PWS Battery replacement-installation.docx

DOCX document 38 KB Posted

Attached to
Uninterrupted Power Supply (UPS) Battery Replacement and Installation for Norfolk Naval Shipyard
Solicitation number
N3904022Q5824
Issued by

View the file

Other files

File Type Posted
QASP-UPS Battery Replacement.docx DOCX document
N3904022Q5824.xls XLS spreadsheet
RFQ N3904022Q5824.docx DOCX document
Battery Specs1 5-27.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Version Date

May 23, 2022

Contract Number:
TBD
Task Order Number:
TBD
Contractor Name
TBD
Tracking Number:
TBD

1. Government Point of Contact.

a. Primary POC.

Name:
Thornton, Dean R.
Organization:
Code 109.11, Norfolk Naval Shipyard (NNSY)

Department of Defense Activity Address Code (DODAAC):

N42158

Address:
Norfolk Naval Shipyard, George Washington Hwy, Portsmouth VA 23709
Phone Number:
757-396-8693

Fax Number:

E-Mail Address:
dean.r.thornton.civ@us.navy.mil

b. Alternate POC.

Name:
Jones, Arnold
Organization:
Code 109.11, Norfolk Naval Shipyard (NNSY)
DODAAC:
N42158
Address:
Norfolk Naval Shipyard, George Washington Hwy, Portsmouth, VA 23709
Phone Number:
757-646-5842

Fax Number:

E-Mail Address:
arnold.l.jones8.civ@us.navy.mil

2. Contract or Task Order Title. Uninterrupted Power Supply (UPS) Battery Replacement and Installation for Norfolk Naval Shipyard.

3. Background. This requirement is for the acquisition of replacement of batteries to support NNSY UPS systems. The UPS systems are used to provide temporary power in the event of power loss to all the hardware that is on the UPS circuits, such as all servers, switches and other information technology hardware used for corporate and local applications supporting the shipyard's business processes on a 24/7 basis.

4. Objectives: The objective of this requirement is UPS battery replacement, installation / removal of old batteries and disposal of old batteries. The new batteries will ensure the UPS system performs at the level of the manufacturer’s original specifications.

5. Scope. The contractor shall provide new brand name or equal replacement batteries, installation/removal and disposal of batteries for existing UPS systems and ensure the UPS systems are operating within the identified manufactures specifications after installation.

6. Performance Requirements.

6.1 Task 1 – Contractor shall provide qualified UPS maintenance tech onsite (PNS) to remove the batteries and install the new batteries, ensuring the batteries are operating within the identified manufacture specifications for the system. Work is to be done during normal working hours 0700-1530 EST.

6.1.1 Visually inspect UPS and associated equipment for signs of damage or problems before installation.

6.1.2 Remove UPS batteries one system at a time to reduce downtime of UPS

6.1.3 Install UPS batteries and ensure they are operating at identified manufacture specifications

6.1.4 Document Findings/Work. Note and correct any discrepancies found for the battery operation. Contractor will be held responsible for fixing any damage to the UPS system due to battery installation to include parts and labor.

6.1 Task Deliverables

PWS Task#
Deliverable Title
Format
Due Date
Distribution/Copies
Frequency and Remarks
6.1.
Detailed Work Plan
Vendor Determined
Before Work
Standard Distribution
For work visit
6.1
Findings
Vendor Determined
At installation
Standard Distribution
At work visit

* Standard Distribution: 1 copy to the site POC dean.r.thornton.civ@us.navy.mil and arnold.l.jones8.civ@us.navy.mil

7. Performance Standards.

Performance Standard
Acceptable Quality Level (AQL)
Methods of Calculation
PS#1 - Services are provided such that system functions as intended
100% compliance
100% review of all documents and service prior to acceptance.
PS#2 - Vendor maintain close liaison and good communication with Government Customer
Any problems or questions encountered by either party are addressed prior to completion of work
Daily interaction between Vendor and Customer insuring any deficiencies are resolved
PS#3 - Final condition report of assessment
100% compliance
Vendor to provide POCs listed in para- graph 1 of this PWS final documentation of work performed

8. Place of Performance. Norfolk Naval Shipyard, Portsmouth VA 23709. Performance building locations are detailed on Attachment 1. No Additional travel within CONUS or OCONUS will be required to perform the requirements of this PWS.

10. Period of Performance (PoP). The PoP for battery installation shall commence no later than 30 calendar days after contract award. The total PoP will be for 60-days.

10.1 Recognized Federal Holidays: The Contractor is not to schedule installation services on any federal holiday.

11. Security Requirements.

11.1 The contractor shall coordinate site visits with site POCs at least 7 days prior to requiring any site access. Contractor personnel without security clearances performing any task under this PWS must be escorted by Government personnel who are cleared to provide access to the UPS locations.

Visit Request: Forward security request to Code 109 Representative XXXX or e-mail XXXX. Visit Request must be on company letterhead and signed by authorized personnel. The request must be submitted at least seven business days prior to the start date to allow enough time for routing of the authorization. It shall contain the following information:

Contract Number
Contract Period of Performance
Contractor Name(s)
State of Residence
Location of visit (C109.1, Bldg. 1500 and Bldg. 9, Norfolk Naval Shipyard, Portsmouth VA 23709

Each person requiring a badge will need to bring in proof of citizenship, and a Government/State Photo Id in accordance with Real Id Guidelines. Upon arrival at the Shipyard, each individual will fill out the required personal information forms.

ALL ITEMS MUST BE ORIGINALS OR CERTIFIED COPIES (Raised Seal)
Acceptable Proof of Citizenship
Birth Certificate
U.S. Passport
Certificate of Naturalization
DD214 (if the form indicates that the person is a U.S. Citizen)
FS-240 – Born abroad of a Citizen of the United States of America

*If you have had a name change since birth (other than by marriage) you will also need the court document showing the change

11.2 If the contractor utilizes computer equipment (including laptops) in performance of services, the individual will need to submit a written request on company letterhead to the Information Assurance Manager (IAM), Code 109, and e-mail address XXXX. The request must be signed by authorized personnel. The request must be submitted at least seven business days prior to the start date to allow enough time for routing of the authorization letter. Request will include the following:

Shipyard point of contact: (Name, Code and Phone number)
Purpose for request: (Provide detailed explanation)
Area of Shipyard where equipment will be used:
Code
Building
Room
Type of equipment
Type (Laptop, Projector, etc.)
Make
Model Number
Serial Number
Company asset number (if any)
How the equipment will be delivered to the shipyard (hand carried, mail)
Dates of Contract Performance

11.3 All camera cell phones will be left in motor vehicle. They are not allowed in buildings where field service representative will be working. Vendor is not allowed to take photos of equipment. They will need to receive approval from Norfolk Naval Shipyard Security if photography is absolutely needed for services. Vendor will need to provide justification and follow Norfolk Naval Shipyard Security regulations if approved.

12. Section 508 Accessibility Standards. The following Section 508 Accessibility Standard(s) (Technical Standards and Functional Performance Criteria) are applicable (if box is checked) to this acquisition. Not Applicable

Attachment 1

PLACE OF PERFORMANCE FOR UPS EQUIPMENT

EQUIPMENT COVERED
MODEL NUMBER
SERIAL NUMBER
LOCATION

UPS System

Building 1500, Server room, first floor

UPS System

Building 9, UPS room, first floor.

Enclosure 4a, PWS Page 1 of 11 Pages 2015/Version 9

Page 2 of 4 Pages