILLING OPERATION. PROTECT MANHOLE
DURING CONSTRUCTION.
3. FOR CONCRETE CURB REMOVAL, SAW CUT AND REMOVE EXISTING
CURB TO NEAREST JOINT.
GENERAL NOTES:
KEYNOTES:
1. PROTECT EXISTING CATCH BASIN, PROVIDE INLET PROTECTION.
2. ADJUST VALVE BOX.
3. PREVENT DEBRIS FROM ENTERING MANHOLE DURING
CONSTRUCTION. DEBRIS IS TO BE IMMEDIATELY REMOVED.
4. ADJUST CASTING TO FINISH GRADE. REMOVE EXISTING CASTING
AND ADJUSTMENT RINGS, INSTALL NEW HDPE ADJUSTMENT RINGS
(MIN 2, MAX 4) AND REINSTALL CASTING. WRAP NEW RINGS/CASTING
WITH GEOTEXTILE FABRIC. SEE DETAIL 3 ON SHEET CP502
5. PROTECT VALVE BOX DURING CONSTRUCTION.
6. PROTECT CASTING DURING CONSTRUCTION.
END OF CONCRETE SECTION
PASW:03 ALIGNS WITH RDAPRON:01
10+00
11+00
12+00
13+00
14+00
15+00
16+00
+0
14+00
+0
+0
+0
+0
+0
+0
+0
+0
13+00 14+00 15+00
11+06
10+00 11+00 11+96
10+00
11+0081
817 819818
" C
M P
RIM=817.8
RIM=816.4
RIM=819.2
RIM=818.0
RIM=816.8
RIM=817.3
RIM=818.6
RIM=818.1RIM=818.2
RIM=815.6
RIM=815.9
RIM=815.6
RIM=816.2
D
A
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
MINNESOTA AIR NATIONAL GUARD
REPAIR APRON & BASE PAVEMENTS
133RD AIRLIFT WING
MSP INTERNATIONAL AIRPORT
SIGNATURE
DATE
NAME
LICENSE #
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
PROJECT MNANG PROJECT NO.
28232.07 QJKL162003
THOMAS G. THOMPSON
07/28/2022 40503
TYPE B-3 100%
CIVIL
PAVEMENT REPAIR PLAN
CP121 0
1" = 40'
28232.07
F. ZIDANI, S. HANSEN
D.J. LITTERER
JULY 28, 2022
B. FEICHTINGER
T.G. THOMPSON
0 100% SUBMITTAL FZ BF TT 07-28-22
40' 80'0
SCALE:1"=40'
REPAIR SETTLED UTILITY
TRENCH PRIOR TO OVERLAY,
CUT AND PATCH BITUMINOUS
BASE COURSE PRIOR TO
WEAR REPLACEMENT, 30 SY.
GRADE TO
DRAIN TO INLET1
PROTECT
BOLLARDS DURING
CONSTRUCTION
PROTECT
BOLLARDS DURING
CONSTRUCTION
HERCULES AVE
BLDG 665
G
EN
ER
AL
M
IL
LE
R
D R
G
EN
ER
AL
M
IL
LE
R
D R
G
EN
ER
AL
M
IL
LE
R
D R
HERCULES AVE
HERCULES AVE
HERCULES AVE
M
IN
UT
EM
AN
D
R
M
IN
UT
EM
AN
D
R
M
IN
UT
EM
AN
D
R
BLDG
681 BLDG
BLDG 663
BL
DG
PA665:02
PA665:02
G
EN
ER
AL
M
IL
LE
R D
R
BLDG 683
BLDG 638
PA663:01
PA663:01
PA687:01
BLDG 668
BLDG 687 PA687:04
PA642:01
PA642:01
PA642:02
BLDG 642
PA662:03
PA662:03
PA662:03
PA662:04
PAVEHMAINT:01
PA638:01
PA
8:
PA642:02
PA640:01
PA640:01
PA640:01
BLDG 640
SEE SHEET CP131
SEE SHEET CP111
SE
E
SH
EE
T C
P1
SE
E
SH
EE
T C
P1
REMOVE EXISTING 36 LF CMP
AND REPLACE WITH 35 LF RCP.
