QASP-UPS Battery Replacement.docx
DOCX document 26 KB Posted
- Attached to
- Uninterrupted Power Supply (UPS) Battery Replacement and Installation for Norfolk Naval Shipyard
- Solicitation number
- N3904022Q5824
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS Battery replacement-installation.docx | DOCX document | |
| N3904022Q5824.xls | XLS spreadsheet | |
| RFQ N3904022Q5824.docx | DOCX document | |
| Battery Specs1 5-27.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
1. 1. Contract or Task Order Title Uninterrupted Power Supply (UPS) Battery Replacement and Installation for Battery Replacement for Norfolk Naval Shipyard Chloride Power UPS system.
2. Purpose:
This QASP provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored?
· How monitoring will take place.
· Who will conduct the monitoring?
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
3. Roles and Responsibilities:
The following personnel shall oversee and coordinate surveillance activities.
Contracting Officer (KO) – The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine the final assessment of the contractor’s performance.
Primary Government Customer (PGC) – The PGC is responsible for providing continuous technical oversight of the contractor’s performance. The PGC uses the QASP to conduct the oversight or surveillance process. The PGC shall keep a Quality Assurance file that accurately documents the contractor’s actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The PGC is responsible for reporting early identification of performance problems to the KO. The QASP is the primary tool for documenting contractor performance. The PGC is not empowered to make any contractual commitments or to authorize any con- tractual change on the Government’s behalf.
Other Key Government Personnel – (Primary Point of Contact: Dean Thornton, dean.r.thornton.civ@us.navy.mil Code 109.11) This may include performance monitors, inspectors, technical experts, workforce service division and center directorate level security personnel, requirements office, or others (i.e. users) who provide information that helps the PGC monitor contractor performance.
4. Primary Method of Surveillance:
100 Percent Inspection. This is usually only the most appropriate method for infrequent tasks or tasks with strin- gent performance requirements, e.g., where safety or health is a concern. With this method, performance is in- spected/evaluated at each occurrence. One hundred percent inspection is too expensive to be used in most cases.
Encl 3
, QASP
Surveillance Matrix
The Surveillance Matrix (Appendix 1) is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance the PGC will use to validate and inspect these perfor- mance elements. Inspection of each element will be documented in the PGC file.
Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performance surveillance, using this QASP, to determine the quality of the contractor’s performance as it relates to the performance element standards. The AQL performance Standard Table should be used to form the foundation of the PGC’s inspection checklist.
5. Performance Standards:
| Performance Standard |
| Acceptable Quality Level (AQL) |
| Method of Surveillance |
| The contractor is required to provide all deliverables IAW Paragraph 6 of the PWS. |
| 100% compliance where services provided are such that system functions as intended. |
| Code 109.11 performs 100% review of all documents and service prior to ac- ceptance. |
6. Documenting Performance:
Acceptable Performance.
The Government shall document positive performance. A Performance Assessment Report (PAR) template is at- tached (Appendix 2). Any report may become part of the supporting documentation for fixed price payments, award/incentive fee payments, Contractor Performance Assessment Reporting System (CPARS) entries, or other actions. Government acceptance of services permits the contractor to invoice for the service fee.
Unacceptable performance.
Unacceptable contractor performance can be identified by customer complaints (Appendix 3) or upon schedule sur- veillance evaluations. When unacceptable performance occurs, the PGC shall inform the contractor. This will nor- mally be in writing unless circumstances necessitate verbal communication. The PGC shall document the discus- sion and place it in the PGC file and provide a copy to the KO.
When the PGC determines formal written communication is required, the PGC shall prepare a Corrective Action Report (CAR). The CAR is forwarded to the KO for dissemination to the contractor. A CAR template is attached to this QASP (Appendix 4).
The contractor shall acknowledge receipt of the CAR in writing. The CAR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CAR will also state how long after receipt the contractor has to present this corrective ac- tion plan to the KO and PGC. The Government may withhold payment for services until corrective action is taken. The Government shall review the contractor's corrective action plan to determine acceptability. Upon Government acceptance of the corrected services the contractor will be permitted to invoice for the service fee.
