This is a Quality Assurance Surveillance Plan (QASP) for elevator maintenance services at the Syracuse VA Medical Center. The QASP establishes the framework for monitoring contractor performance throughout the contract period, which includes a base year plus four option years. Key government personnel include Contracting Officer Nathan Northrup, Contract Specialist Julie Monagan Barnard, Contracting Officer's Representative Donald Devito, and Alternate Government Personnel Derek Walshe.

The QASP defines 12 performance standards and indicators organized by service category: cleaning, lubrication, and adjustment services; cleaning services; adjustment services; parts furnishing and installation; record maintenance; performance and uptime; emergency service; and inspections/safety compliance. Performance standards include routine manufacturer-specified maintenance, biweekly inspection of hoist motor and generator brushes, quarterly cleaning of guide rails and machine room equipment, complete facility cleaning, OEM parts installation, maintenance of complete service records with written reports, 95 percent elevator uptime, two-hour emergency response time, and 100 percent compliance with passenger and service elevator inspection and safety standards. The Acceptable Quality Level ranges from 95 to 100 percent depending on the task. Surveillance methods include direct observation, periodic inspection, user surveys, validated complaints, 100 percent inspection, periodic and random sampling, and analysis of contractor progress reports. Performance is rated as either PASS (met standard) or FAIL (did not meet standard), with unacceptable performance documented through Contract Discrepancy Reports and corrective action plans. The incentive for performance is exercising option periods and favorable past performance reporting.

View the file

Other files

File Type Posted
36C24226Q0262 0003.pdf PDF
20250414161625780.pdf PDF
PWS SYR Elevator Maint - 26-06-01 Sol Amend 0003.docx DOCX document
20250414161646446.pdf PDF
36C24226Q0262 0003.docx DOCX document
36C24226Q0262 0002.docx DOCX document
36C24226Q0262 0001.pdf PDF
Solicitation Pricing Worksheet - SYR Elevator.xlsx XLSX spreadsheet
36C24226Q0262_2.pdf PDF
Wage Determination DBA Onondaga Elevator Pulled 26-03-03.docx DOCX document
Col Barg Unit Union IUEC Agreement 2022-2027 2.pdf PDF
Wage Determination SCA Custom from 2020 1967-0484 Elevator Repairer.pdf PDF
36C24226Q0262_2.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

For: Syracuse VA Medical Center Elevator Maintenance Service Contract

Contract Number:

Contract Description: The Contractor shall be able to provide and maintain services for the Syracuse VAMC elevators, per the Performance Work Statement (PWS), for the period of ____________– ____________, with the provision of four (4) option years.

Contractor’s name: _______________. (hereafter referred to as the Contractor).

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

· What will be monitored.

· How monitoring will take place.

· Who will conduct the monitoring.

· How monitoring efforts and results will be documented.

This QASP does not detail how the Contractor accomplishes the work. Rather, the QASP is created with the premise that the Contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the Contractor. Copies of the original QASP and revisions shall be provided to the Contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also ensures that the Contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

Assigned CO: Nathan Northrup Assigned CS: Julie Monagan Barnard Organization or Agency: Department of Veterans Affairs, RPO East, NCO 2 Contracting Office

b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall ensure proper Government surveillance of the Contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR: Donald Devito.

c. Other Key Government Personnel – Derek Walshe

Alternate COR: None

3. CONTRACTOR REPRESENTATIVES

The following employees of the Contractor serve as the Contractor’s program manager for this contract.

a. Program Manager –

b. Other Contractor Personnel –

4. PERFORMANCE STANDARDS

Performance standards define desired services. The Government performs surveillance to determine if the Contractor exceeds, meets, or does not meet these standards. The Government shall use these standards to determine Contractor performance and shall compare Contractor performance to the Acceptable Quality Level (AQL).

5. INCENTIVE

The incentive for all tasks will be the exercising of option periods and past performance reporting.