SEE SECTION B
SHEET CP213 FOR PROFILE
LEGEND:
ROUTE/SEAL CRACKS AND CHIP SEAL
(SEE DETAIL A1 ON SHEET CP301)
MILL & OVERLAY
(SEE DETAIL D3 ON SHEET CP301)
LIGHT DUTY: 3.5" HMA
(SEE DETAIL A4 ON SHEET CP301)
HEAVY DUTY: 5" HMA
(SEE DETAIL A6 ON SHEET CP301)
FULL DEPTH REPAIR, PCC
(SEE DETAIL D8 ON SHEET CP301)
CONCRETE JOINT, REPAIR
(SEE SHEET CP501)
EXISTING CONCRETE
CURB REPAIR
(SEE DETAIL 1 ON SHEET CP502)
BEGIN CONSTRUCTION
STA 10+76
BEGIN CONSTRUCTION
STA 10+14
BEGIN CONSTRUCTION
STA 10+05
SEE PROFILE C SHEET CP212
END CONSTRUCTION
STA 10+92
SEE PROFILE C SHEET CP212
1. VALVE BOX ADJUSTMENT ASSUMES 2 ADJUSTMENTS FOR
RECLAMATION - DOWN FOR PAVEMENT RECLAMATION AND UP TO
FINISH GRADE. VALVE BOX ADJUSTMENT ASSUMES 1 ADJUSTMENT
TO FINISHED GRADE FOR MILLING OPERATION. PROTECT VALVE
BOX DURING CONSTRUCTION.
2. MANHOLE ADJUSTMENT ASSUMES 2 ADJUSTMENTS FOR
RECLAMATION - DOWN FOR PAVEMENT RECLAMATION AND UP TO
FINISH GRADE. MANHOLE ADJUSTMENT ASSUMES 1 ADJUSTMENT
TO FINISHED GRADE FOR MILLING OPERATION. PROTECT MANHOLE
DURING CONSTRUCTION.
3. FOR CONCRETE CURB REMOVAL, SAW CUT AND REMOVE EXISTING
CURB TO NEAREST JOINT.
GENERAL NOTES:
KEYNOTES:
1. PROTECT EXISTING CATCH BASIN, PROVIDE INLET PROTECTION.
2. ADJUST VALVE BOX.
3. PREVENT DEBRIS FROM ENTERING MANHOLE DURING
CONSTRUCTION. DEBRIS IS TO BE IMMEDIATELY REMOVED.
4. ADJUST CASTING TO FINISH GRADE. REMOVE EXISTING CASTING
AND ADJUSTMENT RINGS, INSTALL NEW HDPE ADJUSTMENT RINGS
(MIN 2, MAX 4) AND REINSTALL CASTING. WRAP NEW RINGS/CASTING
WITH GEOTEXTILE FABRIC. SSE DETAIL 3 ON SHEET CP502
5. TRENCH SETTLEMENT AREAS TO BE CORRECTED BY REMOVING
EXISTING BASE PAVEMENT (~20 FT WIDE), AND ADDING GRAVEL
BASE (COMPACTED IN PLACE) TO ADJUST/FILL SETTLEMENT. PAVE
SEE PROFILE D
SHEET CP212
23+00
+2
+0
+0
+0
+0
+0
+0
+0
+0
17+00
18+00
19+00
20+00 20+50
+0
+0
+0
+0
+0
+0
+0
+0
RIM=813.4
RIM=814.5
RIM=813.8
RIM=813.2
RIM=814.0
RIM=813.4
RIM=813.3
RIM=814.6
RIM=814.8
RIM=814.2
RIM=813.9
RIM=813.6 RIM=812.9
RIM=813.6
RIM=813.7
RIM=812.8
RIM=814.4
RIM=813.6
RIM=815.3
RIM=815.2
RIM=815.2
RIM=815.2
RIM=815.2
RIM=813.6
815814
D
A
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
MINNESOTA AIR NATIONAL GUARD
REPAIR APRON & BASE PAVEMENTS
133RD AIRLIFT WING
MSP INTERNATIONAL AIRPORT
SIGNATURE
DATE
NAME
LICENSE #
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
PROJECT MNANG PROJECT NO.