Any CAR may become a part of the supporting documentation for contract payment deductions, fixed fee deduc- tions, award fee nonpayment, CPARS or other actions deemed necessary by the KO.
7. Mandatory or regulatory compliance items:
The contractor will provide initial proof of compliance with regulatory and compliance items contained in the con- tract. The Primary Government Customer (PGC) and the Contracting Officer (KO) will evaluate the initial submis- sion and will conduct ad hoc reviews of the contractor's compliance throughout the remainder of the contract. The contractor will monitor compliance as required by FAR 52.222-50, Combating Trafficking in Persons, and report any issues to the KO.
8. Acceptable Quality Level (AQL):
The AQL for this project is 100% compliance where the services are provided such that the system functions as intended. Any problems or questions encountered by either party are addressed prior to completion of work.
9. Evaluation Method:
The PGC will review the Final Inspection Summary Report provided by the Contractor to validate that the APC Power Protection System is properly operating following the replacement of the battery modules.
10. Performance Rating
In evaluating the quality of contractor’s performance, the following performance ratings may be used (same as CPAR ratings).
| Performance Rating |
| Criteria |
Exceptional Performance meets contractual requirements and exceeds many to the govern- ment’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly ef- fective.
Very Good Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective.
Satisfactory Performance meets contractual requirements. The contractual performance con- tains some minor problems for which corrective actions taken by the contractor were satisfactory.
Marginal Performance does not meet some contractual requirements. The contractual perfor- mance reflects a serious problem for which the contractor has not yet identified cor- rective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented.
Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Appendix 1 - Surveillance Matrix
Performance Standards Acceptable Quality Levels
Methods of Calculation
Surveillance
Results/Ratings
| The contractor is required to provide all de- liverables IAW Para- graph 6 of the PWS. |
| The AQL for this project is 100% where services provided are such that system func- tions as intended. |
| Any problems or questions encoun- tered by either party are ad- dressed prior to completion of work |
| Code 109.11 performs 100% review of all docu- ments and service prior to acceptance. |
| Payment for Services and Satisfactory rating |
Appendix 2 – Performance Assessment Report
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
| 1. CONTRACT/TASK ORDER NUMBER |
| 2. CONTRACTOR |
| 3. TYPE OF SERVICES |
| 4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE |
| 5. COR PHONE |
| 6. SUSPENSE DATE |
I. PERFORMANCE
7. DEFICIENCY (CHECK ALL BOXES THAT APPLY)
NEW REPEAT
NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED
| 9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED) |
| 10. DETAILED PERFORMANCE ASSESSMENT |
II. CONTRACTOR VALIDATION
| 11. CONTRACTOR REPRESENTATIVE | CONCUR NON-CONCUR |
| 12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE |
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. CONCUR NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
6. CONTRACTOR REPRESENTATIVE REMARKS
Appendix 3 – Customer Complaint Record
| CUSTOMER COMPLAINT RECORD |
| DATE/TIME OF COMPLAINT |
SOURCE OF COMPLAINT
| ORGANIZATION |
| BUILDING NUM- BER |
| INDIVIDUAL |
| PHONE NUMBER |
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
Appendix 4 – Corrective Action Report
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
| 1. CONTRACTOR |
| 2. CONTRACT NUMBER |
| 3. TYPE OF SERVICES |
| 4. FUNCTIONAL AREA |
| 5. SUSPENSE DATE |
| 6. CONTROL NUMBER |
7. DEFICIENCY MAJOR MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the defi- ciency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
| TYPED NAME AND GRADE |
| SIGNATURE AND DATE |
9. ISSUING AUTHORITY
| TYPED NAME AND GRADE |
| SIGNATURE AND DATE |
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
| 11. COR DETERMINATION ACCEPTED | REJECTED |
| 12. CLOSE DATE |
File details come from the government source that posted it. Updated .