Task
ID
Indicator
Standard
Acceptable Quality Level
Method of Surveillance
Cleaning, Lubrication, and Adjustment Services
1
Routine care, lubrication, and repacking in accordance with manufacturers’ service manuals.
In accordance with manufacturer’s service manuals
100%
Direct Observation and random inspection (auditing)
2
Hoist motor and generator brushes shall be checked for wear at least every two weeks. Accumulated carbon dust shall be removed from commutators, brush rigs and windings at the same time.
In accordance with section B.3.2.
100%
Direct Observation and random inspection (auditing)
Cleaning Services
3
Guide rails, overhead sheaves and beams, counterweight frames, tops of cars, bottom of platforms and machine room floors shall be brushed clean at least every three months. All accumulated rubbish shall be removed from the pits at least once every three months.
In accordance with sections B.3.2 and B.3.4.
95%
Inspection
4
A complete cleaning of the entire installation including all machine room equipment, hoist way, equipment, machine room floors, hoist way, supporting structures, etc.,
In accordance with section B.3.2.
95%
Inspection
Adjustment Services
5
All adjustment services in accordance with manufacturer’s recommendations and as necessary based upon inspection
In accordance with manufacturer’s service manuals
100%
Direct Observation and random inspection (auditing)

Furnish, install, repair parts

6
Furnish, install, or repair OEM parts
In accordance with section B.3.1.4.
100%
Inspection
Record Maintenance
8
Maintain a complete, orderly and chronological file, including drawings, complete parts lists and copies of all reports as required by these specifications. A record of all call backs and repairs shall be kept by the Contractor indicating any difficulty experienced and the corrective measures taken to eliminate these difficulties.
In accordance with section B.3.1.8.
100%
Periodic sampling and inspection
9
Written report upon completion of service
In accordance with section B.3.1.8.
100%
Analysis of Contractor's progress reports.
Performance
10
Elevators performance and uptime.
In accordance with section B.3.1.6.
95%
Direct Observation
11
Emergency Service
2 hour response time
95%
Direct Observation

Inspections/ Safety

12
Inspection of passenger and service elevators
In accordance with sections B.3.2.4.
100%
Observation and random inspection (auditing)
11
Compliance to safety standard
Compliance; no stop work orders
100%
Direct Observation

6. METHODS OF QA SURVEILLANCE

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

a. DIRECT OBSERVATION. (Can be performed periodically or through 100% surveillance.)

b. PERIODIC INSPECTION. (Evaluates outcomes on a periodic basis. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)

c. USER SURVEY. (Combines elements of validated user complaints and random sampling. Random survey is conducted to solicit user satisfaction. May also generate inspections and sampling.)

d. VALIDATED USER/CUSTOMER COMPLAINTS. (Relies on the patient to identify deficiencies. Complaints are then investigated and validated.)

e. 100% INSPECTION. (Evaluates all outcomes.)

f. PERIODIC SAMPLING. (Variation of random sampling. However, sample is only taken when a problem/deficiency is suspected. Sample results are applicable only for the specific work inspected. Since sample is not entirely random, it cannot be applied to total activity performance.)

g. RANDOM SAMPLING. (Designed to evaluate performance by randomly selecting and inspecting a sample of cases.

h. Progress or status meetings.

i. Analysis of Contractor's progress reports. (Evaluate cost, schedule, etc.)

7. RATINGS

Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:

PASS – Met the standard FAIL – Did not meet the standard

8. DOCUMENTING PERFORMANCE

a. ACCEPTABLE PERFORMANCE

The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.

b. UNACCEPTABLE PERFORMANCE

When unacceptable performance occurs, the COR shall inform the Contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.

When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the Contractor's program manager.

The Contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the Contractor is required to prepare a corrective action plan to document how the Contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the Contractor has to present this corrective action plan to the COR. The Government shall review the Contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.

9. FREQUENCY OF MEASUREMENT

a. Frequency of Measurement.

During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.

Signature – Contractor Program Manager

Signature – COR

SAMPLE QUALITY ASSURANCE MONITORING FORM

SERVICE or STANDARD:

SURVEY PERIOD:

SURVEILLANCE METHOD (Check):

Random Inspection100% InspectionPeriodic SamplingObservation
Analysis of Contractor’s reports

LEVEL OF SURVEILLANCE (Check):

MonthlyQuarterlySemi-AnnualAs needed/required
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD:______ %

ANALYSIS OF RESULTS:

Observed Service Provider Performance Measurement Rate: ______%

Service Provider’s Performance (Check):Meets Standards (PASS)
Does Not Meet Standards (FAIL)

Narrative of Performance During Survey Period:

PREPARED BY: ___________________________________ DATE: _________________