28232.07 QJKL162003
THOMAS G. THOMPSON
07/28/2022 40503
NORTH
TYPE B-3 100%
CIVIL
PAVEMENT REPAIR PLAN
CP122 0
1" = 40'
28232.07
F. ZIDANI, S. HANSEN
D.J. LITTERER
JULY 28, 2022
B. FEICHTINGER
T.G. THOMPSON
0 100% SUBMITTAL FZ BF TT 07-28-22
40' 80'0
SCALE:1"=40'
REPAIR SETTLED WATER MAIN
TRENCH PRIOR TO OVERLAY, CUT AND
PATCH BITUMINOUS BASE COURSE
PRIOR TO WEAR REPLACEMENT.
82 SY ON SHEET CP112.
61 SY ON SHEET CP122.
REPLACE 55 LF CURB WITH
CONCRETE SURMOUNTABLE CURB.
(SEE CURB TYPE S ON SHEET CP502)
PROTECT BOLLARDS
DURING CONSTRUCTION
HERCULES AVE
PA610:02
BLDG 610
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG 612
BLDG 614
BLDG 618
BLDG 613
M
IL
IT
IA
D R
M
IL
IT
IA
D R
M
IL
IT
IA
D R
AI
R
LI
FT
D R
AI
R
LI
FT
D R
AI
R
LI
FT
D R
PA610:03
PA
0:
PA
0:
PA610:01
PA610:01
PA610:01
PA638:01
BLDG
PA610:04
PA
SU
PP
LY
:0
PA629:03
PA
9:
PA
9:
PA
9:
PA612:02
PA612:01
PACE:01
PA614:01PA614:01
PA613:01
PA613:01
PA613:01
PA618:01
PA613:01
PA613:01
PA613:01
PA613:01
PA618:01SEE SHEET CP132
SEE SHEET CP112
SE
E
SH
EE
T C
P1
LEGEND:
ROUTE/SEAL CRACKS AND CHIP SEAL
(SEE DETAIL A1 ON SHEET CP301)
MILL & OVERLAY
(SEE DETAIL D3 ON SHEET CP301)
LIGHT DUTY: 3.5" HMA
(SEE DETAIL A4 ON SHEET CP301)
HEAVY DUTY: 5" HMA
(SEE DETAIL A6 ON SHEET CP301)
FULL DEPTH REPAIR, PCC
(SEE DETAIL D8 ON SHEET CP301)
CONCRETE JOINT, REPAIR
(SEE SHEET CP501)
EXISTING CONCRETE
CURB REPAIR
(SEE DETAIL 1 ON SHEET CP502)
REMOVE EXISTING CONCRETE TOP
SLAB, INSTALL NEW CONCRETE TOP
SLAB WITH MANHOLE FRAME/CASTING.
SEE DETAIL 2-CP502.
CONSTRUCT OPENING IN SURMOUNTABLE
CURB AND 6 FOOT WIDE VALLEY GUTTER
TO EXISTING STORM DRAIN, 8 SY.
ST
A
+7
1. VALVE BOX ADJUSTMENT ASSUMES 2 ADJUSTMENTS FOR
RECLAMATION - DOWN FOR PAVEMENT RECLAMATION AND UP TO
FINISH GRADE. VALVE BOX ADJUSTMENT ASSUMES 1 ADJUSTMENT
TO FINISHED GRADE FOR MILLING OPERATION. PROTECT VALVE
BOX DURING CONSTRUCTION.
2. MANHOLE ADJUSTMENT ASSUMES 2 ADJUSTMENTS FOR
RECLAMATION - DOWN FOR PAVEMENT RECLAMATION AND UP TO
FINISH GRADE. MANHOLE ADJUSTMENT ASSUMES 1 ADJUSTMENT
TO FINISHED GRADE FOR MILLING OPERATION. PROTECT MANHOLE
DURING CONSTRUCTION.
3. FOR CONCRETE CURB REMOVAL, SAW CUT AND REMOVE EXISTING
CURB TO NEAREST JOINT.
GENERAL NOTES:
KEYNOTES:
1. PROTECT EXISTING CATCH BASIN, PROVIDE INLET PROTECTION.
2. ADJUST VALVE BOX.
3. PREVENT DEBRIS FROM ENTERING MANHOLE DURING
CONSTRUCTION. DEBRIS IS TO BE IMMEDIATELY REMOVED.
4. ADJUST CASTING TO FINISH GRADE. REMOVE EXISTING CASTING
AND ADJUSTMENT RINGS, INSTALL NEW HDPE ADJUSTMENT RINGS
(MIN 2, MAX 4) AND REINSTALL CASTING. WRAP NEW RINGS/CASTING
WITH GEOTEXTILE FABRIC. SEE DETAIL 3 ON SHEET CP502.
5. TRENCH SETTLEMENT AREAS TO BE CORRECTED BY REMOVING
EXISTING BASE PAVEMENT (~20 FT WIDE), AND ADDING GRAVEL
BASE (COMPACTED IN PLACE) TO ADJUST/ FILL SETTLEMENT. PAVE
SOD DISTURBED AREA, 10 SY
SEE VALLEY GUTTER DETAIL 1 ON SHEET CP503
BEGIN REPAIR
STA 22+76
OR NEAREST JOINT BEFORE
END REPAIR
STA 23+02
OR NEAREST JOINT AFTER
ENTR
Y
10+00
RIM=818.1
RIM=817.8
RIM=819.4
RIM=819.4
D
A
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
MINNESOTA AIR NATIONAL GUARD
REPAIR APRON & BASE PAVEMENTS
133RD AIRLIFT WING
MSP INTERNATIONAL AIRPORT
SIGNATURE
DATE
NAME
LICENSE #
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
PROJECT MNANG PROJECT NO.
28232.07 QJKL162003
THOMAS G. THOMPSON
07/28/2022 40503
TYPE B-3 100%
CIVIL
PAVEMENT REPAIR PLAN
CP130 0
1" = 40'
28232.07
F. ZIDANI, S. HANSEN
D.J. LITTERER
JULY 28, 2022
B. FEICHTINGER
T.G. THOMPSON
0 100% SUBMITTAL FZ BF TT 07-28-22
40' 80'0
SCALE:1"=40'
PA685:01
PA685:01
PA SW:02
BLDG 685
PA685:02
PA685:02
PA SW:02
PA SW:02
PA SW:02
PA SW:02
PA SW:02
PA SW:02
PA SW:01
PA SW:01
3 FT WIDE MILL
ALONG 410 LF LINE
410 LF OF 3 FT WIDE DIAMOND
GRIND TO CREATE FLUSH EDGE
WITH EXISTING CONCRETE
SEE SHEET CP120
SE
E
SH
EE
T C
P1
APRON PCC ESTIMATED QUANTITY OF REPAIRS FOR
PURPOSES OF BIDDING. INCLUDES BOTH CP120 AND CP130.
SPALL REPAIR = 410SY
CORNER BREAK REPAIR= 20SY
JOINT SEALANT REPLACEMENT = 20,000 LF
JOINT ROUTE AND SEAL = 750 LF
REPAIR EXISTING PATCHES = 20 SY
3 FT CONCRETE GRINDING = 410 LF
SEE SHEET CP410
LEGEND:
ROUTE/SEAL CRACKS AND CHIP SEAL
(SEE DETAIL A1 ON SHEET CP301)
MILL & OVERLAY
(SEE DETAIL D3 ON SHEET CP301)
LIGHT DUTY: 3.5" HMA
(SEE DETAIL A4 ON SHEET CP301)
HEAVY DUTY: 5" HMA
(SEE DETAIL A6 ON SHEET CP301)
FULL DEPTH REPAIR, PCC
(SEE DETAIL D8 ON SHEET CP301)
CONCRETE JOINT, REPAIR
(SEE SHEET CP501)
EXISTING CONCRETE
CURB REPAIR
(SEE DETAIL 1 ON SHEET CP502)
1. VALVE BOX ADJUSTMENT ASSUMES 2 ADJUSTMENTS FOR
RECLAMATION - DOWN FOR PAVEMENT RECLAMATION AND UP TO
FINISH GRADE. VALVE BOX ADJUSTMENT ASSUMES 1 ADJUSTMENT
TO FINISHED GRADE FOR MILLING OPERATION. PROTECT VALVE
BOX DURING CONSTRUCTION.
2. MANHOLE ADJUSTMENT ASSUMES 2 ADJUSTMENTS FOR
RECLAMATION - DOWN FOR PAVEMENT RECLAMATION AND UP TO
FINISH GRADE. MANHOLE ADJUSTMENT ASSUMES 1 ADJUSTMENT
TO FINISHED GRADE FOR MILLING OPERATION. PROTECT MANHOLE
DURING CONSTRUCTION.
3. FOR CONCRETE CURB REMOVAL, SAW CUT AND REMOVE EXISTING
CURB TO NEAREST JOINT.
GENERAL NOTES:
KEYNOTES:
1. PROTECT EXISTING CATCH BASIN, PROVIDE INLET PROTECTION.
2. ADJUST VALVE BOX.
3. PREVENT DEBRIS FROM ENTERING MANHOLE DURING
CONSTRUCTION. DEBRIS IS TO BE IMMEDIATELY REMOVED.
4. ADJUST CASTING TO FINISH GRADE. REMOVE EXISTING CASTING
AND ADJUSTMENT RINGS, INSTALL NEW HDPE ADJUSTMENT RINGS
WORK BOUNDARY LIMIT
ENTRY
+0
+0
+0
+0
14+00
+0
+0
9+
+0
+0
+0
11+00
12+00
13+00
14+00
15+00
16+00
17+00 18+00
+8
+0
11+00 12+00
13+00
14+00
15+00
15+15
10+00
11+00
12+00
13+00
14+00
15+00
10+00
10+96
+8
10+00
RIM=817.4
RIM=817.4
RIM=817.2
RIM=817.1
RIM=817.0
RIM=817.1
RIM=817.3
RIM=815.3
RIM=814.8
RIM=815.3
RIM=815.6
RIM=815.9
RIM=816.3
RIM=817.4
RIM=816.3
9 81
D
A
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
MINNESOTA AIR NATIONAL GUARD
REPAIR APRON & BASE PAVEMENTS
133RD AIRLIFT WING
MSP INTERNATIONAL AIRPORT
SIGNATURE
DATE
NAME
LICENSE #
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
PROJECT MNANG PROJECT NO.
28232.07 QJKL162003
THOMAS G. THOMPSON
07/28/2022 40503
TYPE B-3 100%
CIVIL
PAVEMENT REPAIR PLAN
CP131 0
1" = 40'
28232.07
F. ZIDANI, S. HANSEN
D.J. LITTERER
JULY 28, 2022
B. FEICHTINGER
T.G. THOMPSON
0 100% SUBMITTAL FZ BF TT 07-28-22
40' 80'0
SCALE:1"=40'
BEGIN 2' PAVEMENT WIDEN
2' GRAVEL SHOULDER
1 1
PROTECT BOLLARDS
DURING CONSTRUCTION
PROTECT BOLLARDS
DURING CONSTRUCTION
PROTECT BOLLARDS
DURING CONSTRUCTION
BLDG 686
M
IL
IT
IA
D R
PA687:02
BLDG 645
BLDG
BLDG 641
BLDG 641
BLDG 640
M
IL
IT
IA
D R
M
IN
UT
EM
AN
D
R
SPITFIRE AVE
SPITFIRE AVE
SPITFIRE AVE
SPITFIRE AVE
PA687:03
PA687:03
PA687:03
PA685:01
PA685:01
RD685:01
PASW:01
PASW:01
PA
5:
PA645:02
PA642:01
PA642:01
PA642:01
PA645:01
PA645:01
PASPITFIRE:02
PASPITFIRE:01
PA
1:
PA
1:
PA619:02
PA640:02
PA640:02PA
0:
PACOMTRAIN:01
SEE SHEET CP121
SE
E
SH
EE
T C
P1
SE
E
SH
EE
T C
P1
PROTECT
DRAINAGE
FLUME
PA
1:
LEGEND:
ROUTE/SEAL CRACKS AND CHIP SEAL
(SEE DETAIL A1 ON SHEET CP301)
MILL & OVERLAY
(SEE DETAIL D3 ON SHEET CP301)
LIGHT DUTY: 3.5" HMA
(SEE DETAIL A4 ON SHEET CP301)
HEAVY DUTY: 5" HMA
(SEE DETAIL A6 ON SHEET CP301)
FULL DEPTH REPAIR, PCC
(SEE DETAIL D8 ON SHEET CP301)
CONCRETE JOINT, REPAIR
(SEE SHEET CP501)
EXISTING CONCRETE
CURB REPAIR
(SEE DETAIL 1 ON SHEET CP502)
WIDEN PAVEMENT BY 2'.
SEE DETAIL 5 SHEET CP502
2' GRAVEL SHOULDER
END 2' PAVEMENT WIDEN
2' GRAVEL SHOULDER
BEGIN CONSTRUCTION
STA 10+04
BEGIN CONSTRUCTION
STA 10+42
BEGIN CONSTRUCTION
STA 10+16
SEE PROFILE A SHEET CP212
END CONSTRUCTION
STA 14+99
SEE PROFILE A SHEET CP212
1. VALVE BOX ADJUSTMENT ASSUMES 2 ADJUSTMENTS FOR
RECLAMATION - DOWN FOR PAVEMENT RECLAMATION AND UP TO
FINISH GRADE. VALVE BOX ADJUSTMENT ASSUMES 1 ADJUSTMENT
TO FINISHED GRADE FOR MILLING OPERATION. PROTECT VALVE
BOX DURING CONSTRUCTION.
2. MANHOLE ADJUSTMENT ASSUMES 2 ADJUSTMENTS FOR
RECLAMATION - DOWN FOR PAVEMENT RECLAMATION AND UP TO
FINISH GRADE. MANHOLE ADJUSTMENT ASSUMES 1 ADJUSTMENT
TO FINISHED GRADE FOR MILLING OPERATION. PROTECT MANHOLE
DURING CONSTRUCTION.
3. FOR CONCRETE CURB REMOVAL, SAW CUT AND REMOVE EXISTING
CURB TO NEAREST JOINT.
GENERAL NOTES:
KEYNOTES:
1. PROTECT EXISTING CATCH BASIN, PROVIDE INLET PROTECTION.
2. ADJUST VALVE BOX.
3. PREVENT DEBRIS FROM ENTERING MANHOLE DURING
CONSTRUCTION. DEBRIS IS TO BE IMMEDIATELY REMOVED.
4. ADJUST CASTING TO FINISH GRADE. REMOVE EXISTING CASTING
AND ADJUSTMENT RINGS, INSTALL NEW HDPE ADJUSTMENT RINGS
BEGIN CONSTRUCTION
STA 10+18
SEE PROFILE B
SHEET CP212
BEGIN CONSTRUCTION
STA 10+13
SEE PROFILE E
SHEET CP212
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
RIM=815.1
RIM=815.1
RIM=815.2
RIM=814.9
RIM=814.4
RIM=814.3 RIM=814.2
RIM=814.4
RIM=814.5 RIM=814.4
RIM=814.6
RIM=815.7
RIM=815.4
RIM=815.5 RIM=814.5 RIM=814.5
RIM=815.8
D
A
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
MINNESOTA AIR NATIONAL GUARD
REPAIR APRON & BASE PAVEMENTS
133RD AIRLIFT WING
MSP INTERNATIONAL AIRPORT
SIGNATURE
DATE
NAME
LICENSE #
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY LICENSED ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
PROJECT MNANG PROJECT NO.
28232.07 QJKL162003
THOMAS G. THOMPSON
07/28/2022 40503
TYPE B-3 100%
CIVIL
PAVEMENT REPAIR PLAN
CP132 0
1" = 40'
28232.07
F. ZIDANI, S. HANSEN
D.J. LITTERER
JULY 28, 2022
B. FEICHTINGER
T.G. THOMPSON
0 100% SUBMITTAL FZ BF TT 07-28-22
40' 80'0
SCALE:1"=40'
PROTECT BOLLARDS
DURING CONSTRUCTION
1 1
BLDG 619
PA618:02
SPITFIRE AVE
M
IL
IT
IA
D R
AI
R
LI
FT
D R
AI
R
LI
FT
D R
AI
R
LI
FT
D R
BLDG
BLDG
BLDG 614
PA618:01
PA618:01
PA618:01
PA614:01
PA614:01
PA617:01
PA617:01
PA617:01
PA619:02
PA619:02
PA619:02
PA619:02
PA619:01
PA619:01
PA619:01
PA619:01
PA619:01
SEE SHEET CP122
SE
E
SH
EE
T C
P1
LEGEND:
ROUTE/SEAL CRACKS AND CHIP SEAL
(SEE DETAIL A1 ON SHEET CP301)
MILL & OVERLAY
(SEE DETAIL D3 ON SHEET CP301)
LIGHT DUTY: 3.5" HMA
(SEE DETAIL A4 ON SHEET CP301)
HEAVY DUTY: 5" HMA
(SEE DETAIL A6 ON SHEET CP301)
FULL DEPTH REPAIR, PCC
(SEE DETAIL D8 ON SHEET CP301)
CONCRETE JOINT, REPAIR
(SEE SHEET CP501)
EXISTING CONCRETE
CURB REPAIR
(SEE DETAIL 1 ON SHEET CP502)
BEGIN CONSTRUCTION
STA 10+81
1. VALVE BOX ADJUSTMENT ASSUMES 2 ADJUSTMENTS FOR
RECLAMATION - DOWN FOR PAVEMENT RECLAMATION AND UP TO
FINISH GRADE. VALVE BOX ADJUSTMENT ASSUMES 1 ADJUSTMENT
TO FINISHED GRADE FOR MILLING OPERATION. PROTECT VALVE
BOX DURING CONSTRUCTION.
2. MANHOLE ADJUSTMENT ASSUMES 2 ADJUSTMENTS FOR
RECLAMATION - DOWN FOR PAVEMENT RECLAMATION AND UP TO
FINISH GRADE. MANHOLE ADJUSTMENT ASSUMES 1 ADJUSTMENT
TO FINISHED GRADE FOR MILLING OPERATION. PROTECT MANHOLE
DURING CONSTRUCTION.
3. FOR CONCRETE CURB REMOVAL, SAW CUT AND REMOVE EXISTING
CURB TO NEAREST JOINT.
GENERAL NOTES:
KEYNOTES:
1. PROTECT EXISTING CATCH BASIN, PROVIDE INLET PROTECTION.
2. ADJUST VALVE BOX.
3. PREVENT DEBRIS FROM ENTERING MANHOLE DURING
CONSTRUCTION. DEBRIS IS TO BE IMMEDIATELY REMOVED.
4. ADJUST CASTING TO FINISH GRADE. REMOVE EXISTING CASTING
AND ADJUSTMENT RINGS, INSTALL NEW HDPE ADJUSTMENT RINGS
10+00
8.
8.
9.
9.
9.
12+00
9.
9.
9.
9.
9.
14+00
9.
9.
8.
8.
8.
16+00
8.
8.
7.
8.
8.
18+00
8.
8.
8.
8.
8.
20+00
3.8% 0.1% -0.2%0.8% 0.4%
-0.5%
PV
I S
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .